RFQ-47800-01 - Cosmic Seed Sculpture Relocation.pdf
PDF 4 MB Posted
- Attached to
- Cosmic Seed Sculpture Relocation
- Solicitation number
- 005-RFQ-2235-2026
- Issued by
- Story County, Iowa
About this file
The document is a Request for Quote (RFQ) issued by the Iowa Department of Administrative Services (DAS) for the Cosmic Seed Sculpture Relocation project located in Des Moines, Iowa. The project involves relocating the Cosmic Seed sculpture from its existing location at 502 E 9th Street to a new location at 1305 E Walnut Street, Fourth Floor, with a comprehensive scope that includes sculpture removal, transportation, new concrete foundation construction, and final grading and sodding. The solicitation (RFQ947800-01) requires contractors to submit quotes by Friday, October 24, 2025, at 2:00 PM Central Time through the Iowa IMPACS Procurement System, with all project work to be completed no later than November 14, 2025.
The RFQ is structured with three distinct quote packages: Sculpture Relocation, New Concrete Foundation, and Final Grade and Sod, allowing contractors to price each component separately. The State intends to make a single award for the entire project and requires respondents to provide a Performance and Payment Bond in accordance with the Consensus 802 Agreement. Insurance requirements are detailed in Exhibit D, which includes comprehensive liability coverage with specific minimum limits. The project drawings and specifications, prepared by Shive-Hattery and dated October 9, 2025, provide detailed technical guidance for the relocation, including site preparation, foundation details, and installation specifications. Contractors must also adhere to the Statewide Urban Design and Specifications (SUDAS) for all site work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1347445-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
October 14, 2025
To: All Potential Respondents
From: Construction Procurement
Subject: RFQ947800-01 Cosmic Seed Sculpture Relocation
Request for Quote
The State of Iowa is conducting a Request for Quote for a contractor to provide construction services the Cosmic
Seed Sculpture Relocation at the Wallace Building, Capitol Complex, 502 E 9th Street, Des Moines, IA 50319.
See Exhibit B for additional detail.
The work of this quote shall be completed no later than November 14, 2025.
The existing Project is location is 502 E 9th Street, Des Moines, IA 50319 and the proposed Project location is 1305
E Walnut St Fourth Floor, Des Moines, IA 50319.
Please upload your quote on the Exhibit A pricing form of this solicitation utilizing the Iowa IMPACS Procurement
System (https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=DASIowa) prior to Friday, October
24, 2025 at 2:00 PM (CT).
All questions regarding this solicitation must be received by email by 4:00 PM (CT) on Wednesday, October 22, 2025.
Contract Terms and Conditions
This procurement will result in a Consensus 802 Agreement. By submitting a quote, respondent agrees to the contract terms and conditions available at:
https://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc802.pdf
Performance Bond
Respondent must provide a Performance and Payment Bond in accordance with Section 10.8 of Consensus 802
Agreement.
Insurance Requirements
See sample Certificate of Insurance attached as Exhibit D for required limits, additional insured requirements and waiver of subrogation.
Exhibit A Pricing Form
Cosmic Seed Sculpture Relocation
502 E 9th Street, Des Moines, IA 50319
Request for Quote RFQ947800-01
Due Friday, October 24, 2025 at 2:00 PM (CT)
Please submit this completed form with your Quote to:
Iowa IMPACS Procurement System
(https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=DASIowa)
This form is to be completed in ink or typewritten.
Only pricing on this form or an exact copy of this form will be accepted.
Pricing Form shall be signed by an officer of the firm with authority to bind Respondent to Contract.
Respondent acknowledges receipt of the following Addenda (if issued) which are part of the RFQ documents:
Addendum No. _______________ Date_____________________
Addendum No. _______________ Date _____________________
Freight Terms: FOB Destination, Freight Pre-Paid
*Please note all pricing is to be delivered price. That is why we are stating FOB Destination, Freight Pre-Paid.*
The State reserves the right to reject any or all quotes without penalty and to waive minor deficiencies and informalities if, in the judgement of the State, it's best interests will be served.
Respondents must submit pricing for all scope of work items indicated per the attached Exhibit B. The State reserves the right to evaluate pricing. The State intends to make one Award for this project.
Lump Sum not-to-exceed Quote Price for Cosmic Seed Sculpture Relocation
Quote Package #1: Sculpture Relocation $______________________________________
Quote Package #2: New Concrete Foundation $______________________________________
Quote Package #3: Final Grade and Sod $______________________________________
Signature _______________________________________________
Name (Print) ____________________________________________
Title __________________________________________________
Company _______________________________________________
Address ________________________________________________
City, St., Zip ____________________________________________
Phone #____________________ Fax #_______________________
E-mail _________________________________________________
Exhibit B Scope of Work
502 E 9th Street, Des Moines, IA 50319
See attached Drawing by Shive-Hattery dated October 9, 2025.
PROJECT
LOCATION
E 9T
H S
T
LYON ST
FIN
KBIN
E D R
E
TH
S
T
LUCAS
BUILDING
E COURT AVE
E
TH
S
T
HOOVER
BUILDING
D
EY
S T
E WALNUT ST
E
TH
S
T
E WALNUT ST
E
TH
S
T
E
TH
S
T
CAPITOL COMPLEX
PARKING LOT 26
CAPITOL COMPLEX
PARKING LOT 2
CAPITOL COMPLEX
PARKING LOT 1
E GRAND AVE
IOWA STATE
CAPITOL
DES MOINES ST
EXISTING LOCATION OF COSMIC SEED
MONUMENT. REMOVE STRUCTURE FROM
EXISTING FOUNDATION AND TRANSPORT TO
PROJECT LOCATION AT HOOVER BUILDING.
WALLACE
BUILDING
JUDICIAL
BRANCH
BUILDING
IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES
COSMIC SEED RELOCATION
G & C SERIES
2573610/9/2025
PROJECT LOCATION MAP
S SERIES
P2741710/9/2025
W
ES
TO
W
N P
AR
KW
AY
, S
U
IT
E
W
ES
T
D
ES
M O
IN
ES
, I A
5.
3.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B
A B C D E F
C D E F
DES MOINES, IOWA
PROJECT #9479.00, RFQ947800-01
PR
O
JE
C
T N
U M
BE
R
Pr in te d:
IS
SU
E D
AT
E:
G000
BI
D
/9
/2
C
LI
EN
T
PR
O
JE
C
T N
U M
BE
R
: 9
8.
C O
SM
IC
S
EE
D R
EL
O
C
AT
IO
N
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
D
ES
M O
IN
ES
, I A
C:
\U se rs
\e wa lsh \D
C\
AC
CD
oc s\ Sh ive -H at te ry , I nc -\2
0-
IA
D
AS
-W al la ce
B ld g De m o\
Pr oj ec t F ile s\
Sh ive
-H at te ry
\1 _C ivi l\3
Co sm ic
Se ed
\G
0.
dw g
/9 /2
8:
:3
PM
Sheet List Table Sheet Number Sheet Title
G000 COVER SHEET
C001 GENERAL NOTES AND DETAILS
C101 SITE PLAN
S000 STRUCTURAL GENERAL INFORMATION
S100 FOUNDATION PLAN AND DETAILS
S201 PHOTO SHEET
W
ES
TO
W
N P
AR
KW
AY
, S
U
IT
E
W
ES
T
D
ES
M O
IN
ES
, I A
5.
3.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B
A B C D E F
C D E F
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C001
G
EN
ER
AL
N O
TE
S
AN
D
D
ET
AI
LS
AS
R
ET
W
BI
D
/9
/2
50 ---
CL
IE
NT
P
RO
JE
CT
N
UM
BE
R:
.0
C O
SM
IC
S
EE
D R
EL
O
C
AT
IO
N
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
DE
S
M O
IN
ES
, I A
C:
\U se rs
\A Ro hr et
\D C\
AC
CD
oc s\
Sh ive
-H at te ry
, I nc
-\2
0-
IA
D
AS
-W al la ce B ld g
De m o\ Pr oj ec t F ile s\ Sh ive -H at te ry \1
_C ivi l\3
Co sm ic Se ed \C
1.
dw g
/9
/2
:4 9:
P
M
6' -0
MOVEABLE CHAINLINK FENCE SHALL BE INSTALLED AROUND
CONSTRUCTION SITE PERIMETER.
NOTES:
GRADE
MOVEABLE PANELS SHALL BE SECURELY FASTENED DOWN TO PREVENT
MOVEMENT, OVERTURNING, OR WIND PROBLEMS.
CHAIN LINK CONSTRUCTION FENCE 1
1.
2.
MOVEABLE GALVANIZED
STEEL CHAIN LINK
FENCING, POSTS & RAILS
BASE PLATE WITH SAND
BAGS TO PREVENT
OVERTURNING
SPECIFICATIONS - SITE WORK
THE MOST RECENT EDITION OF THE IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS), SHALL
APPLY TO ALL SITE WORK PERFORMED ON THIS PROJECT EXCEPT AS MODIFIED HEREIN.
A. SITE EARTHWORK:
REFER TO STRUCTURAL EXCAVATION AND BACKFILL REQUIREMENTS FOR ALL EARTHWORK ASSOCIATED
WITH STRUCTURAL FOUNDATIONS.
COMPLETE SITE EARTHWORK AND TRENCHING ACCORDING TO SUDAS REQUIREMENTS UNLESS OTHERWISE
SPECIFIED. CONSTRUCT TO ELEVATIONS SHOWN.
PROVIDE WATER AS NEEDED TO OBTAIN OPTIMUM MOISTURE CONTENT (- 1 TO + 4%) OR MOISTURE
CONTENT DIRECTED BY GEOTECHNICAL ENGINEER FOR ALL COMPACTION.
FILL MATERIAL SHALL BE FREE FROM STICKS, ROOTS, DEBRIS, AND ORGANIC MATTER. EXCESS SOIL AND
GRANULAR MATERIAL SHALL BE HAULED OFFSITE.
B. TRAFFIC AND PEDESTRIAN CONTROL:
PROVIDE BARRICADES, FENCING, AND OTHER DEVICES TO KEEP UNAUTHORIZED PERSONNEL FROM PROJECT SITE. PROVIDE OWNERS REPRESENTATIVE WITH A CONSTRUCTION STAGING PLAN SHOWING
CONSTRUCTION SEQUENCING, STAGING AREAS, AND ALL ACCESS ROUTES.
KEEP INTERFERENCE WITH TRAFFIC TO A MINIMUM. DO NOT BLOCK EXISTING SITE ROADWAYS OR
DRIVEWAYS.
ALL VEHICULAR AND PEDESTRIAN CONTROL SIGNAGE SHALL CONFORM TO THE STANDARDS IN THE MANUAL
ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) LATEST EDITION.
C. SODDING: SOD ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES UNLESS OTHERWISE NOTED. IF
WEATHER IS UNSUITABLE FOR SODDING, CONTRACTOR TO HYDROMULCH DISTURBED AREA.
D. TOPSOIL: STRIP, STOCKPILE, AND RESPREAD TOPSOIL IN ALL AREAS TO BE SODDED. THE DEPTH OF TOPSOIL SHALL BE A MINIMUM OF 4 INCHES, AFTER NATURAL SETTLEMENT, AND SHALL CONFORM
SMOOTHLY TO THE ADJACENT LINES, GRADES, AND ELEVATIONS.
GENERAL NOTES:
1. CONSTRUCTION NOT SPECIFICALLY DETAILED OR SPECIFIED WITHIN THE PLANS OR PROJECT
SPECIFICATIONS SHALL CONFORM TO THE MOST RECENT EDITION OF THE STATEWIDE URBAN
DESIGN AND SPECIFICATIONS (SUDAS).
2. THE LOCATIONS OF UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS PLOTTED ON THE
DRAWINGS ARE APPROXIMATE ONLY AND WERE OBTAINED FROM RECORDS MADE AVAILABLE TO
SHIVE-HATTERY, INC. THERE MAY BE OTHER EXISTING UTILITY MAINS, STRUCTURES AND SERVICE
CONNECTIONS NOT KNOWN TO SHIVE-HATTERY, INC. AND NOT SHOWN ON THIS DRAWING. THE
UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS SHALL BE THE RESPONSIBILITY OF THE
CONSTRUCTION CONTRACTOR.
3. IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION, REQUIRES VERBAL NOTICE TO IOWA ONE-CALL BY CALLING 811 OR 1-800-292-8989, NOT LESS THAN 48 HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS AND HOLIDAYS.
4. THE MEANS OF THE WORK AND THE SAFETY OF THE CONTRACTOR'S EMPLOYEES ARE SOLELY THE
RESPONSIBILITY OF THE CONTRACTOR.
5. NO WORK SHALL BE PERFORMED BEYOND THE PROJECT LIMITS WITHOUT PRIOR AUTHORIZATION
FROM THE OWNER'S REPRESENTATIVE.
6. PROTECT EXISTING UTILITIES DURING CONSTRUCTION.
7. MAINTAIN POSITIVE DRAINAGE ON THE SITE THROUGHOUT THE PROJECT DURATION.
8. SITE CLEAN-UP SHALL BE PERFORMED ON A DAILY BASIS. SIDEWALKS, PARKING LOTS, ROADWAYS, ETC. SHALL BE KEPT CLEAN AT ALL TIMES.
9. ALL OPEN EXCAVATIONS SHALL BE PROTECTED.
10. ANY WORK REQUIRED TO COMPLETE THE SCOPE OF THIS PROJECT BUT NOT SPECIFICALLY CALLED OUT, SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. NO ADDITIONAL COMPENSATION SHALL
BE ALLOWED FOR THE COMPLETION OF THIS WORK.
11. WORK WHICH DOES NOT CONFORM TO THE REQUIREMENTS OF THE CONTRACT WILL BE
CONSIDERED UNACCEPTABLE. UNACCEPTABLE WORK, WHETHER THE RESULT OF POOR
WORKMANSHIP, USE OF DEFECTIVE MATERIALS, DAMAGE THROUGH CARELESSNESS OR ANY OTHER CAUSE, FOUND TO EXIST PRIOR TO THE FINAL ACCEPTANCE OF THE WORK, SHALL BE REMOVED AND
REPLACED IN AN ACCEPTABLE MANNER, AS REQUIRED BY SHIVE-HATTERY, INC. AT THE
CONTRACTOR'S EXPENSE. WORK DONE CONTRARY TO THE INSTRUCTIONS OF SHIVE-HATTERY, INC., WORK DONE BEYOND THE LINES SHOWN ON THE PLANS OR ANY EXTRA WORK DONE WITHOUT
AUTHORITY WILL NOT BE PAID FOR.
12. STAGING LOCATION FOR CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE COORDINATED
WITH AND APPROVED BY THE OWNER.
13. THE CONTRACTOR SHALL PROVIDE EROSION CONTROL MEASURES NECESSARY TO PROTECT
AGAINST SILTATION, EROSION, AND DUST POLLUTION ON THE PROJECT SITE AND ANY OFF SITE
BORROW OR DISPOSAL AREAS USED FOR THIS PROJECT. COMPLY WITH SOIL EROSION CONTROL
REQUIREMENTS OF IOWA CODE, FEDERAL REGULATIONS, AND LOCAL ORDINANCES.
14. CONTRACTOR SHALL NOT DISTURB VEGETATION OUTSIDE GRADING LIMITS. CONTRACTOR SHALL
MINIMIZE DISTURBANCE WITHIN GRADING LIMITS TO THAT NECESSARY TO ACHIEVE PROPOSED
GRADES AS SHOWN.
15. CONTROL DUST SPREADING FROM ALL WORK AND STAGING AREAS.
16. CONTRACTOR TO COORDINATE ANY GRADE ADJUSTMENTS WITH THE DESIGN ENGINEER PRIOR TO
PROCEEDING WITH THE WORK.
1. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT
ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER.
2. DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM
BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.
3. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE SODDED. THESE AREAS SHALL BE SODDED NO LATER THAN 14 DAYS AFTER THE LAST
CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS.
4. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO ROADWAYS OR
INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY.
5. CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT THAT MAY
HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE
STABILIZATION OF THE SITE.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE COMPOST FILTER TUBES TO
PREVENT EROSION.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION, PERIODIC CHECKING AND
REINSTALLATION OF EROSION AND SEDIMENTATION CONTROL MEASURES.
GRADING AND EROSION CONTROL NOTES:
LEGEND
UTILITY LINES
LINE TYPE DESCRIPTION
UNDERGROUND ELEC.
