This is a Request for Qualification Statements/Proposals (RFQ/P) issued by the City of Marion, North Carolina for engineering and design services related to the Lady Marian Dam Decommissioning Project. The City seeks qualified firms to provide comprehensive dam engineering and design services for the decommissioning of the Lady Marian Dam located at 89 Westwood Chateau Drive, Marion, North Carolina. Services include repair or replacement of the failed spillway (culvert) to convert the dam to a "dry" impoundment, with work encompassing project management, grant administration, survey and data collection, hydrologic and hydraulic design, geotechnical and structural investigations, construction drawings and specifications, permits and approvals, construction bidding services, construction administration, and project closeout. The RFQ/P was issued on September 16, 2026, with questions from firms due by September 30, 2026 at 4:00 p.m. and qualification statements/proposals due by October 16, 2026 at 4:00 p.m. The evaluation period runs from October 19 through October 30, 2026, with the announcement of the selected firm scheduled for November 4, 2026. Proposals are limited to a maximum of 20 pages and must be submitted electronically in PDF format to bsikes@marionnc.org with copies to wayers@marionnc.org, cyoung@marionnc.org, and hclark@marionnc.org.
Evaluation criteria are weighted as follows: Technical Approach and Understanding of Services Requested (35 points), Experience of Proposed Engineering Personnel with Similar Projects (35 points), Direct Experience with Administration of FEMA High Hazard Potential Dam Grants and NC Dam Safety Helene Grants (10 points), References and Past Performance (10 points), and Firm Capacity and Availability (10 points). The Lady Marian Dam is a 34-foot "high hazard potential" dam constructed in 1965 with a failed spillway that poses significant risk to 67 properties, including a shopping center, businesses, residential properties, and a U.S. Highway. A 2019 Dam Safety Order requires repair or removal, and a 2020 feasibility study determined that decommissioning through permanent draining and culvert repair is viable. Following Hurricane Helene damage in September 2024, the original slip-lining approach is no longer feasible, requiring a redesigned engineering approach. The project is funded through FEMA High Hazard Potential Dam construction grants and NC Dam Safety Helene Grants awarded to the City of Marion, with all prospective bidders required to acknowledge funding contingency on compliance with grant terms and conditions. The City intends to negotiate a contract with the selected firm, develop a detailed scope of services and cost proposal, and proceed immediately upon written authorization.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Marion, NC
Lady Marian Dam
Request for Qualification Statements/Proposals (RFQ/P): Engineering and Design Services for Dam Decommissioning Project
1. RFQ/P Overview & Project Introduction
A. Project Title: Lady Marian Dam Decommissioning Project
B. Issuing Organization: City of Marion
C. Date of Issuance: September 16, 2026
D. Qualification Statement/Proposal Submission Deadline: October 16, 2026 at 4:00PM
E. Project History, Description, and Objective: In this Request for Qualification Statements/Proposals (RFQ/P) the City of Marion, NC (“City”) requests qualification statements/proposals from qualified firms interested in providing dam engineering and design services for the decommissioning of the Lady Marian Dam located at 89 Westwood Chateau Drive, Marion, North Carolina. Services should include all engineering and design services required to repair or replace the failed spillway (culvert) to sufficiently facilitate the conversion of the dam to a “dry” impoundment, so that it can be decommissioned by the State.
The Lady Marian dam is a 34 ft. “high hazard potential” dam that was constructed in 1965. The Emergency Action Plan (EAP) for the dam identified 67 properties at risk, including Lady Marian Plaza shopping center, numerous businesses along North Main Street, over 50 residential properties, public streets, and a US Highway. The only spillway for the dam is a 34 ft. high riser (which failed during Hurricane Helene) and box culvert that connects to a larger box culvert known as the Garden Creek culvert. The 6.5' x 7.5' (WxH) box culvert spillway for the Lady Marian Dam crosses Westwood Chateau Drive (a City maintained street) and connects with a 10’ x 7.5’ box culvert that is part of the Garden Creek drainage network, at the Lady Marian Plaza shopping center.
From there, the Garden Creek drainage network extends under the Lady Marian Plaza shopping center parking lot and crosses under North Main Street to its discharge point north of the intersection of Garden Creek Road and North Main Street. A map depicting the approximate alignment of the spillway and Garden Creek culvert is attached.
In 2019, a Dam Safety Order (DSO-019-002) was issued by the NC Division of Energy, Mineral, and Land Resources (NCDEMLR) Dam Safety for the repair or removal of the Lady Marian Dam. The DSO was addressed to the five parties that the State has identified as being responsible for the repair or breaching of the dam. That assertion was based on the premise that the spillway includes all of the culvert from the spillway riser at the lake to the point where the culvert discharges into Garden Creek, north of the intersection of Garden Creek Road and North Main Street. The City maintains its ownership interest is limited to the Right of Way for Westwood Chateau Drive (a City maintained street that the culvert crosses under). The state has indicated, preliminarily, that we can limit the dam “spillway” to the roughly 250 LF box culvert section between the riser and the City of Marion right of way for Westwood Chateau Drive, if we can “daylight” the culvert at the Westwood Chateau Drive right of way.
