RFQ-MFR - Updated.docx
DOCX document 30 KB Posted
- Solicitation number
- 12314423Q0166
About this file
This memorandum requests quotes for small grains area surveying and mapping services to be provided under a firm fixed price contract. The Department of Agriculture's Acquisition Management Branch is soliciting quotes by September 20th to conduct satellite imagery collection and mapping of designated agricultural areas. Evaluation will be based on technical acceptability and lowest price. Offerors must demonstrate relevant experience and provide two past performance examples for responsibility determination. The selected vendor will be required to fulfill all scope of work requirements detailed in the attached performance work statement. Award will be made to the technically acceptable lowest priced offeror, with the second lowest quote receiving a technical review if the lowest is found unacceptable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A01 PWS Small Grains Area Estimates Middle East_North Africa.docx | DOCX document | |
| 12314423Q0166.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 14, 2023
MEMORANDUM FOR SMALL GRAINS AREA SURVEYING AND MAPPING SRVICE REQUIREMENT
FROM: USDA, DM/OCP/POD/AMB, POD Acq. Mgmt.
Acquisition Management Branch-CO 301 S. Howes St., Suite 321 Fort Collins CO 80521-2795
SUBJECT: Request for Quote (RFQ)
1. This solicitation is issued as a Request for Quote for the attached requirements package for the Small Grains Area Surveying and Mapping Service Requirement
2. This is a Firm Fixed Price requirement, and your submitted quote should be based on the attached Performance Work Statement (Attachment 1). Award will be based on the Lowest Price Technically Acceptable (LPTA) as well as the Evaluation Factors listed on the next page.
3. All quotes must be submitted in English to the Contracting Officer listed below. The Offeror's UEI number, POC information, and all bundled services must all be listed in the details.
4. Response to RFQ should not exceed 15 pages.
5. Quotes are due no later than 10:00 am Central Standard Time (CST) 20 September 2023.
6. Offeror shall quote ALL requirements of this solicitation. Incomplete quotes will not be accepted.
7. This RFQ is not an authorization to begin performance, and in no way obligates the Government for any cost incurred by your company for this requirement. The Government reserves the right to cancel this RFQ at any time prior to award and is under no obligation to make an award as a result of this RFQ.
8. If you have questions, please email the Contracting Officer, Andrew Williams at Andrew.williams3@usda.gov .
ANDREW T. WILLIAMS, GS-13
Contracting Officer
Evaluation Criteria Template Lowest Price Technically Acceptable
Basis of Award:
A Lowest Priced Technically Acceptable procurement is being conducted. As such, award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for the non-cost factor. Each vendor must provide two examples of past performance. Past Performance history will be considered for responsibility determination purposes only (FAR 9.104-1(c). The evaluation factors are as follows:
Factor 1-Technical Factor 2-Price
Under the ‘technical factor,’ each offeror’s responses will be evaluated on a ‘pass/fail’ basis or ‘acceptable/unacceptable’ basis. This determination will be based on the offeror demonstrating in its proposal a technical solution that minimally meets the technical requirements specified in the Solicitation’s Statement of Work.
Factor 1 – TECHNICAL CAPABILITIES: Offerors must submit relevant information demonstrating technical capability to satisfactorily perform the requirements, as expressed in the Statement of Work in the solicitation.
Factor 2 – PRICE: Prices will be evaluated on the basis of price fairness and reasonableness.
*Note the government only intends on sending the lowest priced quote for technical evaluation. In the event that the lowest priced quote is found not acceptable, the second lowest quote will be sent for technical evaluation.
File details come from the government source that posted it. Updated .