RFQ 4818.pdf

PDF 126 KB Posted

Attached to
Ductile Iron Pipe
Solicitation number
4818-0-2019-BO
Issued by
Wisconsin

About this file

This Request for Quotation (RFQ) 4818-0-2019-BO is issued by the City of Madison Finance Department Purchasing Services on behalf of the Madison Water Utility for the procurement of ductile iron pipe. The solicitation requests unit prices per linear foot for centrifugally cast ductile iron pipe conforming to AWWA C151 standards in eight diameter sizes ranging from 3 inches through 20 inches, with specified wall thicknesses and Classes 51 or 52. The pipe must be cement-lined on the inside, tar-coated on the outside, supplied in standard 18-foot or 20-foot lengths with push-on joints, gaskets, lubricant, and bonding straps. Each truckload delivery must include at least 4 quarts of lubricant. The questions due date was May 6, 2019, with answers provided by May 10, 2019, and quotations due by May 15, 2019 at 1:00 PM CST. Delivery is required to Madison Water Utility at 110 S. Paterson Street with 24-hour advance notice, with unloading limited to weekdays between 7:30 AM and 2:00 PM.

Quotations must include all shipping charges with F.O.B. delivery to Madison and are subject to City of Madison Standard Terms and Conditions. The City will award the contract to the responsive and responsible bidder whose bid is most advantageous, considering criteria including cost, quality, warranty, delivery, past performance, and service capability. Bidders may submit substitute items with complete specifications for City evaluation. The local vendor preference policy applies, with scoring preference available to registered local suppliers as of the bid due date. Partial orders are acceptable unless otherwise specified, and bidders may not withdraw quotes for 90 days following the due date. Bidders must provide pricing firm for at least one year and specify payment terms and days to delivery after order receipt.

View the file

Other files

File Type Posted
4818 Summary.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev. 07/20/2015-0000-0-2019-BO-RFQ TEMPLATE.doc Page 1

Finance Department David P. Schmiedicke, Finance Director City-County Building, Room 406 Purchasing Services 210 Martin Luther King, Jr. Boulevard Madison, Wisconsin 53703 Phone: (608) 266-4521 Fax: (608) 266-5948 finance@cityofmadison.com www.cityofmadison.com/finance/purchasing

REQUEST FOR QUOTATION

RFQ #: 4818-0-2019-BO

For: Ductile Iron Pipe

Released Date: Wednesday, May 1, 2019

Questions Due Date: Monday, May 6, 2019

Answers Due Date: Friday, May 10, 2019

Quotation Due Date: Wednesday, May 15, 2019 @ 1:00 PM CST

City Agency: Madison Water Utility

Method of Delivery Options

Email Quotation to: bids@cityofmadison.com

Mail Quotation to: Brittany O’Donnell

210 Martin Luther King, Jr. Blvd.

Madison, WI 53703 Attn: 4818-0-2019-BO

Fax Quotation to: (608) 266-5948

1 GENERAL CONDITIONS AND INSTRUCTIONS TO BIDDERS

1.1 Applicable Terms and Conditions

• Products or Equipment. All quotations for supplies and/or equipment must be submitted in accordance with the specifications contained in this solicitation and City of Madison Standard Terms and Conditions.

• Services. All quotations for services must be submitted in accordance with; the specifications contained in this solicitation, City of Madison Standard Terms and Conditions, and Purchase of Services Contract.

• Copies. Copies of above-referenced forms are available from the Purchasing Office or from the following links:

www.cityofmadison.com/finance/documents/STC.pdf www.cityofmadison.com/finance/documents/ConditionsofPurchasePO.pdf www.cityofmadison.com/attorney/documents/posContract.doc mailto:finance@cityofmadison.com http://www.cityofmadison.com/finance/purchasing mailto:bids@cityofmadison.com http://www.cityofmadison.com/finance/documents/STC.pdf http://www.cityofmadison.com/finance/documents/ConditionsofPurchasePO.pdf http://www.cityofmadison.com/attorney/documents/posContract.doc

REQUEST FOR QUOTATION RFQ # 40T4818-0-2019-BO40T

0000-0-2019-BO-RFQ TEMPLATE.doc Page 2

1.2 Delivered Prices Only

Prices quoted must include shipping charges, FOB Madison.

1.3 Substitutes

If offering a substitute item, include manufacturer, number, model, specifications and product literature.

The City will evaluate substitutes and make the final determination of equivalency.

1.4 Partial Order

Unless otherwise noted, it will be assumed that bidder will accept an order for all or part of the items priced.

1.5 Award

The City will award the bid to the responsive and responsible bidder whose bid is most advantageous to the City. In determining the most advantageous bid, the City will consider criteria such as, but not limited to, cost, quality/workmanship, compatibility, standardization, major and minor exceptions to our specifications, superior design features, warranty, delivery, past experience, installation, equality, discount, customer satisfaction, bidder’s past performance and/or service reputation, and service capability. The City may opt to establish alternate selection criteria to protect its best interest or meet performance or operational standards. After the due date, no quotes may be withdrawn for a period of 90 days or as otherwise specified or provided by law.

2 CONTACTS

Technical: For questions regarding technical specifications.

Adam Wiederhoeft Madison Water Utility

(608) 266-9121 awiederhoeft@madisonwater.org

Buyer: For questions regarding instructions, terms & conditions.

Brittany O’Donnell City of Madison Purchasing Services

(608) 243-0529 bodonnell@cityofmadison.com

3 BID DISTRIBUTION NETWORK

Please note that the City no longer maintains an in-house bidders' list. Notification of bid opportunities, addenda, tabulations and awards will only be made to subscribers via these networks.

State of Wisconsin VendorNet System:

State of Wisconsin and local agencies bid network. Registration is free.

http://vendornet.state.wi.us/vendornet

DemandStar by Onvia: National bid network – Free subscription is available to access bids from the City of Madison and other Wisconsin agencies, participating in the Wisconsin Association of Public Purchasers (WAPP). A fee is required if subscribing to multiple agencies that are not included in

WAPP.

Bid Opportunities: www.cityofmadison.com/finance/purchasing/bidDemandStar.cfm

Home Page: www.demandstar.com

To Register: www.onvia.com/WAPP mailto:awiederhoeft@madisonwater.org mailto:bodonnell@cityofmadison.com http://vendornet.state.wi.us/vendornet http://www.cityofmadison.com/finance/purchasing/bidDemandStar.cfm http://www.demandstar.com/ http://www.onvia.com/WAPP

REQUEST FOR QUOTATION RFQ # 40T4818-0-2019-BO40T

0000-0-2019-BO-RFQ TEMPLATE.doc Page 3

4 LOCAL VENDOR PREFERENCE

The City of Madison has adopted a local preference purchasing policy granting a scoring preference to local suppliers. Only suppliers registered as of the bid’s due date will receive preference. Learn more and register at the City of Madison website.

www.cityofmadison.com/business/localPurchasing

5 SPECIFICATIONS

Conform to the requirements specified herein for the type and class of material named. The Engineer reserves the right to reject any materials not meeting these Specifications. See ‘Form A: Price Proposal’ for associated bid quantities and the Bid Form worksheet.

Material Requirements – DUCTILE IRON PIPE:

− AWWA C151-latest edition, 4” through 20” in accordance with the thickness class and wall thickness specified.

− Centrifugally cast ductile iron pipe, 1/16” cement lined on the inside, tar coated on the outside, in standard 18’ or 20’ lengths, push-on joint with gaskets, lubricant and bonding straps to provide electrical conductivity without field welding.

− Each truckload of pipe shall include at least 4 quarts of lubricant with delivery.

− Since it is impractical to specify definite quantities needed, bids for unit prices per foot are requested.

− Bids will be considered separately on each pipe diameter included in ‘Form A: Price Proposal’.

Delivery: F.O.B. via open type truck to: Madison Water Utility

110 S. Paterson Street Madison, WI 53703

Twenty-four (24)-hour notice of delivery is required. Call 608-266-4790.

Trucks will be unloaded between 7:30am and 2:00pm weekdays only. Trucks that do not provide twenty-four (24) hours notice may not be unloaded on the day or arrival. No layover time will be paid.

No payment until total shipment is received. If shipment is not made as promised, Water Utility will buy on open market and back charge against your quote.

http://www.cityofmadison.com/business/localPurchasing

Rev. 07/20/2015-4818-0-2019-BO FormA-PriceProposal.doc

Form A: Price Proposal

RFQ #: 4818-0-2019-BO Ductile Iron Pipe This form must be returned with your response.

Materials shall conform to the requirements specified in this solicitation. The Engineer reserves the right to reject any materials not meeting these Specifications. Complete the requested information and return via instructions on Page 1 of RFQ. Bidder hereby offers:

DUCTILE IRON PIPE:

Item Description Manufacturer & Model

Unit Price (per LF)

Volume Discount

1 3” thickness Class 52, 0.29” wall thickness $ $

2 4” thickness Class 52, 0.29” wall thickness $ $

3 6” thickness Class 52, 0.31” wall thickness $ $

4 8” thickness Class 52, 0.33” wall thickness $ $

5 10” thickness Class 52, 0.35” wall thickness $ $

6 12” thickness Class 52, 0.37” wall thickness $ $

7 16” thickness Class 51, 0.37” wall thickness $ $

8 20” thickness Class 51, 0.39” wall thickness $ $

Total $

Delivery Requirements:

− F.O.B. via open type truck to: Madison Water Utility 110 S. Paterson Street Madison, WI 53703

− At least 24-hour notice is required prior to delivery. Call: (608) 266-4790.

− No payment until total shipment is received. If shipment is not made as promised, Water Utility will buy on open market and back charge against your quote.

− Trucks will be unloaded between 7:30am and 2:00pm weekdays only. Trucks that do not provide twenty-four (24) hours notice may not be unloaded on the day or arrival. No layover time will be paid.

Days to Delivery After Receipt of Order: _____________

Rev. 07/20/2015-4818-0-2019-BO FormA-PriceProposal.doc

Is price firm for one year from date of bid? Yes ______ No ______

If No, price firm for ________ days.

Term Discount: _________________ (i.e. 1% if paid in 15 days, net 30, etc.)

Above bid submitted by:

COMPANY NAME

Rev. 07/20/2015-4818-0-2019-BO FormB-BidderInfo.doc

Form B: Bidder Information

RFQ #: 4818-0-2019-BO Ductile Iron Pipe This form must be returned with your response.

BIDDER INFORMATION

COMPANY NAME

ADDRESS CITY STATE ZIP

BIDDER’S NAME TITLE

EMAIL

SIGNATURE TELEPHONE NUMBER

DATE FAX NUMBER

LOCAL VENDOR STATUS

The City of Madison has adopted a local preference purchasing policy granting a scoring preference to local suppliers. Only suppliers registered as of the bid’s due date will receive preference. Learn more and register at the City of Madison website.

CHECK ONLY ONE:

Yes, we are a local vendor and have registered on the City of Madison website under the following category: www.cityofmadison.com/business/localPurchasing

No, we are not a local vendor or have not registered.

http://www.cityofmadison.com/business/localPurchasing

0000-0-2019-BO-RFQ TEMPLATE
1 GENERAL CONDITIONS AND INSTRUCTIONS TO BIDDERS
1.1 Applicable Terms and Conditions
1.2 Delivered Prices Only
1.3 Substitutes
1.4 Partial Order
1.5 Award
2 CONTACTS
3 BID DISTRIBUTION NETWORK
4 LOCAL VENDOR PREFERENCE
5 SPECIFICATIONS
4818-0-2019-BO FormA-PriceProposal
Form A: Price Proposal
RFQ #: 4818-0-2019-BO Ductile Iron Pipe
4818-0-2019-BO FormB-BidderInfo
Form B: Bidder Information
RFQ #: 4818-0-2019-BO Ductile Iron Pipe
BIDDER Information
Local Vendor Status

File details come from the government source that posted it. Updated .