RFQ #665 - Attachment 1 - Admin. Info - Forklift.docx

DOCX document 105 KB Posted

Attached to
Forklift - 6, 500 LB Lift Capacity
Solicitation number
665
Issued by
Canyon County, Idaho

About this file

This document is an Attachment 1 - Administrative Information related to a Request for Quotes (RFQ #665) issued by the Idaho Department of Fish & Game (IDFG) for the purchase and delivery of a 6,500 lb Forklift. The RFQ specifies that the Forklift must meet detailed technical requirements, including fuel type, engine size, transmission, steering, brakes, tires, mast, tilt cylinders, side shifter, fork carriage, and various other operational features. The RFQ provides submission requirements, including electronic submission via IPRO, required forms and documents, the award criteria of lowest total cost, and details on the resulting contract and purchase order. Delivery requirements, acceptance criteria, warranty terms, and vendor qualification criteria are also outlined.

The price sheet and signature page are required submittals. The RFQ indicates the award will be made to the responsive, responsible vendor with the lowest total cost for the Forklift. Invoicing and payment terms, as well as termination provisions, are specified in the document. Remedial action clauses provide the agency with options if the awarded Forklift does not meet the requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDAHO DEPARTMENT OF FISH & GAME

ATTACHMENT 1 – SECTION 1

RFQ Title:
Forklift – 6,500 LB Lift Capacity
RFQ Number:
RFQ #665
RFQ Solicitation Contact:
Eric Wagner, Buyer

Eric.wagner@idfg.idaho.gov 208.287-2815

Submit Electronically via IPRO:
Supplier Portal / Supplier Portal (inforgov.com)
Deadline to Receive Questions:
See IPRO
RFQ Closing Date:
See IPRO
Award:
Award will be made, all or none, to the responsive responsible vendor with the lowest Total Cost.

A. Purpose The Idaho Department of Fish & Game (IDFG) is requesting Quotes from qualified vendors for the purchase and delivery of a Gasoline, Diesel, or Propane powered Forklift (forklift) as further detailed below.

B. General Information & Solicitation Instructions This Solicitation is issued by IDFG via IPRO - Supplier Portal / Supplier Portal (inforgov.com) The RFQ Lead is the only contact for this Solicitation. All correspondence regarding this RFQ must be in writing. In the event that it becomes necessary to revise any part of this RFQ, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this RFQ will not be relied upon. All changes to this RFQ must be in writing and posted in IPRO to be valid. Alternate Bids are not allowed.

C. Submission Requirements Your response to this RFQ may be submitted electronically via IPRO or email. IDFG will not be accepting manual submissions for this solicitation. Your submission must include the Required Submittals listed below and be received prior to the deadline noted below. Failure to provide any of the documents or submission on a form different from those provided, may cause your submission to be found as non-responsive.

Electronic Submission:

IPRO – Enter your pricing in IPRO- Supplier Portal / Supplier Portal (inforgov.com)` . and upload all Required Submittals.

When a Bidder has successfully submitted a response to IPRO, the Bidder should see a change in the system from “Draft Bid” (see Fig. 1) to “Submission confirmation email sent” (see Fig. 2). Bidders are encouraged to document notification of successful submission for their records. If you believe you have submitted your Bid, but have not received the “Bid Submitted” message, you are advised to contact the IPRO provider’s help desk (phone number available at https://purchasing.idaho.gov/ipro.html) and notify the solicitation lead prior to the solicitation End Time. Vendors are strongly encouraged to begin the process of submitting the response far enough in advance of the End Time to allow for resolution of technical difficulties. Be advised that the State is not responsible for a Vendor’s failure to timely submit a responsive submission due to any technical or technological difficulties. See IDAPA 38.05.01.61.02.

Fig. 1

Fig. 2

If submitting via IPRO, be advised that that the Offeror for Proposal evaluation and award purposes is the entity profile under which the Proposal is submitted in IPRO, which must be the same legal entity presented in the uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Proposal in IPRO, the information provided on the Signature Page prevails.

While it is not mandatory to submit your Proposal electronically via IPRO, all Offerors participating in a Solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a Proposal manually outside of IPRO) as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free and only takes a few minutes.

Offerors are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows evaluators to efficiently navigate the Offeror’s response; as the State will print uploaded documents for evaluation in the manner received via IPRO

Email:

Send an email to the Solicitation Contact (listed above) and attach all Required Submittals.

D. Required Submittals As part of your response to this RFQ, the following documents are required.

Attachment 2 – Price Sheet Attachment 3 – Signature Page Brochures and/or specifications sheet detailing the (forklift) being submitted for this solicitation.

E. Award Award may be all to one or by line item (if applicable) to the responsive responsible Bidder with the lowest fully burdened cost per Forklift in the best interest of the State, as provided in Attachment 2 in IPRO.

F. Resulting Contract If IDFG awards a contract from this Solicitation, it will do so by issuing a Purchase Order (PO) document, which will be an acceptance of the successful bid. The PO will be comprised of the following documents; this RFQ, including any incorporated documents; the successful bid, including any clarifications requested by IDFG; and an artifact formalizing any requirements agreed upon through Contract discussions or negotiations, if applicable.

The following documents are incorporated into this RFQ as if set out in their entirety:

Solicitation Instructions for Vendors – January 2017
State of Idaho Standard Contract Terms and Conditions – July 2024

The documents may be found on the “Information for Vendors” page of the State’s Division of Purchasing (DOP) website ( https://purchasing.idaho.gov/governing-laws-and-policies/ ). If multiple versions of any of these documents are available on the website, the version in effect on the day the RFQ is issued shall apply.

ATTACHMENT 1 – SECTION 2

The following special terms and conditions are incorporated into the resulting Contract to supplement or add to the State of Idaho Standard Contract Terms and Conditions.

A. Delivery Contractor must provide an estimated Delivery date on Attachment 2 – Price Sheet. The Contractor is responsible for the unloading of the Forklift. Freight FOB destination, prepaid and allowed.

Delivery must be made Monday through Thursday, 8:00 am to 4:00 pm local time excluding state of Idaho recognized holidays (https://www.idaho.gov/government/holidays.html), unless otherwise approved in writing by IDFG. Contractor must notify IDFG, in writing, no less than seven (7) business days prior to delivery. IDFG delivery contact information will be provided upon Award.

Delivery Location
Idaho Department of Fish and Game 15950 N. Gate Boulevard, Nampa, Idaho 83687.

B. Acceptance Upon receipt of the Forklift, per the delivery location, the Forklift will be inspected by the delivery contact (or approved designee) to ensure the requirements and specifications are met. The Acceptance period will be for thirty (30) calendar days from the date the Forklift is delivered.

In the event the specifications are not met, the Contractor must pick-up, correct any discrepancies, and re-deliver within thirty (30) calendar days after notification from IDFG, at no additional cost to IDFG. In the event that the Forklift does not meet the specifications or is found with discrepancies that are not fixed by the Contractor during the Acceptance period, IDFG reserves the right to reject the Forklift via official notification.

If approved by IDFG, the Contractor may correct discrepancies on-site at IDFG’s location in lieu of pick-up and return shipping. The Contractor will be responsible for providing all labor; tools, parts, supplies, and worksite clean up to make any necessary corrections. The timeframe for corrective action will still be as identified above.

C. Invoicing & Payments Invoices – Invoices must be submitted as further detailed below. Invoices submitted prior to Acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission.

Invoices must include the following information:

· Contractor Company Name & Contact Information

· Contract Name & Number (PO #)

· Invoice Number & Date

· Itemization of the purchased goods to include: description matching the contract, quantity, unit of measure, unit price, extended price, and total invoiced amount.

Payments – Payment for correctly submitted invoices will be made in accordance with Idaho Code 67-2302: https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/

D. Warranty Warranty must be for a minimum period of one (1) year / unlimited hours, for the entire (forklift), after Acceptance. Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warrantied item, which may include the entire (forklift).

A factory authorized repair and warranty service facility must be located within a one hundred (100) mile radius of delivery location listed above to provide full trailer service, repairs, factory support and full warranty repair.

Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warranted item, which may also include the entire (forklift). All warranty work must be complete within thirty (30) calendars days after receipt of written notice from IDFG. If approved by IDFG, the Contractor may perform warranty work on-site, at the Delivery location, in lieu of pick-up and return shipping. The Contractor will be responsible for all travel costs and work-site clean-up associated with any necessary repairs. The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the (forklift) on-site within thirty (30) calendars days, or if the (forklift) continuously malfunctions and causes it to be out of service on multiple occasions, IDFG reserves the right to require the Contractor to pick-up, repair, and return the (forklift) at no additional cost to IDFG.

Contractor is responsible for all warranty requirements. No third-party warranties will be allowed.

E. Vendor Requirement Vendor must have a current and signed written agreement with the manufacturer stating that the vendor is an authorized dealer or authorized re-seller for the product(s) being quoted in this solicitation.

F. Remedial Action In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to IDFG, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) terminate the Contract pursuant to Section 2.F, Termination of Contract, in addition to any remedies imposed by the State.

If IDFG must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, IDFG may withhold the actual cost to IDFG from the Contractor’s payment(s).

G. Termination of Contract For Cause - See Section 1.4, Termination, of the State of Idaho Standard Contract Terms and Conditions – July 2024.

For Fiscal Necessity – See Section 1.18, Termination for Fiscal Necessity, of the State of Idaho Standard Contract Terms and Conditions – July 2024.

For Convenience – Either party may terminate this Contract for its convenience at any time upon providing its written notification at least ninety (90) calendar days prior to the desired termination date.

ATTACHMENT 1 – SECTION 3

A. Requirements The Forklift must meet the minimum specifications provided below and must be the latest model produced and sold to commercial trade. The Forklift must be new, not used. Though they are not specifically covered herein, all parts necessary to provide a complete and functional Forklift must be included. All parts must conform in design, strength, quality of materials, and workmanship to meet or exceed current engineering practices and accepted standards of the industry. All parts must be the manufacturers standard unless otherwise specified in this RFQ.

B. Brand Name The brand name(s) specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Contractor offering an “equal” must include documentation, which demonstrates, to IDFG’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, IDFG reserves the right to seek clarification from the Contractor. Failure to provide satisfactory documentation or a clarifying response to IDFG may eliminate the Contractor from further consideration.

C. Manuals The Contractor must provide one (1) parts manual (Manual) and one (1) operation Manual for the Trailer at the time of Delivery. The manuals must include all components and exploded view drawings with both parts’ identification and parts list. The manuals must be in either paper (book) format or portable document format (PDF) via universal serial bus (USB) drive.

D. Forklift – 6,500 LB Lift Capacity – General Specifications The following Specifications are the minimum that IDFG is willing to accept.

1. Crown C5P 1065 Series Forklift, or equal.

2. Lift Capacity – Must have a minimum of sixty-five hundred (6,500) pound load capacity.

3. Fuel – Gasoline, diesel, or propane fuel source.

4. Engine – two-point four (2.4) liter inline four (4) cylinder, water cooled, or equal.

5. Transmission – Must have a power shift transmission, or equal.

6. Steering – Must have power steering with tiltable steering column.

7. Brakes – Oil cooled disc brakes.

8. Tires – Single, pneumatic tires. Must have all terrain tires to accommodate snow / ice conditions.

9. Mast – Three (3) stage full free triple, high visibility. Minimum height of one hundred and ninety-nine (199) inches.

10. Tilt Cylinders – minimum of five (5) degree forward tilt and minimum of five (5) degree back tilt.

11. Side Shifter – Integral, with a forty-three (43) inch wide fork spread.

12. Fork Carriage – ITA Class III

13. Forks – Hook Type, Partial tapered, one point eight (1.8) inch by five (5) inch by forty-eight (48) inch.

14. Overhead Guard – standard height of eighty-six (86) inches or equal.

15. Hydraulic Lines – three (3) way for side shifter.

16. Hydraulic Control Valve – three (3) section with three (3) levers.

17. Tow hitch pin – Must have a tow hitch with pin.

18. Instrumentation Panel – Must have an LED instrument panel.

19. Seat – Adjustable vinyl suspension seat with safety switch and adjustable arm rests.

20. Seat Belt – High Visibility seat belt with alarm for operator to fasten seat belt.

21. Direction Control – Lever directional control.

22. Mirrors – Large rear-view mirrors.

23. Grab bar – rear grab bar with integrated horn button.

24. Warning Lights – Amber strobe light mounted above overhead guard.

25. Warning Device – Back up alarm with outside mount.

26. Front Work Lights – Two (2) Front LED flood lights.

27. Rear Work Light – One (1) Rear LED floodlight.

28. Fork Extensions – Unit must come with seventy-two (72) inch fork extensions.

29. If the unit is LPG fuel, it must have a rear mounted LP cradle with a minimum thirty-three (33) pound LPG tank.

30. If the unit is LPG fuel, the vendor is to provide a backup thirty-three (33) pound LPG tank.

RFQ # 665 Forklift – 6,500 LB Lift Capacity Page 4 of 4 image1.gif image2.png image3.png

File details come from the government source that posted it. Updated .