This Request for Qualifications (RFQ) is issued by the City of Lenoir, North Carolina, for professional engineering services to conduct arc flash assessments at public utilities facilities. The scope of work encompasses arc flash analyses meeting NFPA 70E and 29CFR1910.132.(d)(1) standards across six primary facilities: Lower Creek Wastewater Treatment Plant, Gunpowder Creek Wastewater Treatment Plant, Lake Rhodhiss Water Treatment Plant, and associated sewer collection facilities and water distribution facilities, totaling 27 distinct locations. Services include field data collection, single-line diagram creation, short circuit studies, arc flash energy calculations, protective device coordination review, detailed reporting, installation of arc flash labels, and delivery of two hard copies and one electronic PDF of the analysis report. The submission deadline is 2:00 pm on Thursday, April 9, 2026, through the North Carolina electronic Vendor Portal. The City anticipates completing the selection process in April 2026 and finalizing contracting by the end of May 2026. The City intends to award one contract for these services.

Respondents must be professional engineers registered in North Carolina with a minimum of three years' experience in arc flash assessment work and must demonstrate financial capability and liability assumption. Qualifications statements are limited to 15 pages (8.5 x 11 inches, 11-point font minimum) and must include company information, proposed staff with organizational structure and professional certifications, and relevant project experience with client references for similar municipal water and wastewater infrastructure projects. Evaluation criteria focus on qualifications of key staff, relevant arc flash assessment experience, working knowledge of municipal water and wastewater infrastructure, and successful past performance on municipal infrastructure projects. No pricing information, set-asides, incumbent status, funding sources, or contract term details are specified in this qualifications-based selection document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUALIFICATIONS (RFQ) FOR PROFESSIONAL ENGINEERING SERVICES

TO CONDUCT AN ARC FLASH ASSESSMENT AT PUBLIC UTILITIES FACILITIES

CITY OF LENOIR, NORTH CAROLINA

1.0 INTRODUCTION

The City of Lenoir is requesting Statements of Qualifications of individuals to provide Professional Engineering Services to conduct an arc flash assessment that meets the requirements of the current standards in accordance with 29CFR1910.132.(d)(1), NFPA 70E.

The procedures for analysis will require developing electrical system impedances using source impedances obtained from Duke Energy or Blue Ridge Energy and a review of the most recent field data. An up-to-date single line diagram of the facilities will need to be created to perform arc flash calculations to determine incident energy levels. From incident energy levels, risk categories and personal protective equipment (PPE) requirements can be determined.

The analysis needs to be completed at:

1. Lower Creek Wastewater Treatment Plant

2. Sewer Collections Facilities serving Lower Creek WWTP

a. Acorn Square WW Lift Station

b. Arrowood WW Lift Station

c. Cajah’s Flume Meter

d. Dula Miller Hill WW Lift Station

e. Gamewell WW Lift Station

f. Georgetown WW Lift Station

g. KFC WW Lift Station

h. Summer Hill WW Lift Station

i. Summit WW Lift Station

j. Town and Country WW Lift Station

k. Valmead WW Lift Station

3. Gunpowder Creek Wastewater Treatment Plant

4. Sewer Collection Facilities serving Gunpowder Creek WWTP

a. Cypress Street WW Lift Station

b. Meadowood WW Lift Station

c. Spring Street WW Lift Station

d. Fir Street WW Lift Station

e. Quarry Estates WW Lift Station

f. Sawmills Flume Meter

5. Lake Rhodhiss Water Treatment Plant

6. Water Distribution Facilities

a. Cajah’s Mountain Tank site

b. Hudson Booster Pump Station and Tank site

c. Whitnel Tank site

d. Finley Tank site

e. Indian Hills Booster Pump Station

f. Indian Hills Tank site

g. Bushtown Booster Pump Station

h. Bushtown Tank site

i. Blue Ridge Forest Booster Pump Station

j. Blue Ridge Forest Tank Site

2.0 FORMAT AND CONTENT OF QUALIFICATIONS STATEMENT

Each Statement of Qualifications shall follow the topic outline shown in Sections 2.1 to 2.4. The overall submittal is limited to fifteen (15) 8.5 x 11 written pages, including the cover letter, with a font size no smaller than 11 pt. Failure to comply with these requirements will result in disqualification of the submittal.

2.1 STATEMENT OF SERVICES

The selected Professional Engineering firm is responsible for providing services that meets the requirements of the current standards in accordance with 29CFR1910.132.(d)(1), NFPA 70E associated with the project including, but not necessarily limited to:

1. Collect field data for service transformers’ nameplate data, generator nameplate data, short circuit and equipment duty ratings, types and sizes of all protective devices, and conductor sizes and lengths for all feeders and necessary branch circuits.

2. Enter field data and create a one-line model in an appropriate power analysis system database.

3. Perform a preliminary short circuit and equipment verification study to verify the facility’s equipment is rated to safely handle short circuit currents without creating hazardous conditions.

4. Calculate impedances using circuit sizes and configurations, transformer nameplate data, generator nameplate data, and source impedance data obtained from Duke Energy’s or Blue Ridge Energy’s electric system.

5. Determine system operating modes and conditions that can impact short circuit currents and arc flash hazard energy levels.

6. Perform and arc flash analysis to determine arc flash energy levels, arc flash protection boundaries, and PPE requirements.

7. Review protective device coordination to determine if arc flash hazard energy levels can be reduced.

8. Prepare and provide a detailed report on findings of the analysis.

9. Provide two (2) hard copies and one (1) electronic copy in .pdf form of the analysis report.

10. Create and install arc flash informational labels for appropriate equipment identified and studied for incident energy and PPE requirements to satisfy FNPA 70E.

2.2 COMPANY INFORMATION

The respondent will provide information concerning: the name of the firm(s) involved; any prime, joint venture, or sub-contractor relationships; key services offered; areas of work responsibilities by company, office location(s) where the work will be performed; company size (number of offices and employees per each office); and brief company history.

2.3 PROPOSED STAFF AND QUALIFICATIONS

The respondent shall be a professional engineer registered in the State of North Carolina, have at least three (3) years’ experience in the field, have the ability to provide written reports of the field investigation, and have the financial ability to undertake the work and assume the liability.

The response shall include an organizational chart indicating the proposed team organization, key staffing, assigned project roles, and company affiliation. A written narrative shall accompany this chart briefly describing each team member’s role, professional certifications, years of experience, background (educational & professional), and qualifications for the work.

2.4 RELEVANT PROJECT EXPERIENCE

The respondent shall provide a list of relevant experience in the planning, design, permitting, bidding, construction administration, and construction observation of wastewater infrastructure projects of a similar nature. A reference shall accompany each project listing client contact information (name, title, and phone number) along with a project description.

3.0 EVALUATION CRITERIA

The City will consider, but not be limited to, the following evaluation criteria in reviewing the Statements of Qualifications:

• Qualifications of key staff members

• Firm’s relevant arc flash assessment experience meeting the requirements of the current standards in accordance with 29CFR1910.132.(d)(1), NFPA 70E.

• Working knowledge of municipal water and wastewater infrastructure

• Successful past performance on municipal infrastructure projects

• Other relevant considerations

The City reserves the right to waive any and all informalities in the selection process and also reserves to the right not to award the project. It is the City’s intent to award one contract for these services. The City reserves the right to accept a firm that is most advantageous to the City.

Selection will be made based on evaluation factors of past performance and experience with municipal public utilities systems, experience with similar projects, and professional personnel.

4.0 ANTICIPATED CITY SCHEDULE

The following is an anticipated schedule and is subject to change without notice.

Selection Process:

• April 2026 Selection Process

• Contracting Process by end of May 2026

5.0 SUBMISSION REQUIREMENTS

Each respondent shall submit electronic Statements of Qualifications through the North Carolina electronic Vendor Portal, https://evp.nc.gov, by 2:00 pm on Thursday, April 9, 2026. Submittals received after that date and time will not be considered.

6.0 CONTACT INFORMATION

Jeff Church, Public Utilities Director, jeff.church@lenoirnc.gov, is the City’s contact for further information. Please note that any request for information or contact with elected officials of the City of Lenoir regarding this Request for Qualifications will result in disqualification. Any request for clarification of the Request for Qualifications shall be directed through the North Carolina electronic Vendor Portal, https://evp.nc.gov.