This Request for Qualifications is issued by the Cape Fear Public Utility Authority (CFPUA) in Wilmington, North Carolina, seeking a qualified engineering firm to provide professional services for gravity sewer repair and rehabilitation projects. The scope of work encompasses condition assessment, planning, design, preparation of bid documents and bidding assistance, construction administration and observation, and surveying services for two primary project areas: Area 1 (Park Avenue and surrounding streets) and Area 2 (N. 6th Street and surrounding streets), plus miscellaneous segments throughout the CFPUA collection system. The work will utilize cured-in-place pipe (CIPP) lining and related trenchless technologies, including pipe bursting, manhole rehabilitation, bypass pumping, flushing, cleaning, and pre/post-construction CCTV inspections. Statements of Qualifications must be received by 2:00 PM on August 6, 2026, and must not exceed 20 pages excluding cover page, table of contents, tabs, resumes, and appendices. Questions regarding the RFQ may be directed to Ben Guerrieri, Procurement Manager, at bids@cfpua.org until 2:00 PM on July 28, 2026. One engineering firm will be selected from this request, and the schedule will be determined for each task order.

Firms must demonstrate experience with gravity sewer rehabilitation and repair projects in active urban environments and must meet specific insurance requirements including General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Workers' Compensation ($500,000/$500,000/$500,000), Auto Liability Insurance ($1,000,000 per occurrence combined single limits), and Professional Liability (not less than $2,000,000 per loss). The Authority must be named as additional insured on applicable policies with required endorsements. All submitting firms must be properly registered with the Office of the Secretary of State of North Carolina. Qualifications will be evaluated based on firm experience, knowledge, familiarity with the typical scope of work, previous project experience, and references. SOQs must be submitted in PDF format (maximum 25MB) to bids@cfpua.org, and firms are responsible for confirming receipt. The CFPUA reserves the right to reject any and all submissions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUALIFICATIONS FOR

PROFESSIONAL ENGINEERING SERVICES IN SUPPORT OF GRAVITY SEWER

REPAIR AND REHABILITATION FOR CAPE FEAR PUBLIC UTILITY AUTHORITY

WILMINGTON, NORTH CAROLINA

July 7, 2026

GENERAL

The Cape Fear Public Utility Authority (CFPUA) is seeking a qualified engineering firm experienced in the repair and rehabilitation of gravity sewer infrastructure using cured-in-place pipe (CIPP) lining and related trenchless technologies. This repair and rehabilitation work may include, but not be limited to, condition assessment, planning, design, preparation of bid documents and bidding assistance, construction administration and observation, and surveying.

Potential tasks include:

• Professional engineering services associated with sanitary sewer pipe and manhole rehabilitation utilizing CIPP lining, point repairs (internal and by open cut), pipe bursting, manhole rehabilitation to include lining/insert technologies, etc. The sanitary sewer work will include bypass pumping, flushing, cleaning, pre/post construction CCTV inspections, etc. Selected engineering firm will coordinate with applicable CFPUA staff throughout the project and provide recommended action plans as necessary throughout construction. In the event that the infrastructure fails during the course of the work, the engineering firm may be required to perform emergency engineering services as required.

• Preparation of design, permitting, and bid documents, bidding assistance, construction administration and construction observation (CA/CO), closeout services including as-built preparation, etc. will be utilized for this project. CA/CO services shall consist of field observation, coordination, preliminary submittal review, preliminary pay request review, etc. The construction observer will report directly to the Engineer of Record.

• Experience with gravity sewer rehabilitation and repair projects in an active urban environment is required. Surveying, if necessary, will typically be manhole rim and inverts of all pipes entering and exiting the structure or equivalent shots on other linear infrastructure. Survey shall be conducted to the nearest tenth of a foot unless otherwise stated.

• For this project, it is anticipated that the CIPP contractor will be a licensed utility contractor and will self-perform the flushing, cleaning, CCTV, CIPP lining, etc.

The contract will include the repair and rehabilitation of gravity sewer infrastructure in different areas of the CFPUA collection system as outlined below:

• Area 1 - Park Avenue and surrounding streets. See Area 1 Figure (attached) for best available information on gravity main sizes and materials.

• Area 2 – N. 6th St. and surrounding streets. See Area 2 Figure (attached) for best available information on gravity main sizes and materials.

• Miscellaneous – There are known segments of gravity sewer pipe outside of Areas 1 and

2 that will likely be included with this project as well.

Prompt delivery and demonstrated accuracy is relevant to selection.

SUBMISSION OF QUALIFICATIONS STATEMENT

Consulting engineering firms are invited to submit a Statement of Qualification (SOQ) to the

CFPUA to be received no later than 2:00 PM on August 6, 2026. Submittals received after this deadline will not be considered.

CFPUA will address questions regarding the RFQ until 2:00 PM on July 28, 2026. Questions submitted after this time will not be addressed. Questions concerning this advertisement should be directed to Ben Guerrieri, Procurement Manager, Cape Fear Public Utility Authority, at bids@cfpua.org.

SOQs shall be limited to 20-pages or less, excluding cover page, table of contents, tabs, resumes and appendices.

Firms shall submit their statement of qualifications for consideration in .pdf format to bids@cfpua.org. Maximum file size for .pdf submission is 25MB. A reply will be sent to the email address submitting the statement of qualifications to confirm receipt. It is the submitting firms’ responsibility to confirm that CFPUA has received statement of qualifications via email. If email reply is not received from bids@cfpua.org, please call 910-332-6472 or 910-332-6651 before deadline for submission.

Submitted information shall comply with N.C.G.S. 143-64.31 through 64.34 (aka Mini Brooks

Act).

All SOQ’s will be evaluated by a CFPUA selection team.

One firm will be selected from this request for qualifications.

Firms submitting Qualifications are encouraged to carefully check them for conformance to the requirements stated herein. Qualifications that do not meet ALL the below listed requirements or are sent to any address other than those shown below, will be disqualified. No exception will be granted.

EVALUATION

Firms submitting Qualification Statements to perform the Engineering Services will be evaluated based upon the firm’s experience, knowledge and familiarity in engineering services for the typical scope of work as defined in the General section of this Request for Qualification, by demonstration with previous project experience, and references.

CFPUA projects are generally contained within New Hanover County, North Carolina. Firms submitting Qualification Statements to perform engineering services shall demonstrate their experience, knowledge and familiarity in typical work assignments as outlined above.

SCHEDULE

Schedule shall be determined for each Task Order.

REQUIREMENTS

Qualifying Statements shall include:

1. Firm name, address, telephone number, fax number, email address, and contact person(s).

2. Year in which the firm was established and any former names under which the firm operated.

3. Qualifications and experience of personnel who would be providing design services for the project(s) by providing:

a. A list of design projects demonstrating experience/understanding of the experience described in the General section above. Project information shall include:

i. a summary of the scope of work and deliverables,

ii. the owner of the project, and

iii. the name, number, and email of a reference for the project.

The following criteria will be deemed necessary for selection:

• The firm must meet the following insurance requirements. Workers’ Compensation may be waived if firm has no employees.

• General Liability $1,000,000 per occurrence/$2,000,000 aggregate. Authority must be additional insured and endorsement required.

• Workers Compensation $500,000/$500,000/$500,000. Waiver of Subrogation against the

Authority and endorsement required.

• Auto Liability Insurance $1,000,000 per occurrence combined single limits applicable to claims due to bodily injury and/or property damage. Authority must be additional insured and endorsement required.

• Professional Liability not less than $2,000,000 per loss.

Any firm wishing to be considered must be properly registered with the Office of the Secretary of State.

NOTIFICATION

The selected firm will be notified by telephone and/or email.

The CFPUA reserves the right to reject any and all submissions.

Any questions concerning this advertisement should be directed to Ben Guerrieri, Procurement

Manager, Cape Fear Public Utility Authority, at bids@cfpua.org by July 28, 2026, at 2:00 PM.

END

Wrightsville Ave

41 ft

Wrightsville Ave Fo re st H il l s D r

Park Ave

Cambridge Dr

Pr in ce to n D r

In de pe nd en ce B lv d

Panera Bread Moe's

Southwest Grill

Jen n in gs

D r

Ros em on t A ve

O rc ha rd Av e

Winston Blvd

D ec at ur D r

La rc hm on t D r

M cD on al d D r

S th St

Fl or al Pk wy

W rightsville

Ave

Wilshire Blvd

Caswell St

Casw ell S t

Je nn in gs D r

Park Ave

La ti m er D r

Bo nh am Av e

Au du bo n Bl vd

Garden Ave

Ro se mo nt Av e

Stratford Blvd

Winston Blvd

Br ya n Av e

Pa ge Av e

Hobby Lobby

Hanover Center

Virginia Pearson Empie

Park

Au du bo n Bl vd

Fo rd ha m Rd

S st St

S st St

Spirea Dr

Gillette Dr

Edgewood Rd

Sylvan Dr Halifax

Rd

Park Ave

S th St

Li nc ol n Rd

Co pl ey Rd

Cherry Ave

Ox fo rd Rd

Oleander Dr

Chipotle

Books-A-Million

Flaming Amy's Burrito Barn

Wi ns to n Bl vd

41 ft

Wilshire Blvd

M on tc la ir Dr

W rightsville

Ave

S 4 3r d St

Bo nh am Av e

Winston Blv d

Cedar Ave

Pa ge Av e

38 ft

Park Ave Peachtree Ave

S nd St

S rd St

Cherry Ave

S th St th St 117

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2 !!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2 !!2

!!2

!!2!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2!!2

!!2

!!2

!!2 !!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2 !!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2 !!2

!!2

!!2!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2!!2 !!2

!!2 !!2

!!2

!!2!!2

!!2

!!2

!!2 !!2!!2

!!2

!!2

!!2

!!2 !!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2 !!2

!!2 !!2

!!2 !!2

!!2!!2

!!2

!!2

!!2

FY27 Gravity Sewer Rehabilitation Area 1

N

0 1,000500 Feet

!!2 Manhole

Sewer Main (Gravity)

Material

? Cast Iron Pipe

? Ductile Iron Pipe

? PVC

? Vitrified Clay Pipe

? Unknown

Diameter (in) Length (LF)

4 106

8 31356

10 1540

This data is from GIS sources. The accuracy can not be guaranteed and should not take the place of a field survey, Nu tt St

Cowan St

Wilson Center

Pier 33 Apartments

Skyline Center

Best Western Plus Coastline

Inn

Wilmington Convention Center

CFCC Joe and Barbara Schwartz Center

Smiths Creek

N 6th

St

M cR ae

StCompton St

Jel W ade

D r

Ca st le Ha yn e R d

H il ton

Rd

Wilmington Police

Department

49 ft

Davis St

N 6th

St

N 7th

St

N 7th

S t Bess St

Hanover St

Taylor St

M cRae

St

N 8th

St

Nixon St

Swann St

Brunswick S t

Bladen St

N 5th

A ve

N 3rd

St

Belle Vue Wilmington

53 ft

N 8th

St

N 10th

St

Rankin St

Campbell St

Red Cross S t

N 3rd

St

Family Fare Burnett-Eaton Museum

Foundation 3.8 (9)

Sm iths Creek

N th St

Fanning St

N th St

Hall St

Hanover St

Rankin St

N th St

N th St

N th St

!!2

!!2 !!2

!!2

!!2!!2 !!2 !!2

!!2

!!2

!!2!!2

!!2!!2 !!2!!2 !!2 !!2!!2 !!2!!2

!!2

!!2 !!2 !!2 !!2

!!2!!2 !!2 !!2 !!2

!!2

!!2

!!2 !!2 !!2

!!2

!!2 !!2 !!2!!2 !!2

!!2 !!2 !!2!!2

!!2 !!2

!!2

!!2!

!2

!!2 !!2 !!2

!!2

!!2

!!2

!!2!!2 !!2

!!2

!!2

!!2

!!2!!2

!!2

!!2

!!2

!!2

!!2

!!2 !!2

!!2

!!2 !!2

!!2!!2 !!2 !!2!!2!!2 !!2!!2!!2 !!2 !!2

!!2!!2!!2

!!2 !!2

!!2 !!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2!!2 !!2

!!2

!!2 !!2!!2!!2

!!2 !!2

!!2 !!2!!2 !!2!!2 !!2!!2 !!2!!2 !!2 !!2 !!2!!2!!2 !!2

!!2!!2 !!2!!2 !!2!!2 !!2!!2

!!2!!2 !!2 !!2 !!2

!!2 !!2

!!2

!!2!!2!!2!!2

!!2!!2!!2!!2!!2 !!2!!2 !!2!!2!!2!!2!!2!!2

!!2

!!2

!!2 !!2!!2!!2!!2

!!2

!!2

!!2

!!2

!!2!!2 !!2

!!2

!!2 !!2!!2

!!2

!!2

!!2

!!2

!!2

!!2 !!2

!!2 !!2!!2!!2!!2!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2 !!2

!!2 !!2

!!2!!2

!!2

!!2 !!2!!2 !!2!!2 !!2

!!2

!!2

!!2!!2 !!2!!2 !!2

!!2

!!2

!!2

!!2

!!2

!!2 !!2

!!2

!!2

!!2

!!2

!!2!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2

!!2!!2!!2

!!2

!!2

!!2

!!2

!!2 !!2

!!2

!!2 !!2

!!2

!!2

!!2

!!2 !!2

!!2 !!2

!!2 !!2

!!2 !!2

!!2

FY27 Gravity Sewer Rehabilitation Area 2

N

0 1,000500 Feet

!!2 Manhole

Sewer Main (Gravity)

Material

? Cast Iron Pipe

? Ductile Iron Pipe

? Polyvinyl Chloride Pipe

? Vitrified Clay Pipe

Diameter (in) Length (LF)

4 145

6 4501

8 48857

12 758

14 40

16 34

20 1719

21 25

24 4092

30 330

36 347

This data is from GIS sources. The accuracy can not be guaranteed and should not take the place of a field survey,

FY27 Gravity Sewer Rehab_A1_A2 (attachments for RFQ).pdf
Area 1.pdf
Area 2.pdf

File details come from the government source that posted it. Updated .