This Addendum No. 1, issued November 5, 2026, by the Bungay Elementary School Building Committee addresses Requests for Information received regarding the RFQ/RFP for Commissioning Agent Services for the new Bungay Elementary School project in Seymour, Connecticut (State Project No. 124-0058N). The original RFQ/RFP was issued October 15, 2026, with a submission deadline of November 10, 2026. The addendum clarifies critical project requirements including confirmation that the August 2009 version of the CT High-Performance Building Compliance Manual will be followed, with all mandatory commissioning requirements to be met. The CxA shall provide comprehensive commissioning and testing services including circuit breaker testing, building envelope system testing per ASTM E783 and ASTM E1105 standards for six total window/storefront locations selected by the architect, and whole-building airtightness testing per ASTM E1827. The project is currently in Schematic Design phase, with HVAC equipment selection not yet finalized; bidders should refer to the Educational Specifications in Exhibit F and program validation information in Exhibit G for planning purposes.
The addendum modifies insurance requirements for both the primary Commissioning Agent and envelope testing subcontractors. Professional Liability/Errors and Omissions coverage requirements have been reduced to $2,000,000 per claim with a $3,000,000 aggregate, Umbrella (Excess) Liability to $3,000,000 per occurrence, and Cyber Liability to $1,000,000 per claim, recognizing the limited liability exposure of commissioning firms compared to design firms. No HPB compliance scorecard is currently available, though all mandatory commissioning requirements must be satisfied. The project is expected to be funded through a Priority List project grant from the State of Connecticut via the Department of Administrative Services. Proposers must acknowledge receipt of Addendum No. 1 on their Fee Proposal form, with the submission deadline remaining November 10, 2026.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEYMOUR PUBLIC SCHOOL DISTRICT
BUNGAY ELEMENTARY SCHOOL BUILDING
COMMITEE
Request for Qualifications and Request for Proposals for Commissioning Agent Services
State Project No: 124-0058N
Issue Date: October 15, 2026
RFQ/RFP ADDENDUM NO. 1 – NOVEMBER 5, 2026
TO: All Prospective Proposers
FROM: Bungay Elementary School Building Committee
DATE: November 5, 2026
This Addendum No. 1 to Seymour Public School District and Bungay Elementary School Building
Committee (“SBC”) Request for Qualifications and Request for Proposals for Commissioning
Agent Services issued November 5, 2026 (“RFQ/RFP”) is being issued by the SBC to Response the following Requests for Information (“RFIs”) received by the SBC in connection with the
RFQ/RFP, and amends and modifies the RFQ/RFP to include the following RFIs, and the SBC’s
Responses, as follows:
REQUESTS FOR INFORMATION/RESPONSES
RFI #1: Please confirm which version of the CT-HPB standards is being followed. As outlined on the CT.GOV website for HPB there are several versions of the standard made available online (2009, 2015, 2025). For instance, the CT.GOV site links the “current HPBS” to the 2015 version, but in the support section has a link to the 2009 and 2025 version. This RFP does not clarify which is being followed. Due to the difference in requirements between the 2015 & 2025 versions for Cx, please confirm which version (By date) of the CT-HPB guidelines will be followed for this project.
Response #1: The August 2009 version of the CT High-Performance Building Compliance Manual is being followed. It can be found online on the CT Department of Energy &
Environmental Protection website.
RFI #2: Is there an HPB compliance scorecard available that shows which points the project is looking to acquire?
Response #2: A compliance scorecard is not yet available for the project. All mandatory commissioning requirements must be met.
RFI #3: The RFI outlines the systems to be commissioned and lists “switchgear & circuit breaker testing.” It is not typical for the CxA to provide circuit breaker testing. Please confirm if this will be for the CxA to review circuit breaker study, otherwise please further clarify expectations by the CxA.
Response #3: The CxA will be required to provide circuit breaker testing. The CxA shall verify that the circuit breakers are installed, tested, and perform in compliance with the design specifications, building safety codes, and the owner’s requirements.
RFI #4: The RFP mentions Building Envelope Testing in several sections. Two sections differ with CxA involvement. One section states that the CxA will witness envelope testing, and another section clarifies that the testing will be performed and provided by the CxA. Since it is typical that the CxA witnesses the building envelope testing provided by others, please confirm expectations for this RFP that the CxA will witness some testing and provide others.
Response #4: The CxA shall provide commissioning and testing services for the building envelope systems as detailed in Exhibit A: Scope of Services.
RFI #5: The building envelope system testing section calls out ASTM E783, ASTM
E1105 for Exterior Windows, Storefronts or Curtain Walls. The RFP requires testing three initial units representing different sizes/types and three additional units between 25% and 50% installation. Is this intended to represent six total test locations for the project, or six test locations for each distinct fenestration size/type? If the latter, please provide an estimated number of fenestration types or the total number of test locations for bidding purposes.
Response #5: The CxA shall provide the ASTM E783 and ASTM E1105 tests for (6) total locations to be selected by the architect.
RFI #6: Whole-Building Airtightness Testing ASTM E1827 – Please provide the anticipated total building enclosure surface area (exterior walls, roof, and lowest floor) and the number of stories. If these values have not yet been established, can preliminary building dimensions and heights be provided for estimating purposes?
Response #6: The project is in the Schematic Design phase, and the total building enclosure surface area is not available currently. Refer to the program validation information outlined in Exhibit G.
RFI #7: The systems to be commissioned lists Domestic Hot water and separately lists
“plumbing systems”. Please clarify what equipment in the plumbing systems should be commissioned outside of the Domestic HW system.
Response #7: See section 1.3.6 of Exhibit B.
RFI #8: In this phase of early design, is there an HVAC equipment list to clarify the expected systems and technologies being designed to? (Will this be DOAS with
VRF, geothermal with heat pumps, chilled beams, modular chillers, etc.)?
Response #8: No selection for the HVAC equipment has been made at this time. Exhibit F includes the Educational Specifications for the new Elementary School.
RFI #9: Our firm carries insurance matching or in excess of the RFQP parameters with the following exceptions. Please advise if Umbrella Liability insurance in the amount of $3,000,000 per occurrence, Professional Liability in the amount of
$2,000,000 per claim and $3,000,000 aggregate, and Cyber Liability in the amount of $1,000,000 is sufficient. As an independent third-party provider of building commissioning services, this is the highest threshold available to us.
We do not perform MEP design and therefore have significantly lower liability exposure. Unlike MEP design firms, which face elevated risk due to potential design errors, often resulting in life safety concerns, code violations, or costly construction changes, commissioning firms are not responsible for creating design documents. Our primary responsibilities relate to verifying system performance and identifying deficiencies, which carries comparatively limited risk.
Response #9: Insurance requirements identified in Exhibit C shall be modified as outlined below.
All other insurance requirements remain as originally scheduled in Exhibit C.
Umbrella (Excess) Liability:
Each Occurrence $3,000,000
Professional Liability / Errors and Omissions:
Each Claim $2,000,000
Aggregate $3,000,000
Cyber Liability
Each Claim $1,000,000
RFI #10: Envelope Testing Consultant specific: Given the limited scope of independent field-testing services, will the Owner accept $2M in professional liability and
$2M in umbrella liability coverage for testing subcontractors? Additionally, can the $2M cyber liability insurance requirement be waived for subcontractors whose services are limited to field testing and reporting?
Response #10: Refer to RFI #9 response issued as part of Addendum No. 1.
All Project requirements set forth in the RFQ/RFP, except to the extent specifically added, amended or modified by this Addendum and the foregoing Response to RFIs, remain unchanged and in full effect.
The deadline for submission of qualifications and proposals stated in the RFQ/RFP remains unchanged.
Proposers must acknowledge receipt of this Addendum No. 1 in the appropriate location on their Fee Proposal form.
END OF ADDENDUM NO. 1
| RFQ/RFP ADDENDUM NO. 1 – NOVEMBER 5, 2026 |
| REQUESTS FOR INFORMATION/RESPONSES |
| RFI #1: Please confirm which version of the CT-HPB standards is being followed. As outlined on the CT.GOV website for HPB there are several versions of the standard made available online (2009, 2015, 2025). For instance, the CT.GOV site links the “cur... |
| Response #1: The August 2009 version of the CT High-Performance Building Compliance Manual is being followed. It can be found online on the CT Department of Energy & Environmental Protection website. |
| RFI #2: Is there an HPB compliance scorecard available that shows which points the project is looking to acquire? |
| Response #2: A compliance scorecard is not yet available for the project. All mandatory commissioning requirements must be met. |
| RFI #3: The RFI outlines the systems to be commissioned and lists “switchgear & circuit breaker testing.” It is not typical for the CxA to provide circuit breaker testing. Please confirm if this will be for the CxA to review circuit breaker study, ot... |
| Response #3: The CxA will be required to provide circuit breaker testing. The CxA shall verify that the circuit breakers are installed, tested, and perform in compliance with the design specifications, building safety codes, and the owner’s requirements. |
| RFI #4: The RFP mentions Building Envelope Testing in several sections. Two sections differ with CxA involvement. One section states that the CxA will witness envelope testing, and another section clarifies that the testing will be performed and prov... |
| Response #4: The CxA shall provide commissioning and testing services for the building envelope systems as detailed in Exhibit A: Scope of Services. |
| RFI #5: The building envelope system testing section calls out ASTM E783, ASTM E1105 for Exterior Windows, Storefronts or Curtain Walls. The RFP requires testing three initial units representing different sizes/types and three additional units betwee... |
| Response #5: The CxA shall provide the ASTM E783 and ASTM E1105 tests for (6) total locations to be selected by the architect. |
| RFI #6: Whole-Building Airtightness Testing ASTM E1827 – Please provide the anticipated total building enclosure surface area (exterior walls, roof, and lowest floor) and the number of stories. If these values have not yet been established, can preli... |
| Response #6: The project is in the Schematic Design phase, and the total building enclosure surface area is not available currently. Refer to the program validation information outlined in Exhibit G. |
| RFI #7: The systems to be commissioned lists Domestic Hot water and separately lists “plumbing systems”. Please clarify what equipment in the plumbing systems should be commissioned outside of the Domestic HW system. |
| Response #7: See section 1.3.6 of Exhibit B. |
| RFI #8: In this phase of early design, is there an HVAC equipment list to clarify the expected systems and technologies being designed to? (Will this be DOAS with VRF, geothermal with heat pumps, chilled beams, modular chillers, etc.)? |
| Response #8: No selection for the HVAC equipment has been made at this time. Exhibit F includes the Educational Specifications for the new Elementary School. |
| RFI #9: Our firm carries insurance matching or in excess of the RFQP parameters with the following exceptions. Please advise if Umbrella Liability insurance in the amount of $3,000,000 per occurrence, Professional Liability in the amount of $2,000,00... |
| Response #9: Insurance requirements identified in Exhibit C shall be modified as outlined below. All other insurance requirements remain as originally scheduled in Exhibit C. |
| Umbrella (Excess) Liability: |
| Each Occurrence $3,000,000 |
| Professional Liability / Errors and Omissions: |
| Each Claim $2,000,000 |
| Aggregate $3,000,000 |
| Cyber Liability |
| Each Claim $1,000,000 |
| RFI #10: Envelope Testing Consultant specific: Given the limited scope of independent field-testing services, will the Owner accept $2M in professional liability and $2M in umbrella liability coverage for testing subcontractors? Additionally, can the ... |
| Response #10: Refer to RFI #9 response issued as part of Addendum No. 1. |
File details come from the government source that posted it. Updated .