RFQ NOAA Painting 2023.pdf

PDF 2 MB Posted

Attached to
Sole Source - INTEGRA Biosciences Corporation
Solicitation number
S-44300-00008100
Issued by
Marion County, Oregon

About this file

This is a Request for Quotation (RFQ) issued by the Port of Newport for interior painting services at the NOAA MOC-P Facility located at 2002 Marine Science Drive in Newport, Oregon. The project involves repainting approximately 53,000 square feet of gypsum board walls in common, office, and demised areas of both the administration building (first and second floors) and warehouse to match existing latex finishes with one coating. The work includes patching, repairing, texturing, and priming damaged drywall as necessary, along with removal and replacement of detachable items such as electrical plates and wall hangings. A mandatory site meeting was scheduled for Friday, September 29, 2023, at 10:30 a.m., with quotations due by Friday, October 13, 2023, at 2:00 p.m. Work is scheduled to begin in November 2023 and be completed by December 2023, with performance required after normal working hours between 5:00 p.m. and 6:00 a.m. Monday through Friday and all hours on weekends. Contractors must provide a full-time, company-employed foreman and submit estimated work duration and schedules demonstrating attempts to improve timelines.

Quotations shall be submitted as lump sum bids inclusive of all taxes, freight, insurance, overhead, permits, fees, and profit, with pricing breakdowns provided on the attached bid form. The Port of Newport reserves the right to reject any or all proposals and will select the successful proposer based on approach and past experience, reference checks, responsiveness to specifications, and fees for services. Contractors must maintain business liability insurance with a minimum of $2,000,000 coverage, name the Port of Newport as an additional insured, and provide a Certificate of Insurance with 30-day notice of cancellation prior to starting work. The project is subject to Oregon prevailing wage requirements depending on the final contract price, with potential BOLI fees of one-tenth of one percent (not less than $100 nor more than $5,000). GSA security requirements apply, including fingerprint charts (Form FD-258) and background investigations for employees with routine, unescorted access for periods exceeding six months. All work must comply with OSHA standards, Oregon environmental and natural resources laws, and MPI paint standards and specifications for institutional low-odor/VOC latex products.

View the file

Other files

File Type Posted
SERVICES PO Terms and Conditions~17.pdf PDF
5701-0 Sole Source Determination~1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ Form page 1 Rev 04/14

REQUEST FOR QUOTATION

(RFQ)

PROJECT: NOAA MOC-P Facility Painting 2023

LOCATION: 2002 Marine Science Dr. Newport, OR

SITE MEETING:Friday 9/29/2023, 10:30AM

BID DUE: Friday 10/13/2023, 2:00PM

Quotations on this project will be accepted by Hand Delivery, Mail, Fax, PDF via email.

SUBMIT TO: Port of Newport C/O Executive Director Phone: (541) 265-7758 600 SE Bay Boulevard Fax: (541) 265-4235 Newport, OR 97365 Email: jim@portofnewport.com

QUESTIONS TO: Jim Durkee 541-270-0545

TERMS AND CONDITIONS:

1. Schedule for Work: Start: TBD/November 2023 Completion: December 2023 Work to be performed after normal working hours between 5:00pm – 6:00am Mon - Fri and all hours on weekends.

Time is of the essence. Contractor to provide estimated work duration and schedule. All attempts at improving the schedule will be made by the contractor

2. General Description: Repainting of approximately 53,000sf at all common, office, and demised area gypsum board walls to match existing latex finish, 1 coating, per attached specification. Contractor to patch, repair, texture and prime damaged drywall, if any, within the scope of work as necessary. Removal and replacement of detachable items such as electrical plates, dry erase boards, wall hangings, movable furnishings and other items as necessary for a professional paint job.

3. Scope of Work: Provide all labor, materials, tools, lift equipment, supervision (min one company employed, full time foreman), submittals, manuals and incidentals necessary to complete all work implied by the attached scope of work you are quoting. Any deviations taken by bidder to the terms, conditions, plans, specifications, codes, etc of this RFQ shall be clearly stated and included as an attachment to the Bid Form. See Bid Form for add/alternate work if applicable

4. Bid Breakdown: Please use attached Bid Form. Your proposal cannot be considered unless the Bid Form has been completed in its entirety. Lump sum bids shall be inclusive of all taxes, freight, insurance, overhead, permits, fees, and profit. Provide pricing for add/alternates if applicable

5. Proposal Selection: The Executive Director or appointed contact will evaluate each submitted proposal and report to the Port Commission with a recommendation if required. If required, the Port Commission shall make the final selection and reserves the right to reject any proposal not in compliance with all prescribed public bidding procedures and requirements and may reject for good cause any or all proposals upon finding that it is in the public interest to do so. The Port will analyze information provided by all Proposers. The successful Proposer will be selected on the basis of the following:

a. Approach and evaluation of the past experience of the individuals who would be performing the work for the Port.

b. The results of reference checks including the ability to meet RFQ requirements.

RFQ Form page 2 Rev 05/14

c. Responsiveness to proposal specifications and required information.

d. Fee for services performed.

6. Drawings and Specifications: If applicable, bidder is provided with documents, which are thought to be necessary in preparing a proposal. Bidder is responsible for requesting any other documents/drawings from references in the scope of work that would be necessary to prepare a complete proposal.

7. Temporary facilities: If applicable, field office, telephone, office equipment, and storage are to be provided by the contractor. Contractor is responsible for receiving and storing materials, clean-up and removal of any waste generated by this scope of work on a daily basis. Restrictions for parking will apply.

8. Safety: Successful bidder will comply with all OR-OSHA & OSHA safety requirements at all times while on Port property. Contractor will be responsible for all employee safety training, safety meetings, record keeping and safety compliance.

9. Insurance: Upon acceptance, contractor will provide proof of proper business licensing and registration in Lincoln County, Oregon, and will maintain all required licensing and permits required by Local, State or Federal jurisdictions to perform the services of this agreement. Contractor will provide proof of business liability insurance with a minimum of $2,000,000 liability coverage and maintain required liability insurance at all times for services and their responsible employees while on Port owned property. Contractor will be fully responsible to maintain all employee workmen's compensation insurance as mandated by Local, State and Federal requirements. Contractor shall name the Port of Newport as an Additional Insured and provide a Certificate of Insurance confirming Liability and Workers Compensation with a 30-day Notice of Cancellation, prior to starting any work. Contractor shall pay any and all payroll and withholding taxes and any other sums that is required by Local, State or Federal agencies.

10. Prevailing Wages: The Contractor may be required to pay prevailing wage rates depending upon the final total price of the project in conformance to ORS 279C.800 thru 279C.870. A current copy of Prevailing Wage Rates for Public Works contracts in Oregon is available from the State of Oregon, Bureau of Labor and Industries and is also included in Section 40 of these specifications.

11. Boli Fee: The Port, if required, will pay a fee to the Bureau of Labor and Industries pursuant to the provisions of ORS 279C.825. The fee is one-tenth of one percent of the price of this contract, but not less than $100.00 nor more than $5,000.00, regardless of the contract price.

12. Nondiscrimination & Affirmative Action: The Port of Newport is an equal opportunity employer and provider and requires all Proposers to comply with policies and regulations concerning equal opportunity. The Proposer, in the performance of this Agreement, agrees not to discriminate in its employment because of an employee’s or applicant’s race, religion, national origin, ancestry, sex, age, or physical handicap.

13. Environmental And Natural Resources Laws To Be Observed: In compliance with ORS 279C.525, the following is a list of federal, state and local agencies, of which the Port has knowledge, that have enacted ordinances or regulations relating to environmental pollution and the preservation of natural resources that may affect the performance of the Contract:

FEDERAL AGENCIES:

Department of Agriculture, Forest Service, Soil Conservation Service, Department of Defense, Army Corps of Engineers, Department of Energy, Federal Energy Regulatory Commission, Environmental Protection Agency, Health and Human Services, Department of Housing & Urban Development, Department of Interior, Bureau of Land Management

STATE AGENCIES:

Department of Agriculture, Soil and Water Conservation Commission, Department of Energy, Department of Environmental Quality, Department of Fish and Wildlife, Department of Forestry, Division of State Lands, Water Resources Department

RFQ Form page 3 Rev 05/14

LOCAL AGENCIES:

Bureau of Reclamation, Geological Survey, U.S. Fish and Wildlife Service, Department of Labor Occupation Safety and Health Administration, Water Resources Council, City Councils, Board of County Commissioners.

14. Public Safety During Construction: Pedestrian safety and traffic control shall be provided for by Contractor in accordance with the latest edition of the Manual on Uniform Traffic Control Devices.

15. Street/Sidewalks Closure requirements: If applicable, street and sidewalk closures shall be kept to a minimum during construction. Access to local businesses shall be maintained at all times to pedestrian traffic. Any disruptions to pedestrian traffic to local businesses shall be coordinated between the Contractor and business owner to their mutual satisfaction. Contractor shall notify City Engineer and Emergency Services before closing any streets.

16. GSA Security Requirements:

IDENTITY VERIFICATION OF PERSONNEL (MAY 2007)

A. The Government reserves the right to verify identities of personnel with routine access to Government space.

The Lessor shall comply with the agency personal identity verification procedures below that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M- 05-24, and Federal Information Processing Standards Publication (FIPS PUB) Number 201, as amended.

B. The Lessor shall insert this paragraph in all subcontracts when the subcontractor is required to have physical access to a federally controlled facility or access to a federal information system.

C. Lessor compliance with subparagraphs 1 through 4 below will suffice to meet the Lessor’s requirements under HSPD-12, OMB M-05-24, and FIPS PUB Number 201.

1. The Government reserves the right to conduct background checks on Lessor personnel and contractors with routine access to Government leased space.

2. Upon request, the Lessor shall submit completed fingerprint charts and background investigation forms for each employee of the Lessor, as well as employees of the Lessor's contractors or subcontractors, who will provide building operating services requiring routine access to the Government’s leased space for a period greater than 6 months. The Government may also require this information for the Lessor's employees, contractors, or subcontractors who will be engaged to perform alterations or emergency repairs in the Government’s space.

3. The Lessor must provide Form FD-258, Fingerprint Chart (available from the Government Printing Office at http://bookstore.gpo.gov), and Standard Form 85P, Questionnaire for Public Trust Positions, completed by each person and returned to the contracting officer (or the contracting officer's designated representative) within 30 days from receipt of the forms. Based on the information furnished, the Government will conduct background investigations of the employees. The contracting officer will advise the Lessor in writing if an employee fails the investigation, and, effective immediately, the employee will no longer be allowed to work or be assigned to work in the Government’s space.

http://www.whitehouse.gov/news/releases/2004/08/20040827-8.html http://www.whitehouse.gov/omb/memoranda/fy2005/m05-24.pdf http://www.whitehouse.gov/omb/memoranda/fy2005/m05-24.pdf http://www.whitehouse.gov/omb/memoranda/fy2005/m05-24.pdf http://www.whitehouse.gov/omb/memoranda/fy2005/m05-24.pdf http://www.whitehouse.gov/omb/memoranda/fy2005/m05-24.pdf http://www.whitehouse.gov/omb/memoranda/fy2005/m05-24.pdf http://www.whitehouse.gov/omb/memoranda/fy2005/m05-24.pdf http://bookstore.gpo.gov/ http://contacts.gsa.gov/webforms.nsf/0/25292D2D26D8B5EC85256A730051F924/$file/sf85p.pdf

RFQ Form page 4 Rev 05/14

SCOPE OF WORK

1. SCOPE:

To provide all labor, supervision, equipment, materials, expendables, submittals, applicable taxes, freight to jobsite, and incidentals necessary to complete all work implied as follows:

1.1 SUMMARY

A. This Section includes surface preparation and the application of paint systems on the following interior substrates:

1. Gypsum board walls at the administration building 1st and 2nd floor; all rooms indicated in yellow on attachment.

2. Gypsum board walls at the warehouse; all rooms indicated in yellow on attachment.

3. See bid form for add/alternates.

1.2 RECOVERED MATERIAL CONTENT

A. Optional Alternate Pricing: Comply with U.S. Environmental Protection Agency (EPA) Comprehensive Procurement Guidelines Recovered Material Advisory Notice (RMAN) for all Latex Paint products, summarized as follows:

Postconsumer Total Recovered Product Content (%) Materials Content (%Reprocessed Latex Paint:

White, Off-White, Pastel Colors: 20 20 Grey, Brown, Earth tones, and 50-99 50-99 Other Dark Colors:

Consolidated Latex Paint: 100 100

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Samples: For each finish and for each color and texture required.

C. Product List: Printout of current "MPI Approved Products List" for each product category specified in Part 2, with the proposed product highlighted.

D. Provide statement that products contain no formaldehyde.

1.4 QUALITY ASSURANCE

A. MPI Standards:

1. Products: Complying with MPI standards indicated and listed in "MPI Approved Products List."

2. Preparation and Workmanship: Comply with requirements in "MPI Maintenance Repainting Manual" for products and paint systems indicated.

1.5 EXTRA MATERIALS

A. Furnish extra materials described below that are from same production run (batch mix) as materials applied and that are packaged for storage and identified with labels describing contents.

1. Quantity: Furnish an additional 5 percent, but not less than 1 gal. of each material and color applied.

2. Packaging: Material will be packaged in 1 gal. containers sealed and clearly marked with product information.

PART 2 - PRODUCTS

2.1 PAINT, GENERAL

A. Material Compatibility:

RFQ Form page 5 Rev 05/14

1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.

2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.

B. VOC Content of Field-Applied Interior Paints and Coatings: Provide products that comply with the following limits for VOC content, exclusive of colorants added to a tint base, when calculated according to 40 CFR 59, Subpart D (EPA Method 24); these requirements do not apply to paints and coatings that are applied in a fabrication or finishing shop:

1. Flat Paints, Coatings, and Primers: VOC content of not more than 50 g/L.

2. Non-flat Paints, Coatings, and Primers: VOC content of not more than 150 g/L.

3. Anti-Corrosive and Anti-Rust Paints Applied to Ferrous Metals: VOC not more than 250 g/L.

4. Clear Wood Varnishes: VOC not more than 350 g/L.

5. Clear Wood Lacquers: VOC not more than 550 g/L.

6. Floor Coatings: VOC not more than 100 g/L.

7. Shellacs, Clear: VOC not more than 730 g/L.

8. Shellacs, Pigmented: VOC not more than 550 g/L.

9. Primers, Sealers, and Undercoats: VOC content of not more than 200 g/L.

10. Stains: VOC not more than 250 g/L.

C. Chemical Components of Field-Applied Interior Paints and Coatings: Provide products that comply with the following limits for VOC content, exclusive of colorants added to a tint base, when calculated according to 40 CFR 59, Subpart D (EPA Method 24) and the following chemical restrictions; these requirements do not apply to primers or finishes that are applied in a fabrication or finishing shop:

1. Aromatic Compounds: Paints and coatings shall not contain more than 1.0 percent by weight of total aromatic compounds (hydrocarbon compounds containing one or more benzene rings).

2. Restricted Components: Paints and coatings shall not contain any of the following:

a. Acrolein.

b. Acrylonitrile.

c. Antimony.

d. Benzene.

e. Butyl benzyl phthalate

f. Cadmium.

g. Di(2-ethylhexyl) phthalate.

h. Di-n-butyl phthalate.

i. Di-n-octyl phthalate.

J. 1,2-dichlorobenzene.

k. Diethyl phthalate.

l. Dimethyl phthalate.

m. Ethylbenzene.

n. Formaldehyde.

o. Hexavalent chromium.

p. Isophorone.

q. Lead.

r. Mercury.

s. Methyl ethyl ketone.

t. Methyl isobutyl ketone.

u. Methylene chloride.

V. Naphthalene.

w. Toluene (methylbenzene).

x. 1,1,1 -trichloroethane.

RFQ Form page 6 Rev 05/14

y. Vinyl chloride.

D. Optional Alternate Pricing: Use reprocessed and consolidated Latex Paint in accordance with Environmental Protection Agency (EPA) Comprehensive Procurement Guidelines, and in accordance with all requirements of this specification. Refer to paragraph 1.2 of this Section and Section 012300, Alternates.

E. Colors: As indicated in Color Schedule.

2.2 PRIMERS/SEALERS

A. Alkyd Anticorrosive Metal Primer: MPI #79.

2.3 METAL PRIMERS

A. Rust-Inhibitive Primer (Water Based): MPI #107.

2.4 WOOD PRIMERS

A. Interior Latex-Based Wood Primer: MPI #39. 2.5 LATEX PAINTS B. Interior Latex (Semigloss): MPI #54 (Gloss Level 5).

C. Institutional Low-Odor/VOC Latex (Low Sheen): MPI #144 (Gloss Level 2).

D. Institutional Low-Odor/VOC Latex (Semigloss): MPI #147 (Gloss Level 5).

E. Interior High Performance Latex: MPI #141 (Gloss Level 5).

2.6 POLYURETHANE VARNISHES

A. Water Based Varnish, Clear: MPI #128.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of work.

B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:

1. Wood: 15 percent.

2. Gypsum Board: 12 percent.

C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.

D. Begin coating application only after unsatisfactory conditions have been corrected and surfaces are dry.

1. Beginning coating application constitutes Contractor's acceptance of substrates and conditions.

3.2 PREPARATION AND APPLICATION

A. Comply with manufacturer's written instructions and recommendations in "MPI Maintenance Repainting Manual" applicable to substrates indicated.

B. Clean substrates of substances that could impair bond of paints, including dirt, oil, grease, and incompatible paints and encapsulates.

1. Remove incompatible primers and reprime substrate with compatible primers as required to produce paint systems indicated.

B. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.

C. Painting Mechanical and Electrical Work: Paint items exposed in equipment rooms and occupied spaces including, but not limited to, the following:

1. Mechanical Work:

a. None

RFQ Form page 7 Rev 05/14

2. Electrical Work:

a. Electrical conduit where exposed to view within occupied spaces.

D. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Owners representative, and leave in an undamaged condition.

3.3 INTERIOR PAINTING SCHEDULE

A. Steel Substrates (if applicable):

1. Institutional Low-Odor/VOC Latex System: MPI INT 5.1S.

a. Spray-apply all coats.

b. Prime Coat: Rust-inhibitive primer (water based).

c. Intermediate Coat: Institutional low-odor/VOC interior latex matching topcoat.

d. Topcoat: Institutional low-odor/VOC interior latex (semigloss).

B. High-Performance Latex System: MPI INT 5.1R. (if applicable)

a. Prime Coat: Alkyd anticorrosive metal primer.

b. Intermediate Coat: High-performance latex matching topcoat.

c. Topcoat: High-performance latex (semigloss).

C. Wood Substrates (if applicable): Including plywood.

1. Latex System: MPI INT 6.4R.

a. Prime Coat: Interior latex-based wood primer.

b. Intermediate Coat: Interior latex matching topcoat.

c. Topcoat: Interior latex (semigloss).

D. Wood Trim and Hardwood Plywood (if applicable) :

1. Clear Polyurethane Varnish (Satin) MPI INT 6.3Q.

a. Prime Coat: Polyurethane varnish.

b. Intermediate Coat: Polyurethane varnish.

c. Topcoat: Polyurethane varnish.

E. Gypsum Board Substrates:

1. Institutional Low-Odor/VOC Latex System: MPI INT 9.2M.

a. Prime Coat (if applicable): Interior latex primer/sealer.

b. Topcoat: Institutional low-odor/VOC interior latex (eggshell).

2. High-Performance Latex System: MPI INT 9.2B.

a. Prime Coat (if applicable): Interior latex primer/sealer.

b. Topcoat: Interior latex (semigloss).

3.4 GENERAL ITEMS INCLUDED IN THIS SCOPE OF WORK:

1. NOAA MOC-P is a federal facility. For projects less than 30 days in duration and at contractors own expense, contractor will provide Form FD-258, Fingerprint Chart completed by the local authority for each employee regularly entering the facility buildings unescorted.

2. Contractor to provide names of short duration trades persons and delivery vehicles submitted prior to entry. All persons are subject to security check-in at NOAA main gate.

3. The NOAA MOC-P federal facility is a working office and warehouse facility. All attempts at reducing impact to administrative personnel during working hours 6:00am – 5:00pm will be made.

Submit a preliminary work schedule for all affected areas prior to mobilization.

4. Mobilization of equipment and materials and de-mobilization of equipment and excess materials off site.

5. Contractor is responsible for protecting all areas adjacent to their work from any damage due to their scope of work. All damage will be cleaned up and/or be repaired by contractor.

RFQ Form page 8 Rev 05/14

6. Contractor is responsible for offloading, storing and weatherproofing materials on job site, and responsible for the necessary equipment needed to unload materials.

7. Provide all equipment, scaffolding, cranes and hoisting needed to complete scope of work.

8. Provide safe working surroundings for own employees and other trades, ensure safe passage of persons around area of service.

9. All work to be performed in accordance with O.S.H.A. standards and requirements.

10. If applicable, provide M.S.D.S. for all materials prior to mobilization.

11. Participate in job scheduling, contractor meetings, and safety meetings scheduled by Port of

Newport.

12. If applicable, conduct weekly jobsite safety meetings and provide Port of Newport with a record of

Safety Meeting Minutes.

13. Work, access, parking, and noise are confined to the limits as defined by project representative.

14. If applicable, onsite job boxes or trailers are to be authorized by the Port of Newport and maintained by contractor.

15. Provide complete set of as-built drawings or work reports to Port of Newport, at the end of the project. If applicable, contractor to provide all warranty certificates and electronic copy of operational and maintenance manuals.

16. Work will not be accepted as complete until punch list is totally accepted by the Port of Newport.

17. Daily cleanup and final cleanup is required.

3.5 WORK SPECIFICLY EXCLUDED FROM THIS SCOPE:

1. NONE

3.6 ATTACHMENTS:

1. Admin 1st , 2nd and warehouse floor plan markup showing area walls (3pgs)

2. Paint color schedule

3.7 ADDITIONAL PROVISIONS:

1. NONE

End of Section

RFQ Form page 9 Rev 05/14

IMPORTANT:

This Document must be filled out and returned to Port of Newport as your quote for this project

PROJECT:__________________________________ BIDDER: _______________________________________

Pricing Breakdown if Applicable:

(Attach separate sheet if necessary)

TOTAL BASE PRICE $

Add/Alternates (if applicable):

(Attach separate sheet if necessary)

* Price includes all materials FOB job location.

** Price includes all licensing, bonding, insurances, permits and taxes.

*** Price is held for minimum 90 days.

**** Please list on separate sheet, any additional alternates or value engineering pricing.

Quotation is in compliance with the entire project Drawings, Specifications and/or Work Scope? Yes No

Clarifications: ______________________________________________________________________________________

(Attach separate sheet if necessary)

Estimated Schedule:

Preparation of Shop Drawings/submittals ________ work days Fabrication, delivery of material to jobsite ________ work days Work performance on jobsite ________ work days Average Crew Size at 40 hr work week: ________ workers

All Inclusive Labor Rates for Extra Work (or Attach Labor Rate Schedule):

Superintendent $________________________/hour.

Foreman $________________________/hour.

Craftsman $________________________/hour.

Helper $________________________/hour.

Markup on cost of Materials ________________________%

Provide a list of equipment rates (if applicable):

RFQ Form page 10 Rev 05/14

Equipment Item Rate Per

List of lower tier suppliers/subcontractors (if applicable):

Name or description of material or work to be performed Approximate Value

_______ (Initial) Receipt of Addendum Numbers __________________ is hereby acknowledged.

_______ (Initial) I acknowledge the terms and conditions as stated in the Request for Quotation form received from Port of Newport as part of the contract documents, and hereby incorporate them into this quotation.

_______ (Initial) I acknowledge the terms, conditions and minimum limits and have included all costs for insurance in this quotation.

_______ (Initial) I acknowledge the requirements of Oregon Prevailing Wage Law ORS 279C.800 and have if applicable incorporated all costs associated into this quotation.

Submitted By:

Name Company

Telephone # FAX/Email

Address

Signature Date

The Port of Newport reserves the right to accept or reject any or all quotations and may at its discretion select the contractor that is deemed to provide the best value to the Port of Newport.

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Text Box Painting Walls in Highlighted Areas

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee Rectangle

JimDurkee

Section Material Manufacturer Color Status

96519 Vinyl Composition Tile - Color 3 5% Mannington Essentials 200 Navy Approved / Specified

96816 Sheet Carpet Shaw Graphic Nature 96755 Natural Tonic Approved / Specified

99113 Painted PVC Downspouts Sherwin Williams 6073 Perfect Greige Approved / Specified

99113 Painted Exterior Steel Sherwin Williams Custom Match to Dark Bronze Flashing Approved / Specified

99123 Interior Wall Paint Typical Rodda 8572 Sandollar Beach Approved / Specified

99123 Interior Wall Paint Corridors Rodda 8551 Pocahantas Approved / Specified

99123 Interior Metal Rail Paint Rodda 8293 Carbon Copy Approved / Specified

99123 Interior Hollow Metal Frame Paint Rodda 8293 Carbon Copy Approved / Specified

99123 Interior Exposed Piping, Conduit and Ductwork Rodda 8572 Sandollar Beach Approved / Specified

99123 Interior Gypsum Board Ceilings Rodda 8572 Sandollar Beach Approved / Specified

99123 Interior Exposed Structure Ceilings Rodda 8572 Sandollar Beach Approved / Specified

99123 Interior Woodwork Finish Maple Clear Finish

101100 Marker boards Platinum Visual Systems White Approved / Specified

101400 Signage AM-7 Storm Blue Architectural Metalworks Approved / Specified

102113 Toilet Compartments Accurate Solid Phenolic Natural Canvas Approved / Specified

102226 Operable Partitions - Hinge Color Modernfold 932 Natural Choice Approved / Specified

102226 Operable Partitions - Trim Color Modernfold 932 Natural Choice Approved / Specified

102226 Operable Partitions - Carpet Color Modernfold 932 Cloud 006 Approved / Specified

102800 Toilet Accessories Bradley Brushed Stainless Approved / Specified

104413 Fire Extinguisher Cabinets J.L Industries - Ambassador White Approved / Specified

105113 Lockers Bradley Lenox Desert Stone S406 Approved / Specified

122113 Louver Blinds Bali 031 Fawn Approved / Specified

124816 Entrance Floor Grilles CS Systems - Peditred 9313 Midnight Approved / Specified

142400 Elevator Wall Panels Kone Hardwood - Maple - Clear Finish Approved / Specified

142400 Elevator (Other Finishes) Stainless, Brushed Approved / Specified

142400 Elevator Ceiling Luminous Ceiling Approved / Specified

Notes

Note: "Approved / Specified" indicates color is approved by NOAA or is specified. Product submittals must be reviewed by gLAs and returned to Andersen prior to ordering.

rfuller Ellipse rfuller Rectangle rfuller Typewritten Text

NOAA MOC-P COLOR SCHEDULE

Request for Quotation - NOAA MOC-P Facility Painting 2023_0
12. Nondiscrimination & Affirmative Action: The Port of Newport is an equal opportunity employer and provider and requires all Proposers to comply with policies and regulations concerning equal opportunity. The Proposer, in the performance of this Agreement, agrees not to discriminate in its employment because of an employee’s or applicant’s race, religion, national origin, ancestry, sex, age, or physical handicap.
IDENTITY VERIFICATION OF PERSONNEL (MAY 2007)
Office First Floor 2023-24 painting
Office Second Floor 2023-24 painting
Warehouse 2023-24 painting
Color Schedule

File details come from the government source that posted it. Updated .