RFQ.pdf

PDF 940 KB Posted

Attached to
MK22 Seal Rings Federal contract opportunity
Solicitation number
N0017423Q0016
Issued by
Department of the Navy Naval Sea Systems Command

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

N0017423Q0016 09-Jan-2023 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

SEE SCHEDULE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

NSWC IHD C02

4081 N. JACKSON RD

BLDG 841

INDIAN HEAD MD 20640-5116

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

13-Feb-2023(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

301-744-6544JODI L. FIELDS

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 10 Each (FAT) Seal Ring 458163

FFP

FOB: Destination

PSC CD: 5342

NET AMT

0002 1,600 Each Seal Ring 458163

FFP

PSC CD: 5342

0003 1 Data

Records

CDRL A001

FFP

Test/Inspection Report

Final Dimensional Inspection Report is due simultaneous with delivery of production units. Government has 15 working days from receipt of draft to review and comment. The Contractor has 10 working days from receipt of Government comments to submit revisions. If the Government does not submit revision request within 15 working days, draft submittal is approved.

Submit via e-mail in Microsoft Office or PDF format to the e-mail recipients listed below.

DISTRIBUTION ADDRESSEE -

Rockets/CAD/PAD Manufacturing Division

NSWC IHEODTD

Attn: Donna Tibbs , Indian Head, MD 20640-5088 Donna Tibbs donna.l.tibbs.civ@us.navy.mil

0004 1 Data

CDRL A002

Certificate of Compliance

Final Dimensional Inspection Report is due simultaneous with delivery of production units. Government has 15 working days from receipt of draft to review and comment. The Contractor has 10 working days from receipt of Government comments to submit revisions. If the Government does not submit revision request within 15 working days, draft submittal is approved.

Submit via e-mail in Microsoft Office or PDF format to the e-mail recipients listed below.

DISTRIBUTION ADDRESSEE -

Rockets/CAD/PAD Manufacturing Division

NSWC IHEODTD

Attn: Donna Tibbs 4522 McMahon Road Bldg. 116, Suite 100 Indian Head, MD 20640-5088 Donna Tibbs

0005 1 Data

CDRL A003

Certification/Data Report

Certificate of Analysis is due simultaneous with delivery of production units. Government has 15 working days from receipt of draft to review and comment. The Contractor has 10 working days from receipt of Government comments to submit revisions. If the Government does not submit revision request within 15 working days, draft submittal is approved.

Submit via e-mail in Microsoft Office or PDF format to the e-mail recipients listed below.

DISTRIBUTION ADDRESSEE -

Rockets/CAD/PAD Manufacturing Division

NSWC IHEODTD

Attn: Donna Tibbs 4341 Carpenter Road Building 1685 Indian Head, MD 20640-5088 Donna Tibbs

Section C - Descriptions and Specifications

STATEMENT OF WORK

MANUFACTURING OF HARDWARE USING NSWC IHD DRAWINGS

PERFORMANCE WORK STATEMENT

1.0 Scope of Work

The requirements in this document contain the information necessary to manufacture hardware for assembly in fleet-deliverable Aviation Critical Safety Items (ACSIs) at Naval Surface Warfare Center Indian Head Division (NSWC IHD).

2.0 Applicable Documents

MK22 - CDRL_A001_Inspection MK22 - CDRL_A002_CoC MK22 – CDRL_A003_CoA 458163 REV P – Seal Ring MIL-STD-2073-1 REV E – Department of Defense Standard Practice for Military Packaging

A-A-59588 Rev B – Commercial Item Description: Rubber, Silicone

N0017423Q0016

2.1 General Specifications

American National Standards Institute (ANSI)/American Society for Quality (ASQ) Standards:

ANSI/ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes

Code of Federal Regulations (CFR):

22 CFR 121 The United States Munitions List 22 CFR 122 Registration of Manufacturers and Exporters

Department of Defense (DoD) Directives:

5230.25 Withholding of Unclassified Technical Data From Public Disclosure

International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:

ISO 9001 Quality Management Systems ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration

Laboratories

2.2 Technical Drawings

Department of Defense Drawings:

458163 REV P – Seal Ring

2.3 Conflicting Document Requirements

If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.

3.0 Requirements

3.1 General Manufacturing

The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.

The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government’s sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor’s quality performance metrics.

3.2 Test and Inspection

The Contractor shall maintain and control processes to inspect and test components as described in this PWS. These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.

3.2.1 First Article Testing

The Contractor shall submit First Article Test (FAT) samples to the Government if the Contractor has not provided contract deliverables for the same drawing numbers within the last 3 years.

The Contractor shall submit a first article sample of 10EA complete units prior to the first delivery of any production hardware. The first article units shall be fully representative of those proposed for production, and demonstrate the adequacy and suitability of the Contractor's processes and procedures in complying with the requirements set forth by the drawings and specifications.

Any production by the Contractor before formal acceptance of the first article sample shall be at the Contractor’s cost risk.

3.2.2 Dimensional Inspection

The Contractor is responsible for performing in-house inspections to ensure each production component and dimension conforms 100% to the contract, PWS, and product dimensional requirements. The Contractor shall provide copies of in-process dimensional data and/or proof of inspections, such as floor shop travelers or final QA inspections, as requested by the Government.

The Contractor shall submit a Final Dimensional Inspection Report in accordance with DI- NDTI-80809 per CDRL A001 for each deliverable line item. The final dimensional inspection report shall include either a list of all drawing dimensions and tolerances, and their actual measured values, or a marked-up copy of the drawing with actual measured values written in red next to the corresponding dimension

3.2.3 Product Certification

The Contractor shall submit a certificate of compliance in accordance with DI-QCIC-81356 per CDRL A002 to accompany the shipment of each first article and production lot, as required by Table 3. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.

The Contractor shall submit a certificate of analysis/test in accordance with E-246-W001, found on Quality Assurance Requirements Form 4200/9 (AKA Form 16), per CDRL A003, showing the first article or production material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract, as required by Table 1. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one (1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:

Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:

“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”

Test Requirement

Certificate Dwg Location

Material 458163 REV P DWG Note #1 Analysis Visual 458163 REV P DWG Note #3 Compliance

Table 1: Certification Requirements

3.3 Quality Control

3.3.1 Quality System and Quality Control Processes

The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:2015 standards.

The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.

3.3.2 Calibration of Measuring and Testing Equipment

Measuring and testing equipment used by the contractor shall, at a minimum, adhere to the requirements of ISO/IEC 17025:2017.

3.3.3 Acceptance of Product

Final acceptance of first article samples and/or production deliverables will be determined by Government dimensional inspection and certification verification at Government destination for each deliverable line item. The Government shall complete sample testing within 60 days of receipt of all documentation and deliverables relevant to the relevant line item. Unless otherwise stated, the Government sampling plan shall be in accordance with Table 2. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability.

This may include testing at other facilities.

ASQ Z1.4 [ANSI/ASQ Z1.4-2003 (R2013) – October 2013]:

Critical: 100% Major: Level II Minor: Level I

Table 2: ACSI Sampling Plan

3.3.4 Government-Identified Nonconformity Reporting Procedures The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.

3.4 Export Control

The Contractor shall comply with either one, or both, of the export control options below.

3.4.1 International Trafficking in Arms Regulations (ITAR) Compliance The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR 122 to export Category III and IV munitions components, as defined by 22 CFR 121.

3.4.2 Joint Certification Program (JCP) Registration

The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD Directive 5230.25.

3.5 Preservation

The contractor shall package the seal rings in accordance to MIL-STD-2073-1, Method 33, in an opaque vacuum sealed bag. The contractor shall vacuum in accordance with MIL-STD-2073-1, Section G.4.3. Each bag of seal rings shall be labeled be original manufacturer, ring type/designation, batch number, cure date, and quantity per DWG. 458163 Rev P. All other requirements and methods shall be in accordance with applicable Form 43.

4.0 Deliverables

The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor’s representative authorized to make such certification.

CDRL Spec Section Title A001 DI-NDTI-80809 3.2.2 Final Dimensional Inspection Report A002 DI-QCIC-81356 3.2.3 Certificate of Compliance A003 E-246-W001 3.2.3 Certificate of Analysis

4.1 Hardware Delivery

The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.

The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.

Item Year Drawing Rev Nomenclature Qty UOI 1 Base 458163 P Seal Ring (FAT)

10 EA

2 Base 458163 P Seal Ring

1,600 EA

Delivery address provided below:

Naval Surface Warfare Center Indian Head Division ATTN: Wade Morgan/Robert Howell-Figueroa 4522 McMahon Road Bldg. 116, Suite 100 Indian Head, MD 20640

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-15 Certificate of Conformance APR 1984 52.246-16 Responsibility For Supplies APR 1984

CLAUSES INCORPORATED BY FULL TEXT

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)

[Contracting Officer shall insert details]

(a) The Contractor shall test unit(s) of Lot/Item as specified in this contract. At least calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within _____ calendar days from the date of this contract to _____ [insert address of the Government activity to receive the report] marked "FIRST ARTICLE TEST REPORT: Contract No. , Lot/Item No. " Within calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph

(b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(End of clause)

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)

(Contracting Officer shall insert details)

(a) The Contractor shall deliver 10 unit(s) of Lot/Item 0001 within 90 calendar days from the date of this contract to the Government at Bldg 116, Receiving Office for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

(b) Within calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor--

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraphs (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018)

The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:2015 “Quality Management Systems – Requirements” and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.

(End of text)

E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)

Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.

E-246-W005 SAMPLING OF RECEIVED MATERIAL – MAN-RATED MATERIAL (NAVSEA) (MAY 2021)

(a) When NAVSEA, Naval Surface Warfare Center Indian Head Division receipt inspects man-rated material under this contract for catapults, cartridge actuated devices, propellant actuated devices and their related component parts, the sampling plan utilized shall be as outlined in the applicable technical data package or as otherwise specified in other controlling documentation. If the sampling plan is not specified within any applicable controlling documentation, the sampling plan and the sampling size shall be as outlined by one of the following:

ASQ Z1.4 (ANSI/ASQ Z1.4 -2003 (R2018):

Critical: 100% Major: Level II Minor: Level I

MIL-STD-1916 (DTD 1 APR 96 with NOTICE 2 DTD 5 JUN 14):

Critical: Level V Major: Level II, N < 200 Level III, N > 200 Minor: Level I, N < 100 Level II, N > 100

(b) In all cases, the acceptance number of defects will be ZERO (0); the lot will be rejected for any defect unless specifically otherwise specified by the inspection type and code.

(c) Notwithstanding the above, NAVSEA, Naval Surface Warfare Center Indian Head Division may, at its discretion, accept a defect on an approved waiver on a case-by-case basis.

H-246-H001 CALIBRATION SYSTEM REQUIREMENTS (NAVSEA) (MAY 2022)

(a) Definitions:

(1) Test, Measurement, and Diagnostic Equipment (TMDE). Includes all devices used to measure, calibrate, gage, test, inspect, diagnose, or otherwise examine materials, supplies, and equipment to quantitatively or qualitatively determine compliance with specifications and tolerances, engineering drawings, technical orders, technical manuals, or use requirements and instructions.

(2) Calibration Standard. A measuring instrument or artifact used as a reference to establish and maintain the accuracy of other measuring instruments or artifacts. Calibration standards may be used to calibrate other standards of lesser accuracy or to calibrate test and measurement equipment directly.

(3) Calibration. The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

(4) Calibration Service Providers. Commercial calibration activities and other government agencies that provide calibration services to the Navy and Marine Corps as a major line of business.

(5) Commercial Service Providers. Suppliers of Navy test, measurement, and diagnostic equipment, including original equipment manufacturers, who may calibrate their own products but are not engaged in calibration as a major line of business, and other commercial laboratories that provide low volume, model specific, or unique parameter calibration services.

(6) Measurement Traceability. The property of a measurement result that can be related to a national or international measurement standard through a documented, unbroken chain of calibrations, each with a stated measurement uncertainty. Individual measurement results must be traced through an unbroken chain of calibrations to accepted references, such as: U.S. national standards such as, the U.S. Naval Observatory, ratio and consensus standards, natural physical constants, or the national standards of other countries correlated with U.S. national standards as held or directed by National Institute of Standards and Technology and Department of Defense (DoD) approved sources.

(7) The End of Period Measurement Reliability. The probability that all the applicable measurement quantities of a test, measurement, and diagnostic equipment are within tolerance at the end of the calibration interval assigned to the given test, measurement, and diagnostic equipment.

(8) Calibration Interval. The periodicity between calibrations that is assigned to achieve Navy end of period measurement reliability objectives for test, measurement, and diagnostic equipment.

(9) The Probability of False Acceptance. The probability that a test used to verify that a measurement quantity is within specified tolerances results in an incorrect acceptance decision.

(10) The Probability of False Rejection. The probability that a test used to verify that a measurement quantity is within specified tolerances results in an incorrect rejection decision.

(11) The Test Uncertainty Ratio (TUR). The ratio of the difference between the upper and lower tolerance limits for a measurement quantity subject to calibration, to the difference between the upper and lower 95 percent uncertainty limits for the measurement process used for calibration.

(b) Test, measurement, and diagnostic equipment and automatic test systems are used to monitor and test systems, equipment, devices, and the environmental conditions under which these systems and personnel operate. The accuracy of Navy and Contractor test, measurement, and diagnostic equipment and automatic test systems used for quantitative and qualitative measurements are ensured through measurement traceability. The Contractor is required to ensure that all test, measurement and diagnostic equipment used for quantitative or qualitative measurements is maintained and calibrated in accordance with U.S. national standards ANSI/NCSL Z540.3 Requirements for the Calibration of Measuring and Test Equipment, dated 3 Aug 2006 or ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration Laboratories (3rd Edition), dated 29 Nov 2017.

(c) Calibration certification to Navy standard NAVSEA 04-4734B, Navy and Marine Crops Calibration Laboratory Audit/Certification Manual, 1 Dec 2006, is acceptable in place of NCSL Z540.3 and ISO/IEC 17025:2017 accreditations. ANSI/NCSL Z540.3 and ISO/IEC 17025:2017 accreditations must be performed by an U.S.

headquartered accreditation body that is a signatory of the Navy Calibration Cooperative Agreement. Calibration accreditation must include the parameters required to execute the calibration at appropriate ranges and tolerances. A calibration certificate meeting the requirements of ISO/IEC 17025:2017 or ANSI/NCSL Z540.3 must be provided with the returned calibrated unit. The calibration certificate must be evaluated to confirm that the calibration was performed within the laboratory's accreditation scope. For activities certificated to NAVSEA 04-4734B, calibrations must be evaluated to confirm that the calibration was performed within the laboratory’s NAVSEA certification, and calibration event records shall be provided to the Government upon request. Calibration intervals that deviate from NAVSEA OD 45845, Metrology Requirements List (METRL), shall reflect TMDE end of period reliability greater than 85%. TMDE reliability data shall be provided upon request. TURs shall be greater than or equal to 4:1, or ensure a probability of false acceptance of 2% or less and a probability of false rejections of 15% or less.

Calibration procedures and methods used by the contractor shall be provided to the Government upon request.

(d) All calibrations supporting this contract shall meet the requirements of OPNAVINST 3960.16. If the Contractor subcontracts or outsources the initial or reoccurring calibration of test, measurement, and diagnostic equipment, the respective calibration laboratory must also meet the requirements of paragraphs (b) and (c).

(e) Calibration service providers and commercial service providers, and all of their employees, who supply or calibrate Navy test, measurement, and diagnostic equipment, shall be certified or accredited to the requirements of the NAVSEA manual or the ISO or ANSI specifications cited in paragraphs (b) and (c).

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

0003 N/A N/A N/A N/A

0004 N/A N/A N/A N/A

0005 N/A N/A N/A N/A

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984

Section G - Contract Administration Data

252.232-7006 Wide Area WorkFlow Payment Instructions DEC 2018

E-246-W001 CERTIFICATE OF ANALYSIS (NAVSEA) (OCT 2018)

(a) A certificate of analysis/test showing that the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract shall be submitted to the COR or TPOC. The certificate shall be maintained by the contractor for a minimum of one (l) year; one (1) copy to accompany the shipment (in the packing list envelope) and one (1) copy mailed at time of the shipment (mark the certificate to the attention of: Code 00Q).

(b) Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:

This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.

(c) Beneath the signature include the typed name of the individual signing this certificate.

(d) Certificate for shipments of bulk chemicals shall state contract number, drawing or specification number, lot number, rail car number if shipped by rail or trailer number if by truck, and the date of shipment.

(e) Any demurrage accrued as a result of detaining commercial carriers because of nonreceipt of the certificate shall be the responsibility of the Contractor.

(f) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.

(g) The certificate shall read as follows:

I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies have been sampled and/or tested and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.

Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________ Title: ___________________________________________

G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN 2019)

(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal.

Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.

(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.

G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021)

(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods.

Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor’s expense with no cost or liability to the U.S. Government.

(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link:

https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.

(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.

(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company’s established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.

(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.

(f) The hours of operation are as follows:

AREA FROM TO

Bldg 116 0730-1130 and 1230-1530

(g) All deliveries to the Receiving Officer, Bldg 116 , shall be made Monday through Friday from 0730-1130 to 1230-1530, local time. Deliveries will not be accepted after 1530. No deliveries will be accepted on federal government holidays.

Section H - Special Contract Requirements

VPP

1. Voluntary Protection Program:

1.1. In August 2006, Indian Head Division (IHD) Naval Surface Warfare Center (NSWC) was nominated to participate in the DoD Voluntary Protection Program Center of Excellence Implementation Initiative of the Defense Safety Oversight Council (DSOC). The Voluntary Protection Program (VPP) was established by the Occupational Safety and Health Administration (OSHA) in 1982 to recognize and promote effective worksite-based safety and health management systems. IHD NSWC, through the utilization of VPP, desires to be a model of safety and health excellence. VPP's emphasis on trust and cooperation between OSHA, the employer, employees, employees representatives, and contractors complements the Agency's enforcement activity but does not take its place. All parties, including Contractors, are to work together to identify and resolve any safety and health problems that may arise, yet obtain Contracting Officer approval of any changes that would impact the terms of the contract. IHD NSWC as the VPP participant develops and implements systems to effectively identify, evaluate, prevent, and control occupational hazards so that injuries and illnesses to employees and contractors are prevented. Contractor and sub-contractor personnel are subject to occupational safety and health oversight. This oversight will be accomplished by IHD NSWC personnel and Contracting Officers. Contractors, sub-contractors, and their employees, while in performance of a contractual action on-site within the geographical boundaries of Naval Support Facility (NSF) Indian Head, shall be subject to the requirements of the IHDIVNAVSURFWARCENINST 5100.22, “Safety Manual” regardless of the type or duration of the contract.

Appendix 13-A, of the chapter 13 entitled “Contractor Safety Requirements When Performing Work at the Naval Support Facility (NSF) Indian Head, MD” shall be signed by the Contractor prior to commencement of services on-site at NSF Indian Head. The Contractor shall maintain one signed copy for future reference in educating its personnel and sub-contractors. A second signed copy shall be provided to the Contracting Officer to be maintained in the contract file. If an occupational safety or health related injury or illness occurs during the performance or as a result of this contractual action, the Contractor shall notify the Contracting Officer Representative (COR) as soon as practicable, who will notify the Safety Office and the Contracting Officer. 1.2 In support of VPP and in compliance with Chapter 13 of the Safety Manual, entitled “Contractor Safety,” all Contractors performing on-site at NSF Indian Head shall comply with the following:

1.2.1 Public Law 91-596 (and Amendments), also known as the Occupational Safety and Health Act of 1970, establishes that all employers, including Contractors, are responsible, as far as possible, for providing every employee a safe and healthful working environment. All employers, including Contractors, shall conform to the standards as issued by OSHA. Contractors are responsible for complying with safety requirements specified in the contract as well as all Federal, State, and local safety and security regulations. Non-compliance may be cause for the removal of a Contractor or any Contractor employee from the activity and such non-compliance may form the basis for contractual action, up to and including termination for default.

1.2.2 Contractor personnel shall participate in basic safety awareness and hazard identification training offered by the Government activity at the work area they are supporting. Contractors performing on-site shall attend area weekly safety meetings and annual safety stand-downs, as determined by the COR.

1.3 The best Safety and Health Programs involve every level of the organization, instilling a safety culture that reduces accidents for workers and improves the bottom line for managers.

When Safety and Health are part of the organization and a way of life, everyone wins. IHD NSWC is committed to safety excellence. The Contractor shall familiarize itself with the IHDIVNAVSURFWARCENINST 5100.22, “Safety Manual,” Appendix 13-C entitled “OSHA Voluntary Protection program (VPP) Fundamentals Training for Contractors”.

2. Contractor On Site Training:

2.1 A Contractor providing support on-site at any IHD NSWC site may be required to have its on-site Contractor personnel participate in training covering rules, practices, procedures, equipment and systems, as needed, based on the type of support being provided. This training may include, but is not limited to: Operation Security training (OPSEC); Personally Identifiable Information training; DoD Information Assurance Awareness training; Information Technology Security; Voluntary Protection Program (VPP) training; and Personnel Security training.

2.1.2 This training will be provided at no cost by the IHD NSWC site and will take place on-site during normal contract working hours without any additional compensation for the Contractor.

This training does not relieve the Contractor of its responsibility to train its employees in such areas as environment, health, safety, security, sexual harassment, ethics, etc. to ensure compliance with all federal, state, and local laws and DoD regulations.

POC

The following contacts are provided for this contract:

Contract Administrator: Jodi Fields Phone Number: 301-744-6544 E-mail: Jodi.l.fields.civ@us.navy.mil

Payments/Invoicing: Comptroller Vendor Pay Phone Number: (301) 744-6998 E-mail: NAVSEA.NSWC.IHEODTDVendorPay@navy.mil

Technical Representative: Wade Morgan Phone Number:

E-mail: wade.e.morgan3.civ@us.navy.mil

Any concerns regarding your contract, should be directed to the above-mentioned personnel, or the Contracting Officer Marlene Ridgell at marlene.l.ridgell.civ@us.navy.mil.

Section I - Contract Clauses

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

NOV 2021

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-5 Material Requirements AUG 2000 52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.219-9 Small Business Subcontracting Plan OCT 2022 52.219-13 Notice of Set-Aside of Orders MAR 2020 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

JUN 2020

52.224-1 Privacy Act Notification APR 1984 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act OCT 2022 52.225-3 Alt I Buy American--Free Trade Agreements--Israeli Trade Act

(OCT 2022) Alternate I

JAN 2021

52.225-3 Alt II Buy American--Free Trade Agreements--Israeli Trade Act (OCT 2022) Alternate II

JAN 2021

52.225-3 Alt III Buy American--Free Trade Agreements--Israeli Trade Act (OCT 2022) Alternate III

JAN 2021

52.232-36 Payment by Third Party MAY 2014 52.234-1 Industrial Resources Developed Under Title III, Defense

Production Act

SEP 2016

52.243-1 Changes--Fixed Price AUG 1987 52.243-3 Changes--Time-And-Material Or Labor-Hours SEP 2000 52.247-17 Charges APR 1984 52.249-1 Termination For Convenience Of The Government (Fixed

Price) (Short Form)

APR 1984

52.249-8 Default (Fixed-Price Supply & Service) APR 1984 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General AUG 2019 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

DEC 2019

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.204-7020 NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.215-7007 Notice of Intent to Resolicit JUN 2012 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors.

JAN 2018

252.219-7003 Small Business Subcontracting Plan (DOD Contracts) DEC 2019 252.219-7011 Notification to Delay Performance JUN 1998 252.225-7001 Buy American And Balance Of Payments Program-- Basic JUN 2022 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JAN 2021 252.247-7023 Transportation of Supplies by Sea FEB 2019

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services-- Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .