RFQ Region 9 Roads BPA - 12445523Q0045.pdf
PDF 2 MB Posted
- Solicitation number
- 12445523Q0045
- Issued by
-
Department of Agriculture Forest Service
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12445523Q0045
1. REQUEST NO.
5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE NUMBER
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
06/05/2023
1 74
1720 PEACHTREE ST NW
STE 876S
ATLANTA GA 30309-2449
USDA-FS CSA EAST 13
Multiple
814 728-6242CAROL NORTHROP
07/07/2023 1600 CT
FOB DESTINATION
OTHER
(See Schedule)X
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Region 9 Roads BPA
CONTRACTOR MUST BE REGISTERED IN www.sam.gov/ in order to submit an offer on this project.
ENTER UEI Number ________________________
Please complete this package and return by the response date via email to carol.northrop@usda.gov Period of Performance: 08/01/2023 to 03/31/2032
REGION 9 ROADS BPA
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
ENTER PRICING ON
SCHEDULE OF
ITEMS ON PAGE 5
OF THIS
SOLICITATION
PACKAGE
Table of Contents
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
B.2 PROPOSED AREAS OF COVERAGE – ZONE……………………………………………...6
B.3 SCHEDULE NOTES .................................................................. ………………………………………….7
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
C.2 PROJECT LOCATIONS
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
C.4 TECHNICAL SPECIFICATIONS
C.5 SPECIFICATIONS APPLICABLE TO INDIVIDUAL PROJECTS……………………..15
C.6 SUBMITTALS…………………………………………………………………………………………………………
C.7 APPLICABILITY OF THE SERVICE CONTRACT LABOR STANDARDS…………16
SECTION D--PACKAGING AND MARKING
D-1 PACKING AND MARKING
D-2 PROJECT LABELING FOR OFFICIAL COORESPONDENCE
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES .............................................................................. ………………………………………..21
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES .............................................................................. …………………………….23
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
J.1 ATTACHMENTS
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
K.1 PROVISIONS
SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS
Solicitation No: 12445523Q0045 Project Name: Region 9 Roads BPA
L.1 PROVISIONS
L.2 QUOTE PREPARATION INSTRUCTIONS
SECTION M--EVALUATION FACTORS FOR AWARD
M.1 PROVISIONS
M.2 PROPOSAL EVALUATION
M.3 TECHNICAL EVALUATION FACTORS
Solicitation No: 12445523Q0045
Instructions and Work Description for Pay Items/Work Activities:
This is a Request for Quotations (RFQ) to establish a pool of vendors for Forest Service Northeast Zone (Region 9) Road Construction and Maintenance services via BPAs.
Please respond fully to the solicitation requirements (e.g. pricing, certifications and representations, and selection criteria). Provide commercial pricing for all applicable line items. The rates your firm proposes shall be commercial “shelf” rates that will be used for award evaluation purposes. Vendors are cautioned that as awards of a Blanket Purchase Agreements are based, in part, on the pricing proposed herein, subsequent vendor quotes for specific unit BPA calls must be representative and reflective of those rates or they shall be removed from the pool of vendors for that work activity. Therefore, it is imperative that each vendor provide the Government with their best commercial rate they are capable of performing and that those rates be similar to the quotes on individual BPA calls submitted for specific units.
Note: The general activities used for future call orders will generally be a firm fixed price service. There may be a need for more complex work requirements than listed in the scope of work. Therefore, contractors submitting proposals for commercial treatments may be requested to use either of these more complex requirements.
As specified herein, utilization of required Service Contract Labor Standards or Construction Wage Rate shall be used in response to this solicitation. BPA Calls issued under this contract shall require Service Contract Act wage rates or Davis-Bacon wage rates or both depending on specific activities within the call order. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant BPA and subsequent call order.
Construction work activities will most often be issued on a lump sum basis or as identified within “CSI Standard Specifications or Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.