In 2020, a feasibility study determined that the dam could be decommissioned by permanently draining the Lady Marian lake and repairing the failed box culvert (from the spillway riser to the right of way for Westwood Chateau Drive) to facilitate the conversion of the dam to a “dry” impoundment. The conventional approach to breaching the dam was determined to be cost prohibitive due to the depth and proximity of the box culvert spillway to a public road and residential structures integral to the dam itself. Preliminary studies indicated that trenchless technology was the best approach to replacing the failed box culvert.
The City retained a firm who prepared plans for the dam decommissioning in accordance with the previously approved feasibility study. The approved decommissioning plans were on hold pending allocation of a 2024 FEMA High Hazard Potential Dam construction grant when Hurricane Helene came through western NC in September 2024. Flooding from Hurricane Helene caused the 34 ft. tall concrete riser to collapse, creating the need for exigent repairs to ensure the safety of the remaining spillway.
Stabilization of the damaged area was completed with FEMA funding.
A redesign of the approved plans for the dam decommissioning is now required because the damage from Hurricane Helene has invalidated the original approach of slip-lining the culvert. The slip-lining option is no longer viable because debris from the riser collapse became lodged in the culvert barrel under the extremely high-pressure head present during the flood, causing further damage to the culvert. The City has been approved for grant funds (FEMA High Hazard Potential Dam Grant and NC Dam Safety Helene Grant) to complete this critical project. A new SOW is required by FEMA to account for the changes at the site post-Helene and to determine the most optimal method of decommissioning the dam. The firm selected to be the Engineer of Record for this dam decommissioning project will be expected to perform all design and engineering services for the entire project, from preliminary design through construction and the successful decommissioning of the dam.
F. Acknowledgment of Government Funds: The Project authorized is the Lady Marian Dam High Hazard Potential Dam Grant Project and NC Dam Safety Helene Grant to be to be financed by grant funds awarded to the City of Marion by FEMA and the NCDEQ- DEMLR. All prospective bidders or offerors and contracts awarded must acknowledge that funding is contingent upon compliance with all terms and conditions of the funding awards.
2. Scope of Work (SOW) & Technical Requirements
A. General Scope of Work: The City anticipates the selected firm’s SOW may include, but not be limited to, Project Management, Grant Administration, Geomatics – Survey & Data Collection of Existing Conditions, Hydrologic & Hydraulic Design, Geotechnical and Structural Investigations, Testing and Analysis, Preparation of Construction Drawings & Technical Specifications, Permits & Approvals, Construction Bidding Services, Construction Engineering – Administration & Observation, and Record Drawings & Project Closeout for the Lady Marian Dam to be decommissioned. All engineering services shall be performed in compliance with all federal, state, and local requirements, including but not limited to the requirements of FEMA, OSHA, and NCDEQ.
B. Key Deliverables may include, but are not limited to the following:
o Deliverable 1: Architectural Concept & Schematics o Deliverable 2: Construction Plans, Technical Specifications, and Opinion of Probable Cost o Deliverable 3: Permits and Approvals. The City anticipates the following permits/approvals may be necessary for this project. Other permits/approvals may also be necessary.
▪ Plans and specifications for NCDEQ/DEMLR Dam Safety approval
▪ FEMA approval
▪ Environmental Permits
▪ Erosion and Sediment Control
▪ Traffic Control Plan o Deliverable 4: Bid Advertisement, Pre-Bid Meeting & Addendums, Bid Opening, Bid Tabulation & Recommendation, and Value Engineering if necessitated.
o Deliverable 5: Prepare the Project Manual & Construction Contract Documents and assist the City with the contract execution process including, but not limited to, obtaining certificates of insurance, performance bonds, payment bonds, and all other required submittals.
o Deliverable 6: Construction Administration & Observation, As-Built Record Drawings, and Project Close-Out & Handover o Deliverable 7: Develop necessary correspondence, preparation of requisitions for reimbursement, progress meetings, reports/presentations to the City Council.
C. Technical / Functional Specifications: Coordination with NCDEMLR Dam Safety, FEMA and all other regulatory authorities.
3. Projected Timeline
• RFQ/P Release Date: September 16, 2026
• Questions from Firms Due: September 30, 2026 at 4pm
• Proposal Submission Deadline: October 16, 2026 at 4pm
• Evaluation Period: October 19, 2026 – October 30, 2026
• Announcement of Selected Firm: November 4, 2026
4. Proposal Submission Instructions
• An electronic (PDF) version of the Qualification Statement/Proposal (QS/P) must be received by email at bsikes@marionnc.org (copy: wayers@marionnc.org, cyoung@marionnc.org, and hclark@marionnc.org) by 4:00 p.m. on Friday October 16, 2026. Include “RFQ/P Lady Marian Dam” in the subject line of the email. Responses received after the deadline will not be considered. The QS/P shall contain a maximum of 20 pages (including dividers, pages intentionally left blank, etc.). The Submitter’s costs incurred in responding to this RFQ/P are the Submitter’s alone and the City does not accept liability for any such costs. The City shall not be required to return any item submitted.
• Point of Contact: Direct all inquiries to Public Works Director Brant Sikes at bsikes@marionnc.org (copy: City Manager Woody Ayers at wayers@marionnc.org, Finance Director Crystal Young at cyoung@marionnc.org and Funding Coordinator/Special Project Assistant Hunter Clark at hclark@marionnc.org).
5. Evaluation Criteria
Proposals will be reviewed and scored based on the following weights:
• Technical Approach and Understanding of Services Requested: 35 points
• Experience of Proposed Engineering Personnel with Similar Projects: 35 points
• Direct Experience with Administration of FEMA High Hazard Potential Dam Grants, NC Dam Safety Helene Grants, and Projects Under a DSO : 10 points
• References & Past Performance: 10 points
• Firm capacity and availability: 10 points
6. Contents of Qualification Statements/Proposals (QS/P)
Interested firms desiring consideration are required to submit a Qualification Statement/Proposal (QS/P) containing, at minimum, the following information. The QS/P shall not exceed 20 total pages (including dividers, pages intentionally left blank, etc.).
A. Firm Name and Contact Information
i. Include the complete legal name and physical address of the prime firm/company and the name, mailing address, email address, and telephone number of the person the City should contact regarding the QS/P.
ii. If the firm has offices in more than one location, identify the location of the office that would oversee the work of this project.
B. Brief history of the firm.
C. Narrative statement of the firm’s understanding of the services being requested and how the firm can provide these services to the City.
i. Include the firm’s overall general vision for the project.
ii. Include an explanation of the firm’s proposed approach and general action plan to successfully complete such work.
iii. Describe any challenges anticipated that may impact the SOW or schedule and proposed solutions to address these concerns.
iv. Discuss quality control and intended firm management of the quality of proposed deliverables.
v. Explain how your team manages the process of reviewing subcontractor submittals, clarification requests, issuances of bulletin drawings, reviews of contractors’ cost proposals, review and justification of change orders, payment requests, final inspections, and assembly of the project close-out documents.
D. An estimation of the project timeline after authorization to proceed is provided by the City.
E. Firm’s related experience: Provide descriptions for up to a maximum of four (4) reference projects for which the firm has provided services substantially similar to those described in this RFQ/P. For each reference project, provide the following:
i. Name and location of the organization to which services were provided.
ii. Brief description of the project.
iii. Start and completion dates.
iv. Firm team members that worked on the project including their title and role.
v. Title, address, telephone number, and email address of a current contact reference for the project.
F. Key Personnel
i. Provide a list of key personnel to be directly involved with this project. For each member of the project team, provide relevant experience, length of service, licenses and certifications, and responsibilities with regard to this project.
Please submit key reference contact information including telephone numbers, fax numbers, and email addresses.
ii. Submit an organizational chart for the entire recommended project team.
G. Capacity
i. Provide an estimation of the time availability and workload capacity for key personnel and the firm overall.
7. Compliance
Respondents are hereby notified that the submission of responses under this RFQ/P and any subsequent contract are governed by the requirements of North Carolina law. Submissions and contracts are further subject to the applicable requirements of federally funded projects.
8. Submissions and Clarifications
Do not submit any material which includes any generated work product or design. The City is not requesting such material to be generated for this RFQ. Such information would not be considered.
It is the responsibility of each submitter to examine the entire RFQ, seek clarifications in writing, and review their submittal for accuracy before submitting their qualifications. Once submission deadlines have passed, all submissions will be final. The City reserves the right to ask for additional information from all parties that have submitted qualifications, and it reserves the right to schedule interviews with potential firms.
The City of Marion reserves the right to: reject any and all qualification statements; select the firm that is, by the City’s determination, most qualified for the referenced work; waive technical errors and informalities; and to accept the qualification statement which, in its sole judgment, best serves the public interest. The City reserves the right to perform all or some of the services described in this document with its own work force. The City also reserves the right to issue future requests for qualifications, as needed, and solicit responses from firms not selected as part of this process.
The City intends to negotiate a contract with the Submitter ranked most advantageous to the
City based on the requirements in this RFQ and Submitter’s response. A written scope of services will be established with the selected firm, a proposal including costs will be developed and submitted by the firm, and the work will proceed immediately upon written authorization by the City.
The City’s intent in supplying information is that such information is solely used to the benefit of this project and/or to assist firms in understanding the project for SOQ preparation.
It is the practice of the City to provide minorities an equal opportunity to participate in all aspects of its contracting and procurement programs and to prohibit any and all discrimination against persons or businesses in pursuit of these opportunities. The City of Marion is an Equal
Employment Opportunity Employer.
The City accepts no liability for the cost and expenses incurred by firms in responding to this
Procurement. Each Firm that enters into the Procurement process shall prepare the required materials and the SOQ at its own expense and with the express understanding that the Firm cannot make any claims whatsoever for reimbursement from the City for the costs and expenses associated with the process, even in the event the City cancels this Project or rejects all submittals.
File details come from the government source that posted it. Updated .