RFQ Wind Tunnel (24 inch test).pdf

PDF 104 KB Posted

Attached to
Closed-Circuit Wind Tunnel (24-inch test)
Solicitation number
PANRSA-26-P-0000-037658
Issued by

About this file

This is a Request for Quote (RFQ) issued by the United States Army Contracting Command-Redstone Arsenal (ACC-RSA) for the procurement of one Closed-Circuit Wind Tunnel with a 24-inch test section. The solicitation number is PANRSA-26-P-0000 037658, issued as a Firm-Fixed-Price (FFP) contract with a 100% set-aside. The response deadline is August 7, 2026, at 3:30pm CDT, with quotes submitted via email to Samantha Shirley (Contract Specialist) and Lisa S. Armes (Contracting Officer).

The wind tunnel must meet specific technical requirements including a closed-circuit design with a 3/8-inch Swagelok bulkhead fitting for seed particle injection, a maximum operating speed of approximately 50 meters per second with capability to achieve 0.15 meters per second through nozzle restriction plates, and turbulence intensity less than 1 percent across the operating range. The test section must be 24 inches by 24 inches with variable length, include at least two sealable ports accommodating specific instrument diameters (4.3mm to 15.9mm), and feature a replaceable 15-inch test section upstream of the nozzle plates. Portions of sidewalls must be optical-quality glass for laser compatibility with a 532-nanometer argon-ion laser. The system must incorporate a centrifugal fan with variable-frequency drive controlled via National Instruments LabVIEW software (not relying on wireless connections), and the total footprint cannot exceed 32 feet length, 8 feet width, or 7.5 feet height. All designs must include quantitative analysis demonstrating compliance with air speed and turbulence requirements. Delivery location is U.S. Army TMDE Activity, Building 5435 Fowler Road, Redstone Arsenal, AL 35898. Complete quotes must include pricing, delivery terms, company information, business size, socio-economic status if applicable, points of contact, CAGE Code, UEI, and GSA Schedule/Contract Number if applicable.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The United States Army Contracting Command-Redstone Arsenal (ACC-RSA) Redstone Services & IT Solutions Branch has a requirement to procure (1) Closed- Circuit Wind Tunnel (24-inch test). This solicitation, PANRSA-26-P-0000 037658, is issued as a Request for Quote (RFQ).

CONTRACT TYPE: Firm-Fixed-Price (FFP)

SET-ASIDE: 100%

RFQ INSTRUCTIONS AND EVALUATION CRITERIA:

In accordance with the REQUIREMENTS below, a submission of a FFP quote for the item(s) listed is hereby requested. The U.S. Government (USG) reserves the right to make award based on initial quotes received, without discussions with vendors;

therefore, the initial quote should contain the vendor's best terms.

REQUIREMENTS:

The Closed-Circuit Wind Tunnel (24-inch test) shall include the following specifications or equivalent (if not brand name):

Requirements:

• This wind tunnel must be a closed circuit, as the operation of an LDV system requires seed particles to be added to the air stream – in this case, a substance called Bis(2-ethylhexyl) subacute. The wind tunnel thus needs to be fitted with a

3/8-inch Swagelok bulkhead fitting placed upstream of the test and transitional sections.

• This wind tunnel must have a maximum operating speed of approximately 50 meters per second (~9900 feet per minute). The test section walls must have

25.908 millimeter (~1.02-inch)-thick grooves placed at approximately 90 percent of the total length of the test section as measured from the entrance in which specialized nozzle restriction plates can be affixed to adjust the operating range and achieve an air speed of 0.15 meters per second (~30 feet per minute). The typical turbulence intensity across this operating range must be less than 1 percent, where turbulence intensity is defined as the root-mean-square of velocity fluctuations divided by the average test section velocity.

• This wind tunnel must have a test section height and width of 60.96 centimeters by 60.96 centimeters (~24 inches by 24 inches). Test section length can vary if the design meets the following requirements: The test section must have at least two sealable ports or fittings for the insertion of instruments of various sizes, such as Pitot-static tubes and hotwire anemometers. These ports or fittings must accommodate the following instrument diameters: 4.3 mm (~0.188 in); 6.3 mm

(0.25 in); 7.9 mm (0.313 in); 9.5 mm (0.375 in); 10.1 mm (0.4 in); 12.7 mm (0.5 in); 15.9 mm (0.625 in). The test section must also be designed such that a 15-inch section of the usable test area located approximately 6 inches upstream of the nozzle restriction plates can be replaced with a test item without introducing any leaks into the circuit. The total footprint of the tunnel and all associated systems must not be larger than 32 feet in length, 8 feet in width and 7.5 feet in height. Additionally, portions of the test section sidewalls must be made of optical-quality glass to minimize interference with laser propagation. The argon-ion continuous-wave laser used in this application has a max wavelength of 532 nanometers and 500 milliwatts output power.

• The wind tunnel must have a centrifugal fan design. The fan should be isolated from the rest of the tunnel system to minimize vibration. The fan must be controlled by a variable-frequency drive (VFD) connected to a motor of appropriate size and power to meet the air speed requirements listed above. The

VFD must be implemented such that an operator could use computer software or manual input to control the drive and automate its function. The computer-VFD interface must not rely on internet or wireless connections, such as Bluetooth or

WiFi. This interface must be programmable via National Instruments’ LabVIEW software.

• Any design submitted must be shown to meet the specific air speed and turbulence requirements listed above through a quantitative analysis, such as by computational fluid dynamics (CFD) simulations or other appropriate methods.

Delivery Location/Address: U.S. Army TMDE Activity, Attn: Michael Tyler, Building 5435 Fowler Road, Redstone Arsenal, AL 35898

A complete quote shall consist of the following:

1. All items, including brand name items, as specified in the REQUIREMENTS section as well as the quantities specified.

2. Delivery terms and conditions.

3. Unit price and subtotal price for each item listed in the REQUIREMENTS section and a total price for all items.

4. Identification of any discounts and/or reductions to established rates or prices.

5. Full company name.

6. Business size.

7. Socio-economic status, if applicable.

8. Point of Contacts (POCs): name, position, office and mobile telephone numbers, and email address.

9. Cage Code.

10. Unique Entity Identifier (UEI).

11. GSA Schedule/Contract Number, if applicable.

The response date for this RFQ is August 7, 2026, at 3:30pm CDT. Quotes received after the required submission date and time will be rejected without further review.

Phone calls will not be accepted. Questions may be submitted, but any submitted after the date and time listed on this RFQ posting are not guaranteed an answer. Quotes may be submitted via email to the following POCs: Samantha Shirley, Contract Specialist at samantha.c.shirley.civ@army.mil and Lisa S. Armes, Contracting Officer at lisa.s.armes.civ@army.mil.

It is the vendor’s responsibility to read the RFQ and all related documents carefully and completely and to monitor for updates to the RFQ on a regular basis. Additionally, it is the vendor’s responsibility to ensure/verify the Government receives its submission on or before the date/time specified.

mailto:samantha.c.shirley.civ@army.mil mailto:lisa.s.armes.civ@army.mil

File details come from the government source that posted it. Updated .