Solicitation No: 12445523Q0045
Solicitation No: 12445523Q0045
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
YEAR ONE RATES FOR SERVICES-EQUIPMENT WITH OPERATOR*
Description Unit Unit Price**
Service Work: General Laborer Hour $
Construction Work: General Laborer Hour $
Excavator, mini (40 to 80 HP) Hour $
Excavator, medium (81 to 110 HP) Hour $
Excavator, large (111 to 155 HP) Hour $
Backhoe Hour $
Grader Hour $
Dozer, Small (minimum 50 HP) Hour $
Dozer, Medium (minimum 100 HP) Hour $
Dump Truck (Single Axle) Hour $
Dump Truck (Tandem Axle) Hour $
Dump Truck (Triaxle) Hour $
Front End Loader Hour $
Skid Steer Hour $
Snowplow (pick-up truck) Hour $
Snowplow (heavy equipment) Hour $
*Note: The method of payment for emergency services, or project work that cannot be definitized on a firm fixed price basis for some reason, only, is by the hour. Hourly rates for these services can be updated annually on the BPA anniversary date. All other work units ordered will be determined at the BPA Call level.
Contractor email address for receiving request for quotes for BPA Calls:
Contractor Name: ____________________________ UEI Number:__________________
(Services)
(Services)
Proposed Areas for Coverage
BPA holders will indicate which zone(s) they are interested in providing coverage. Indicate in the table below “X” the Zones in which you would like to provide quotations and are willing to travel for work.
See “Project Location” and additional information on geographic zones.
Zone Areas of Coverage (mark with “X”)
Zone 1 – Allegheny NF Zone 2a – Chequamegon-Nicolet NF--Northern WI Zone 2b –Chequamegon Nicolet NF – Central WI Zone 2c -- Blackwell Job Corps Center Zone 3 – Chippewa & MIFC Zone 4 – Forest Product Lab (FPL) Zone 5a – Green Mountain NF - Central & Southern VT Zone 5b – Finger Lakes NF - Hector/Lodi NY Zone 6a – Hiawatha NF - East Zone 6b – Hiawatha NF - West Zone 7 – Hoosier NF Zone 8a – Huron Manistee NF - East Zone 8b – Manistee NF - West Zone 9a – Mark Twain NF – Potosi-Fredericktown Zone 9b – Mark Twain NF – Poplar Bluff-Eleven Point Zone 9c – Mark Twain NF – Salem-Rolla-Houston Zone 9d – Mark Twain NF – Ava-Willow Springs Zone 9e – Mark Twain NF -- Cassville Zone 9f – Mark Twain NF – Cedar Creek Zone 9g – Mingo Job Corps Center Zone 10—Midewin Tall Grass Prairie Zone 11a – Monongahela NF Zone 11b – Harpers Ferry Job Corps Center Zone 12 – Ottawa NF Zone 13a – Shawnee NF – West (Mississippi Bluffs) Zone 13b – Shawnee NF – East (Hidden Springs) Zone 14—Superior NF Zone 15a – Wayne NF - Athens Zone 15b – Wayne NF – Ironton Zone 15c – Wayne NF – Marietta Zone 16— White Mountain NF
B.1 SCHEDULE NOTES
1. There will not be a pre-quote meeting. All questions should be emailed directly to Carol Northrop at carol.northrop@usdsa.gov.
2. There is no requirement for bonding at this time. Individual call order request for quotes may require payment bonds and/or payment protections. See Section I for additional information.
3. The ordering period will be active from 9 years from date of award.
4. Hourly rates for these services can be updated annually on the BPA anniversary date. All other work units ordered will be determined on the Individual Project BPA Call level.
5. Prospective awardees must be registered and active in the System for Award Management (SAM) data base at time of quote submission (see FAR 4.1102). Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system. NOTE: THIS IS A
FREE REGISTRATION
*Use Wage Determinations attached in Section J in hourly rate calculations. If you are proposing to provide quotations for multiple Zones in the table below, your unit price above must account for the highest rate for the labor across the zones of interest; these are being attached at this time for price evaluation purposes only. Disclosure of the magnitude of construction projects will be included in any Individual Project BPA Calls for construction.
tel:+12026500123,,812956343#%20
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
BACKGROUND AND PURPOSE
The USDA, Forest Service, Region 9, is comprised of the 14 National Forests, 1 Tall Grass Prairie and several other specialized units. These National Forest System units have a variety of road systems which support all Forest missions for public users and agency staff. Maintenance and repair of these road systems is required on a regular basis.
The intent of this procurement action is to enter into multiple Blanket Purchase Agreements (BPAs) under which road construction and maintenance work may be competed and BPA Calls for project work issued. While a pre-set limitation is not established regarding the number of BPAs that will be entered in to, the amount may be limited in any geographic area if it is determined that sufficient competition is taking place and the administrative burden of entering into more agreements offsets the potential benefit.
Region 9 has been broken up in to sixteen (16) zones as described in C2 below.
When projects come available in those zones, BPA holders who have indicated interest in covering the applicable zone will be requested to provide a quote.
Individual Projects will be packaged with the project-specific details that supplement the standard specifications and terms of the basic agreement. These Individual Project requirements will include detailed payment items, special or supplemental project specifications, drawings, specialized inspection terms, performance period requirements, government-furnished property, government-furnished facilities, or government-furnished services, special contract requirements, exhibits and other detailed requirements applicable to the specific Individual Project (if applicable). Additionally, the Individual Project Call will identify whether the project is categorized as a Construction Call or a Service Call. All Construction and Service Calls will not exceed $250,000.00 per Call Order.
For each Individual Project, a best-value analysis and source selection will be completed. Project specific pricing and project-specific technical proposals will be requested as described herein. If a fair and reasonable price is negotiated through the Individual Project quote process, an Individual Project Call will be prepared for that specific project. If a fair and reasonable price is not reached through the Individual Project quote process, that Individual Project will be withdrawn for acquisition separate from this agreement.
Bonding requirements will be included with each Individual Project Call and will apply only to that specific Individual Project Call. There are no separate bonding requirements for the agreement as a whole.
The Government reserves the right to determine whether any specific Individual Project is to be made available under this agreement. Numerous projects that also use the standard specifications and terms covered under this agreement may be acquired separately from this agreement. Typical projects that may be contracted separately often involve work that is more specialized in nature.
Other factors may also influence whether projects are applied under this agreement.
The Forest Service may utilize a labor hour approach in which specific equipment will be ordered, with an operator, on a per hour basis for emergency situations or standard project work that cannot be definitized in such a way that a firm-fixed price order is possible. In such a situation, it may not be possible to accurately estimate the amount or duration of work needed for project completion. The Contractor shall provide the necessary equipment, with operator, to adequately perform the BPA Call at hourly rates in the parent BPA, which may be updated annually.
Both service and construction activities may be ordered through the use of the established BPAs. Individual call orders shall dictate which terms, conditions, and clauses are applicable. This solicitation and any resultant BPA may incorporate service, construction, emergency work, and potential for other complex work requirements. Contractors must be licensed, bonded, and/or insured per the respective state and local requirements under each individual call order. Work includes but is not limited to the following:
Typical Work Activities
ROADS:
Work includes repair and construction of native surface, gravel or paved roads; and road repair and reconstruction due to damage from human or natural causes.
Work includes but is not limited to:
• Roadside Brushing: Includes removal and disposal of limbs, residual brush, live roadside brush and trees, logs and windfall within the roadside clearing limits. See Appendix A for complete roadside brushing specification.
• Road Blading: Includes blading and shaping forest roads to create a smooth roadbed cross section free of hollows, depressions, and projections above the adjacent roadbed surface.
See Appendix B for complete road blading specification.
• Roadside Mowing: Includes mowing and cutting vegetation adjacent to forest roads. See Appendix C for complete roadside mowing specification.
• Mechanical Debris Removal: Includes removal of debris from plugged culverts, bridges and dams; cleaning inlet and outlet ditches; and loading and hauling debris to designated disposal areas. See Appendix D for complete mechanical debris removal specification.
• Road Repairs: Includes repair and construction of roads damaged by human and/or natural causes.
Roads may have pavement, gravel, and/or native surface.
• Road Decommissioning: Includes de-compaction, partial or full re-contouring of road prism to restore the roadway to a hydrologically stable condition; removal of drainage structures and associated fill to restore natural contours; roadway excavation and removal at stream channels, streambank construction and stabilization; installation of gradient control devices in channels or sediment basins; seeding, fertilizing and mulching; and the construction of water bars.
• Culverts and Aquatic Organism Passage (AOP) Structures: Includes repair and construction of road structures for aquatic passages; large culverts, bottomless arches, small bridges, stream grade alignment control and scour protection.
• Demolition: Includes demolition of bridges, culverts, structures, gates/fences, utilities, BRIDGES:
PARKING LOTS
Work includes but is not limited to:
Work includes but is not limited to:
Work includes repair and construction of steel, concrete, and timber road bridges; re-construction of approaches;
and related stream work within the project area.
Work includes repair and construction of parking lots damaged by human and/or natural causes. Parking lots may have pavement, gravel, and/or native surface.
• Asphalt Placement, Asphalt Restoration (grinding, overlays, pothole patching, skin patching, crack sealing, chip sealing). Gravel placement, spreading, grading and compaction.
• Snow Removal: Snow removal and plowing of parking lots.
• Paint striping, landscape manipulation, drainage installation and maintenance, installation of bike racks, and activities associated with tying differing surfaces together.
• Minor Construction: of retaining walls, gates and fencing, etc.
• Aggregate Production: Includes crushing and stockpiling gravel road surfacing aggregate composed of crushed gravel, stone or other similar materials meeting the gradation and other quality criteria specified; screening, sorting, and stockpiling rock, cobbles, and boulders. Work will be done in specified US Forest Service gravel pits.
• Snow Removal: Snow plowing of US Forest Service roads.
• Related work includes signs; guardrails; closure devices such as gates, cattle guards, fences; stream grade; alignment control; and scour protection.
• General excavation work: Including but not limited to: installation of septic systems, building footing excavation and replacement, and related work.
• Demolition: Includes demolition of bridges, culverts, structures, gates/fences, utilities, signage, etc.;
earthwork to remove below-grade elements; restoration of affected sites to a natural grade and condition.
• Bridge guard railing, transition railing and approach railing, curbs, and drainage; debris removal from streams including debris buildup due to storms, beaver dams, ice flows, and other storm activities.
• Repairs and rehabilitation due to damages, deterioration, scour and channel erosion to bridge abutments, foundations, rip rap, piles, stream banks, and other stream devices and natural objects including repairs and rehabilitation to bridge deck, wearing surface, superstructure, substructure, and approaches.
• Bridge associated signage installation and replacement.
• Cleaning of bridge deck and brushing of approach areas.
• Bridge inspection, national bridge element or component testing and photographic services, surveying of bridge and surrounding area, hydraulics and hydrology studies, and soil borings including under bridge bucket and platform equipment rental/services.
• Temporary/modular bridge installation. Bridge bearing element maintenance, cleaning, repairs, and replacements.
• Work required for bridge closure, rerouting, and traffic controls.
Requirements of all equipment:
1. All equipment and vehicles to be used at the job site shall be cleaned and free of invasive species (noxious weeds), seeds, external grease and oil and shall be inspected prior to entrance onto Federal lands.
The restriction shall include equipment and vehicles intended for off-road use as well as on road use, whether they are owned, leased, or borrowed by the Contractor or Subcontractor.
2. All protective plating and armoring shall be intact and properly functioning on the equipment to reduce the potential for damaging hydraulic hoses or the undercarriage.
3. Spill kit approved by OSHA for petroleum product leaks will be on site at all times.
Labor Rates:
Call orders issued under this BPA shall require Service Contract Labor Standards or Construction Wage Rate requirements or both depending on specific activities within the call order.
General Guidelines:
Project areas are located within the geographic limits of Region 9. The scope covers federal and local agency lands within Forests’ boundaries which include but are not limited to; all counties and lands within Forests’ boundaries, Midewin National Tall Grass Prairie, Job Corps Civilian Conservation Centers, Northern Research Station, Forest Product Lab, Wood Education and Resource Center, Grey Towers, Region 9 Administrative Facilities. The BPA call will be issued and administered by a Government entity.
Resultant Award – BPA calls will be issued against any resultant BPAs and reference the parent BPA when ordered by warranted contracting personnel from USDA Forest Service. In accordance with the Ordering Procedures Provision herein, BPA calls placed against the Agreements may be competed within the awardee pool or sole source when determined to be in the Governments best interest.
All maintenance specifications, drawings, and construction specifications are made a part of this solicitation and any resultant contract. Specifications and drawings may be found at the following links:
Specification Address Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects
Standard Specifications (FP-14) | FHWA (dot.gov)
Any specifications or supplemental specifications not included at these sites will be physically attached to the individual call orders.
The agreement incorporates Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14 or any future approved version) in U. S. customary measurement format. The agreement also incorporates the “800” series, Performance Based Road Maintenance Specification.
https://highways.dot.gov/federal-lands/specs
C.2 PROJECT LOCATIONS
Zone 1 Allegheny National Forest: Located in the state of Pennsylvania
Zone 2 Chequamegon-Nicolet National Forest: Located in the state of Wisconsin 2a - Northern Wisconsin:
2b – Central Wisconsin:
2c - Blackwell Job Corps Center:
Zone 3 Chippewa National Forest & Minnesota Interagency Fire Cache (MIFC):
Located in the state of Minnesota.
