This statement of needs outlines the technical requirements for eleven biocontainment sterilizers to be installed at the National Institute of Allergy and Infectious Diseases facilities. The National Institutes of Health National Institute of Allergy and Infectious Diseases requires ten Getinge GSSB 6710 units or equal, and one Getinge GSSB 6713 unit or equal. The sterilizers must meet specified dimensions and technical capabilities including pressure and temperature sterilization cycles, double doors, control systems, service access panels, and interfaces for utilities. The sterilizers will replace existing units and must be integrated into existing high containment wall spaces. The solicitation number for this requirement is RFQ-NIAID-23-2166588.

View the file

Other files

File Type Posted
RFQ-NIAID-23-2166588.pdf PDF
RFQ Attachment 3 - FAR 52.212-5.pdf PDF
RFQ Attachment 2 - BOM.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ Attachment 1: Statement of Needs Building 33 BSL-3 Autoclaves/Sterilizers

This statement of needs is for the acquisition of eleven (11) autoclaves capable of providing sterilization and decontamination as well as maintaining biocontainment for Building 33 Biosafety Level-3 (BSL-3) Laboratories. The National Institute of Allergy and Infectious Diseases (NIAID), Division of Intramural Research (DIR) also requires the decommissioning and disposal of existing autoclaves being replaced. Specifically, NIAID, DIR is seeking eleven

(11) biocontainment sterilizer units with associated supplies and services. NIAID is seeking Getinge brand GSSB 6710 (10 units) and GSSB 6713 (1 unit) or equal products that must meet all required minimum characteristics listed below:

1. Sterilizer net weight shall not exceed 2194 lbs. for the Getinge GSSB 6710 or equal units and 3549 lbs. for the Getinge GSSB 6713 or equal unit by hydrostatic test.

2. Shall provide and install a chamber with a physical method to steam sterilize and disinfect various biological wastes and other items by reaching and maintaining 121.0°C/ 249.8°F for at least 30 minutes with a pressure of at least 15.0 Pounds per square inch (PSI)/103.4 kilopascal (kPa).

3. Shall have password protected initiation of the following operational cycle settings from an electronic human-machine interface (HMI).

a. Liquid Cycle – for liquid media, non-flammable liquids, aqueous solutions, and liquid biological wastes.

b. Solids or Dry Cycle – for glassware, dry hard items, metal items with porous parts, and other porous materials.

c. Wrapped Goods or Pre-vacuum Cycle – for glassware that must be sterilized upright or can trap air, pipette tip boxes, sharps decontamination, biohazard waste decontamination in autoclave bags (wet or dry).

4. Shall have double doors as to allow installation with one door on the BSL-2 “cold” side of the chamber and one in the BSL-3 “hot” high containment area.

5. Shall be designed for operation via HMI from either of the double doors and have engineering safeguards to ensure that both doors are never open at the same time (Pass-through autoclave).

6. A hard-wired interlock shall be provided to prevent both doors from opening simultaneously.

7. Shall have double doors that are fully automatic and electrically operated with safety features that prevent doors from closing if obstructed by an object.

8. Shall be floor mounted and able to be recessed and biologically sealed into the high containment wall space.

9. Shall provide custom engineered wall frames that meet the dimensional requirements needed to fit the existing high containment wall space to provide a true biological sealing.

10. Shall provide units that fit in existing spaces which are 22.6 sqft and 4’ 4 ⅜” in depth.

11. Shall provide units that accommodate the following existing dimensions:

a. A wall frame height of 78⅞”

b. A wall frame width of 48”

c. A wall frame depth of 3’ 3’⅜”

d. A chamber flange width of 40⅛”

12. Control Panels installed above the chamber to create more space for servicing.

13. Shall provide and install a biological sealing flange with lagged wall frame, stainless steel, and bolted to wall. The seal must be 6mm thick butadiene rubber gasket material using stainless steel clamping bars, nuts, and lock washers. Must provide an airtight seal capable of preventing passage of airborne microorganisms between classified zones of the facility. Any necessary penetrations shall be through potted conduit fittings. Must include HEPA filtration for pneumatic signals though the biological seal for decontamination of the door air system and piping to provide for safe filter replacement.

Must be able to demonstrate no leakage through the sealing flange with a pressure differential of 0.22psig in Gas tightness tests.

14. Shall have a unit power requirement of 460-480V, 3Ph, 60Hz.

15. Shall have a control system power requirement of 100-120V, 60Hz.

16. Shall provide orientable unit side service access to include (9 of 11 including the 1 extra capacity) units with right side service and (2 of 11) units with left side service.

17. Shall have a B&R Industrial Automation Control System or equivalent for both BSL-3

“hot” high containment and BSL-2 “cold” sides of the unit including a 9-11” color touch screen HMI on both BSL-3 “hot” high containment side and BSL-2 “cold” side. The BSL-3 “hot” high containment side to shall show chamber pressure/vacuum and process steam supply pressure. The BSL-2 “cold” side shall show chamber pressure/vacuum.

18. Shall have a Multi-flow - Dual sterilizer control with possibility to start a cycle on any side and possibility to unload on any side upon a successful sterilization process.

19. Shall have a control system that fully controls the machine and is developed according to Good automated manufacturing practice (GAMP) guidelines.

20. Shall have control panels installed above the chamber to create more space for servicing units.

21. Shall provide and install Remote located control and electrical panels which will be 50+ feet away from the units.

22. Shall have a 4-5” fascia printer to capture operational data.

23. Getinge GSSB 6710 or equal product shall provide a usable chamber dimension of 26” wide, 26½” high, and 39⅜” deep and equating to a chamber volume of 16.6 cubic feet.

24. Getinge GSSB 6713 or equal product shall provide usable chamber dimensions of 26” wide, 26½” high, and 51¼” deep and equating to a chamber volume of 21.5 cubic feet.

25. Shall provide for a condensate return connection to capture non-product contact steam.

26. Shall provide for a chilled water recirculation connection to use chilled water to reduce potable water consumption up to 75%.

27. Shall provide for a compressed air connection for instrument air/pneumatics.

a. Unit shall have one common compressed air connection for both process air and instrument air.

b. Unit shall provide chamber pressure equalization after drying vacuums through an atmospheric air sterile grade air filter.

c. Unit shall provide process air used for pressure equalization after drying vacuums as well as for support pressure during cooling.

28. Shall include incoming media pressure gauges.

29. Shall include a jacket pressure gauge.

30. Shall include a chamber pressure sensor.

31. Shall include a chamber temperature sensor.

32. Shall include a jacket temperature sensor.

33. Shall include a load temperature sensor for liquid load.

34. Shall include one 2” tri-clamp chamber port to accommodate temperature sensors for validation.

35. Shall include an emergency stop button in the front fascia that will stop the cycle and take the machine to a safe state.

36. Shall include a chamber and door plate made from solid high quality 316L stainless steel with internal surfaces highly polished to Ra<0.5µm (20µin).

37. Shall include internal surfaces highly polished to Ra< 0.5 μm (20 μin).

38. Shall include radiused internal corners of the chamber and a chamber floor that slopes to a central drain.

39. Shall have a supporting jacket for the unit made from 304 stainless steel.

40. Shall have door reinforcements made from corrosion protected carbon steel SA516

Gr60/EN10028-2 1.0425.

41. Shall include a stainless-steel mesh strainer to protect the drain port from blockage by debris as well as protecting the components in the drain line from clogging.

42. Shall have a sterilizer chamber insulated with chloride free mineral wool encased by rigid sheet aluminum cladding.

43. The front fascia of the sterilizer unit shall be constructed of 304 stainless steel and designed to support frequent cleaning of external surfaces.

44. The unit shall have instrumentation mounted in a stainless-steel panel placed above the chamber door.

45. Doors shall be constructed for sealing by parylene coated silicone rubber gaskets with both air and steam capacity. The door gasket shall be pushed against the back of the door by compressed air and retracted by vacuum. Steam shall be utilized when pressurizing door gasket for redundancy in pressurization media. A backup tank shall be provided for door gasket pressure.

46. Shall provide a chamber leak rate test at manufacturing facility to meet regulatory standards.

47. Shall provide for effluent sterilization process to entrap potentially contaminated discharge until successful completion of the sterilization cycles.

48. Shall include automatic filter intrusion test (WIT) of effluent retention filter. This is used to automatically test and dry the chamber effluent retention filter in place.

49. Shall include standard process and non-process piping that consists of stainless-steel piping and automatic valves. The piping and components shall be welded, connected threaded, or adjoined with flanged fittings.

50. Process valves shall be pneumatically operated piston globe valves for extended life and limited maintenance.

51. Shall have a highly efficient liquid ring vacuum pump protected by an upstream condenser provided to effectively remove air from within the chamber. The vacuum pump shall be mounted on vibration dampers and connected with flexible hoses in order to protect against vibration. Water to the vacuum pump shall be sealed, recirculated, and cooled.

52. The drain discharge for the unit shall be cooled to reduce the effluent temperature to an average of 60°C/140°F or less.

53. A 0.2 μm sterile grade filter shall be provided as vent filter for equalization of chamber pressure after post sterilization drying vacuum.

54. Shall be provided with stainless steel filter housing with 0.2 μm sterile filter to support air pressure.

55. For effluent cycles, an effluent retention filter system shall be provided to ensure that exhaust from the chamber is sterile before discharge to drain.

56. For effluent retention cycles the door gasket shall be sealed by steam instead of compressed air.

57. Shall have diaphragm pressure gauges & switches on the chamber.

58. Shall include isolation valves and ports for decontamination (fumigation) of effluent, a drain piping system, and air signals through the barrier to allow for safe maintenance or emergency service.

59. Shall include a vacuum decontamination support cycle.

60. Shall have a hard-wired interlock that will prevent the drain valve and BSL-2 “cold” side door from opening before a successful sterile phase.

61. Shall include a high-pressure alarm that will prevent the safety valve from opening.

62. Shall provide a closed bonnet safety valve to including bursting disc.

63. Shall provide withdrawable shelves for the chamber specifically designed for easy loading and unloading of the sterilizers without using external trolleys.

64. Shall provide extra top shelf placed on top of provided withdrawable shelf in the chamber to give an extra level of product loading.

The following additional services are required:

1. Shall provide service to disconnect plumbing, mechanical and electrical services on the existing machines.

2. Shall provide service to install and level new units.

3. Shall provide service to install biological seals that are industry tested.

4. Shall provide service to commission new units and provide necessary documentation including warranty information.

5. Shall provide onsite training for 120 staff and technicians. Shall provide details on how the training will be provided: mode and duration of training, learning objectives and outcomes, learning materials provided, and contributions to Standard Operating Procedure (SOP) modifications.

6. Shall provide service to program software – including the transfer user information such as names and passwords from old units to the new units. Shall provide service to customize software to require user password after selecting cycle and before starting the cycle.

7. Shall provide service to remove, haul away, and properly dispose of existing “old” units that are being replaced with “new” units.

8. Shall provide a base year plus three option years for the delivery of the units. The timeframe the units must be delivered and installed for the base period is between May 2024 and August 2024 and between May and August of subsequent option years. This May to August timeframe is an annual planned event in which the BSL-3 suites are shut down for maintenance to fulfill regulatory requirements. Once NIAID specifies an installation time period, each autoclave disconnect, and new installation needs to be fully completed and commissioned within three (3) weeks.