RFQ - Engineering Services for 2025 RRF Upgrades Project.pdf
PDF 324 KB Posted
- Attached to
- School Buses State and local contract opportunity
- Solicitation number
- S-P34048-00013535
- Issued by
- Washington County, Barlow City, Oregon
About this file
This is a Request for Qualifications (RFQ) issued by the City of Pendleton, Oregon for professional engineering services related to the 2025 Wastewater Treatment and Resource Recovery Facility (WWT/RRF) Upgrades Project. The City seeks a qualified firm to complete the design phase of a nine-million-dollar CWSRF-funded project, with qualifications due by May 1, 2025, at 4:00 pm (PST). The project focuses on five primary areas: rehabilitation of the Secondary Digester Complex (including replacement of legacy piping and integration into the SCADA system), design specifications for the West Secondary Clarifier (based on completed East Secondary Clarifier specifications), construction of a new climate-controlled storage warehouse, structural repairs to the Chlorine Contact Chamber with heat recovery integration, and construction of a new Administration Building. The selected consultant will build upon approximately 30 percent of design work completed by Anderson Perry and is expected to work with the City's existing SCADA contractor, Control Systems Northwest, and the established Allen Bradley/Rockwell Automation control systems. The project assumes a work start date of July 2025 with a 3 to 5-year completion window, phased across multiple fiscal years.
Eligible firms must have experience with at least two municipal clients on complex system projects within the past five years, maintain a location within the Pacific Northwest within four-hour travel time from Pendleton, and provide certificates of required insurance coverage upon award. Proposals must include a letter of transmittal, project understanding and approach, experience and references (minimum three, with at least two including proposed key team members), a proposed project schedule aligned with fiscal years, insurance coverage statements, and resumes for key team members, with the main proposal not exceeding 20 pages. Selection will be weighted as follows: Technical Competence (20 percent), Project Team Experience and Capabilities (20 percent), Project Understanding and Approach (40 percent), Schedule (10 percent), and References (10 percent), with particular emphasis on experience with wastewater digestion systems, structural rehabilitation, SCADA integration, and facility design. Final deliverables include design drawings in AutoCAD and PDF format, specifications in Word and PDF format, and as-built drawings upon project completion. The City may select a single firm or multiple firms and will conduct interviews before final selection by City Council.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Notice of Intent to Use Cooperative over 250k.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUALIFICATIONS
Issue Date: April 9, 2025
For: Engineering Services for 2025 RRF Upgrades Project
Submittal Deadline: May 1, 2025, 4:00 pm (PST)
Mailing Address: City of Pendleton
Attn: Public Works RRF 500 SW Dorion Ave
Pendleton, OR 97801
Contents General Overview
Areas of Focus
Digester Complex
West Secondary Clarifier
Storage Warehouse
Chlorine Contact Chamber
Administration Building
Consultant Qualifications
Instructions for Qualifications Submittal
Proposal Submittal
Contents
Selection Criteria
Scoring Criteria
Materials provided upon request
Contact Information
Final Project Deliverables
Professional Services for 2025 RRF Upgrades Project
General Overview
The City of Pendleton, Oregon invites qualified firms to submit qualifications for professional services for Wastewater Treatment & Resource Recovery Facility (WWT/RRF) projects related to wastewater treatment infrastructure.
The City applied for and received a nine-million-dollar loan from the CWSRF to complete this project. Where possible, the City also seeks consultant support in identifying and securing additional funding to enhance the RRF Upgrades Project.
City staff require professional services to complete the design phase of the loan-funded work. The City previously contracted with Anderson Perry (AP) to initiate this project. AP has completed approximately 30% of the design; the selected firm will be responsible for completing the remaining design work based on AP’s deliverables.
This project addresses deficiencies identified in the June 2020 WWTRRF Facility Plan Update, Volume 1, Section 6.3.12, and the extensive list outlined in Volume 2, Appendix G. The full document is available on the City website.
For all new and existing facilities since 2003, the City has sole-sourced the use of Allen Bradley standard controls, drives, PLC/MMI; and Rockwell software products via Rockwell Automation.
Our distributor is Columbia Electric Supply, or CES, located in Pasco, Washington. SCADA Contractor is Control Systems Northwest (CSNW).
Areas of Focus
Digester Complex
The upcoming project will focus on the rehabilitation of the aging Secondary Digester Complex, which has shown signs of structural settlement requiring corrective action. Planned improvements include the replacement of legacy piping and valves—some potentially dating back to the original 1942 installation—as well as enhancements to the mixing system and gas retention capabilities.
The project also entails full integration of all mechanical and process equipment into the SCADA system. A ferric chloride dosing system will be installed, and a new boiler unit matched to existing equipment will be added. Improvements to the hot water loop will also be made.
West Secondary Clarifier The city is currently rehabilitating the east secondary clarifier and will provide those specifications and plans to the successful consultant to address the west secondary clarifier.
Storage Warehouse The City will construct a new storage facility with climate control and hydrogen sulfide-free environment for safe storage of parts, safety equipment, and chemicals.
Chlorine Contact Chamber
This includes structural concrete repairs, elastomeric seal reestablishment, and integration of a heat recovery system for green infrastructure. An expanded final effluent sampling shed will be constructed, and an existing shed may be relocated to support this need.
Administration Building
The new building will include office space, breakroom, operations room, conference room, and locker rooms. Efficiency upgrades are also planned for the current office and laboratory building.
Consultant Qualifications
Eligible firms must meet the following criteria:
• Experience with at least two municipal clients involving complex system work within the past five years
• Located within the Pacific Northwest and within a four-hour travel time from Pendleton
• Carry required insurance coverage; certificates must be provided upon award
Instructions for Qualifications Submittal
Proposal Submittal
One original and five (5) copies of the qualifications packet must be received by 4:00 pm (PST), May 1, 2025, at:
City of Pendleton RRF Attn: Jeff Brown, Public Works Director 500 SW Dorion Avenue Pendleton, OR 97801
Verification of receipt can be confirmed via email or by calling 541.966.0202.
Contents - The qualifications packet must be organized using the following outline:
• Letter of Transmittal
• Project Understanding and Approach
• Experience and References
• Proposed Project Schedule
• Insurance Coverage Statement
• Project Team Resumes
• The main proposal (excluding the transmittal letter) must not exceed 20 pages.
• Letter of Transmittal (1–2 pages):
o Company name and expertise o Office address and contact information o Name of point of contact and Project Manager
• Proposal Body (Max 20 pages):
• Understanding and Approach o Description of project understanding and relevant experience o Work with municipal public works and IT staff (SCADA) o Work methodology and scope of work suggestions (if any)
• Experience and References o Descriptions of similar past projects, including at least two completed within the past five years o Include key personnel bios and their roles in each project o Describe project management strategy and coordination approach o For each project, provide a point of contact with title, phone number, and email
• Project Schedule(s) o Completion schedule for each phase o Phasing aligned with fiscal years o Assumes work start in July 2025 with a 3 to 5-year completion window
• Insurance Coverage Statement o Description of all required insurance coverage
• Resumes o Resumes for each key project team member
Selection Criteria The City may select a firm based on qualifications specific to wastewater treatment and any additional criteria it deems necessary. The City may interview project managers before making a selection. Awarding work to multiple firms may be considered.
City staff will rank proposals and notify firms at least one week before Council consideration.
Following Council confirmation, staff will negotiate work orders, salary schedules, project timelines, and budgets with the successful firm(s).
Scoring Criteria
20% – Technical Competence
• Wastewater digestion system design
• Structural and mechanical rehabilitation of aging plant infrastructure
• Additional relevant municipal wastewater treatment experience
20% – Project Team Experience and Capabilities
• Qualifications and experience of Point of Contact, Project Manager(s), Leads, and key team members
• Clearly defined roles and past collaboration with proposed subcontractors
• Demonstrated success working as an integrated team
40% – Project Understanding and Approach
• Demonstrated understanding of project goals and challenges
• Effective work strategy, including coordination with City staff and existing contractors (e.g., AP, CSNW)
• Experience integrating process systems with SCADA and standard controls (Allen Bradley/Rockwell)
• Capability to manage both process infrastructure and associated facility design (e.g., admin, lab, and operations buildings)
• Relevant examples from similar past projects
10% – Schedule
• Ability to meet time constraints and align with phased funding
• Availability of personnel and support services
• Realistic and structured project timeline
10% – References
• Minimum of 3 professional references, 2 of which must include proposed key team members.
• Include name, facility, contact name, phone, and email (if available)
Materials provided upon request o June 2020, WWTRRF Facility Plan Update https://www.pendletonor.gov/media/8101 o CWSRF Loan application o August 2024 Preliminary design report (Anderson Perry) o 30% design drawings (Anderson Perry) o 1942, 52, 72, and 2010 Plant drawings
Contact Information
• Jeff Brown, Public Works Director jeff.brown@pendletonor.gov 541-966-0202
• Kyle Willman, RRF Superintendent kyle.willman@pendletonor.gov 541-276-3372
• Keri Standley, PW Office Specialist keri.standley@pendletonor.gov 541-966-0202
Final Project Deliverables
Please be aware that the final project must include these deliverables:
• Design drawings in AutoCAD and PDF format
• Specifications in Word and PDF format
• As Build final/completed drawings in AutoCAD and PDF