Zone 4 Forest Product Lab (FPL): Located in Madison, Wisconsin.
Zone 5 Green Mountain & Finger Lakes National Forests 5a Green Mountain National Forest: Located in the state of Vermont 5b Finger Lakes National Forest: Located in the state of New York.
Zone 6 Hiawatha National Forest: Located in the state of Michigan 6a - Hiawatha – East 6b - Hiawatha – West
Zone 7 Hoosier National Forest: Located in the state of Indiana
Zone 8 Huron Manistee National Forest: Located in the state of Michigan 8a - Huron Manistee NF – East 8b - Manistee NF - West:
Zone 9 Mark Twain National Forest: Located in the state of Missouri 9a – Mark Twain NF – Potosi-Fredericktown 9b – Mark Twain NF – Poplar Bluff-Eleven Point 9c – Mark Twain NF – Salem-Rolla-Houston 9d – Mark Twain NF – Ava-Willow Springs 9e -- Mark Twain NF -- Cassville 9f -- Mark Twain NF – Cedar Creek 9g – Mingo Job Corps Center
Zone 10 Midewin Tall Grass Prairie: Located in the state of Illinois
Zone 11 Monongahela NF: Located in the state of West Virginia 11a – Monongahela NF 11b – Harpers Ferry Job Corps Center
Zone 12 Ottawa NF: Located in the state of Michigan
Zone 13 Shawnee National Forest: Located in the state of Illinois 13a – Shawnee NF – West, Mississippi Bluffs 13b – Shawnee NF – East, Hidden Springs
Zone 14 Superior National Forest: Located in the state of Minnesota
Zone 15 Wayne National Forest: Located in the state of Ohio 15a – Wayne NF – Athens 15b – Wayne NF – Ironton 15c – Wayne NF – Marietta
Zone 16— White Mountain National Forest: Located in state of New Hampshire and portions of Maine.
See attachment J1-Maps to view the approximate zone boundaries within which projects will be located. Each respective Call Order will identify the zone, or zones, that the project falls within. The intent is that the zonal location of a project will be controlled by the county that the project is located within, in order to provide clarity for wage rate determinations on individual call orders.
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
Project magnitudes will be specified by each individual call order for construction.
C.4 TECHNICAL SPECIFICATIONS
BIOPREFERRED
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user.
All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).
The following is an example list of products that may be used in this contract for services for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Hydraulic fluids Penetrating lubricants Concrete and asphalt release fluids Absorbents Diesel fuel additives Greases Dust suppressants 2-cycle engine oil Wood and concrete sealers Fertilizers Roof coatings Water tank coatings Adhesive and mastic removers Cleaners Sorbents Floor finish Floor stripper Composite panels Janitorial supplies Insulating foam Sealers Carpet Metalworking fluids Graffiti and grease removers Stain removers Degreasers De-icers
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content. In addition to the biobased products designated by the U.S.
Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other biobased products.
The Contractor shall submit with the initial proposal a complete list of biobased products, indicating the name of the manufacturer, cost of each material, and the intended use of each of the materials that are to be used in carrying out the requirements of the contract. Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.
http://www.biopreferred.gov/
C.5 SPECIFICATIONS APPLICABLE TO INDIVIDUAL PROJECTS
The standard specifications that apply will be identified with Individual Projects. A Specification List and the actual Special Project or Supplemental Project Specifications will be included. All Standard or supplemental specifications shown in the Specification Listing are applicable to this agreement. All specifications not included in the specification listing, but referenced by listed specifications, are applicable.
Supplemental Specifications which refine, revise, and/or add to the requirements stated in the Standard Specifications, either FP-14 or “800” series, and shall be included with the Individual Project BPA Call when appropriate.
The Standard Specifications and Supplemental Specifications must be read holistically to gain a full understanding of the work required. In the case of discrepancies, however, between these specifications, the Supplemental Specifications will take precedence over the Standard Specifications.
