Request for Quotes - Chromebook Storage Carts
FCPS RFQ #25-030-073 | GPR# PE-65615-NONST-2025-000000060
Objective
The Fayette County Public Schools Purchasing Department (hereinafter FCPS) invites you to participate in a request for quote (RFQ). This RFQ will consist of providing and delivering JAR Systems Elevate EDU 32 storage carts for Chromebooks as specified to the Technology Services Department located at the LaFayette Educational Center, 205 LaFayette Ave., Fayetteville, GA 30214.
Responses Due
Responses to this request for quote are due no later than the date and time specified in the timeline of events either physically or electronically to the FCPS Purchasing Department located at the LaFayette Educational Center, Building A, 205 LaFayette Avenue, Fayetteville, GA, 30214. Quotes received after the specified date and time will not be considered.
Vendors are instructed to carefully read all items, conditions, terms, specifications, and attachments herein and referenced before completing their quote. Failure to comply with any requirements of the RFQ may be a cause for rejection.
Section A: Instructions to Respondents
1. Schedule of Events
1.1. RFQ Released: Tuesday, March 18, 2025
1.2. Responses Due: Before 10:00 AM, Monday, March 31, 2025
2. Respondent Registration
2.1. Respondents are encouraged to register with the issuing agent, Matthew Roberts, by sending an email to roberts.matthew@fcboe.org after reviewing this solicitation. Respondents who register will automatically receive an email update with additional documents such as addenda and be notified of award issuance, even if they choose not to submit a response.
3. Project Documents and Forms
3.1. Documents and forms required for submission as part of this RFQ can be found on the FCPS Purchasing Department website and/or attached https://www.jar-systems.com/new-elevate-usbc-charging-cart-edu mailto:roberts.matthew@fcboe.org
Chromebook Storage Carts (RFQ 25-030-073) herein. Failure to include required submissions listed herein may result in a rejection of the response.
3.2. A list of required forms is contained herein and additional submissions may be required per the specifications contained herein.
4. Response Delivery
4.1. Responses may be submitted electronically, by mail, or hand-delivered to the LaFayette Educational Center, Building A, 205 LaFayette Avenue, Fayetteville, Georgia 30214, Attention: Purchasing Department.
4.2. Quote openings will occur at the date and time specified at the address above.
4.2.1. No faxed or telephone responses will be accepted or considered.
4.3. Responses may be emailed to the issuing agent if meeting the following guidelines:
4.3.1. Emailed responses must be in a consistent, clear, and readable format and complete. (Adobe PDF format is preferred)
4.3.2. All response documents should be bound in one document.
Multiple separate documents may result in evaluation score reductions.
5. Attachments
5.1. Any specification listed with “Must Include Attachment” should include a document within the response conforming to standards set forth.
5.2. All attachments must be marked and labeled using the following format:
Attachment #, Solicitation Reference, Respondent Name, Solicitation Title, and Number.
6. Response Format Requirements
6.1. The solicitation document has been carefully organized. All sections, specifications, requirements, and appendices are numbered; therefore responses should be organized in the same manner referencing the solicitation document when necessary.
6.2. All pages should be numbered and contain page headings or footers with the respondent's name and the solicitation title and number.
6.3. Multiple Response from the Same Respondent
- 2 -
6.3.1. Respondents may submit more than one response when offering multiple alternatives.
6.3.2. Responses must be separate and each should conform to all terms and conditions within the solicitation.
6.3.3. Responses must be labeled separately to easily identify differing responses from the same respondent.
Section B: Scope of Work and Specifications
7. Technical Specifications
7.1. The District is requesting 200 units of new JAR Systems Elevate EDU 32 storage carts for Chromebooks. (Manufacturer Data Sheet Included Below)
7.2. No alternatives will be considered.
Section C: General Terms and Conditions
FCPS’s General Terms and Conditions are posted on the Purchasing Department website under the heading of Vendor Terms, Conditions, and Forms at www.fcboe.org.
By submission of a response, the respondent acknowledges they have read and understood these General Terms and Conditions as well as any terms and conditions contained herein.
Section D: Special Terms and Conditions
8. Quote Opening
8.1. Quotes will be opened at the date and time provided in the schedule of events. All results will be publicly posted on the FCPS website once an award recommendation is made.
8.2. Quotes must be marked with the RFQ number.
8.3. Electronically delivered quotes will utilize the timestamp generated on the email.
8.4. Quotes must conform to the guidelines listed herein.
8.5. Quotes received late will be marked “non-responsive” and may not be considered at the sole discretion of the FCPS Purchasing Department.
- 3 -https://www.fcboe.org/Page/2707
9. Questions
9.1. All questions concerning this solicitation must be submitted in writing by email to the issuing agent.
9.2. No questions other than written will be accepted and only answers provided via addenda shall be binding.
10. Award Oversight
10.1. The awarded respondent will report to the Chief Technology Officer or their designee.
11. Cooperative Purchasing
11.1. This solicitation allows for other Fayette County, Georgia government entities, including local municipalities, to purchase from the awarded contract at the same prices quoted during the effective term pending an agreement between the awarded respondent(s) and the third party.
12. Quote Evaluations
12.1. According to the Fayette County Board of Education policy, DJE “lowest price alone will not be the sole determining criteria in the selection process”.
12.2. Factors that may be used in evaluating responses may include but are not limited to, the following: price/cost, warranty, service guarantees or past performance, costs of ownership analysis, business capabilities analysis, delivery schedules and methods, and product-specific manufacturer/quality standards.
12.3. Respondents may inquire as to specific evaluation methods and may request in writing an explanation of evaluation methods used to determine an award. See General Terms and Conditions regarding award protests.
13. Delivery
13.1. Delivery is expected on or about the date requested ARO.
13.2. Freight is FOB destination, freight prepaid (allowed).
13.3. The respondent must contact the end-user listed on purchase orders at least 24 hours before delivery to confirm the delivery date and time.
13.4. FCPS standard hours of operation are 7:30 AM to 3:30 PM (EST), Monday through Friday, except for school holidays.
- 4 -
13.5. The delivery location does not have a loading dock; therefore, all deliveries must be made as a tailgate or inside delivery as defined in the solicitation, any resulting purchase order, or resulting contract.
13.5.1. Tailgate delivery will be defined as follows: the driver will be required to move the pallets from the interior bed of the truck to the edge of the bed. The FCSD will use a forklift to move the pallets from the edge of the truck bed to the warehouse.
13.5.2. Inside-delivery will be defined as follows: the driver will be required to move the material from the interior bed of the truck to the interior of the facility.
13.6. Any pallets must be covered or shrink-wrapped to protect cartons from dirt and moisture during shipment and pallet construction should allow for four-way entry of handling equipment and surface/platform board approximately one inch apart minimizing carton damage.
13.7. Failure to deliver per the response could result in the awarded respondent being declared in default.
13.8. The awarded respondent shall be responsible for the delivery of items in good condition at the point of destination.
13.9. Respondent shall file with the carrier all claims for breakage, imperfections, and other losses, which will be deducted from invoices.
13.10. Back Orders: Back orders may be made only when specifically authorized to do so by the project administrator. The necessity to back-order may be deemed a breach of contract.
14. Cost Escalation/Price Change
14.1. The Purchasing Department recognizes that independent market factors may result or necessitate the need for price changes. Through the submission of a quote, the respondent agrees to the following:
14.2. All price increases must be based upon product cost ONLY, and documentation of the price increase is required.
14.3. Quote prices must be held firm for the term of the solicitation or December 31st of the issuing year, after which an escalator can be invoked.
14.4. The awarded respondent must provide the FCPS Purchasing Department written notification at a minimum of 30 days before a price escalation change.
- 5 -
14.5. Single changes of no more than the lower of 10% or the twelve-month average of the Consumer Price Index (CPI) at the time of the request is allowed. There are exceptions only when market conditions dictate a revised escalator for a particular commodity.
14.6. FCPS reserves the right to accept or reject any price escalation. A rejection of a price escalation may result in the termination of any agreement, contract, purchase order, or other agreement without fault or obligation.
15. Term
15.1. The term of this RFQ and resulting agreement is from the date of resulting award issuance until December 31, 2025, with the option to renew for four
(4) additional one-year terms beginning January 1st and ending December 31st of each year.
15.2. The RFQ and resulting agreement will automatically renew each year beginning January 1st with the awarded pricing structure unless a cost escalation/price change process is initiated per the General Terms & Conditions.
15.3. Per the General Terms & Conditions, should the Fayette County Board of Education fail to appropriate funding for each fiscal year beginning July 1st, this solicitation and resulting contract or purchase orders will be canceled with no-fault or obligation beyond products or services already received and properly invoiced.
15.3.1. FCPS may notify the awarded bidder in writing thirty (30) days prior to cancellation for non-appropriation.
16. Required Forms
16.1. The forms listed below are required for submission and included as attachments. They may also be located on FCPS’s Purchasing Department website at www.fcboe.org.
16.1.1. Solicitation Response Form
16.1.2. Reference Form
16.1.3. Quote Response Form
16.2. Failure to include any form may result in a reduction in evaluation scoring or the submitted quote being declared non-responsive at the sole discretion of the FCPS Purchasing Department.
- 6 -https://www.bls.gov/cpi/ https://www.fcboe.org/Page/2707
16.3. This request for quote, any addenda, and the awarded quote will be incorporated into any resulting contract and/or purchase order.
- 7 -
Solicitation Response Form
RFQ 25-030-073
Place this form on top of your response.
Company Name:
Point of Contact:
Street Address:
City:
State:
Zip Code:
Telephone:
Email:
Website:
Authority to Act The undersigned states that he/she has the requisite authority to act on behalf of his/her employer in these matters and has offered to provide the products/services in accordance with the terms and conditions herein.
Terms, Conditions, and Specifications Through the submission of response and signature below, the respondent verifies that their solution, if applicable, complies fully, or complies with an exception, to all stated general and special terms, conditions, and specifications. See the FCPS General Terms and Conditions for further information and directions on notating exceptions to stated specifications.
Addenda Through the submission of response and signature below the respondent verifies that they have read and understood any addenda issued for this solicitation if issued.
Signature: _____________________________________ Date: ________________
- 8 -
FCPS Purchasing Department Reference Form
Requested Information Response
Reference Name
Contact for Reference
Street Address
City, State, Zip
Phone Number
Contact for Reference
Street Address
City, State, Zip
Contact for Reference
Street Address
City, State, Zip
- 9 -
Quote Response Form
Company Name: ______________________________________________________
Item Quantity Unit Price
(USD)
Line Total
(USD)
JAR Systems Elevate EDU 32 storage carts for Chromebooks as Defined
200 $ $
Shipping & Handling 200 $ $
TOTAL QUOTED PRICE (USD): $______________________________
DELIVERY TIME ARO (DAYS): ___________________________
Authorized Signature Date
Before 10:00 AM, Monday, March 31, 2025
- 10 -www.JAR-Systems.com | 866.393.4202
Efficient USB-C PD Charging Quick-Sense USB-C charging identifies the devices’ power needs to deliver a fast and balanced charge.
Stop Wiring Carts!
No need for messy AC adapters! Save time by removing cable management processes from your team’s workflow.
Connect Any Charging Port Available emulator adapters provide charging for any port type. Cables lock into place, so they are always ready.
ELEVATE USB-C Charging Cart EDU AC Adapter-Free, USB-C Charging
5014384
Universal Charging for Up to 32 Chromebooks, Notebooks, or Tablets!
Education Line
Emulator Adapter Cables (Sold Separately)
Specifications
32 Quick-Sense USB-C PD Charging Ports Bay Dimensions:
20 Bays: 10.5”H x 1.5”W x 14.25”D 24 Bays: 10.5”H x 1.25”W x 14.25”D 32 Bays: 10.5”H x .875”W x 14.25”D Dimensions: 5.5”H x 7.7”W x 13.6”D Weight: 126 lbs Empty Input | 120V 50/60Hz 10A Output | 5V@3A/9V@3A/12V@2.5A/15V@ 2.0A/20V@1.5A Total 500W Max Output Per Hub Compatible with Devices Up to 65W
Included
Standard Part Number: MC-6032-EDU The part number used for your order may vary due to custom configurations.
Key Features
• Individually Keyed Lock with 2 Keys Included
• Hasp for Padlock
• Swivel Casters, 2 Locking
• Durable Steel Construction
• Quick-Sense USB-C PD Charging LED
Charging Indicators
• Overcurrent and Overvoltage Protection
• Door Ventilation and LED Visibility
• Numbered Device Bays
• Adjustable/Removable Metal Dividers
• Cable Lock (32 USB-C Cables Pre-Installed)
Warranty
Cart Enclosure | Lifetime Quick-Sense USB-C Charging Hub | 2 years Cables | 1 year
Create a better charging experience and save hours of time with AC adapter-free carts.
Quick-Sense USB-C PD Charging is an easy, low-maintenance solution to replace AC adapters and efficiently distribute power. The Education Line is fine-tuned to educational devices, charging all devices simultaneously, extending battery life, and aligning with lean technology budgets.
https://www.jar-systems.com
| Request for Quotes - Chromebook Storage Carts |
| Objective |
| Responses Due |
| Section A: Instructions to Respondents |
| 1.Schedule of Events |
| 2.Respondent Registration |
| 3.Project Documents and Forms |
| 4.Response Delivery |
| 5.Attachments |
| 6.Response Format Requirements |
| Section B: Scope of Work and Specifications |
| 7.Technical Specifications |
| Section C: General Terms and Conditions |
| Section D: Special Terms and Conditions |
| 8.Quote Opening |
| 9.Questions |
| 10.Award Oversight |
| 11.Cooperative Purchasing |
| 12.Quote Evaluations |
| 13.Delivery |
| 14.Cost Escalation/Price Change |
| 15.Term |
| 16.Required Forms |
| Solicitation Response Form |
| Authority to Act |
Terms, Conditions, and Specifications
Addenda
FCPS Purchasing Department Reference Form
Quote Response Form
| Company Name: |
| Point of Contact: |
| Street Address: |
| City: |
| State: |
| Zip Code: |
| Telephone: |
| Email: |
| Website: |
| Date: |
| ResponseReference Name: |
| ResponseContact for Reference: |
| ResponseStreet Address: |
| ResponseCity State Zip: |
| ResponsePhone Number: |
| ResponseEmail: |
| ResponseReference Name_2: |
| ResponseContact for Reference_2: |
| ResponseStreet Address_2: |
| ResponseCity State Zip_2: |
| ResponsePhone Number_2: |
| ResponseEmail_2: |
| ResponseReference Name_3: |
| ResponseContact for Reference_3: |
| ResponseStreet Address_3: |
| ResponseCity State Zip_3: |
| ResponsePhone Number_3: |
| ResponseEmail_3: |
| Company Name_2: |
| fill_11: |
| fill_12: |
| fill_15: |
| fill_16: |
| TOTAL QUOTED PRICE USD: |
| DELIVERY TIME ARO DAYS: |
| Date_2: |