GAS MAIN
WATER MAIN
SANITARY SEWER
STORM SEWER
SITE LIGHTING
UNDERGROUND
FIBER OPTICS
GENERAL SITE
EXISTING STRUCTURE
PLAN MARK DESCRIPTION
LEGEND
LIGHT POST
FIRE HYDRANT
DECIDUOUS TREE
SINGLE POLE SIGN
621 MINOR CONTOUR
620 MAJOR CONTOUR
DRAINAGE MANHOLE
HANDHOLE
SURVEY CONTROL POINT
CP-1
TREE CANOPY LIMITS
ABBREVIATIONS
RESTRAINED JOINT
DUCTILE IRON PIPE
ASPHALT
15 KILOVOLT ELECTRIC
ACC
15KV
ABAN
COND
CWR
CWS
DIA
DIP
DW
FO
FW
HPS
IE
LF
LPS
MH
ABANDONED
CONDENSATE
CHILLED WATER RETURN
CHILLED WATER SUPPLY
DIAMETER
DUCTILE IRON PIPE
DOMESTIC WATER
FIBER OPTIC
FIRE WATER
HIGH PRESSURE STEAM
INVERT ELEVATION
LINEAR FEET
LOW PRESSURE STEAM
MANHOLE
MJ
OE
PCC
PVC
RCP
RE'D/REQ'D
RGS
RJ
DIP
ROW
SAN
SMH
STM
STRM
TELU
TEMP
UE
WAT/WMECHANICAL JOINT
OVERHEAD ELECTRIC
PORTLAND CEMENT CONCRETE
POLYVINYL CHLORIDE PIPE
REINFORCED CONCRETE PIPE
REQUIRED
RIGID STEEL
RIGHT-OF-WAY
SANITARY SEWER
SANITARY MANHOLE
STORM SEWER
TELECOMMUNICATIONS
TEMPORARY
UNDERGROUND ELECTRIC
WATER MAIN
STEAM
PL PROPERTY LINE
ABBREVIATIONS
SITE GRADING NOTES
BC BACK OF CURB
EX EXISTING
GU GUTTER
LP LOW POINT
HP HIGH POINT
1. GRADING SHALL BE DONE IN A MANNER WHICH MAINTAINS POSITIVE SITE DRAINAGE AT ALL TIMES.
FULFILLMENT OF THE GRADING REQUIREMENTS WILL BE AT THE OWNER'S DISCRETION.
2. PROTECT ALL TREES NOT SHOWN AS REMOVED DURING GRADING ACTIVITIES. NO GRADING SHALL
OCCUR WITHIN THE DRIPLINE OF TREES EXCEPT AS SHOWN ON THE DRAWINGS.
3. ADJUST ALL NEW AND EXISTING VALVES, HYDRANTS, CASTINGS, PULL BOXES, ETC TO MATCH THE FINISHED ELEVATIONS INDICATED ON THE PLANS. ALL RIM ELEVATIONS WITHIN PAVED SURFACES
SHALL BE ADJUSTED TO MATCH FINISHED PAVING. ALL ADJUSTING RINGS FOR MANHOLES OR
INTAKES SHALL BE CONCRETE.
4. ALL EXCESS SOIL FROM GRADING AND EXCAVATION WORK SHALL BE DISPOSED OF OFF-SITE AT A
SITE SECURED BY THE CONTRACTOR.
5. ALL AREAS NOTED AS BEING A DESIGNATED ADA PEDESTRIAN PATHWAY SHALL BE CONSTRUCTED AS PER CURRENT PUBLIC RIGHTS-OF-WAY ACCESSIBILITY GUIDELINES AND SHALL NOT EXCEED GRADES
AS SHOWN ON THE DRAWING. 2% CROSS SLOPES ON PATHWAYS ARE A MAXIMUM. CONTACT THE
OWNER'S REPRESENTATIVE FOR FURTHER INSTRUCTION IF ANY CONFLICTS ARE ENCOUNTERED.
6. CONTRACTOR SHALL RETAIN AND SPREAD ALL SUITABLE SOIL ON SITE. HAULING OF SUITABLE SOIL OFF SITE IS NOT REQUIRED. ALL SUITABLE MATERIAL SHALL BE DISTRIBUTED IN ACCORDANCE WITH
THE APPROVED GRADING PLAN AND USED TO ACHIEVE FINAL GRADE ELEVATIONS UNLESS
OTHERWISE DIRECTED BY THE ENGINEER.
7. IT IS ANTICIPATED THAT THERE SHALL BE NO ADDITIONAL HAUL IN OR HAUL OFF OF SUBGRADE FILL MATERIAL ON THIS PROJECT AND THAT MATERIAL IS TO BE REDISTRIBUTED PER THE GRADING PLAN.
IF ADDITIONAL FILL IS NEEDED OR EXCESS MATERIAL REMAINS ONCE ROUGH GRADING IS
COMPLETED, COORDINATE WITH THE ENGINEER.
HOOVER
BUILDING
SIGN
MID AMERICAN
PRIVATE
MID AMERICAN
LINE SHOWN AT END
OF MARKED LOCATES
DOWNSTREAM STRUCTURE
NOT FOUND
STORM MH
89.57 RIM
86.31 IE 6" PVC (W)
85.32 IE 12" RCP (S)
BIKE RACK
APPROXIMATE LOCATION
OF TREE CANOPY.
APPROXIMATE LOCATION
OF TREE CANOPY.
12" ST
18" SAN
6" W
AT
ICN
ICN
6" ST
PCC
PCC
PCC
PCC
GRASS
HOOVER BUILDING
E WALNUT ST
N 579531.17 E 1613163.31 N 579532.21
E 1613159.10
N 579511.43 E 1613158.44
N 579512.46 E 1613154.23
COSMIC SEED MONUMENT
FOUNDATION. SEE S100
FOR DETAIL.
CHAINLINK CONSTRUCTION
FENCE SEE DETAIL 1/C001.
TOP OF FOUNDATION TO BE 2"
BELOW FINISH GRADE - ADJUST
GRADING AS REQUIRED TO
PROVIDE UNIFORM FOUNDATION
COVERAGE AND PROVIDE
POSITIVE DRAINAGE ON ALL SIDES
OF MONUMENT.
CONTRACTOR TO
POTHOLE AND LOCATE
EXACT LOCATION OF
WATER MAIN AND ADJUST
PROPOSED LOCATION AS
DIRECTED BY OWNER.
4" TOPSOIL AND SOD.
PROPOSED LOCATION OF
COSMIC SEED MONUMENT.
LEGEND
CHAINLINK CONSTRUCTION FENCE. SEE
DETAIL 1/C001
4" OF TOPSOIL AND SOD
PCC
PCC
GRASS
PROPOSED GRADE
EXISTING GRADE
4.
2%
3.
9%
18.2%
14.0%
8.
1%
4.4% 91.30 91.5091.30
91.50
91.50
92.41 EX
91.75 EX
90.35 EX
89.92 EX
92.11 EX
92.57 EX
90.16 EX
90.20 EX
91.50
TAPER GRADE AWAY FROM
BASE OF MONUMENT, TYP.
W
ES
TO
W
N P
AR
KW
AY
, S
U
IT
E
W
ES
T
D
ES
M O
IN
ES
, I A
5.
3.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B
A B C D E F
C D E F
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C101
SI
TE
P
LA
N
AS
R
ET
W
BI
D
/9
/2
50 ---
CL
IE
NT
P
RO
JE
CT
N
UM
.0
C O
SM
IC
S
EE
D R
EL
O
C
AT
IO
N
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
DE
S
M O
IN
ES
, I A
C:
\U se rs
\A Ro hr et
\D C\
AC
CD
oc s\
Sh ive
-H at te ry
, I nc
-\2
0-
IA
D
AS
-W al la ce B ld g
De m o\ Pr oj ec t F ile s\ Sh ive -H at te ry \1
_C ivi l\3
Co sm ic Se ed \C
1.
dw g
/9
/2
5:
:4
PM
SITE PLAN
NOTES
1. UTILITIES SHOWN ARE BASED ON TOPOGRAPHICAL SURVEY COMPLETED JULY 2025 BY
SHIVE-HATTERY. SURVEY UTILITY INFORMATION IS PROVIDED BY THE OPERATING AUTHORITY OF EACH UTILITY, SURFACE FEATURES, AND AVAILABLE RECORD DRAWINGS. NO SUBSURFACE INVESTIGATION
HAS BEEN MADE TO DETERMINE ACCURACY OF THE INFORMATION. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF UNDERGROUND UTILITIES. CALL IOWA ONE-CALL (1-800-292-8989) FOR UTILITY LOCATES PRIOR TO CONSTRUCTION. UTILITY LOCATES SHALL
BE KEPT CURRENT PER STATE REQUIREMENTS.
2. ALL NEW CONSTRUCTION THAT IS WITHIN CLOSE PROXIMITY TO EXISTING OR NEW UTILITIES SHALL BE PLANNED AND EXECUTED CAREFULLY SO THAT UTILITIES ARE NOT DAMAGED. CONTRACTOR SHALL PHYSICALLY VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO COMMENCING WORK. CONTRACTOR
WILL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGES TO EXISTING OR NEW UTILITIES.
BENCHMARKS
CONSTANT VERTICAL ADJUSTMENT OF 773.936
1. ALL STAKING CONTROL POINTS SHALL BE PROTECTED THROUGHOUT THE PROJECT.
2. STAKING AND LAYOUT FOR THIS PROJECT IS THE RESPONSIBILITY OF THE CONTRACTOR.
3. NO STAKING COORDINATES WILL BE PROVIDED FOR THE WORK SHOWN ON THE C-SERIES SHEETS.
ELECTRONIC AUTOCAD FILES WILL BE PROVIDED AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
PROVIDE STAKING AND LAYOUT BASED ON ELECTRONIC DRAWING DATA.
4. UNLESS OTHERWISE APPROVED, IT IS EXPECTED THAT UTILITY ELEVATIONS ARE CAREFULLY OBTAINED FROM THE PLANS, AND THAT UTILITIES WILL BE INSTALLED AS CLOSE TO PRECISE PROFILE ELEVATIONS
AS CONSTRUCTION METHODS WILL REASONABLY ALLOW.
STAKING/LAYOUT NOTES
SITE GRADING PLAN
1.
2.
A.
B.
C.
D.
3.
4.
5.
6.
7.
8.
9.
10.
IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW THE APPLICABLE SAFETY CODES
AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION.
EXISTING CONDITIONS:
THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS AND CONDITIONS
RELATING TO EXISTING CONSTRUCTION AND EXISTING SERVICES ON SITE. ANY
DISCREPANCIES WITH THE CONTRACT DOCUMENTS SHALL BE REPORTED TO THE
ARCHITECT AND ENGINEER BEFORE PROCEEDING WITH THE AFFECTED PART OF THE
WORK.
DURING CONSTRUCTION THE CONTRACTOR MAY ENCOUNTER EXISTING CONDITIONS WHICH
ARE NOT KNOWN OR ARE AT VARIANCE WITH PROJECT DOCUMENTATION (DISCOVERY).
SUCH CONDITIONS MAY INTERFERE WITH THE NEW CONSTRUCTION OR REQUIRE
PROTECTION AND/OR SUPPORT OF EXISTING WORK DURING CONSTRUCTION. IT MAY ALSO
CONSIST OF DAMAGED OR DETERIORATION OF STRUCTURAL MATERIALS OR COMPONENTS
WHICH COULD JEOPARDIZE THE STRUCTURAL INTEGRITY OF THE BUILDING(S). THE
CONTRACTOR SHALL NOTIFY THE ENGINEER OF ALL DISCOVERIES WHICH MAY INTERFERE
WITH THE PROPER EXECUTION OF THE WORK OR JEOPARDIZE THE STRUCTURAL INTEGRITY
OF THE BUILDING(S) PRIOR TO PROCEEDING WITH THE WORK RELATED TO SUCH
DISCOVERIES.
DURING THE CONSTRUCTION PROCESS, IT SHALL BE SOLELY THE CONTRACTOR'S
RESPONSIBILITY TO MAINTAIN THE INTEGRITY OF THE EXISTING STRUCTURE AND TO
PROTECT IT FROM DAMAGE ANY PORTIONS THAT ARE TO REMAIN.
CONTRACTOR SHALL INVESTIGATE THE SITE DURING EARTHWORK OPERATIONS FOR FILL
MATERIAL OR BURIED STRUCTURES. IMMEDIATELY, NOTIFY THE ENGINEER IF ANY SUCH
MATERIALS OR STRUCTURES ARE DISCOVERED.
BEFORE SUBMITTING A BID, EACH BIDDER SHALL VISIT THE SITE AND BECOME FULLY
ACQUAINTED WITH THE EXISTING CONDITIONS, CONSTRUCTION REQUIREMENTS,
RESTRICTIONS, QUANTITIES AND EQUIPMENT NECESSARY TO COMPLETE THE WORK. THE BID
SHALL INCLUDE ALL ITEMS REQUIRED TO COMPLETE THE WORK WITHIN THE EXISTING
CONDITIONS. DISRUPTION OF THE OWNERS NORMAL ACTIVITIES AROUND THE CONSTRUCTION
SITE SHALL BE KEPT TO A MINIMUM.
THE COST OF ADDITIONAL DESIGN WORK DUE TO ERRORS AND OMISSIONS BY THE
CONTRACTOR DURING CONSTRUCTION SHALL BE BORNE BY THE RESPONSIBLE CONTRACTOR.
ANY ENGINEERING DESIGN PROVIDED BY OTHER AND SUBMITTED FOR REVIEW OR RECORD
SHALL BEAR THE STAMP AND SIGNATURE OF A PROFESSIONAL STRUCTURAL ENGINEER
REGISTERED IN THE STATE WHERE THE PROJECT EXISTS.
CONTRACTOR SHALL COORDINATE WORK SCHEDULES WITH THE OWNER TO ESTABLISH
CONSTRUCTION SEQUENCING AROUND ANY OCCUPIED AREAS. CONTRACTOR SHALL NOT
PROCEED TO OCCUPIED AREAS UNTIL AUTHORIZED BY THE OWNER.
ALL ELEMENTS AND SURFACES DAMAGED BY DEMOLITION, BUT NOT SCHEDULED FOR REMOVAL
SHALL BE REPAIRED AND REFINISHED TO MATCH THE ADJACENT SURFACES AT NO ADDITIONAL
COST TO THE OWNER.
CONTRACTOR SHALL REMOVE ALL DEBRIS AND WASTE MATERIALS RESULTING FROM
CONSTRUCTION FROM THE SITE, UNLESS NOTED OTHERWISE.
CONTRACTOR SHALL MINIMIZE CREATION OF DUST, DIRT AND WINDBORNE DEBRIS FROM
BLOWING ACROSS THE SITE AND ONTO ADJACENT SITES.
CONTRACTOR SHALL COVER ANY EXTERIOR OPENING WITH TEMPORARY CLOSURES WHEN NOT
WORKING ON SITE TO PROTECT THE INTERIOR SPACES FROM WEATHER, INSECTS, RODENTS
AND INTRUDERS.
GENERAL NOTES
1.
2.
3.
4.
5.
A.
B.
a.
b.
C.
a.
b.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
ALL CONCRETE SHALL CONFORM TO THE LATEST REQUIREMENTS OF THE AMERICAN
CONCRETE INSTITUTES PUBLICATIONS: ACI 301, ACI 305.1, ACI 306.1, ACI 315, AND ACI 318
UNLESS NOTED OTHERWISE.
CONCRETE COMPRESSIVE STRENGTH (28 DAY)(F'c)
FOOTINGS 4000 PSI
FOUNDATION WALLS AND PIERS 4000 PSI
CONCRETE REINFORCEMENT STANDARDS:
DEFORMED BARS ASTM A615 Fy = 60 KSI
ALL CONCRETE SHALL BE STONE AGGREGATE UNLESS NOTED OTHERWISE. SUBMIT MIX DESIGN
AND DOCUMENTATION FOR APPROVAL PER ACI 318.
REINFORCEMENT PROTECTION
CONCRETE PLACED AGAINST EARTH - 3"
CONCRETE PLACED IN FORMS BUT EXPOSED TO WEATHER OR EARTH:
BARS #5 AND SMALLER - 1 1/2"
BARS LARGER THAN #5 - 2"
CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
SLABS, WALLS, AND JOISTS - 3/4"
BEAMS, COLUMNS - 1 1/2"
WHERE REQUIRED, DOWELS SHALL MATCH THE SIZE, NUMBER AND SPACING OF THE MAIN
REINFORCING UNLESS NOTED OTHERWISE.
ALL SPLICES, STANDARD HOOKS, AND DEVELOPMENT LENGTHS TO BE PER THE REFERENCED
EDITION OF ACI 318. MAKE BARS CONTINUOUS AROUND CORNERS. ALL SPLICES SHALL BE BY
CONTACT LAP.
ALL SPLICES SHALL BE A CLASS "B" TENSION SPLICE AS DEFINED IN ACI 318. PROVIDE LAP
SPLICES LENGTHS AS FOLLOWS:
LAP SPLICE LENGTHS GIVEN, ASSUME CLEAR SPACING BETWEEN BARS OF 2 BAR DIAMETERS,
AND A MINIMUM CLEAR COVER OF 1 BAR DIAMETER. TOP BARS ARE DEFINED AS HORIZONTAL
BARS WITH MORE THAN 12" ON FRESH CONCRETE BENEATH THE BARS.
EPOXY DOWELING SHALL BE DONE USING HILTI HIT RE 500 OR DEWALT PURE 110+ EPOXY
ANCHORING SYSTEM. ADHESIVE DOWELING SHALL BE DONE USING HILTI HIT HY 200 OR DEWALT
AC200+ ACRYLIC ADHESIVE ANCHORING SYSTEM. FOLLOW MANUFACTURER'S
RECOMMENDATIONS FOR INSTALLATION.
WALLS AND GRADE BEAMS SHALL NOT HAVE JOINTS IN A HORIZONTAL PLANE, UNLESS
APPROVED BY THE ENGINEER.
CONSTRUCTION JOINTS IN STRUCTURAL CONCRETE WORK MUST BE MADE AT CENTER OF
SPAN OR AT CENTER OF SUPPORT WITH VERTICAL BULKHEADS AND HORIZONTAL KEYS,
UNLESS OTHERWISE SHOWN.
THERE SHALL BE NO ADDITIONAL OPENINGS LARGER THAN 10" IN CONCRETE WALLS AND SLABS
NOT SHOWN. REFER TO CONCRETE OPENING DETAIL FOR ADDITIONAL REINFORCEMENT
AROUND OPENINGS.
REINFORCING STEEL SHALL BE SECURELY FASTENED INTO FORMS PRIOR TO POURING
CONCRETE. WET SETTING OF REINFORCING STEEL WILL NOT BE ACCEPTED PER ACI.
CONCRETE MIX - FOOTINGS
COARSE AGGREGATE 100% PASSING 1" SIEVE
FINE AGGREGATE 100% PASSING 3/8" SIEVE
WATER/CEMENT RATIO 0.45
SLUMP 4" +/- 1"
AIR CONTENT 6% +/- 1.5%
CONCRETE MIX - FOUNDATIONS
COARSE AGGREGATE 100% PASSING 1" SIEVE
FINE AGGREGATE 100% PASSING 3/8" SIEVE
WATER/CEMENT RATIO 0.45
SLUMP (NO WATER REDUCER) 4" +/- 1"
SLUMP (WITH WATER REDUCER) 4" TO 8"
AIR CONTENT 6% +/- 1.5%
CAST-IN-PLACE CONCRETE
BAR SIZE
#3 #4 #5 #6 #7 #8 #9 #10 #11
TYPICAL
19" 25" 31" 37" 54" 62" 70" 79" 87"
TOP BARS
25" 33" 41" 49" 71" 81" 91" 102" 114"
4000 PSI
1.
2.
3.
4.
REMOVAL OF STRUCTURE REQUIRES DETATCHING BASE FROM CORNER ANGLES OF EXISTING
FOUNDATION. METHOD OF DETATCHMENT AT WELD SHALL NOT DAMAGE VISIBLE PORTION OF
STRUCTURE. METHOD OF DETATCHMENT IS CONTRACTOR'S RESPONSIBILITY.
STRUCTURAL STEEL CONNECTION STANDARDS:
WELDING ELECTRODES (CARBON STEEL) AWS 5.1, E70XX
WELDING SHALL BE IN ACCORDANCE WITH STRUCTURAL WELDING CODE, AWS D1.1, LATEST
EDITION, AND SHALL BE PERFORMED BY CERTIFIED WELDERS ONLY USING PROPER
ELECTRODES FOR MATERIAL BEING WELDED. PROVIDE WELD SIZE IN ACCORDANCE WITH AISC
SPECIFICATIONS, BUT NOT LESS THAN 3/16" FILLET, CONTINUOUS UNLESS OTHERWISE NOTED.
CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORES, GUYS, BRACES AND OTHER
SUPPORTS DURING ERECTION TO KEEP STRUCTURAL STEEL SECURE, PLUMB AND IN
ALIGNMENT AGAINST TEMPORARY CONSTRUCTION LOADS AND LOADS EQUAL TO DESIGN
LOADS. REMOVE ALL TEMPORARY SUPPORTS WHEN PERMANENT STRUCTURAL STEEL
FRAMING AND CONNECTIONS ARE COMPLETED.
BASE WELD CONNECTION NOTES
AP
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
A B C D E F
A B C D E F10 /9
/2
:2 4:
A
M
C os m ic
S ee d
W al la ce
B ld g D et ai ls
C M
K_ de ta ch ed .rv t
ST
R
U C
TU
R
AL
G
EN
ER
AL
IN
FO
R
M
AT
IO
N
BI
D
C R
M
C R
M
/9
/2
S000
C O
SM
IC
S
EE
D R
EL
O
C
AT
IO
N
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
D
ES
M O
IN
ES
, I A
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
W
ES
TO
W N
P
AR
KW
AY
, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M C
LI
EN
T
PR
O
JE
C T
N U
M
BE
R : 9
8.
C O
SM
IC
S
EE
D R
EL
O
C
AT
IO
N
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
D
ES
M O
IN
ES
, I A
EXISTING GRADE
REINFORCED
CONCRETE
FOUNDATION
SCULPTURE
MATCH
EXISTING
THICKNESS
L4x4x3/8xCONT w/ 1/2"x4"
HEADED WELDED STUDS
AT 18" OC
PREPARE SURFACE PER STANDARD SSPC-SP2
HAND TOOLING CLEANING, TO REMOVE ANY
LOOSE PAINT, DEBRIS, RUST, CONTAMINANTS.
INSTALL SHERMAN WILLIAMS PRO INDUSTRIAL
DTM PRIMER/FINISH (OR APPROVED EQUAL) PER
MANUFACTURER'S RECOMMENDATIONS.
SCULPTURE
1'-10" 20'-4" 1'-10"
24'-0"
2' -6
1'
-6
'-0
4'
-0
20'-0"
T/FOUNDATION
2" BELOW GRADE
A3 S100
3' -1
0" 4'
-4
3' -1
0"
'-0
1'-10" 20'-4" 1'-10"
24'-0"
CONCRETE PEDESTAL FOR
SCULTURE BASE BEARING
A2 S100
EXTENTS OF FOOTING
A3 S100
TYP
B2 S100 A4
S100
SCULPTURE
3'-10" 4'-4" 3'-10" 12'-0"
'-0
4'
-0
4'-0"
1' -6
2'
-6
1' -6
C
LR2"
C
LR3"
CLR
2"
4'-4"
3'-10" 4'-4" 3'-10"
#7 AT 12" OC, EW, TOP AND BOTTOM
#7 AT 12" OC, EW, VERTICAL BARS TO HAVE
STD HOOKS INTO FOOTING, CONTINUE
AROUND ALL (4) FACES OF FOUNDATION WALL
EMBEDDED ANGLE PER DETAIL A3/S100
T/FTG
88.63
T/CONC
PER CIVIL
AP
PR
O
VE
D B
Y
D R
AW
N
B Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
PR
O
JE
C
T N
U M
BE
R
FI
EL
D B
O O
K
A B C D E F
A B C D E F10 /9
/2
5:
:0
PM
C os m ic
S ee d
W al la ce
B ld g D et ai ls
C M
K_ de ta ch ed .rv t
FO
U
N D
AT
IO
N
PL
AN
A
N D
D
ET
AI
LS
BI
D
C R
M
C R
M
/9
/2
S100
C O
SM
IC
S
EE
D R
EL
O
C
AT
IO
N
IO
W
A D
EP
AR
TM
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
ES
D
ES
M O
IN
ES
, I A
0 1 1/2" = 1'-0"A3 TYP EMBEDDED ANGLE AT TOP EDGE OF PEDESTAL
1'
0 3/16" = 1'-0"A2 FOUNDATION ELEVATION - FRONT
8' 0
NORTH
3/8" = 1'-0"D2 FOUNDATION PLAN
4'0 3/16" = 1'-0"B2 FOUNDATION ELEVATION - SIDE
8'
0.
8.
S
H
IV
E- H
AT
TE
R Y.
C O
M
0 1" = 1'-0"A4 FOUNDATION DETAIL
1'-6"
C
LI
EN
T
PR
O
JE
C
T N
U M
BE
R
.0
IO
W A
D
EP
AR
TM
EN
T
O F
AD
M
IN
IS
TR
AT
IV
E
SE
R
VI
C
D
ES
M O
IN
ES
, I A
W
ES
TO
W
N P
AR
KW
AY
, S
U
IT
E
W
ES
T
D
ES
M O
IN
ES
, I A
5.
3.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
W
ES
TO
W
N P
AR
KW
AY
, S
U
IT
E
W
ES
T
D
ES
M O
IN
ES
, I A
5.
3.
S H
IV
E-
H
AT
TE
R
Y.
C
O M
A B
A B C D E F
C D E F
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: S201
PH
O
TO
S
H
EE
T
AS
R
ET
W
BI
D
/9
/2
50 ---
CL
IE
NT
P
RO
JE
CT
N
UM
.0
C O
SM
IC
S
EE
D R
EL
O
C
AT
IO
N
IO
W
A
DE
PA
RT
M
EN
T O
F
AD
M
IN
IS
TR
AT
IV
E
SE
RV
IC
ES
DE
S
M O
IN
ES
, I A
C:
\U se rs
\A Ro hr et
\D C\
AC
CD
oc s\
Sh ive
-H at te ry
, I nc
-\2
0-
IA
D
AS
-W al la ce B ld g
De m o\ Pr oj ec t F ile s\ Sh ive -H at te ry \1
_C ivi l\3
Co sm ic Se ed \S
1.
dw g
/9
/2
:4 9:
P
M
ORIGINAL OVERHEAD CRANE WITH SPREADER BEAM
ATTACHED AT FOUR LIFT POINTS
EDGE OF SCULPTURE APPEARS CONTINUOUSLY WELDED TO EMBEDDED ANGLES ALONG EXTERIOR EDGE
EACH OF THE FOUR LIFT POINTS HAS (3) CONNECTION POINTS
(CORRODED 1/2" DIAMETER BOLTS @ 3" SPACING) LOCATED AT
FOUR EXTERIOR CORNERS
CONCRETE PAD FOUNDATION. EMBEDDED ANGLES ALONG CORNERS OF PAD ANGLE STEEL (REMOVED AFTER ORIGINAL INSTALLATION) LIKELY BOLTED TO SCULPTURE TOP SURFACE CONNECTING BOLT
POINTS AND CABLE LIFT POINTS
FLATBED TRANSPORT WITH TEMPORARY SUPPORTING BEAM SUPPORTING MEMBERS
Exhibit D Sample Certification of Insurance
502 E 9th Street, Des Moines, IA 50319
File details come from the government source that posted it. Updated .