C.6 SUBMITTALS
Submittals shall include the following unless otherwise required in the specification:
1. Date and revision dates.
2. Project name and contract number.
3. Names of contractor, subcontractor, supplier and manufacturer.
4. Specifications section number.
5. Field dimensions and relation to adjacent structures.
6. Applicable standards such as ASTM or Federal Specifications.
7. Contractor’s stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents.
Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification.
C-7 APPLICABILITY OF THE SERVICE CONTRACT LABOR STANDARDS STATUTE
(SCLSS) AND CONSTRUCTION WAGE RATES REQUIREMENTS STATUTE (CWRRS)
A. The Contractor is responsible for compliance with the Service Contract Labor Standards Statute (SCLSS, previously called the Service Contract Act (SCA) and Construction Wage Rates Requirements Statute (CWRRS, previously called Davis-Bacon Act). The Department of Labor (DOL) is responsible for enforcement of the SCLSS and CWRRS. Contractor shall contact the DOL to resolve any questions concerning the applicability of the SCLSS or CWRRS for road construction and maintenance activities.
B. Activities included on both lists will be determined on a case-by-case basis according to the requirement of the individual call order.
Note: This is not an all-inclusive list. The work to be performed under this BPA includes but is not limited to:
1. The SCLSS applies to the following typical activities on, or along, a paved road:
a. Brushing and mowing;
b. Ditch cleaning and brushing;
c. Sign, cattleguard, gabion, and guardrail repair;
d. Minor patching performed in conjunction with normal maintenance activities;
e. Cleaning culverts;
f. Minor slump/slide removal;
g. Litter cleanup; and
h. Minor culvert and drainage repair.
i. Snow removal
j. Road Decommissioning (can be SCLSS or CWRRS)
2. The SCA applies to the following typical activities on, or along, an unpaved road:
a. The above noted activities;
b. Grading;
c. Rock raking; and
d. Removal of oversized material.
The following is also considered service work:
Sign Maintenance; Work Area Management (traffic control); Bridge maintenance; Surface Maintenance (Blading, Compaction, Watering); Drainage Maintenance (Slide & Slough Removal, Ditch Cleaning, Culvert Inlet/Outlet Cleaning, Cross-drain installation and maintenance, Ditch and Catch Basin Buttressing), Shoulder maintenance, Fill slope Armoring, Hazard Removal (Danger Tree Falling, Rock Fall and Debris Removal, etc.); Vegetation Management (seeding, brushing requirements); Bridge, guardrail, and Cattle guard Maintenance; Road Closure Device Maintenance or Construction, Rock Crushing and Stockpiling; Placement of Spot Rock; Dust Abatement; Minor Flood Repair and Water Diversion, and Road Demolition. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, and Stream Restoration. Other complex systems may be within the scope to support road maintenance and restoration activities.
3. The CWRRS applies to the following typical activities:
a. Patching of asphalt or other pavements;
b. Replacing culverts;
c. Striping pavements;
d. Rehabilitation/recycling pavements;
e. Fog or chip sealing;
f. Major slump/slide removal;
g. Bridge maintenance; and
h. Aggregate surfacing, except minor spot surfacing.
i. Damaged road repair.
The following is also considered construction work:
Surveying/Staking of Work Activities, signing (traffic control and new sign installation); Clearing;
Earthwork and realignment; Drainage (surface, subsurface, drain dips, corrugated metal pipe, under drains, etc.); Aquatic Passage Work activities (small bridges or prefabricated structures, etc.); Aggregate Placement (base, surface, pit-run, riprap, etc.); Erosion Control (some erosion control such as seeding may be a service work activity; Shoulder, cut and fill slope reconstruction; Asphalt Placement, Asphalt Restoration (grinding, overlays, pothole patching, skin patching, crack sealing, chip sealing (some activities may be service work activity for supply/install), etc.); Cut/Fill Slope Stabilization; Aquatic Passage Construction; Cattle guard Installation; Installing Closure Devices (gates, earthen barriers, guardrails, etc.); Fence and Gate construction; Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation.
SECTION D--PACKAGING AND MARKING
D-1 PACKING AND MARKING
All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.
D-2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
52.246-4 Inspection of Services--Fixed-Price (AUG 1996) 52.246-6 Inspection – Time-and-Material Labor-Hour (MAY 2001)
52.246-12 Inspection of Construction (AUG 1996)
Inspection and acceptance procedures for construction are found in the construction specifications that will be referenced in each call order.
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
52.211-18 Variation in Estimated Quantity (APR 1984) 52.242-14 Suspension of Work (APR 1984)
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
G.2 OTHER REQUIREMENTS
PERFORMANCE REQUIREMENTS
All work shall be performed in accordance with the attached standard specifications unless otherwise specified in a call order.
Acceptable Quality Levels (AQLs) for each performance standard shall be established in individual call orders. AQLs may vary between forests. These AQLs will apply to all ordered work unless otherwise specified in a call order.
CONTRACTOR QUALITY CONTROL INSPECTION
When requested by the Contracting Officer, the successful Contractor(s) shall provide a written Quality Control Plan satisfactory to the Government describing how the Contractor will control work quality and document inspection results for awarded call orders.
Contractor shall conduct ongoing quality control inspections in accordance with the approved plan. Contractor shall also provide written certification for all invoiced work that was accomplished in accordance with the terms and conditions of the contract.
Inspection shall be maintained concurrent with contract work. Contractor inspection results shall be available to the Contracting Officer at all times.
GOVERNMENT QUALITY ASSURANCE
Government Quality Assurance Plan
The Government may make periodic inspections while work is in progress. After completion of a pay item, the Government may also inspect to determine compliance with performance standards and acceptable quality levels. Determination of the acceptability of the work performed will be based on these verification inspections and will be considered conclusive.
Acceptance and Payment for Service Maintenance
Acceptance will be based on visual inspection of pay items in addition to specifications. If visual inspection finds that Acceptable Quality Levels for any Performance Standard is not met, rework will be required.
Before final acceptance, all areas occupied by the Contractor in connection with the work shall be cleaned of all Contractor's rubbish, excess materials, temporary structures, and equipment, and all parts of the work area shall be left in a neat and presentable condition.
MEASUREMENT AND PAYMENT
Measurement and Payment are defined in the Specification Sections included within the individual call order(s).
ORDERING PROCEDURE
(a) Any supplies and services to be furnished under this agreement shall be ordered by issuance of BPA calls by the individuals or activities designated in the Schedule. Such orders may be issued from date of award through 9 years after award. The agreement shall remain until either party to the agreement determines that it is no longer beneficial or effective during the performance period. Should the Government make this determination, a cancellation notice shall be provided to the vendor. Should the Vendor make the determination, they shall provide written notice to the Government of their intent to cancel the agreement. Cancellation of the BPA will not affect the obligations of either party regarding outstanding Call Orders which have not been closed out.
(b) All BPA calls are subject to the terms and conditions of this agreement. In the event of conflict between a BPA call and this agreement, the parent BPA shall control.
(c) If mailed, a BPA call is considered “issued” when the Government deposits the order in the mail. BPA calls may be issued orally or by electronic commerce methods only if authorized in the Schedule.
BLANKET PURCHASE AGREEMENTS – REVIEW PROCEDURES
This agreement is subject to the annual review procedures outlined in FAR 13.303-6. “Maintain awareness of changes in market conditions, sources of supply, and other pertinent factors that may warrant making new arrangements with different suppliers or modifying existing arrangements”.
PURCHASE LIMITATIONS
All call orders placed under this blanket purchase agreement shall not exceed the Simplified Acquisition Threshold of $250,000.00.
jgellings Highlight
Project Name: Region 9 Roads BPA Page 23 of 74
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES
FAR Part 13.303-3 Preparation of BPAs.
(1) Description of agreement. The supplier shall furnish supplies or services, described in general terms, if and when requested by the contracting officer (or the authorized representative of the contracting officer) during a specified period and within a stipulated aggregate amount, if any.
(2) Extent of obligation. The Government is obligated only to the extent of authorized purchases actually made under the BPA.
(3) Purchase limitation. The dollar limitation for each individual purchase under the BPA is subject to the purchase limitations described on page 19 herein.
(4) Individuals authorized to purchase under the BPA. A list of individuals authorized to purchase under the BPA, identified either by title of position or by name of individual, organizational component, and the dollar limitation per purchase for each position title or individual shall be furnished to the supplier by the contracting officer per each individual call order. Any Forest Service Contracting Officer may obligate funds under this BPA.
(5) Delivery tickets. All shipments under the agreement, except those for newspapers, magazines, or other periodicals, shall be accompanied by delivery tickets or sales slips that shall contain the following minimum information:
(i) Name of supplier.
(ii) BPA number.
(iii) Date of purchase.
(iv) Purchase number.
(v) Itemized list of supplies or services furnished.
(vi) Quantity, unit price, and extension of each item, less applicable discounts (unit prices and extensions need not be shown when incompatible with the use of automated systems, provided that the invoice is itemized to show this information).
(vii) Date of delivery or shipment.
(6) Invoices.
When billing procedures provide for an individual invoice for each delivery, these invoices shall be accumulated, provided that-
(A) A consolidated payment will be made for each specified period; and
(B) The period of any discounts will commence on the final date of the billing period or on the date of receipt of invoices for all deliveries accepted during the billing period, whichever is later.
H.2 OTHER REQUIREMENTS
USE OF PREMISES
(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.
(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.
SANITATION AND SERVICING
Contractor shall take all reasonable precautions to prevent pollution of air, soil, and water by Contractor's operations. If facilities for employees are established on Contract Area, they shall be operated in a sanitary manner. Contractor shall not service tractors, trucks, or other equipment on National Forest lands where servicing is likely to result in pollution to soil or water. Contractor shall remove from National Forest lands all refuse resulting from use, servicing, repair, or abandonment of equipment. In the event that Contractor's operations or servicing of equipment result in pollution to soil or water, Contractor shall conduct cleanup to restore the polluted site to the satisfaction of the Forest Service.
PREVENTION OF OIL SPILLS
If Contractor maintains storage facilities for oil or oil products on Contract Area, Contractor shall take appropriate preventive measures to ensure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States.
If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR
112) including certification by a registered professional engineer.
NOXIOUS WEED CONTROL
(1) In order to prevent the potential spread of noxious weeds onto National Forest lands, the Contractor shall be required to furnish the Forest Service with proof of weed-free equipment.
(2) Noxious weeds are defined as any exotic plant species established or that may be introduced in the State, which may render the land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by the Department of Agriculture or the local counties vendor is operating in, or by other appropriate agencies having jurisdiction.
(3) All equipment and vehicles to be used at the job site shall be cleaned and certified free of noxious weeds and their seeds prior to entrance onto the National Forest. The restriction shall include equipment and vehicles intended for off-road use, as well as on road use, whether they are owned, leased, or borrowed by the Contractor or subcontractor.
(4) Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose.
Cleaning shall occur off Federal lands.
(5) Equipment, materials and vehicles shall be visually inspected by a designated Forest Service Officer, and certified in writing to be reasonably clean and weed free. Inspections will take place at a location designated by the Contracting Officer in advance of equipment and material arrival. Equipment and vehicles are expected to proceed directly to the job site following the inspection.
SUBMITTALS, SHOP DRAWINGS, MATERIAL CERTIFICATIONS AND TESTING
REPORTS
Any submittals, shop drawings, material certifications or testing reports to be submitted will be identified in the call order.
PRODUCT SUBSTITUTION
Any modification of other items, designs, materials, products or equipment (including Government-furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
MOISTURE SENSITIVE SOILS
Contractors are cautioned that the roadway structure is designed so that the completed road will support highway legal loads during a limited use season. Construction equipment often subjects the uncompleted roadway structure to loadings it is not designed to support. This is especially critical during periods of excessive moisture. Materials on this project are sensitive to excessive moisture and will require careful selection and scheduling of equipment to permit efficient operation. Any damage resulting from operations which renders the material unsuitable for use or results in potential siltation of streams will be corrected by the Contractor at Contractor's expense.
CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
C. Government inspections and tests are for the sole benefit of the Government and do not--
1. Relieve the Contractor of responsibility for providing adequate quality control measures;
2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
3. Constitute or imply acceptance; or
4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.
D. The presence or absence of a government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary.
The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction.
However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
CONSTRUCTION STAKES, LINES, AND GRADES
(a) Unless a Pay Item for Construction Staking is included in the Schedule of Items, the Government will set initial construction stakes establishing lines, slopes, and continuous control points, reference lines, and bench marks for other structures and improvements and will furnish the Contractor with all necessary information relating to lines, slopes, and grades.
(b) These stakes and control points shall constitute the field control from which the
Contractor shall establish other necessary controls and execute the work. The Contractor shall furnish, without additional compensation, all additional stakes, all templates, batter boards, and other materials and supplies…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .