This is an Request for Quote (RFQ) Attachment 1 Administrative Information document issued by the Idaho Department of Fish & Game for the Cove Arm Dock and Installation project (RFQ #940). The solicitation seeks qualified vendors to purchase and install a new dock system while removing and disposing of the existing dock at Cove Arm Reservoir. The project requires four eight-foot by twenty-foot dock sections configured in an L-shape, complete with twenty polyethylene floats, aluminum or steel truss frames, Trex decking, fishing pole holders, and ADA-compliant handrails on the top dock section. Submissions must be received electronically through IPRO Supplier Portal or via email to Doug Peterson, Purchasing Agent, at Doug.peterson@idfg.idaho.gov or 208.287.2816. The RFQ closing date and question deadline are listed in IPRO. Award will be made on an all-or-none basis to the responsive responsible vendor with the lowest total cost. The resulting contract will be issued as a Purchase Order and will incorporate the RFQ, the successful bid, the State of Idaho Standard Contract Terms and Conditions (July 2024), and any clarifications or negotiated requirements.

The contractor must provide an estimated delivery date and is responsible for unloading and installation with freight FOB destination, prepaid and allowed. Delivery must occur Monday through Thursday, 8:00 a.m. to 4:00 p.m. local time, excluding Idaho state holidays, with seven business days' written notice required prior to delivery to the Cove Arm Reservoir location (42.96915°N, -115.86294°W). The dock will be inspected upon delivery and must meet all specifications within a thirty-calendar-day acceptance period; any discrepancies must be corrected and re-delivered within thirty days at no additional cost to IDFG. The contractor must provide one-year warranty coverage for the entire dock system, including all parts, labor, tools, and freight, with a factory-authorized repair and warranty service facility required within one hundred miles of the delivery location. All warranty work must be completed within thirty calendar days of written notice from IDFG. The contractor must also provide one parts manual and one operation manual in paper or PDF format, demonstrate current authorization from the manufacturer as an authorized dealer or reseller, and submit pricing via Attachment 2 along with a signed Attachment 3 and proof of insurance (Attachment 4).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDAHO DEPARTMENT OF FISH & GAME

ATTACHMENT 1 – SECTION 1

RFQ Title:
Cove Arm Dock and Installation
RFQ Number:
RFQ # 940
RFQ Solicitation Contact:
Doug Peterson, Purchasing Agent

Doug.peterson@idfg.idaho.gov 208.287.2816

Submit Electronically via IPRO:
Supplier Portal / Supplier Portal (inforgov.com)
Deadline to Receive Questions:
See IPRO
RFQ Closing Date:
See IPRO
Award:
Award will be made, all or none, to the responsive responsible vendor with the lowest Total Cost.

A. Purpose The Idaho Department of Fish & Game (IDFG) is requesting Quotes from qualified vendors for the purchase and installation of a new dock along with removal and disposal of the old dock, as further detailed below.

B. General Information & Solicitation Instructions This Solicitation is issued by IDFG via IPRO - Supplier Portal / Supplier Portal (inforgov.com) The RFQ Lead is the only contact for this Solicitation. All correspondence regarding this RFQ must be in writing. In the event that it becomes necessary to revise any part of this RFQ, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this RFQ will not be relied upon. All changes to this RFQ must be in writing and posted in IPRO to be valid. Alternate Bids are not allowed.

C. Submission Requirements Your response to this RFQ may be submitted electronically via IPRO or email. IDFG will not be accepting manual submissions for this solicitation. Your submission must include the Required Submittals listed below and be received prior to the deadline noted below. Failure to provide any of the documents or submission on a form different from those provided, may cause your submission to be found as non-responsive.

Electronic Submission:

IPRO – Enter your pricing in IPRO- Supplier Portal / Supplier Portal (inforgov.com)` . and upload all Required Submittals.

When a Bidder has successfully submitted a response to IPRO, the Bidder should see a change in the system from “Draft Bid” (see Fig. 1) to “Submission confirmation email sent” (see Fig. 2). Bidders are encouraged to document notification of successful submission for their records. If you believe you have submitted your Bid, but have not received the “Bid Submitted” message, you are advised to contact the IPRO provider’s help desk (phone number available at https://purchasing.idaho.gov/ipro.html) and notify the solicitation lead prior to the solicitation End Time. Vendors are strongly encouraged to begin the process of submitting the response far enough in advance of the End Time to allow for resolution of technical difficulties. Be advised that the State is not responsible for a Vendor’s failure to timely submit a responsive submission due to any technical or technological difficulties. See IDAPA 38.05.01.61.02.

Fig. 1

Fig. 2

If submitting via IPRO, be advised that that the Offeror for Proposal evaluation and award purposes is the entity profile under which the Proposal is submitted in IPRO, which must be the same legal entity presented in the uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Proposal in IPRO, the information provided on the Signature Page prevails.

While it is not mandatory to submit your Proposal electronically via IPRO, all Offerors participating in a Solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a Proposal manually outside of IPRO) as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free and only takes a few minutes.

Offerors are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows evaluators to efficiently navigate the Offeror’s response; as the State will print uploaded documents for evaluation in the manner received via IPRO

Email:

Send an email to the Solicitation Contact (listed above) and attach all Required Submittals.

D. Required Submittals As part of your response to this RFQ, the following documents are required.

Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 - INSURANCE Brochures and/or specifications sheet detailing the Dock being submitted for this solicitation.

E. Award Award may be all to one or by line item (if applicable) to the responsive responsible Bidder with the lowest fully burdened cost in the best interest of the State, as provided in Attachment 2 in IPRO.

F. Resulting Contract If IDFG awards a contract from this Solicitation, it will do so by issuing a Purchase Order (PO) document, which will be an acceptance of the successful bid. The PO will be comprised of the following documents; this RFQ, including any incorporated documents; the successful bid, including any clarifications requested by IDFG; and an artifact formalizing any requirements agreed upon through Contract discussions or negotiations, if applicable.

The following documents are incorporated into this RFQ as if set out in their entirety:

Solicitation Instructions for Vendors – January 2017
State of Idaho Standard Contract Terms and Conditions – July 2024

The documents may be found on the “Information for Vendors” page of the State’s Division of Purchasing (DOP) website ( https://purchasing.idaho.gov/governing-laws-and-policies/ ). If multiple versions of any of these documents are available on the website, the version in effect on the day the RFQ is issued shall apply.

ATTACHMENT 1 – SECTION 2

The following special terms and conditions are incorporated into the resulting Contract to supplement or add to the State of Idaho Standard Contract Terms and Conditions.

A. Delivery Contractor must provide an estimated Delivery date on Attachment 2 – Price Sheet. The Contractor is responsible for the unloading and installation of the Dock. Freight FOB destination, prepaid and allowed.

Delivery must be made Monday through Thursday, 8:00 am to 4:00 pm local time excluding state of Idaho recognized holidays (https://www.idaho.gov/government/holidays.html), unless otherwise approved in writing by IDFG. Contractor must notify IDFG, in writing, no less than seven (7) business days prior to delivery. IDFG delivery contact information will be provided upon Award.

Delivery Location
Idaho Department of Fish and Game - Cove Arm Reservoir -

42.96915° or 42° 58' 9" north - -115.86294° or 115° 51' 47" west B. Acceptance Upon receipt of the Dock, per the delivery location, the Dock will be inspected by the delivery contact (or approved designee) to ensure the requirements and specifications are met. The Acceptance period will be for thirty (30) calendar days from the date the Dock is delivered.

In the event the specifications are not met, the Contractor must pick-up, correct any discrepancies, and re-deliver within thirty (30) calendar days after notification from IDFG, at no additional cost to IDFG. In the event that the Dock does not meet the specifications or is found with discrepancies that are not fixed by the Contractor during the Acceptance period, IDFG reserves the right to reject the Dock via official notification.

If approved by IDFG, the Contractor may correct discrepancies on-site at IDFG’s location in lieu of pick-up and return shipping. The Contractor will be responsible for providing all labor; tools, parts, supplies, and worksite clean up to make any necessary corrections. The timeframe for corrective action will still be as identified above.

C. Invoicing & Payments Invoices – Invoices must be submitted as further detailed below. Invoices submitted prior to Acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission.

Invoices must include the following information:

· Contractor Company Name & Contact Information

· Contract Name & Number (PO #)

· Invoice Number & Date

· Itemization of the purchased goods to include: description matching the contract, quantity, unit of measure, unit price, extended price, and total invoiced amount.

Payments – Payment for correctly submitted invoices will be made in accordance with Idaho Code 67-2302: https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/

D. Warranty Warranty must be for a minimum period of one (1) year, for the entire Dock. after Acceptance. Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warrantied item, which may include the entire Dock.

A factory authorized repair and warranty service facility must be located within a one hundred (100) mile radius of delivery location listed above to provide full Dock service, repairs, factory support and full warranty repair.

Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warranted item, which may also include the entire Dock. All warranty work must be complete within thirty (30) calendars days after receipt of written notice from IDFG. If approved by IDFG, the Contractor may perform warranty work on-site, at the Delivery location, in lieu of pick-up and return shipping. The Contractor will be responsible for all travel costs and work-site clean-up associated with any necessary repairs. The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the Dock on-site within thirty (30) calendars days, or if the Dock continuously malfunctions and causes it to be out of service on multiple occasions, IDFG reserves the right to require the Contractor to pick-up, repair, and return the Dock at no additional cost to IDFG.

Contractor is responsible for all warranty requirements. No third-party warranties will be allowed.

E. Vendor Requirement Vendor must have a current and signed written agreement with the manufacturer stating that the vendor is an authorized dealer or authorized re-seller for the product(s) being quoted in this solicitation.

F. Remedial Action In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to IDFG, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) terminate the Contract pursuant to Section 2.F, Termination of Contract, in addition to any remedies imposed by the State.

If IDFG must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, IDFG may withhold the actual cost to IDFG from the Contractor’s payment(s).

G. Termination of Contract For Cause - See Section 1.4, Termination, of the State of Idaho Standard Contract Terms and Conditions – July 2024.

For Fiscal Necessity – See Section 1.18, Termination for Fiscal Necessity, of the State of Idaho Standard Contract Terms and Conditions – July 2024.

For Convenience – Either party may terminate this Contract for its convenience at any time upon providing its written notification at least ninety (90) calendar days prior to the desired termination date.

ATTACHMENT 1 – SECTION 3

A. Requirements The Dock must meet the minimum specifications provided below and must be the latest model produced and sold to commercial trade. The Dock must be new, not used. Though they are not specifically covered herein, all parts necessary to provide a complete and functional Dock must be included. All parts must conform in design, strength, quality of materials, and workmanship to meet or exceed current engineering practices and accepted standards of the industry. All parts must be the manufacturers standard unless otherwise specified in this RFQ.

B. Brand Name The brand name(s) specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Contractor offering an “equal” must include documentation, which demonstrates, to IDFG’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, IDFG reserves the right to seek clarification from the Contractor. Failure to provide satisfactory documentation or a clarifying response to IDFG may eliminate the Contractor from further consideration.

C. Manuals The Contractor must provide one (1) parts manual (Manual) and one (1) operation Manual for the Dock at the time of Delivery. The manuals must include all components and exploded view drawings with both parts’ identification and parts list. The manuals must be in either paper (book) format or portable document format (PDF) via universal serial bus (USB) drive.

D. Dock – General Specifications The following Specifications are the minimum that IDFG is willing to accept.

The vendor will be required to remove and dispose of the old dock currently in place, installing the new dock as specified below. The old dock system is like in size and structure as the following specifications. The existing gangway and transition plate will be reused for the new dock.

L – Configuration Dock

1. Four (4) eight (8) foot by twenty (20) foot dock sections in an “L” shaped format as in Exhibit A.

2. Four (4) each Truss Frames – Must be constructed of one and a half (1 1/2) inch thick aluminum, steel angle or square tubing. Must have bracing to create a rigid frame. Truss Frames must be eight (8) feet wide by twenty (20) feet in length by minimum of seventeen (17) inches high. Truss Frames must be powder coated for corrosion resistant durability.

3.Dock to dock connection – Must be made with corrosion resistant three quarter (3/4) inch cold rolled pin through sleeves, or equal.
4.Gangway connections– Must be made with two (2), corrosion resistant half (1/2) inch stainless steel pins through sleeves.
5.Twenty (20) each Floats – Must be constructed from polyethylene and filled with expanded polystyrene. Must be four (4) feet in width by eight (8) feet in length by sixteen (16) inches deep. Floats must come with corrosion resistant hardware for attaching to the truss frames.
6.Must have fishing pole holders every four (4) feet- all steel powder-coated.

7. Must have Trex Decking, or equal, installed on all four (4) truss frame walking surfaces.

8. Each truss frame section must have two and a half (2.5) inch removable piling collars bolted to the dock frames.

TOP DOCK ONLY

1. The top dock must have handrails with knockouts for ADA compliance and fishing pole holders. Handrail locations are indicated by a RED LINE on exhibit A.

2. Lower handrails must be twenty-one (21) inches from deck surface for ADA compliance.

3. Top handrails must be forty-six (46) inches tall.

4. ADA handrail knockouts need to be thirty-four (34) inches tall, four (4) feet long and spaced out every two (2) feet. ADA handrail knockouts need to be on the top eight by twenty (8x20) dock only, as indicated in exhibit A.

5. The outer twenty (20) foot dock side must have three (3) knockouts, the eight (8) foot dock ends and twelve (12) foot dock side must have one (1) knockout.

6. Handrail placement must be appropriate for connection points with the other docks.

7. Must have two fishing pole holders per knockout- all steel and powder-coated.

EXHIBIT A

20’x8’ Top Dock ____HANDRAILS_____

20’x8’

20’x8’

20’x8’

Gangway

SHORE
RFQ # 940COVE ARM DOCKPage 4 of 4

image1.gif image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png