The Town of Davidson, North Carolina has issued a Request for Qualifications (RFQ) for engineering services related to the Fisher Farm to Narrow Passage Greenway project. The RFQ seeks to select an engineering firm to provide survey, design, environmental assessment, permitting, bidding, and construction administration for an approximately 1/2-mile greenway segment connecting the existing greenways at Fisher Farm and Narrow Passage neighborhood. Key dates include the RFQ issue on Monday, April 28, 2025, proposal submissions due by Friday, May 30, 2025 at 2 PM, firm selection by Friday, July 11, 2025, and contract/notice to proceed by Friday, August 1, 2025.

The town will evaluate proposals based on a scoring system: 50% for experience in similar projects, 25% for firm and consultant experience, 15% for proposed design approach and timeline, and 10% for Minority and Women Owned Business Enterprise (MWSBE) participation. Respondents must submit an electronic proposal including detailed information about the firm, project team, previous greenway projects, design approach, timeline, and MWSBE participation. The selected firm must be licensed in North Carolina, and the town reserves the right to reject any proposals or request additional information. If negotiations are unsuccessful with the first selected firm, the town will initiate negotiations with a second firm.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUALIFICATIONS

by Town of Davidson, NC for Engineering Services for the Fisher Farm to Narrow Passage Greenway

Introduction: In accordance with North Carolina General Statutes Section 143-64.31, the Town of Davidson requests qualifications from engineering firms for the design of a greenway segment. The Town of Davidson anticipates awarding a single contract for the services required.

Project Description: The Fisher Farm to Narrow Passage Greenway is an approximately 1/2-mile planned section connecting the existing greenway at Fisher Farm to the existing greenway at the Narrow Passage neighborhood to the east. This segment is part of the greater West Branch Rocky River Greenway system. The selected firm will provide survey, design, environmental assessment, permitting, bidding, and construction administration for the project.

Project Schedule: The following are preliminary milestone dates for this project:

TASK DUE DATE

RFQ ISSUE Monday, April 28, 2025 PROPOSALS DUE Friday, May 30, 2025

FIRM SELECTION & NOTIFICATION Friday, July 11, 2025 CONTRACT AND NOTICE TO PROCEED Friday, August 1, 2025

Qualifications Content: The qualifications submittal should provide background information about the firm, its employees, and its experience with related projects and related clients. It should cover the experience of the firm, as well as any consultants on the proposed firm’s project team. For the purposes of the RFQ, the term “Firm” shall refer to the prime respondent of this RFQ, or in other words, the firm with whom the Town of Davidson will contract. The term “consultant” shall refer to all consultants whom the prime respondent will include on the project team. The proposal shall clearly delineate any experience, background, etc. between the prime “firm” and “consultants.”

Specifically, the proposal should address the following information:

1: Firm profile listing: name, address, year established, type of ownership, size of firm and staff. If the firm has multiple offices, please list where the work for this project will be performed (1 page).

2: An organizational chart of the firm project team and consultants (1 page).

3. Profiles of the firm’s project team (up to 10 pages).

4: Team’s experience in greenway projects, including cutsheets of similar projects. Cutsheets must include project location, budget, completion date or status, owner contact, and a description of the project. Do not use list format. Projects can be included by consultants and must be identified as such (up to 10 pages).

5: Proposed design approach narrative for this project (1 page).

6: Proposed timeline if accepted starting July 2025 (1 page).

7. Proposed Minority and Women Owned Business Enterprise participation (1 page).

8. List of any pending or settled lawsuits or professional liability claims in which the firm was involved during the past ten (10) years (1 page).

9: Additional information the respondent believes to be relevant to the selection efforts of the Town of Davidson (up to 2 pages).

10. Attachment A and Attachment B.

Proposal Submission: Submit one (1) electronic copy of the proposal, including Attachment A & Attachment B, by FRIDAY, MAY 30, 2025, at 2 PM. No submittals will be accepted after this time.

Submit Proposals to:

Town of Davidson Jesse Bouk, Public Works Director jbouk@townofdavidson.org

All questions regarding this package or project shall be emailed to Jesse Bouk at jbouk@townofdavidson.org.

In order that the selection process is as objective as possible, do not contact any Town of Davidson officials other than noted above.

Evaluation: The town will generally evaluate proposals based on the following scoring:

• Experience of the firm and consultants 25%

• Experience in similar projects 50%

• Proposed design approach and timeline 15%

• MWSBE participation 10% mailto:jbouk@townofdavidson.org mailto:jbouk@townofdavidson.org

General Comments:

1: Any cost incurred by respondents in preparing or submitting a proposal for the project shall be the respondents’ sole responsibility.

2: Ownership of all data, materials and documentation originated and prepared for the Town of Davidson pursuant to the RFQ shall belong exclusively to the Town and be subject to public inspection in accordance with the Freedom of Information Act. Trade secrets or proprietary information submitted shall not be subject to public disclosure under the Freedom of Information Act; however, the respondent must invoke the protections of the appropriate section of the Code of North Carolina, in writing, either before or at the time the data or other materials are to be protected and state the reasons why protection is necessary. The proprietary or trade secret material submitted must be identified by some distinct method such as highlighting or underlining and must indicate only the specific words, figures, or paragraphs that constitute trade secret or proprietary information. The classification of an entire document, line-item prices and/or total costs as proprietary or trade secrets is not acceptable and will result in rejection of the proposal.

3: The Town of Davidson reserves the right to reject any or all packages received or to request additional information as may be needed to determine qualifications.

4. Following the selection of a design-build firm by the Town of Davidson, a contract will be negotiated for services. If negotiations are unsuccessful with the first firm selected, a second firm will be selected, and negotiations initiated.

5. The firm must be licensed in North Carolina.

Attachment A

TOWN OF DAVIDSON

NORTH CAROLINA

REQUEST FORM

FOR

ENGINEERING SERVICES

Date:

Firm Name:

Address:

Contact Person:

Phone #:

Email address:

Authorized Signee:

Print Name:

Print Title:

Attachment B

REFERENCES

Respondent must supply three (3) references for clients for whom similar work was performed.

Reference Firm Name:

Contact: Phone#:

Nature of work performed: