RFQ Jib Crane Replacement 140R6021Q0002.pdf
PDF 909 KB Posted
- Solicitation number
- 140R6021Q0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R6021Q0002_Amd_0001.pdf | ||
| Amendment 1 - 140R6021Q0002_0001.pdf | ||
| Sol_140R6021Q0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
0009910061 CODE 16. ADMINISTERED BYCODE
X
X
X
333923
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORR60
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
12/02/2020 1700 MT
11/02/2020
928-718-3787Senthia Bruns (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140R6021Q0002
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 59 0040508606OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
Billings MT 59107
TELEPHONE NO.
17a. CONTRACTOR/
Helena MT 59602 7700 Canyon Ferry Road Canyon Ferry Bureau of Reclamation-GP-MTAO
15. DELIVER TO
Billings MT 59107 PO Box 36900 Regional Office Great Plains Region
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
1,250
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
Bureau of Reclamation
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
00010
Jib Crane Replacement for the Canyon Ferry Powerplant, per the attached Specifications.
Jib Crane Replacement for the Canyon Ferry Powerplant
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Senthia Bruns
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
1 AU $_________ $_______________
Jib Crane Structure Replacement RFQ 140R6021Q0002
JIB CRANE STRUCTURE REPLACEMENT
For the CANYON FERRY POWERPLANT
October 20, 2020
1.0 Background
The Canyon Ferry Powerplant jib crane structure is damaged and needs complete replacement. The jib crane is used to transport supplies from the generator floor to the lower powerplant turbine levels. This jib crane is an important piece of equipment necessary for powerplant maintenance especially when the overhead bridge crane is out of service for rehabilitation. Without the jib crane, powerplant staff will have to carry equipment and supplies down the stairwells which poses a significant safety hazard. Marked up drawings and pictures are provided to assist the contractor with this jib crane replacement.
2.0 Scope
The work to be performed under this contract consists of procuring, delivering and installing a replacement jib crane structure. To facilitate this installation, removal of the old jib crane structure will be required. The new jib crane structure shall be capable of being installed in the same location as the existing jib crane without disturbing other equipment. The contractor shall provide any necessary mounting hardware to attach the top of the new jib crane structure to the powerplant wall support column. Once the jib crane structure is installed, the contractor will be required to mount the existing hoist, load test and certify the complete assembly. Facility electricians will be available to provide electrical connection of the existing hoist once installed on the jib crane structure.
STATEMENT OF WORK
AND SPECIFICATIONS
1.0 Background
2.0 Scope
3.0 Objectives
4.0 Requirements
5.0 Delivery
6.0 Government-Furnished Property
7.0 Security
8.0 Place of Performance
9.0 Period of Performance
10.0 BOR Points of Contact
Jib Crane Structure Replacement RFQ 140R6021Q0002
3.0 Objectives
• Provide replacement jib crane structure drawings and any engineering approvals required to mount the new jib crane structure in the existing location.
• The government will review the drawings for accuracy, proper engineering approvals and compliance with crane standards (ASME/OSHA/CMAA). After government approval of drawings, procure new mast style jib crane structure and all necessary mounting hardware to replace the existing structure and deliver to site.
• Mobilize to site to remove the existing jib crane structure and install the new structure per the approved drawings.
• Install existing jib crane hoist on the new structure and load test per OSHA standard (29 CFR 1910). Contractor to provide the necessary test weights.
• Demobilize from site after successful load test and certification.
4.0 Requirements
The Contractor shall provide and install a new powerplant jib crane structure to replace the existing damaged jib crane structure. The new structure shall meet the following specifications:
• Indoor mast style jib crane
• 2-Ton capacity
• 15’0” span, 14’0” height under boom (+/- 3-inch).
• 360-degree rotation.
• Full Cantilever.
• Furnished with top and bottom mounting hardware.
• Compatible with existing hoist.
• Paint – yellow industrial enamel.
• Spanco 200 Series or equal.
The contractor shall provide all labor and materials to remove the damaged powerplant jib crane structure and install the new jib crane structure in the same location.
Installation drawings approved and signed by a professional engineer (P.E.) are required for this project. Engineering required to produce these drawings for the jib crane structure, including mounting brackets and hardware is the sole responsibility of the contractor. The new jib crane structure shall meet the requirements of OSHA 29 CFR 1910 and ANSI B30. The government will review and approve these drawings prior to commencing the onsite installation work.
In addition to the work listed above, the contractor will also be required to complete the following:
• Install the existing (1-ton) hoist on the new jib crane structure. The existing hoist is currently stored on the generator floor near the powerplant jib crane.
• Load test the new powerplant jib crane per OSHA standard (29 CFR 1910).
• Government electricians will make all electrical connections required to power the existing hoist once it is placed on the new jib crane structure.
Jib Crane Structure Replacement RFQ 140R6021Q0002
5.0 Delivery
The new powerplant jib crane structure shall be delivered and installed at the Canyon Ferry Powerplant located in Lewis and Clark County, approximately 18 miles East of Helena, Montana. The existing powerplant jib crane is located on the generator floor inside the confines of Canyon Ferry Power Plant. The Contractor is encouraged to perform a site visit to view the existing powerplant jib crane structure should there be any questions regarding the contract requirements. If a site visit is required, the Contractor shall submit a written request to the Government requesting a site inspection. The written request must be submitted, and government approval received, prior to the Contractor showing up on site for an inspection. All inspections are subject to the government’s availability. The contractor schedule shall be as follows:
• Approval drawings to the government for review (21 days after award).
• After Government approval, procure all necessary equipment and ship to site (6 weeks after government approval).
• Install and load test new powerplant jib crane structure/hoist (within 14 days of equipment arriving at site).
• Provide load test certification (7 days after completion of work).
CF Powerplant Shipping Address:
Bureau of Reclamation Canyon Ferry Powerplant 7700 Canyon Ferry Road Helena, MT 59602 Attn.: Budd Breining, Phone: (406) 475-3906
6.0 Government-Furnished Property
The only government-furnished property for this project is the existing powerplant jib crane hoist. Contractor will be responsible for mounting this hoist on the new jib crane structure and load testing the hoist/structure once assembled.
7.0 Security
Contractor will be allowed unescorted access through the powerplant gate to the powerplant door. The Contractor shall call the control room from the outside phone for access through the powerplant gate. Contractor access restriction will be at the powerplant door. Contractor personnel will be positively identified at the powerplant door.
Once the identity of the Contractor personnel is verified and the Contractor’s representative has signed on to the special work permit which defines the work area, the Contractor personnel will be allowed to move about the work area unescorted during allowable work hours. The allowable work hours as Canyon Ferry Powerplant are Monday through Thursday 7:00 a.m. to 5:30 p.m. The contractor personnel shall sign in and out of the powerplant visitor log every day. The visitor log is located in the control room.
Jib Crane Structure Replacement RFQ 140R6021Q0002
8.0 Place of Performance
The new powerplant jib crane structure shall be delivered and installed at the Canyon Ferry Powerplant located in Lewis and Clark County, approximately 18 miles East of Helena, Montana.
9.0 Period of Performance
The period of performance is anticipated to be 12 weeks from date of award.
10.0 Bureau of Reclamation Points of Contact
Contracting Officer (CO): US Bureau of Reclamation - GP-5000; Attn: Senthia Bruns, Contracting Officer; PO Box 30137, Billings, MT 59101, 928-718-3787 sbruns@usbr.gov
Technical Point of Contact (TPOC):
Bureau of Reclamation – Montana Area Office; Attn: Aaron Peterson (MT 606) 2900 4th Avenue North, Suite 501, Billings, MT 59101, (406) 247-7327 apeterson@usbr.gov mailto:sbruns@usbr.gov mailto:apeterson@usbr.gov
Jib Crane Structure Replacement Canyon Ferry PowerPlant RFQ 140R6021Q0002
CLAUSES
52.252-2 CLAUSES INCORPORATED BY REFERENCE - (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): FAR Clauses – https://www.acquisition.gov/far/
(End of clause)
GP-7 SITE SECURITY FEB 2004
(a) At least 10 days prior to arriving at the worksite, the contractor shall submit a list to the Contracting Officer (CO) of the names of all contractor employees that will be on-site initially. Additional employee names must be provided to CO prior to additional employees arriving on-site. The list(s) must include a legible photocopy of each employee's driver's license. In the absence of a driver's license, provide an alternate source of official identification that includes: First, Middle, Last Name; date and place of birth;
and place of residence. All contractor employees must be U.S. citizens or have a valid Immigrant Visa Number, Permanent Resident Card or Resident Alien Card authorizing them to work in the U.S.
