RFQ2024AXISCNC Multi-Axis CNC Manufacturing.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
Multi-Axis CNC Manufacturing System
Solicitation number
RFQ2024AXISCNC
Issued by
Pierce County, Washington

About this file

This document is a Request for Quotation (RFQ) issued by Clover Park Technical College in Lakewood, Washington for a Multi-Axis CNC Manufacturing System. The equipment will be used to train students in the Manufacturing Engineering Technologies (MET) Program. The College is seeking to procure one Multi-Axis CNC Manufacturing System with the following key specifications: 5-axis, 20-tool ATC, CAT-40 taper, capable of positional and simultaneous 5-axis operation, and integration with collaborative robot arms. Interested vendors must submit their quotes by November 19, 2024 at 2:00 PM Pacific Time. The College reserves the right to accept or reject quotes on each item separately or as a whole.

The RFQ provides details on the quote submission process, including formatting and delivery requirements. It also outlines the College's reserved rights, such as rejecting any and all quotes, basing awards on quality, and selecting individual items. The RFQ further specifies that the award will be made to the lowest responsible and responsive bidder based on various criteria, including price, quality, and the vendor's ability to perform the contract.

View the file

Other files

File Type Posted
ATTACHMENT A - WIPHE.docx DOCX document
Standard Terms Conditions-MWMBE (002)F (004).docx DOCX document
RFQ2024AXISCNC Amendment #1.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ - Multi-Axis CNC

REQUEST FOR QUOTATION
THIS IS NOT AN ORDER
Return to:
Clover Park Technical CollegePhone:(253) 589-5846
Purchasing DepartmentFax:(253) 589-5784
4500 Steilacoom Blvd SWemail: kimberly.bills@cptc.edu
Lakewood WA 98499
ATTN: Kimberly Bills
Quote Reference Number: RFQ2024AXISCNC
Quote Title: Multi-Axis CNC Manufacturing System
QUOTES ACCEPTED UNTIL: November 19, 2024 2:00 PM Pacific Time
Clover Park Technical College is requesting quotes to provide Multi-Axis CNC Manufacturing System(s) as specified below. Equipment will be used to train students in the Manufacturing Engineering Technologies (MET) Program.

Please quote net prices at which you will agree to furnish any or all of the articles, F.O.B. destination

The College reserves the right to accept or reject quotes on each item separately or as a whole, to reject any or all quotes, waive informalities and to contract as the best interests of the College may require. Quotes are subject to the standard terms and conditions as printed below and attached. Initial all erasures and changes.

DescriptionQuantityCost
Item 1Multi-Axis CNC Manufacturing System

* Number of Axes: 5, Dedicated/Integrated (no 3+2 / 4+1)

* Tooling: Minimum 20-tool ATC, CAT-40 Taper

* Capable of both positional and simultaneous, full 5-Axis operation & programming

* CAM post-processors either provided/included or freely & readily available for the following software: Autodesk Fusion 360, Siemens NX, MasterCAM, etc.

* System capable of being readily integrated with collaborative robot arm(s) for machine tending application (ex: multiple digital & analog inputs & outputs)

* System includes integrated tool- and work-probing systems, and is ready and capable of using custom-written Macro subprograms 1 $ - 0

TOTAL AMOUNT (excluding WA sales tax) $ - 0

Estimated delivery date:

Warranty Information:

Payment Terms: Invoice-Net 30 Other (Visa, Please Specify)

Firm Name

Street and Number:

City and State: Zip:

Date: Signature:

Title:

Phone Number: Email:

Federal Tax ID Number

We have read the conditions noted above and the terms and conditions below; agree thereto and have stated hereon the prices at which we will furnish and deliver at station or location named above the articles as specified.

QUOTE INSTRUCTIONS

(1) COMPLETING QUOTE: Vendors must provide the requested information on the Request for Quote page (page one and two of this document).

(2) SUBMITTING QUOTES: Quotes must be submitted by mail or express delivery as noted below. Submit page 1 & 2 of this RFQ document. Attach any supporting documentation.

If hand-delivered or sent via courier: If delivery is by US mail the address is:

Clover Park Technical College
Purchasing: Bldg 17 Rm 104
4500 Steilacoom Blvd SW
Lakewood WA 98499-4004Clover Park Technical College

Purchasing – Kimberly Bills 4500 Steilacoom Blvd SW Lakewood WA 98499-4004

QUOTE DUE DATE
November 19, 2024 2:00PM Pacific Time

When original copies are submitted, an authorized representative must sign quotation in ink. The Vendor is responsible for the means of delivering the quote to the appropriate office on time. Delays due to the methods used to transmit the quote including delay occurring by the internal mailing system of the campus will be the responsibility of the Vendor. Likewise, delays due to inaccurate directions given, even if by campus staff shall be the responsibility of the Vendor. The quotation must be completed and delivered in sufficient time to avoid disqualification for lateness due to difficulties of delivery.

(3) LATE QUOTES: Any quote received after the hour specified in the Request for Quote will not be considered.

(4) QUOTE FORM: Vendors are requested to use the Quote Forms furnished by the College. Attach any supporting documentation supporting the quote. Please retain a copy for your records.

(5) REQUIREMENTS AND GUARANTEE
The vendor shall warrant all materials delivered and installed under this RFQ to be new and free from defects, damage, or failure for any reason whatsoever which Clover Park Technical College may reasonably determine is the responsibility of the vendor.

(6) AMENDMENTS TO QUOTE SPECIFICATIONS: Any amendment(s) to or error(s) in the specifications called to the attention of the College will be added to or corrected and furnished to all those holding specifications.

(7) MULTIPLE QUOTES: Each vendor is entitled to quote on one, several, or all of the items. Alternate quotes can be accepted on separate quote forms.

(8) RESERVED RIGHTS: The College expressly reserves the following rights:
A. To reject any and/or all irregularities in the quotes submitted
B. To reject any and/or all quotes or portions thereof.
C. To base awards with due regard to quality.
D. To make the award to any Vendor whose quote, in the opinion of the Purchasing Coordinator and Finance & Budget management, is the lowest and best quote.
E. On multiple item quotes, to select individual items based on cost and qualitative factors unless the bidder stipulates “all or nothing” on the quote.

(9) "OR EQUAL"

a)Whenever a material is specified by using the name of the proprietary product or a particular manufacturer or supplier, any material or article which will perform adequately, the duties imposed by the general design, will be considered equal and satisfactory, providing the material or article so proposed is of the same general design and of equal substance, quality, functions and finish. Where the words "or equal" are used, the College is the sole judge of the quality and suitability of the proposed substitutions. Any materials proposed as an equal to that herein specified must be substantiated with supporting data to justify such a request for substitution.
b)Bidders quoting on supplies or equipment other than the manufacturers listed herein or on any alternates shall identify substitute items on the quote and submit with their bids, photographs and/or complete specifications of said materials, in addition to any standard commercial catalogue sheets. Actual samples must also be submitted upon request. The College shall review such substitutions and, if acceptable, they shall be included as part of the specifications.

10) ACCESSABILITY: Contractor represents and warrants it shall exercise commercially reasonable efforts to comply with the Office of Chief Information Officer (OCIO) Standard 188.10 – Minimum Accessibility Standard located at https://ocio.wa.gov/policy/minimum-accessibility-standard. Contractor shall regularly review its systems and at the commencement of this Contract, and annually thereafter, certify to Enterprise Services that Contractor’s Services meet OCIO Standard 188.10.

(11) PCBs: Polychlorinated biphenyls, commonly known as PCBs, have adverse effects on human health and the environment. Accordingly, the State of Washington through its procurements of goods is trying to minimize the purchase of products with PCBS and to incentive its vendors to sell products and products in packaging without them.

(12) INTERLOCAL AGREEMENTS: The Purchaser has entered into Interlocal Purchasing agreements with other governmental agencies, pursuant to RCW 39.34. The Contractor agrees to sell additional units at the offer prices and terms and conditions to other eligible governmental agencies that have such agreements with the Purchaser. The Purchaser accepts no responsibility for the payment of the purchase price by other governmental agencies.

(13) AWARD CRITERIA: Per RCW 39.26.160, award will be made to the lowest responsible and responsive bidder based upon, but not limited to, the following criteria where applicable and only that which can be reasonably determined
A. The price and effect of payment terms. Price may be determined by life cycle cost if so indicated in the Request for Quote.
B. The quality of articles proposed, their conformity with specifications and their fitness for intended use.
C. The ability, capacity and skill of the Vendor to perform the contract or provide the services required.
D. The character, integrity, reputation, judgment, experience and efficiency of the Vendor.
E. Whether the Vendor can perform the contract within the time specified
F. The quality of performance on previous contracts for purchased goods or services.
G. The previous and existing compliance by the Vendor with the laws relating to the contract for purchased goods or services.
H. Servicing resources, capability and capacity.
I. Lack of uniformity or interchangeability, if such factors are important.
J. The energy efficiency of the product as projected throughout the anticipated useful life of the product.
K. The effect of reciprocity assessments, MWBE, institutional industries preferences or other preferences defined by statute or rule.

&P image1.png

File details come from the government source that posted it. Updated .