RFQ_No._3_Haven_on_Vine_Exterior_Stucco_Replacement.pdf

PDF 161 KB Posted

Attached to
Haven on Vine Exterior Stucco Restoration
Solicitation number
RFQ No. 3
Issued by
Polk County, Lake Harbor CDP, Florida

About this file

This Request for Quotations (RFQ No. 3) is issued by the City of Kissimmee, Florida, for exterior stucco restoration services at Haven on Vine Apartments, a four-unit building located at 1815 W. Vine Street, Kissimmee, Florida. The scope of work encompasses complete removal and replacement of the exterior stucco system for Building #D, including demolition, preparation, installation, finishing, cleanup, and final inspection. The project requires furnishing all labor, materials, supervision, equipment, permits, disposal, scaffolding, and incidentals necessary to complete the work. Approximate quantities include 5,650 square feet of exterior stucco replacement, 5,650 square feet of expanded metal lath, 360 square feet of Hardie lap siding, various linear feet of casing beads, corner beads, expansion/control joints, and polyurethane sealant, 100 square feet of EIFS decorative band, and two aluminum gable vents. The quotation deadline was Wednesday, July 8, 2026, with submissions required electronically to facilities.proposals@kissimmee.gov. The successful contractor must execute an agreement immediately upon award, obtain all required permits, and mobilize during the second week of July 2026, with work completion in accordance with the submitted project schedule. A non-mandatory site visit was available for contractors to verify existing conditions.

The project is federally funded and subject to Davis-Bacon Prevailing Wage Requirements and Build America, Buy America (BABA) requirements, necessitating compliance with applicable wage determinations and material sourcing standards. Contractor qualifications must include a valid Florida Contractor License, Certificate of Insurance, three references for similar stucco restoration projects, a proposed project schedule, and project superintendent information. Quotations must include a lump sum price, proposed schedule, earliest available mobilization date, warranty information, material lead times, and confirmation of Davis-Bacon and BABA compliance. The contractor shall provide manufacturer's material warranty and a minimum one-year workmanship warranty with documentation at project closeout. Additional federal compliance requirements include adherence to 2 CFR Part 200, Equal Employment Opportunity requirements, federal certified payroll reporting, and Debarment and Suspension requirements. The City reserves the right to reject any or all quotations, request clarification, negotiate pricing, and award the project based on best overall value determination.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS (RFQ No. 3)

HAVEN ON VINE APARTMENTS

EXTERIOR STUCCO RESTORATION

One (1) Four-Unit Apartment Building

1. PURPOSE

The City of Kissimmee is requesting written quotations from qualified contractors to furnish all labor, materials, supervision, equipment, permits, and incidentals necessary to complete the exterior stucco restoration for one (1) four-unit apartment building at the Haven on Vine

Apartments. (Apartment Unit - Building #D Only).

This project is federally funded and is subject to Davis-Bacon Prevailing Wage Requirements and Build America, Buy America (BABA) requirements.

2. QUOTATION DUE DATE

Wednesday, July 8, 2026

Submit quotations electronically to:

facilities.proposals@kissimmee.gov

3. PROJECT LOCATION

Haven on Vine Apartments

1815 W. Vine Street

Kissimmee, Florida 34741

4. PROJECT SCHEDULE

The successful contractor shall:

• Execute an agreement immediately upon award.

• Obtain all required permits.

• Mobilize during the second week of July 2026.

• Complete the work in accordance with the submitted project schedule.

5. SCOPE OF WORK

The Contractor shall furnish all labor, materials, supervision, equipment, permits, disposal, scaffolding, and incidentals necessary to remove and replace the exterior stucco system.

The work shall include demolition, preparation, installation, finishing, cleanup, and final inspection.

DEMOLITION

The Contractor shall:

• Remove existing stucco from the entire building.

• Protect all windows, doors, roofs, sidewalks, landscaping, and adjacent improvements.

• Remove and reinstall existing building signage.

• Dispose of all demolition debris.

NEW STUCCO SYSTEM

Provide and install:

• New expanded metal lath.

• Three-coat stucco system (scratch coat, brown coat, finish coat).

• Bonding agent.

• Vinyl casing beads.

• Vinyl corner beads.

• Expansion/control joints.

• PVC weep screed.

• EIFS decorative band.

• Hardie lap siding below designated windows.

• New aluminum gable vents.

• Sealant and caulking at all required joints.

All work shall comply with the Florida Building Code and manufacturer installation requirements.

APPROXIMATE QUANTITIES

The following quantities are provided for bidding purposes only.

Contractors shall verify all existing conditions during the non-mandatory site visit.

Description Approximate Quantity

Exterior Stucco Replacement 5,650 SF

Expanded Metal Lath 5,650 SF

Bonding Agent 5,650 SF

Hardie Lap Siding 360 SF

EIFS Decorative Band 100 SF

EIFS Reinforcing Mesh 100 SF

PVC Weep Screed 360 LF

Vinyl Casing Bead 1,200 LF

Vinyl Corner Bead 540 LF

Expansion/Control Joint 300 LF

Polyurethane Sealant 900 LF

Aluminum Gable Vents 2 EA

CLEANUP

The Contractor shall:

• Maintain a clean jobsite daily.

• Remove all debris.

• Dispose of waste legally.

• Protect adjacent improvements.

• Leave the site clean upon completion.

6. WARRANTY

Provide:

• Manufacturer's material warranty.

• Minimum one-year workmanship warranty.

• Warranty documentation at project closeout.

7. FEDERAL REQUIREMENTS

The selected contractor shall comply with:

• Davis-Bacon Prevailing Wage Requirements.

• Build America, Buy America (BABA).

• 2 CFR Part 200.

• Equal Employment Opportunity requirements.

• Federal certified payroll reporting.

• Debarment and Suspension requirements.

8. CONTRACTOR QUALIFICATIONS

Contractor shall provide:

• Florida Contractor License.

• Certificate of Insurance.

• Three references for similar stucco restoration projects.

• Proposed project schedule.

• Project Superintendent information.

9. QUOTATION REQUIREMENTS

Quotation shall include:

• Lump Sum Price.

• Proposed schedule.

• Earliest available mobilization date.

• Warranty information.

• Material lead times.

• Confirmation of Davis-Bacon and BABA compliance.

10. CITY RESERVATIONS

The City reserves the right to reject any or all quotations, request clarification, negotiate pricing where appropriate, and award the project to the contractor determined to provide the best overall value to the City.

ATTACHMENTS

Attachment A – None

Attachment B – Building Elevations

Attachment C – Davis-Bacon Wage Determination

Attachment D – Build America, Buy America (BABA) Requirements

Attachment E – Project Photographs