(b) The contractor is hereby notified of the following:
The Government may perform background checks on any or all workers. If the Government performs background checks, workers shall be required to submit additional personal and work history information. The Government may deny access to any worker at any time, based on information discovered during the background check. Information related to criminal matters (e.g., outstanding arrest warrants) that is discovered during a background check will be reported to the appropriate authorities.
(c) At least 10 days prior to arriving at the worksite, the contractor shall submit an initial list to CO of all contractor vehicles to be brought to the worksite. A supplemental list shall be provided to CO before additional vehicles are brought on-site. For each vehicle the list shall include the year, make, model and color; and license plate numbers and state of issuance when applicable.
(d) Reclamation will provide keys and/or locks to gates and doors, etc. as necessary for contractor personnel to access points within the scope of this project. Any duplication of keys or substitution of locks is strictly prohibited. Contractor shall be accountable to secure and return all keys and/or locks provided by the Government and shall immediately notify the CO of the loss or misplacement of any provided key and/or lock.
(e) All drawings, plans, and other sensitive documents issued to the contractor shall remain under their direct control at all times. These sensitive documents shall not be reproduced or copied or further distributed without approval from CO.
(f) All firearms and dangerous weapons are prohibited in Federal facilities for all persons not specifically authorized by Title 18, United States Code, Section 930. A license to carry a concealed firearm issued http://www.acquisition.gov/far/ under state law is not an exception to this prohibition. This prohibition shall apply to all areas within the construction worksite and contractor use area.
(g) In case of an emergency situation, the contractor shall follow emergency instructions provided by
CO.
(h) Unless exempted by CO, the contractor shall comply with all security requirements already in place at the site, i.e., those security requirements that have been adopted as standard operating procedures at the site.
(i) The contractor shall report to the CO all incidents of criminal and/or suspicious activity observed by their employees on or adjacent to the construction site.
(j) Reclamation reserves the right to change or modify security requirements as mandated by the Office of Homeland Security and/or as deemed necessary by Reclamation security staff.
(k) Any violations of Reclamation security requirements and/or restrictions may result in Reclamation denying the contractor personnel access to the worksite.
(l) Cost - Include cost incurred for General Security Requirements in prices offered in the schedule for other items of work. In the event Reclamation changes of modifies these requirements after the contract is in place, increased Contractor costs will be paid for under the Contract Change Clause.
(m) Contractor shall notify the CO at least 24 hours in advance of any material delivery to worksite.
Material may only be delivered to areas approved by CO.
(End of Clause)
52.212-4 Contract Terms and Conditions-Commercial Items (OCT 2018)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include-
(i) Name and address of the Contractor;
(ii)Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v)Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi)Terms of any discount for prompt payment offered;
(vii)Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/52233-1-disputes#i1048610 https://www.acquisition.gov/content/52202-1-definitions#i1063244
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C.3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.-
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C.3903) and prompt payment regulations at 5 CFR Part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall-
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C)Affected line item or subline item, if applicable; and
(D)Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
https://www.acquisition.gov/content/52232-33-payment-electronic-funds-transfer-system-award-management#i1050674 https://www.acquisition.gov/content/52232-34-payment-electronic-funds-transfer-other-system-award-management#i1050705 http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/52212-5-contract-terms-and-conditions-required-implement-statutes-or-executive-orders-commercial-items#i52_212_5
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if–
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A)The date fixed under this contract.
(B)The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-
(A) The date on which the designated office receives payment from the Contractor;
(B)The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C)The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/content/33211-contracting-officer%E2%80%99s-decision#i1080268 https://www.acquisition.gov/content/32607-2-deferment-collection#i1081898 https://www.acquisition.gov/content/32608-2-interest-credits#i1081962
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml%3Bjsessionid%3D114A3287C7B3359E597506A31FC855B3
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) [Reserved]
(u) Unauthorized Obligations.
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
https://www.acquisition.gov/content/52212-5-contract-terms-and-conditions-required-implement-statutes-or-executive-orders-commercial-items#i52_212_5 https://www.gsa.gov/forms-library/solicitationcontractorder-commercial-items
(End of clause)
Code of Federal Regulations (CFR) 13 CFR § 121.406 – NON-MANUFACTURER RULE
(a) General. In order to qualify as a small business concern for a small business set-aside, service-disabled veteran-owned small business set-aside or sole source contract, HUBZone set-aside or sole source contract, WOSB or EDWOSB set-aside or sole source contract, 8(a) set-aside or sole source contract, partial set-aside, or set aside of an order against a multiple award contract to provided manufactured products or other supply items, an offeror must either:
(1) Be the manufacturer or producer of the end item being procured (and the end item must be manufactured or produced in the United States); or
(2) Comply with the requirements of paragraph (b), (c) or (d) of this section as a nonmanufacturer, a kit assembler or a supplier under Simplified Acquisition Procedures.
(b) Nonmanufacturers.
(1) A firm may qualify as a small business concern for a requirement to provide manufactured products or other supply items as a nonmanufacturer if it:
(i) Does not exceed 500 employees (or 150 employees for the Information Technology Value Added Reseller exception to NAICS Code 541519, which is found at § 121.201, footnote 18);
(ii) Is primarily engaged in the retail or wholesale trade and normally sells the type of item being supplied;
(iii) Takes ownership or possession of the item(s) with its personnel, equipment or facilities in a manner consistent with industry practice; and
(iv) Will supply the end item of a small business manufacturer, processor or producer made in the United States, or obtains a waiver of such requirement pursuant to paragraph (b)(5) of this section.
(2) For size purposes, there can be only one manufacturer of the end item being acquired. The manufacturer is the concern which, with its own facilities, performs the primary activities in transforming inorganic or organic substances, including the assembly of parts and components, into the end item being acquired. The end item must possess characteristics which, as a result of mechanical, chemical or human action, it did not possess before the original substances, parts or components were assembled or transformed. The end item may be finished and ready for utilization or consumption, or it may be semifinished as a raw material to be used in further manufacturing. Firms which perform only minimal operations upon the item being procured do not qualify as manufacturers of the end item.
Firms that add substances, parts, or components to an existing end item to modify its performance will not be considered the end item manufacturer where those identical modifications can be performed by and are available from the manufacturer of the existing end item:
(i) SBA will evaluate the following factors in determining whether a concern is the manufacturer of the end item:
(A) The proportion of total value in the end item added by the efforts of the concern, excluding costs of overhead, testing, quality control, and profit;
(B) The importance of the elements added by the concern to the function of the end item, regardless of their relative value; and
(C) The concern's technical capabilities; plant, facilities and equipment; production or assembly line processes; packaging and boxing operations; labeling of products; and product warranties.
(ii) Firms that provide computer and other information technology equipment primarily consisting of component parts (such as motherboards, video cards, network cards, memory, power supplies, storage devices, and similar items) who install components totaling less than 50% of the value of the end item are generally not considered the manufacturer of the end item.
(3) The nonmanufacturer rule applies only to procurements that have been assigned a manufacturing or supply NAICS code, or the Information Technology Value Added Resellers (ITVAR) exception to NAICS code 541519. The nonmanufacturer rule does not apply to contracts that have been assigned a service (except for the ITVAR exception to NAICS code 541519), construction, or specialty trade construction NAICS code.
(4) The nonmanufacturer rule applies only to the supply component of a requirement classified as a manufacturing, supply, or ITVAR contract. If a requirement is classified as a service contract, but also has a supply component, the nonmanufacturer rule does not apply to the supply component of the requirement. The rental of an item(s) is a service and should be treated as such in the application of the nonmanufacturer rule and the limitation on subcontracting.
(End of Clause)
WBR 1452.237-80 Security Requirements. BUREAU OF RECLAMATION (February 2017)
(a) General Security Requirements:
(1) This clause addresses security requirements, including general procedural requirements, information security requirements, contractor employee suitability requirements, identification card requirements, site security requirements, vessel exclusion barriers, and information technology security requirements.
Within this clause, COR means Contracting Officer's Representative. If there is no COR appointed and identified to the Contractor, the term instead will mean the Program Manager or any other authorized individual responsible for technical oversight under the contract. “Work site” means the Government facility, office, construction site, and any other area within the Government office or facility that the Contractor must access to accomplish work under this contract.
(2) The work performed under this contract shall only be accomplished by individuals (in the employment of the Contractor or any subcontractors) whose conduct and behavior is consistent with the efficiency of the Federal Service and the requirements of this contract, and who are acceptable to the CO. If Reclamation finds a Contractor employee to be unsuitable or unfit for his or her assigned duties, the CO will direct the Contractor to remove the individual from the contract and access to the Federal facility at which the contract activities are occurring.
(3) The Contractor’s employees governed by this contract may need access to sensitive information and/or sensitive areas. The Federal Government (Government) reserves the right, in its sole discretion, to determine suitability of Contractor personnel and deny access to any sensitive information or project specific area to any personnel for any cause.
(4) The Contractor is responsible for informing and ensuring compliance by its employees with any applicable security procedures of the Government facility where work may be performed under this contract.
(5) Any Contractor employee that will have access to a Federally-controlled facility or information system will be required to have a Government-issued identification card, consisting of a Personal Identity Verification (PIV) Card, a temporary identification card, or a visitor badge. (Note: within the Department of the Interior this card is known as a DOI Access Card.) During performance of the contract, the Contractor shall keep the COR apprised of any changes in personnel, or changes in personnel access or duration, to ensure that performance is not delayed by compliance with credentialing processes.
(6) A Contractor employee will not be provided access to a Government facility or information system until a Government PIV Card, temporary identification card, or visitor identification badge has been issued to the Contractor employee. For those individuals that will be receiving a PIV Card, the Government may, at its discretion, issue a temporary identification card or visitor identification badge after the electronic background investigation forms have been received and the investigation is initiated.
(7) All Contractor employees shall access the facility via the facility’s entry screening system and visibly display the Government-issued PIV Card, temporary identification card, or visitor identification badge at all times. Contractor employees must visibly wear the Government-issued identification card at all times they are on Government facilities. Contractor employees are responsible for the safekeeping of all Government-issued identification cards, whether on-site or off-site. Cards that have been lost, damaged, or stolen must be reported to the COR and DOI Access Sponsor within 24 hours. The Contractor shall return all identification cards and card keys and any other Government property and information upon completion of performance or when personnel depart permanently or for a period of 7 days or more.
The Contractor may be required to turn in access control cards or identification cards on a daily basis.
(8) Misuse or loss of access control or identification cards, or failure to comply with required surrender of such cards may, at Government discretion, result in Contractor personnel being denied access to the work site, at no cost to Government. The Contractor may be charged up to $500 for each occurrence for any required replacement of Government-issued access control or identification cards due to loss or misuse. At the end of contract performance, or when a Contractor employee is no longer working under this contract, the Contractor shall ensure that all access control and identification cards are returned to the COR.
(9) All Contractor personnel, including subcontractor personnel, with access to the work site shall be U.S. citizens or foreign individuals legally residing in, or legally admitted to, the U.S. For all non-U.S.
citizens working under this contract, irrespective of length of time working on the contract, the Contractor shall provide to the COR, legible and valid copies of the individual’s passport and visa (unless individual is on the Visa Waiver Program) a minimum of 14 calendar days prior to beginning work or arriving at the facility. A driver’s license is not acceptable identification. In addition, a completed form I-
94 shall be submitted to the COR upon the individual’s arrival at the work facility and prior to beginning work.
(10) The Contractor shall report all contacts with entities, individuals, and counsel/representatives (including foreign entities and foreign nationals) who seek in any way to obtain unauthorized access to sensitive information or areas. The Contractor shall report any violations of contract provisions, laws, executive orders, regulations, and guidance to the Contracting Officer (CO). The Contractor shall report any information raising a doubt as to whether an individual’s eligibility for continued employment or access to sensitive information is consistent with the interests of National Security and the Public Trust.
(11) Unsanctioned, negligent, or willful inappropriate action on the part of the Contractor (or its employees) may result in termination of the contract or removal of some Contractor employees from Reclamation facilities at no cost to the Government. These actions include, but are not limited to, exploration of a sensitive system and/or information, introduction of unauthorized and/or malicious software, inappropriate release of sensitive information, or failure to follow prescribed access control policies and/or security procedures. Failure to comply with Reclamation policies, procedures, or other published security requirements may result in termination of the contract or removal of some contracted employees from Reclamation buildings and/or facilities at no cost to the Government.
(12) All provisions of this clause shall equally apply to all subcontractors. The Contractor shall incorporate the substance of this clause in all subcontracts.
(13) These security requirements apply to all sections of this Contract including Contract Drawings and other Contract Specifications as applicable. Related documents include other general provisions of Construction or Operations and Maintenance type Contracts, including FAR clauses by reference or as amended by related documents.
(b) Information Security Requirements.
(1) Sensitive Information. The term “sensitive information” means any information which warrants a degree of protection and administrative control as defined by Reclamation or that meets the criteria for exemption from public disclosure set forth under Sections 552 and 552a of Title 5, United States Code:
the Freedom of Information Act and the Privacy Act. Sensitive information is generally categorized as FOR OFFICIAL USE ONLY (FOUO) information or CONTROLLED UNCLASSIFIED INFORMATION (CUI), but in some cases may include other unclassified information. (The protection of National Security information is beyond the scope of this clause. If any work on National Security information is required under this contract, it is addressed under other contract clauses.) The Contractor shall protect this type of information from unauthorized release into public domain, or to unauthorized persons, organizations, or subcontractors. Information which, either alone or in aggregate, is deemed sensitive by Reclamation shall be handled and protected in accordance with Reclamation directives and standards for identifying and safeguarding sensitive information (SLE 02-01), which is available from the COR or at http://www.usbr.gov/recman/DandS.html#sle.
(i) Any Government-furnished information or material does not become the property of the Contractor and may be withdrawn at any time. Upon expiration or termination of the contract, all documents released to the Contractor and any material created using data from such documents shall be returned to the COR for final disposition. Government-furnished information residing on any http://www.usbr.gov/recman/DandS.html#sle http://www.usbr.gov/recman/DandS.html#sle electronic systems (laptops, servers, desktops, media) shall be deleted from those systems using a COR-approved data erasure solution. Only with prior authorization from the CO may the Contractor retain the material. The Contractor or subcontractor shall not disclose or release the materials provided to the Contractor to any individuals of the Contractor's organization not directly engaged in providing services under the contract or that do not have a valid need-to-know. All technical data provided to the Contractor by the Government shall be protected from public or private disclosure in accordance with the markings printed on them. All other information relating to the items to be delivered or the services to be performed under this contract shall not be disclosed by any means without prior approval of the CO. Prohibited dissemination or disclosure includes, but is not limited to: permitting access to such information by foreign nationals or by immigrant aliens who may be employed by the Contractor, publication of technical or scientific papers, advertising, disclosure to Contractor staff not investigated and deemed acceptable at the appropriate information sensitivity level, and any other public release.
The Contractor shall maintain, and furnish upon request of the CO, records of the names of individuals who have access to sensitive material in its custody. All questions regarding information security, access, and control shall be referred to the COR.
(ii) The Contractor shall not release to anyone outside the Contractor’s organization any sensitive, or otherwise protected information, regardless of medium in which it is contained (for example, film, tape, document, electronic), pertaining to any part of this contract or any Reclamation program or activity, unless the CO has given prior written approval. This includes, but is not limited to, news releases, marketing promotions, articles, interviews, reports, social media posts, and any other media releases.
Requests for approval shall identify the specific information to be released, the medium to be used, the purpose for the release, and a description of the need-to-know. The Contractor shall submit its request to the CO ten business days before the proposed date for release. Subcontractors shall submit requests for authorization to release through the prime Contractor to the CO.
(iii) The Contractor shall notify the COR immediately when known or suspected loss/compromise of sensitive information or other documents, notes, drawings, sketches, reports, photographs, exposed film or similar information which may affect the security interests of Government has occurred. This requirement extends to employees and other personnel working on behalf of the Contractor, and expands responsibility to include prompt reporting of security issues, including observed or subsequently discovered efforts by unauthorized persons to gain unauthorized access to sensitive information.
(2) Classified Information.
(i) The disclosure of U.S. Government documents by third parties can result in damage to our national security. While this contract may not deal directly with classified information, each contractor is obligated to protect classified information pursuant to all applicable laws and to use Government information technology systems in accordance with agency procedures so that the integrity of such systems is not compromised.
(ii) Unauthorized disclosures of classified documents (whether in print, on a blog, or on websites, or other electronic or non-electronic media) do not alter the documents' classified status or automatically result in declassification of the documents. To the contrary, classified information, whether or not already posted on public websites or disclosed to the media, remains classified, and must be treated as such by Federal employees and contractors, until it is declassified by an appropriate U.S.
Government authority. Executive Order 13526, Classified National Security Information (December 29, 2009), Section 1.1.(c) states, "Classified Information shall not be declassified automatically as a result of any unauthorized disclosure of identical or similar information." Although the Department has taken steps to prevent access to publicly disclosed classified materials…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .