RFQ N6264926QB051.pdf
PDF 2 MB Posted
- Solicitation number
- N6264926QB051
About this file
This is a Request for Quote (RFQ) for asbestos contractor/supervisor initial training services to be provided at the U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) in Yokosuka, Japan.
The contractor shall conduct seven 5-day classroom training sessions for 78 total attendees (maximum 12 per class) between July 27 and October 19, 2026. Training must be delivered in Japanese and satisfy EPA regulation 40 CFR 763 requirements, covering topics including physical characteristics of asbestos, health effects, personal protective equipment, work practices, hygiene, safety hazards, medical monitoring, air monitoring, regulatory requirements, respiratory and medical monitoring programs, insurance/liability issues, recordkeeping, supervisory techniques, contract specifications, and course review. The contractor must be a qualified, accredited asbestos training instructor with work experience as an asbestos building inspector and contractor/supervisor, possess strong communication skills, and provide practical training observed by law and satisfying Navy requirements. Training shall be conducted 0815-1615 daily at A-37 Training Room, Building A-37, 3F, SRF-JRMC. The government will furnish classroom space with air conditioning, whiteboard, flip chart, screen, projector, and loaner laptop PC if needed. The contractor is responsible for all training materials, equipment shipping, and virus checks for any equipment brought to the site. USB and wireless LAN use are prohibited at the training site. Quotations must be submitted on an all-or-none basis with firm-fixed pricing, FOB destination door-to-door. The solicitation is restricted to women-owned small businesses (WOSB), with an unrestricted acquisition set-aside. The offer due date is June 9, 2026, 11:00 AM Japan Standard Time, with award expected by May 28, 2026. Payment will be made by electronic funds transfer, and invoicing shall be submitted through the Wide Area WorkFlow (WAWF) system using Invoice 2in1 document type.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
Solicitation/Contract Form Continuation
Asbestos Contractor/Supervisor Initial Training
N6264926QB051
Continuation of Supplies or Services and Prices/Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
Asbestos Contractor/Supervisor Initial Training
5-day class x 7 session
The 1st session: 27-31 Jul 2026 The 2nd session: 03-07 Aug 2026 The 3rd session: 10-14 Aug 2026 The 4th session: 17-21 Aug 2026 The 5th session: 28 Sep - 02 Oct 2026 The 6th session: 05-09 Oct 2026 The 7th session: 13-16, 19 Oct 2026
See the Performance Work Statement (PWS) for details.
Pricing Arrangement: Firm Fixed Price
1 Group
Continuation of Description
PERFORMANCE WORK STATEMENT
ASBESTOS CONTRACTOR/SUPERVISOR INITIAL TRAINING
1.0. SCOPE
The contractor shall provide sufficient quantities and types of trained, qualified and certified contractor personnel as requested by the government to perform required tasks for each service type described in this Performance Work Statement (PWS) for C900 Production department workers, U.S.
Naval Ship Repair Facility and Japan Regional Maintenance Center, Yokosuka, Japan (SRF-JRMC).
2.0. BACKGROUND
U.S. Navy Ships still remain Asbestos-containing materials on shipboard (insulation, lagging, deck tile, underlayment, gaskets, shipboard cabling and mastic). Navy policy states that asbestos-containing materials will not be used on U.S. ships. SRF-JRMC has a mission to provide abatement service to Ship's Force. This is a legal requirement by U.S. Law and USN Policy.
3.0. REFERENCES
a. NAVSHIPREPFACPI 593-2 Asbestos Exposure Control Plan
b. Enforcement Order of the Industrial Safety and Health Act: Japanese Cabinet Order No. 318, August 19, 1972. And Amendments: Cabinet Order No. 331. October 20, 2006
c. Ordinance on Prevention of Health Impairment due to Asbestos: Japanese Ordinance of the Ministry of Health, Labour and Welfare, No.21, February 24,
d. Enforcement Order of the Industrial Safety and Health Act: Japanese Cabinet Order No. 318, August 19, 1972. And Amendments: Cabinet Order No. 331. October 20, 2006
e. 29 CFR Part 1915.1001 Occupational Safety and Health Standards for Shipyard Employment, Maritime Asbestos
f. 29 CFR Part 1910.1001 Occupational Safety and Health Standards, General Industry Asbestos
g. DOD Japan Environmental Governing Standards (JEGS), April 2018
h. 40 CFR Part 763 Subpart E. U.S. Environmental Protection Agency, Asbestos
i. OPNAVINST 5100.23 Series, Chapter17, Asbestos Control
j. NAVSHIPREPFACINST 5100.8, Safety and Occupational Health Program Manual
k. NAVSHIPREPFACPI 593-2, Asbestos Sampling Requirements and Guidelines
4.0. PERFORMANCE REQUIREMENT/TASKING.
4.1 Service type: Instructor
a. Task: Training
(1) Performance goal
(a) Asbestos Contractor/Supervisor Initial Training efficiently.
(b) The training shall be designed to enable all students to successfully pass the certification exam.
(2) Training Requirement
(a) The contractor shall conduct the course in Japanese.
(b) The training shall satisfy the requirements under Environmental Protection Agency (EPA) regulation, 40 CFR 763. The course shall cover the topics below:
1. Asbestos Contractor/Supervisor Initial Training
a. The physical characteristics of asbestos and asbestos-containing materials.
b. Potential health effects related to asbestos exposure.
c. Employee personal protective equipment.
d. State of the art work practices.
e. Personal hygiene.
f. Additional safety hazards.
g. Medical monitoring.
h. Air monitoring.
i. Relevant Federal, State, and local regulatory requirements, procedures, and standards.
j. Respiratory Protection Programs and Medical Monitoring Programs.
k. Insurance and liability issues.
l. Recordkeeping for asbestos abatement projects.
m. Supervisory techniques for asbestos abatement activities.
n. Contract specifications.
o. Course review.
(3) Skills and Knowledge Required
(a) The contractor shall have qualification for accredited Asbestos Training Instructor.
(b) The contractor shall make effort to know SRF-JRMC's business process concerning ship repair service and work environment prior to convening the classes to utilize the knowledge in performing the training to the employees at SRF-JRMC.
(c) Strong communication skills, including the ability to interact efficiently with attendees.
(d) The contractor shall have work experience as Asbestos Building Inspector and Contractor/Supervisor.
(e) The contractor shall provide practical training which is observed by the law and satisfied the navy's requirement.
(f) Attendees are Japanese employees who are not required for English proficiency at work, therefore, the contractor shall provide attendees with supplemental translations or explanations to promote their comprehension of English terms or sentences related to asbestos as necessary.
5.0. SPECIFICATION
a. Language: Japanese
b. Trainings to be conducted:
(1) Asbestos Contractor/Supervisor Initial Training (5-day course)
c. Class Size and Class frequency
(1) 7 sessions: Max 12 attendees/per class Total number of students: 78
d. Target Audience
(1) Code 900 Production department workers: Number following Shop shows the number of attendee(s).
X17 Sheet Metal Shop (1) X31 Machinist Shop (6) X37 MICE/Refrigeration/AC Shop (4) X51 Electrical Shop (53) X41 Boiler Shop (4) X56 Pipe/Coppersmith Shop (7) X07 Insulation Shop (3)
6.0. PLACE OF PERFORMANCE
A-37 Training Room, Bldg A-37, 3F, SRF-JRMC Fleet Activities Yokosuka, Japan
PSC 473 BOX 8
FPO AP 96349-0008
7.0. PERIOD OF PERFORMANCE
(1) Asbestos Contractor/Supervisor Initial Training (5-day class x 7 session) The 1st session: 27-31 Jul 2026 The 2nd session: 03-07 Aug 2026 The 3rd session: 10-14 Aug 2026 The 4th session: 17-21 Aug 2026 The 5th session: 28 Sep - 02 Oct 2026 The 6th session: 05-09 Oct 2026 The 7th session: 13-16, 19 Oct 2026
8.0. WORK HOURS
The training shall be performed from 0815 to 1615 per day.
9.0. WORK ENVIRONMENTAL AND PHYSICAL DEMANDS
a. At the training site, followings are prohibited.
(1) Use of USB
(2) Use of Wireless LAN
b. When the contractor brings a PC and digital data into the training site, they shall receive a virus check beforehand.
c. Shipping (From/To) for all training materials and equipment shall be responsible by the contractor.
10.0. GOVERNMENT-FURNISHED SUPPORT
a. Classroom with air condition system
b. Whiteboard and Flip Chart (paper and easel stand), if necessary.
c. Screen and projector for PowerPoint slides.
d. Loaner laptop PC is available, if necessary. (Need advance notice)
e. For mock-up for practical training, the training location may be altered to appropriate place or the layout of classroom may be changed for it accordingly.
11.0. PERFORMANCE REQUIREMENTS SUMMARY (PRS)
Task or Deliverable Performance Standard Acceptable Quality Level (AQL) Surveillance Method Performance Measure PWS Paragraph 4.0 & 5.0 Adherence to full requirement of PWS 4.0. 100% compliance in meeting PWS 4.0.
Number of students who attained certificate upon completion Examine course appraisal by attendees post completion of evaluation sheet
12.0. POINTS OF CONTACT (POCs)
To be determined.
Requirements Asbestos Contractor/Supervisor Initial Training (SRF-JRMC)
Continuation of Packaging and Marking
Continuation of Inspection and Acceptance
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: The POC or their designated representative shall inspect and accept the service(s) or supply(ies).
DoDAAC: N62758 CountryCode: USA
SRF AND JRMC YOKOSUKA
PSC 473 BOX 8, FPO AP 96349
FPO, AP 96349
UNITED STATES
TBD, TBD
Email: TBD Telephone: TBD
Continuation of Deliveries or Performance
Line Item Delivery Schedule Quantity Address and POC
Delivery Period From 27 Jul 2026 to 19 Oct 2026
Period of Performance From 27 Jul 2026 To 19 Oct 2026
1 Group Ship To DoDAAC: N62758 CountryCode: USA
SRF AND JRMC YOKOSUKA
PSC 473 BOX 8, FPO AP 96349
FPO, AP 96349
UNITED STATES
TBD, TBD
Email: TBD Telephone: TBD
Continuation of Accounting and Appropriation Data
Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.233-3 Protest after Award. (Deviation 2026-O0038) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-O0038) Feb 2026
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026-O0038)
Feb 2026
52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation 2026- O0038)
Feb 2026
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7004 Antiterrorism Awareness Training for Contractors. Jan 2023 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.232-7010 Levies on Contract Payments. Dec 2006 252.247-7023 Transportation of Supplies by Sea. Oct 2024 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023 252.204-7022 Expediting Contract Closeout. May 2021 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.
WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Not Applicable N/A
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice 2 in 1
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.
when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD
Issue By DoDAAC TBD
Admin DoDAAC TBD
Inspect By DoDAAC TBD
Ship To Code TBD
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) TBD
Accept at Other DoDAAC N/A
LPO DoDAAC TBD
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
*Agency Accounting Identifier (AAI) Number (If applicable) TBD
"The Contractor shall enter the e-mail address(es) identified below in the "Send Additional E-mail Notifications" field of WAWF once a document is submitted in the system."
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
Inspector: TBD
Acceptor: TBD
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
TBD
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Addendum to 52.212-4, Contract Terms and Conditions - Commercial Products and Commercial Services THE FOLLOWING NAVSUP LOCAL TEXT IS HEREBY MADE PART OF THE STATEMENT OF WORK/PERFORMANCE WORK
STATEMENT
ELECTRONIC FUND TRANSFER (EFT)
The Contractor must agree to receive payment by EFT. Transaction fee (currently JPY 735) will be deducted by the Financial Institution (Bank of America) making payment. Additional fee may be imposed by the bank designated to receive payment.
CONSUMPTION TAX
(a) The Government of the United States and Japan have agreed that this contract is exempt from the Japanese Consumption Tax. In accordance with paragraph (c) of the clause FAR 52.229-6, "TAXES--FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)," the offerors or quoters shall not include the Consumption Tax (including underlying taxes) in their proposal or quotations. By submission of your proposal or quotation, you are certifying that your proposal or quotation does not contain any such tax. The following U.S. Government (USG) proof of purchase forms shall be used to claim the exemption at tax offices:
USG Standard Form 1034 USG Standard Form 1113 USG Standard Form 44 Department of Defense Form 1155 Navy Comptroller Form 2277
(b) The Contractor shall retain the appropriate USG proof of purchase forms set forth above for a period of seven (7) years. In addition, the Contractor shall maintain adequate records containing all pertinent information with regards to the claiming of Consumption Tax exemptions related to this contract. These records shall be subject to review by the Contracting Officer, or his or her designated representative, at any time up to seven (7) years from the date of final payment under this contract.
(c) Any questions concerning the applicability of the Consumption Tax should be directed to the appropriate local tax office.
CUSTOMS AND TAX EXEMPTION
(a) The Contractor shall, notwithstanding any other clause in this contract to the contrary, be required to submit a request in writing to the Contracting Officer for issuance of a Tax Exemption Certificate for any import duties and all taxes paid or to be paid from which the U.S. Government is entitled to an exemption. These taxes and duties are enumerated in Article XII of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between the Governments of the United States of America and Japan, regarding facilities areas and the status of United States Armed forces in Japan. The Contractor's request shall include the following information:
(1) Name of Contractor;
(2) Contract number and job order number (if applicable);
(3) Nomenclature of taxable material to be delivered and intended use;
(4) Quantity of taxable material used or to be delivered; and
(5) Period of taxable material use.
(b) In this case of gasoline and other petroleum products, the Contractor shall be responsible for making every reasonable effort to determine the accuracy of his figures on consumption. In this regard, the Contractor shall, upon request of the Contracting Officer, present all available data used by the Contractor as the basis for determining such figures. The Contractor shall be required to maintain adequate records containing all pertinent information with regard to the above requirements. Further, these records shall be subject to review by the Contracting Officer at any time up to three years from the date of final payment under this contract.
Contract Terms and Conditions Required To Implement Statutes or Executive Orders — Commercial Products and Commercial Services
Addendum to Contract Clauses
Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.204-9 Personal Identity Verification of Contractor Personnel. Jan 2011
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026- O0038)
Feb 2026
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026-O0038) Feb 2026
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026- O0038)
Feb 2026
52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.225-14 Inconsistency between English Version and Translation of Contract. Feb 2000 52.240-93 Basic Safeguarding of Covered Contractor Information Systems. (Deviation 2026-O0038) Feb 2026 52.247-34 F.o.b. Destination. Jan 1991
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.232-7008 Assignment of Claims (Overseas). Jun 1997 252.233-7001 Choice of Law (Overseas). Jun 1997 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023 252.222-7002 Compliance with Local Labor Laws (Overseas). Jun 1997 252.225-7041 Correspondence in English. Jun 1997 252.225-7048 Export-Controlled Items. Jun 2013 252.243-7001 Pricing of Contract Modifications. Dec 1991
252.225-7972 Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems. (DEVIATION 2024-O0014)
Aug 2024 Deviation 2024-O0014 Aug 2024
252.244-7999 Subcontracts for Commercial Products or Commercial Services.
(DEVIATION 2026-O0015)
Feb 2026 Deviation 2026-O0015 Jan 2026
FAR Clauses Incorporated by Full Text
52.232-34 Payment by Electronic Funds Transfer-Other than System for Award Management. (Jul 2013)
Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013)
(a) Method of payment.
(1) All payments by the Government under this contract shall be made by electronic funds transfer (EFT) except as provided in paragraph (a)(2) of this clause. As used in this clause, the term "EFT" refers to the funds transfer and may also include the payment information transfer.
(2) In the event the Government is unable to release one or more payments by EFT, the Contractor agrees to either-
(i) Accept payment by check or some other mutually agreeable method of payment; or
(ii) Request the Government to extend payment due dates until such time as the Government makes payment by EFT (but see paragraph (d) of this clause).
(b) Mandatory submission of Contractor's EFT information.
(1) The Contractor is required to provide the Government with the information required to make payment by EFT (see paragraph (j) of this clause).
The Contractor shall provide this information directly to the office designated in this contract to receive that information (hereafter: "designated office") by . If not otherwise specified in this contract, the the date when the contractor submit first invoice, using EFT Form established by DAFS payment office is the designated office for receipt of the Contractor's EFT information. If more than one designated office is named for the contract, the Contractor shall provide a separate notice to each office. In the event that the EFT information changes, the Contractor shall be responsible for providing the updated information to the designated office(s).
(2) If the Contractor provides EFT information applicable to multiple contracts, the Contractor shall specifically state the applicability of this EFT information in terms acceptable to the designated office. However, EFT information supplied to a designated office shall be applicable only to contracts that identify that designated office as the office to receive EFT information for that contract.
(c) . The Government may make payment by EFT through either the Automated Clearing House (ACH) network, Mechanisms for EFT payment subject to the rules of the National Automated Clearing House Association, or the Fedwire Transfer System. The rules governing Federal payments through the ACH are contained in .31 CFR part 210
(d) Suspension of payment.
(1) The Government is not required to make any payment under this contract until after receipt, by the designated office, of the correct EFT payment information from the Contractor. Until receipt of the correct EFT information, any invoice or contract financing request shall be deemed not to be a proper invoice for the purpose of prompt payment under this contract. The prompt payment terms of the contract regarding notice of an improper invoice and delays in accrual of interest penalties apply.
(2) If the EFT information changes after submission of correct EFT information, the Government shall begin using the changed EFT information no later than 30 days after its receipt by the designated office to the extent payment is made by EFT. However, the Contractor may request that no further payments be made until the updated EFT information is implemented by the payment office. If such suspension would result in a late payment under the prompt payment terms of this contract, the Contractor's request for suspension shall extend the due date for payment by the number of days of the suspension.
(e) Liability for uncompleted or erroneous transfers.
(1) If an uncompleted or erroneous transfer occurs because the Government used the Contractor's EFT information incorrectly, the Government remains responsible for-
(i) Making a correct payment;
(ii) Paying any prompt payment penalty due; and
(iii) Recovering any erroneously directed funds.
(2) If an uncompleted or erroneous transfer occurs because the Contractor's EFT information was incorrect, or was revised within 30 days of Government release of the EFT payment transaction instruction to the Federal Reserve System, and-
(i) If the funds are no longer under the control of the payment office, the Government is deemed to have made payment and the Contractor is responsible for recovery of any erroneously directed funds; or
(ii) If the funds remain under the control of the payment office, the Government shall not make payment and the provisions of paragraph (d) shall apply.
(f) . A payment shall be deemed to have been made in a timely manner in accordance with the prompt payment terms of this EFT and prompt payment contract if, in the EFT payment transaction instruction released to the Federal Reserve System, the date specified for settlement of the payment is on or before the prompt payment due date, provided the specified payment date is a valid date under the rules of the Federal Reserve System.
(g) . If the Contractor assigns the proceeds of this contract as provided for in the assignment of claims terms of this EFT and assignment of claims contract, the Contractor shall require as a condition of any such assignment, that the assignee shall provide the EFT information required by paragraph
(j) of this clause to the designated office, and shall be paid by EFT in accordance with the terms of this clause. In all respects, the requirements of this clause shall apply to the assignee as if it were the Contractor. EFT information that shows the ultimate recipient of the transfer to be other than the Contractor, in the absence of a proper assignment of claims acceptable to the Government, is incorrect EFT information within the meaning of paragraph (d) of this clause.
(h) . The Government is not liable for errors resulting from changes to EFT information Liability for change of EFT information by financial agent provided by the Contractor's financial agent.
(i) . The payment or disbursing office shall forward to the Contractor available payment information that is suitable for Payment information transmission as of the date of release of the EFT instruction to the Federal Reserve System. The Government may request the Contractor to designate a desired format and method(s) for delivery of payment information from a list of formats and methods the payment office is capable of executing.
However, the Government does not guarantee that any particular format or method of delivery is available at any particular payment office and retains the latitude to use the format and delivery method most convenient to the Government. If the Government makes payment by check in accordance with paragraph (a) of this clause, the Government shall mail the payment information to the remittance address in the contract.
(j) . The Contractor shall provide the following information to the designated office. The Contractor may supply this data for this or EFT information multiple contracts (see paragraph (b) of this clause). The Contractor shall designate a single financial agent per contract capable of receiving and processing the EFT information using the EFT methods described in paragraph (c) of this clause.
(1) The contract number (or other procurement identification number).
(2) The Contractor's name and remittance address, as stated in the contract(s).
(3) The signature (manual or electronic, as appropriate), title, and telephone number of the Contractor official authorized to provide this information.
(4) The name, address, and 9-digit Routing Transit Number of the Contractor's financial agent.
(5) The Contractor's account number and the type of account (checking, saving, or lockbox).
(6) If applicable, the Fedwire Transfer System telegraphic abbreviation of the Contractor's financial agent.
(7) If applicable, the Contractor shall also provide the name, address, telegraphic abbreviation, and 9-digit Routing Transit Number of the correspondent financial institution receiving the wire transfer payment if the Contractor's financial agent is not directly on-line to the Fedwire Transfer System; and, therefore, not the receiver of the wire transfer payment.
(End of clause)
52.252-2 Clauses Incorporated by Reference. (Feb 1998)
Clauses Incorporated By Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR Clauses: https://www.acquisition.gov/far-overhaul/far-part-deviation-guide DFARS Clauses: https://www.acq.osd.mil/dpap/dars/dfars_far_overhaul_class_deviations.html
(End of clause)
52.252-6 Authorized Deviations in Clauses. (Nov 2020)
Authorized Deviations in Clauses (Nov 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any (48 CFR ) clause with an authorized deviation is indicated by the addition of DFARS Chapter 2 "(DEVIATION)" after the name of the regulation.
(End of clause)
DFARS Clauses Incorporated by Full Text
252.225-7963 Antiterrorism/Force Protection for Defense Contractors Outside the United States. (DEVIATION 2026-O0041)
(Feb 2026) Deviation 2026-O0041 (Feb 2026)
ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE CONTRACTORS OUTSIDE THE UNITED STATES
(DEVIATION 2026-O0041) (FEB 2026)
(a) . "United States," as used in this clause, means, the 50 States, the District of Columbia, and outlying areas.Definition
(b) Except as provided in paragraph (c) of this clause, the Contractor and its subcontractors, if performing or traveling outside the United States under this contract, shall--
(1) Affiliate with the Overseas Security Advisory Council, if the Contractor or subcontractor is a U.S. entity;
(2) Ensure that Contractor and subcontractor personnel who are U.S. nationals and are in-country on a non-transitory basis, register with the U.
S. Embassy, and that Contractor and subcontractor personnel who are third country nationals comply with any security related requirements of the Embassy of their nationality;
(3) Provide, to Contractor and subcontractor personnel, antiterrorism/force protection awareness information commensurate with that which the Department of Defense (DoD) provides to its military and civilian personnel and their families, to the extent such information can be made available prior to travel outside the United States; and
(4) Obtain and comply with the most current antiterrorism/force protection guidance for Contractor and subcontractor personnel.
(c) The requirements of this clause do not apply to any subcontractor that is--
(1) A foreign government;
(2) A representative of a foreign government; or
(3) A foreign corporation wholly owned by a foreign government.
(d) Information and guidance pertaining to DoD antiterrorism/force protection can be obtained from Naval Criminal Investigative Service (NCIS), .Code 21; telephone, DSN 288-9077 or commercial (202) 433-9077
(End of clause)
Additional Regulation or Supplemental Clauses Incorporated by Full Text
225-9401(4-22) SUPTXT225-9401(4-22) JAPANESE CONCILIATION PROCEDURES (Jan 2024)
JAPANESE CONCILIATION PROCEDURES
(a) Except as otherwise provided in this contract any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the US-Japan Joint Committee for conciliation in accordance with paragraph 10, Article XVIII, of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between Japan and the United States of America. Request by the Contractor for conciliation shall be made in accordance with the procedures provided herein.
(b) In the event the Contractor desires conciliation after the decision of the Contracting Officer has been served upon him, he will first file his appeal from such findings of fact within the time limits described therein before filing request for conciliation with the Joint Committee and then request for appellate authority under the clause of this contract entitled Disputes to suspend its action on his appeal until such time as the Joint Committee has had an opportunity for effecting conciliation.
(c) The request for conciliation will be submitted by the Contractor through the nearest local Japanese Defense Facilities Administration Bureau to the Contract Conciliation Panel of the Joint Committee. Upon the filing of the request with the Joint Committee, the Contractor will immediately notify the Contracting Officer in writing that the request for conciliation has been filed.
(d) In the event the disagreement submitted to the Joint Committee under subparagraph (b) above has been resolved through conciliation, it will be the responsibility of the Contractor to notify the appellate authority designated in the clause of this contract, entitled Disputes, of the settlement of the dispute and to withdraw his appeal.
(e) In the event the Contractor who has submitted a request for conciliation to the Joint Committee under subparagraph (b) above desires, notwithstanding the pending request for conciliation, that action by the appropriate authority under the clause of this contract entitled Disputes be resumed on his appeal, it is his responsibility to so request the said authority in writing. The Joint Committee shall be immediately informed by the Contractor of his action taken hereunder.
(f) No request for conciliation can be submitted to the Joint Committee in the case of a dispute upon which the final decision of the appropriate authority under the clause of this contract entitled Disputes has been rendered. Pending the hearing of conciliation panel the Contractor shall proceed diligently with the performance of the contract and in accordance with the Contracting Officer's decision. The provisions of this local text shall not prejudice any right which the parties to the contract may have to file a civil suit.
203.1106-1(3-18) SUPTXT 203.1106-1 (3-18) NAVY USE OF ABILITYONE SUPPORT
CONTRACTOR - RELEASE OF OFFEROR INFORMATION
(Jan 2024)
NAVSUP Fleet Logistics Center Yokosuka (FLCY) may utilize contractor support through the AbilityOne Program, as needed, to perform contract closeout functions for this acquisition. Information, including business sensitive/confidential or proprietary data, that the offeror provides to the Government or information already in the possession of the Government may be viewed and utilized by the AbilityOne Program support contractor personnel during the course of its contract performance. The information that may be made available to the support contractor may include, for example, pricing and technical proposals, historical contract, pricing and performance information, Commercial Asset Visibility (CAV) reporting information and similar data/information.
By submission of a proposal in response to this solicitation, the offeror and its subcontractors consent to a release of their business sensitive /confidential or proprietary data to the Government's AbilityOne Program support contractor personnel in order to perform close out services. Prior to the release of any such information to the support contractor, the support contractor will have in place with the Government a Non-Disclosure/Non- Use Agreement in accordance with the terms of the AbilityOne Program support contract.
Offerors may execute their own Non-Disclosure Agreement with the AbilityOne Program (AbilityOne contact information available from the contracting point of contact). The support contractor must provide copies of the executed agreements to the Contracting Officer and the Contracting Officer's Representative (COR) for the support contract; and the offeror/contractor for this acquisition must provide copies of the executed Agreement to the Contracting Officer for this acquisition. If the offeror/contractor seeks such a Non-Disclosure Agreement with the AbilityOne Program support contractor, the Agreement must be executed no later than the date of final delivery under the resulting NAVSUP FLCY contract.
SUPTXT243-9400(1-92) AUTHORIZED CHANGES ONLY BY THE
243-9400(1-92) CONTRACTING OFFICER (Jan 2024)
AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
(a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.
(b) The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. The Contracting Officer is FLCY
.Warranted Contracting Officer, Ashore Contracts Branch, Contracting Department (Code 200)
204-9400(05-24)
SUPTXT204-9400(05-24) CONTRACTOR UNCLASSIFIED ACCESS TO
FEDERALLY CONTROLLED FACILITIES, SENSITIVE INFORMATION,
INFORMATION TECHNOLOGY (IT) SYSTEMS OR PROTECTED HEALTH
INFORMATION
(Jan 2024)
(a) Insert the following, as applicable, in full text in all solicitations and contracts (including commercial acquisitions) Statement of Work (SOW) or Performance Work Statement (PWS) under the Schedule of Supplies/Services.
To submit recommended contract language to be incorporated into the Naval Supply Systems Command (NAVSUP) Contracts Handbook (CH) as NAVSUP component text, the language must not meet the requirements for a regulation clarification or change. All submissions (utilizing the text template on Contracting Knowledge Site (CKS)) should be reviewed and approved by the activity's Chief of the Contracting Office (CCO) prior to submission.
(1) SUPTXT204-9400 (05-24) Prescription and Alternative Language
The following shall be inserted in full text in all solicitations and contracts (including commercial acquisitions) which require contractor unclassified access to federally controlled facilities, sensitive information, Information Technology (IT) systems or protected health information. For commercial acquisitions, this text shall be incorporated into either the SOW or PWS.
* Consult with your CSM and ISSM/IAM for local policy when Authorized User (non-sensitive) access is required for non-U.S. citizens outside the U.
S.
** Alternative language which may be included as appropriate:
Contractor and all Contractor employees with access to or responsibility for XXXXXX of this contract shall comply with DoD Directive 8500.1E IA, DoDI 8510.01 Risk Management Framework (RMF) for DoD IT, DoD Directive 5400.11 DoD Privacy Program, DoD 5200.2-R Personnel Security Program and HSPD 12
X.1 Be CAC ready at the properly designated IT System Level
X.2 At minimum, all contractor employees must possess/maintain the required background investigation as determined by the PDT and/or IT access user level. This requirement is critical in order to access the government data base systems It is the contractor's responsibility to ensure that 100% of the contractor employees have the ability to acquire a favorably adjudicated background investigation. In addition, interim approval of clearances is not authorized.
X.3 Be citizens of the U.S
X.4 If at any time, any contractor employee requiring a Common Access Card (CAC) is unable to possess/maintain the required adjudicated background investigation, the contractor shall immediately notify the NAVSUP COR to coordinate removal of such a person from work under this contract.
X.5 Contractor employees with access to or responsibility for nonpublic government data under this contract must comply with HSPD-12 Personal Identity Verification (PIV) issuance requirements, known as the CAC.
(1) SUPTXT204-9400(4-22) CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES, SENSITIVE
INFORMATION, INFORMATION TECHNOLOGY (IT) SYSTEMS OR PROTECTED HEALTH INFORMATION
The security text does not apply in cases where the contractor/vendor does not have access to Navy Marine Corps Intranet (NMCI) computers, is not issued a Common Access Card (CAC) and is involved in training or other short term duties of less than 30 days duration that allow for the use of a visitor request. In these cases, the government employee must submit a Visitor Access Request (VAR) to the main gate or applicable processing entity for your facility and assume responsibility to escort those without CAC Credentials.
This local text does not apply to non-United States (U.S.) Nationals (foreign nationals) who are contactor employees performing work overseas. This text is applicable to the U.S. Nationals living in the U.S. or overseas who are performing work on a Navy contract.
The investigation of a non-U.S. national at a foreign location must be consistent with a National Agency Check with Written Inquiries (NACI), to the extent possible and include a fingerprint check against the Federal Bureau of Investigation (FBI) criminal history database, an FBI investigations file (name check) search and a name check against the terrorist screening database. Also, the above cited reference notes that Foreign Nationals may not be granted CAC credentials until completion of their investigation and not in the interim.
Per Department of Defense Memorandum (DoDM) 5200.2, Department of Defense (DoD) components must initiate and ensure completion of a background investigation before applying the credentialing standards to a non-U.S. national at a foreign location. The background investigation must be favorably adjudicated before a CAC can be issued to a non-U.S. national at a foreign location. The type of background investigation may vary based on standing reciprocity treaties concerning identity assurance and information exchanges that exist between the U.S. and its allies or agency agreements with the host country.
CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES, SENSITIVE INFORMATION, IT
SYSTEMS OR PROTECTED HEALTH INFORMATION
Executive Order 13467, Reforming Processes Related to Suitability for Government Employee, Fitness for Contractor Employees and Eligibility for Access to Classified National Security Information, Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The 5 CFR 32 Part 157 in concert with DoD Manual 1000.13, Vol 1, implements the Federal Standards.
APPLICABILITY
This text applies to all DoD sponsored individuals who require CAC eligibility (or login and P/W if acceptable per contract) for: Physical access to DoD facilities or non-DoD facilities on behalf of DoD; Logical access to information systems (whether on site or remotely); or remote access to DoD networks that use only the CAC logon for user authentication, or access to sensitive and protected information. This applies to the Office of the Secretary of Defense (OSD), the Military Departments, the Office of the Chairman of the Joint Chiefs of Staff and the Joint Staff, the Combatant Commands, the Office of the Inspector General of the DoD, the Defense Agencies, the DoD Field Activities and all other organizational entities within the DoD (hereinafter referred to collectively as the "DoD Components").
Each contractor employee providing services at a Navy command under this contract is required to obtain a DoD CAC. Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.
ACCESS TO FEDERAL FACILITIES
Definition. As used in this clause - Military installation means a base, camp, post, station, yard, center, or other activity under the jurisdiction of the Secretary of a military department, or, in the case of an activity in a foreign country, under the operational control of the Secretary of a military department or the Secretary of Defense (see 10 U.S.C. 2801(c)(4)).
Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Command's Security Manager (CSM) upon arrival to the command and shall out-process prior to their departure at the completion of the individual's performance under the contract.
Training. Contractor employees who require routine physical access to a Federally controlled facility or military installation shall complete "Level I Antiterrorism Awareness Training" prior to gaining access to a facility and annually thereafter in accordance with DoDI O-2000.16 Vol. 1. In accordance with Department of Defense Instruction O-2000.16 Volume 1, DoD Antiterrorism (AT) Program Implementation: DoD AT Standards, Level I Antiterrorism Awareness Training shall be completed by:
1. Completion of "Level I Antiterrorism Awareness Training" available at https://jkodirect.jten.mil/pdf/atl1/launch.html; or
2. Under the instruction of a qualified Level I Antiterrorism Awareness instructor; or
3. By providing a training certificate for "Level I Antiterrorism Awareness Training" training showing completion within the last calendar year.
The contractor will submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, prior to being granted access to a Federally controlled facility or military installation.
Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts, including subcontracts for commercial items, when subcontractor performance requires routine physical access to a Federally-controlled facility or military installation.
OPERATION SECURITY (OPSEC)
It is DoD policy according to DoD Directive 5205.02E, "DoD Operations Security (OPSEC) Program," June 20, 2012, as amended to establish and maintain OPSEC programs to ensure national security-related missions and functions are protected.
Training: Contractor employees shall comply with all DoD OPSEC requirements and complete "OPSEC Awareness for Military Members, DoD Employees and Contractor" training within 30 days of onboarding the contract and annual refresher training thereafter. Training shall be completed through a DoD sponsored and certified computer or web-based learning instruction available at https://securityawareness.usalearning.gov/opsec/index.
htm.
The contractor will submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after training is completed by all employees and subcontractor personnel.
START-UP PERIOD
All contractor resource onboarding documents must be submitted via the prime contractor. The prime contractor shall make all necessary preparations to assume full responsibility for productive performance as of the performance start date.
Definition of "productive":
a. OF-306 signed by contractor employee
b. FD-258 Fingerprint Card (Contingent upon availability of electronic fingerprinting submission)
c. Completed Electronic Investigation (e-QIP)
d. All contractor employees with need for a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .