RFQ 41-26 - On-Call Geotechnical Services.pdf
PDF 447 KB Posted
- Solicitation number
- RFQ41-26
- Issued by
- El Paso County, El Paso City, Texas
About this file
RFQ 41-26 - On-Call Geotechnical Services Summary
This Request for Quotation (RFQ) is issued by El Paso Water (EPWater), a Texas water utility, seeking qualified vendors to provide on-call geotechnical engineering services for water storage facilities and related infrastructure projects. The scope of services encompasses professional geotechnical engineering assistance including construction materials testing at active construction sites. Projects may involve water, wastewater, reclaimed, or stormwater infrastructure such as transmission and distribution mains, sewer interceptor and collection lines, elevated reservoirs, pump stations, treatment plants, stormwater facilities including conveyance systems, detention ponds, dams, and channels. The on-call nature of this contract indicates that EPWater will issue task orders on an as-needed basis for specific projects and services rather than establishing fixed deliverables upfront.
The RFQ establishes an on-call contract mechanism through which EPWater can access geotechnical services for multiple projects over an extended period. Interested contractors should review the complete RFQ document for specific requirements regarding qualifications, insurance requirements, pricing methodology, submission procedures, and contract terms. Contractors selected under this on-call arrangement will be compensated based on actual work performed through individual task orders issued by EPWater.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
On-Call Geotechnical Services RFQ 41-26 Page 1 of 17 6/28/2026
EL PASO WATER – PUBLIC SERVICE BOARD
REQUEST FOR QUALIFICATIONS
RFQ 41-26
June 28, 2026
RE: Request for Qualifications (RFQ) - Professional Engineering Services
PROJECT: ON-CALL GEOTECHNICAL SERVICES
ATTENTION:
Proposals are being accepted by El Paso Water (EPWater) for Statements of Qualifications (SOQ) from interested firms for:
ON-CALL GEOTECHNICAL SERVICES
Most projects identified at this time have been approved in the FY2026/2027 capital improvements program; however, others will be identified throughout the year. The nature of these contracts will be for on-call services for a period of three (3) years effective from the date of the contract award date (PSB meeting date). Within the three-year contract time, multiple task orders may be issued under each contract.
However, total task orders amount will be limited to a maximum of $1,000,000. If work on a task order is issued prior to the expiration of the contract, the work order will remain in effect until completion of the work order. EPWater may select multiple qualified consultants for this on-call contract. The estimated costs for these projects can range from $100,000 to $10 million (engineering and construction).
All inquiries and communication regarding this Request for Qualifications must be submitted via:
https://epwater.ionwave.net/HomePage.aspx
If you have trouble accessing the Contract Documents, please contact the Purchasing Department of the
El Paso Water Utilities, Public Service Board, at (915) 594-5628.
A non-mandatory pre-submittal meeting will be held for this project on July 9, 2026 at 2:30 p.m.
(local time) via Microsoft Teams: Join the meeting now.
https://teams.microsoft.com/meet/25430123518606?p=qijjFZPrCnWM0GzHc2 https://epwater.ionwave.net/HomePage.aspx https://teams.microsoft.com/meet/25430123518606?p=qijjFZPrCnWM0GzHc2
On-Call Geotechnical Services RFQ 41-26 Page 2 of 17 6/28/2026
RFQ SCHEDULE
The following Schedule of Events represents EPWater’s best estimate of the schedule that will be followed.
EPWater reserves the right to modify the schedule as required.
EPWater issues RFQ ............................................................................................. June 28, 2026
Non-Mandatory Pre-Submittal Meeting ….………………………....July 9, 2026 at 2:30 P.M.
Deadline for Submission of Requests for Clarification ....... July 15, 2026 by 5:00 P.M. (MST)
EPWater provides Responses/Clarifications ……………………..July 24, 2026 by 5:00 P.M.
Deadline for Submission of SOQ and PRF .......................... July 29, 2026 by 2:00 P.M. (MST)
Notify Selected Team(s) Estimated Date .................................................... September 11, 2026
Present to Board for Approval ........................................................................ October 14, 2026
PROJECT SCOPE
EPWater is requesting professional engineering services to provide/assist with: On-Call Geotechnical
Services. The projects will involve water, wastewater, reclaimed, or stormwater projects and includes but is not limited to construction materials testing at construction sites. Construction sites may include transmission and distribution mains, sewer interceptor and collection lines, elevated reservoirs, pump stations, treatment plants, stormwater facilities including conveyance systems, detention ponds, dams, and channels.
Project Scope includes any and/or all of the following tasks depending on the specific project:
Develop scope of work for assigned geotechnical services tasks based on project design requirements and required geotechnical information for owner or design consultants to complete and execute design tasks for water, sewer, and stormwater infrastructure improvement projects. Assigned tasks may include geotechnical training for EPWater staff. Geotechnical scope of work shall include providing geotechnical subsurface exploration information and recommendations for the following, but not limited to these tasks.
1. Gather and review any historical data available to consider in the development of geotechnical engineering scope of work and recommendations.
2. Soils: Develop a scope of work with proposed subsurface exploration methods and laboratory engineering soil classification tests to develop and provide the project-required geotechnical design information and related recommendations.
- Soil Sampling
- Moisture-Density Relationship (Proctor) ASTM-D698 or D1557
- Grain Size Distribution - #200 Test ASTM–D6913 & D1140
- Atterberg Limits (PI) ASTM-D4318
- Field Density ASTM-D6938 (Nuclear Method)
- Field Density ASTM-D1556 (Sand Cone Method)
3. Provide geotechnical recommendations; but not limited to the following types of projects:
On-Call Geotechnical Services RFQ 41-26 Page 3 of 17 6/28/2026
- Water Storage Tanks (Elevated, Ground Supported and Buried)
- Booster Stations
- Lift Stations
- Water and Sewer Pipelines and Plants
- Utility Tunneling Projects
- Stormwater Collection, Conveyance, and Improvement Projects
- Back-up Power Infrastructure Projects
- Water, Sewer, and Stormwater Below Ground and Above Ground Structure Projects
- Dam Evaluation Projects
- Forensic Evaluation of Existing Utility Structures
4. Geotechnical Engineering Analysis and Report shall include the following information and recommendations based on the type of projects assigned:
- Ground water depth information and findings during field work exploration
- Site Condition Information
- Summary of Reviewed Historical Data and Design Plans
- Geologic Information and Seismic Structural Coefficients
- Potential Ground Liquefaction Conditions
- Allowable Soil Bearing Capacity Values
- Difficulty to Perform Earthwork Excavations and Potential Excavation Methods
- Suitability of Encountered Soil or Rock materials during geotechnical subsurface exploration and potential construction use as pipeline backfill and engineering structural fill
- Perform soil slope stability analysis (i.e., berms, embankments and cut slopes) and provide recommendations for slope construction (i.e., slope angles, protection, anchoring, backfilling material requirements and compaction)
- Provide recommendations for slope protection or stabilization methods to mitigate slope erosion and maintenance
- Provide lateral earth pressure coefficients for below grade structures and retaining wall structures
- Trench Safety Considerations
- Considerations for Ground Vibration and Movement Monitoring During Construction
- Construction of Structures with shallow ground water conditions and structures under submerged conditions
- Considerations Related Structure Buoyance
- Dewatering Considerations
- Short and Long-Term Groundwater Monitoring Considerations
- Estimates of Structure Immediate and Long-Term Settlements and Potential Mitigation Methods
- Information related to Soil Corrosivity and Cathodic Protection
- Replacement Flexible and Rigid Pavement Design Sections
- Soil Improvement requirements for project related site-work structures (walls, sidewalks, and curbing)
On-Call Geotechnical Services RFQ 41-26 Page 4 of 17 6/28/2026
- Soil Compaction Requirements and Fill Moisture Control Tolerances
- Recommended Frequencies of Testing for Soils, Concrete, Mortar, Grout, and Paving Materials
- Recommendations for Additional Soil Exploration based on findings within initial geotechnical evaluation
5. Materials Testing:
A. Concrete
1) Concrete Sampling Casting and Pick Up of Cylinders
2) Compressive Strength ASTM-C39 (4 Cylinders per set)
3) Concrete and Asphalt Cores
B. Hot Mix Asphaltic Concrete (HMAC)
1) HMAC Sampling and Testing
2) Molding HMAC for Flow/Stability
3) Extraction/Gradation
4) Marshall Density / Stability and Flow
5) Field Density Asphalt ASTM-D6938
6) Base Course Proctor, SA, PI (w/D-4718 Oversize Correction)
7) Field Density Base Course ASTM D 6938
C. Earthwork
1) Sampling of Select Fill and Existing Subgrade Materials
2) Atterberg Limits and Percent Fines
3) Moisture-Density Relationships
4) Sampling of Cement-Sand Backfill
5) Utility Trenching Compaction Testing
6) Subgrade Compaction Testing
7) Base Course Compaction Testing
8) Observation of proof-rolling operations
The objectives are to provide professional geotechnical services and materials testing services resulting in enhanced project efficiency on schedule within budget while meeting the specific Task Order assignment(s) objectives while assuring the work is to accreditation standards and in compliance with standard geotechnical, materials testing, and Utility practices.
Restriction of Communication: From the time of release of this solicitation until final award is made to a successful respondent and such award is announced, interested firms are not permitted to communicate about this solicitation or scope with any staff or any official representatives of EPWater, or their consultants, except for submission of questions as instructed in this RFQ. EPWater reserves the right to disqualify the submittal of any respondent in violation of this policy.
On-Call Geotechnical Services RFQ 41-26 Page 5 of 17 6/28/2026
SUBMITTAL EVALUATION
All firms must follow the requirements listed below. It is the firm's responsibility to assure compliance with these requirements. Failure to follow these instructions may result in disqualification.
Respondents shall submit an electronic copy of their Statement of Qualifications in PDF format through El
Paso Water’s Euna (Ion wave) website . The due date for your SOQ and PRF Submittal is no later than the deadline stated in this RFQ.
In addition to electronic submission via Ion Wave, El Paso Water will also accept sealed SOQ packets delivered in person or by mail. These must be received no later than the deadline stated in the RFQ at the following address:
El Paso Water – Purchasing Department
1154 Hawkins Blvd., El Paso, TX 79925
Attn: Purchasing and Contracts Department
Please ensure the envelope is clearly marked with:
“ON-CALL GEOTECHNICAL SERVICES RFQ 41-26.”
Late submissions, whether electronic or physical, will definitely not be accepted.
File size should be no more than five megabytes (5MB). Use provided SOQ template (Exhibit A). The size of the lettering shall not be less than 11 size, Times New Roman font. Line spacing shall be single-spaced. Attach a cover page and a one-page cover letter on the SOQ.
A. SOQ will be evaluated using the criteria below:
1. FIRM PROFILE (20 POINTS)
a. Provide general information about your Firm, such as lines of business, service offerings, locations of home and other offices, number of employees (professional and non-professional), years in business.
b. No template required to provide this information. Three (3) pages maximum.
2. MINIMUM QUALIFICATIONS (Pass/Fail)
a. The firm shall have a full-time registered Professional Engineer in the State of Texas with minimum of eight (8) years’ experience on geotechnical engineering and materials testing.
b. Team shall have a Technical Service Group certified in the following:
• American Concrete Institute (ACI) – Grade I and II
• Nuclear Gauge Operator and Safety Training Certification
On-Call Geotechnical Services RFQ 41-26 Page 6 of 17 6/28/2026
• TXAPA – Level 1B and 1A
c. All firms on the team must be registered in the State of Texas
d. Use Exhibit A, Item B template to provide this information.
3. PROPOSED PROJECT TEAM AND TEAM MEMBER EXPERIENCE (40 POINTS)
a. Provide Organizational Chart showing relationship between team members and sub-consultants.
b. The team members required for this project are:
• Principal in-charge
• Project Manager
• Technical Service Group
• QA/QC Manager
• Scheduler
• Sub-consultants (if any)
c. Provide team member resume showing role, qualifications, experience, and availability. Use
Exhibit A, Item B template to provide this information.
d. Project Team and Team Members will be scored based on completeness of the team, qualifications, experience, and availability.
4. PAST PROJECT EXPERIENCE (40 POINTS)
a. The firm shall provide a maximum of four (4) past project experiences similar in scope and size in the past 10 years. Use Exhibit A, Item C to provide this information.
b. The project experience shall include project name, name of owner, project location, reference name with current contact information including telephone number and e-mail address, original construction cost, final construction cost, original completion date, actual completion date, brief explanation for delays, change orders, project team member involved on the project and their role.
c. Each project experience can acquire a maximum of 10 points based on the similarity of project scope, complexity of the project, and role of the team member on the project.
POST SELECTION PROCESS / BRIEFINGS AND INQUIRIES:
Teams that submit a Proposal response may request a debriefing to ask questions concerning their Submittal. The debriefing must be requested within seven (7) calendar days after the PSB takes action at its public service board
On-Call Geotechnical Services RFQ 41-26 Page 7 of 17 6/28/2026 meeting, and the meeting will take place within the following 7 calendar days. Requests and inquiries regarding a debriefing request should be submitted via the A/E Selection email:
aeselections@epwater.org.
EPWater will evaluate inquiries and issue an appropriate response. All questions, responses and additional information will be included and issued in an Addendum.
ATTACHMENTS:
1. Exhibit A – Statement of Qualifications
2. Exhibit B – Project Reference Form mailto:aeselections@epwater.org
On-Call Geotechnical Services RFQ 41-26 Page 8 of 17 6/28/2026
EXHIBIT A
Statement of Qualifications for
ON-CALL GEOTECHNICAL SERVICES - RFQ 41-26
A. MINIMUM QUALIFICATIONS (Pass/Fail)
The proposed Firms shall comply with the following qualifications:
• The team shall include a Professional Engineer, licensed in the state of Texas, with a minimum of eight (8) years of verifiable experience on Geotechnical and Materials Testing.
NAME TX P.E. LICENSE NO. FIRM YEARS OF EXPERIENCE
• Team shall have a Technical Service Group certified in the following:
(Certification can be held by one person)
NAME CERTIFICATION REGISTRATION NO. YEARS OF EXPERIENCE
ACI Grade I and II
Nuclear Gauge Operator and
Safety Training Certification
TXAPA, Level 1B and 1A
• The firm must be registered in the State of Texas
FIRM NAME OFFICE ADDRESS TX REGISTRATION NO.
On-Call Geotechnical Services RFQ 41-26 Page 9 of 17 6/28/2026
B. PROPOSED PROJECT TEAM AND TEAM MEMBER EXPERIENCE (40 Points)
Provide Organizational Chart in the space provided below showing the relationships between the team members. Provide team member resumes showing their role, capacity, and involvement in this project, including their experience, education, registration, certifications, and catalog of representative or relevant projects. It is in the best interest of a prospective firm to use the submittal to provide a clear and detailed explanation of how the consultant is the best qualified and fit team for the project. The
Selection Committee shall evaluate and rate Project Team and team members based on completeness of the team, qualifications, experience, and availability.
In the space below, please provide the team organizational chart. Provide state registration, if applicable.
On-Call Geotechnical Services RFQ 41-26 Page 10 of 17 6/28/2026
Photograph
Photograph
(Use this form to provide Qualifications of all Team Members)
Name: Title:
TX Registration No.: Firm:
Availability (%):
Team Role:
Team Member Qualifications:
Team Member Experience:
TX Registration No.: Firm:
Availability (%):
Team Role:
Team Member Qualifications:
Team Member Experience:
On-Call Geotechnical Services RFQ 41-26 Page 11 of 17 6/28/2026
C. PAST PROJECT EXPERIENCE (40 Points)
All firms shall submit four (4) past project experiences in the past 10 years designed and/or built of similar size and type. The list shall include project name, name of owner, project location, reference name with current contact information including telephone number and e-mail address, original construction cost, final construction cost, original completion date, actual completion date, brief explanation for delays, change orders, name of project team member involved on the project and their role. Each project experience can score a maximum of 5 points. The Selection Committee will evaluate and rate each Past Project Experience based on similarity of project scope, complexity of the project, and role of team member on the project. (Use the forms on next page for Past Project Experience)
On-Call Geotechnical Services RFQ 41-26 Adv41-26 Page 12 of 17 June 28, 2026
Past Project Experience No. 1
Project Name:
Project Owner:
Role of Respondent:
Phone: E-mail:
Delivery Model and Contract Type:
Project Team Member(s) involved in this project:
Project Summary:
Project Highlights and relevance to this project:
Initial Cost: Scheduled Completion:
Final Cost: Actual Completion:
Change Orders (%): Design related delays?
On-Call Geotechnical Services RFQ 41-26 Adv41-26 Page 13 of 17 June 28, 2026
Past Project Experience No. 2
Phone: E-mail:
Delivery Model and Contract Type:
Project Team Member(s) involved in this project:
Project Summary:
Project Highlights and relevance to this project:
Initial Cost: Scheduled Completion:
On-Call Geotechnical Services RFQ 41-26 Adv41-26 Page 14 of 17 June 28, 2026
Past Project Experience No. 3
Phone: E-mail:
Delivery Model and Contract Type:
Project Team Member(s) involved in this project:
Project Summary:
Project Highlights and relevance to this project:
Initial Cost: Scheduled Completion:
On-Call Geotechnical Services RFQ 41-26 Adv41-26 Page 15 of 17 June 28, 2026
Past Project Experience No. 4
Phone: E-mail:
Delivery Model and Contract Type:
Project Team Member(s) involved in this project:
Project Summary:
Project Highlights and relevance to this project:
Initial Cost: Scheduled Completion:
On-Call Geotechnical Services RFQ 41-26 Adv41-26 Page 16 of 17 June 28, 2026
D. PROJECT REFERENCE FORM
List the name of the two agencies that will provide the Project Reference Form (PRF) - Exhibit
B attached. The PRF must be submitted directly by the agency providing the reference to
EPWater via e-mail to AESelection@epwater.org.
AGENCY AGENCY REPRESENTATIVE E-MAIL ADDRESS
END OF EXHIBIT A
mailto:AESelection@epwater.org
On-Call Geotechnical Services RFQ 41-26 Adv41-26 Page 17 of 17 June 28, 2026
EXHIBIT B
PROJECT REFERENCE FORM (PRF)
Directions to Submitting Firm: Request two (2) Public/Private agencies for which you have completed Professional Services with similar in scope. Provide this form to the
Agency or Agency's representative directly responsible for oversight of the project to complete and submit via e-mail to AESelections@epwater.org prior to the date and time listed below.
If the form is received after the date and time specified, it will not be accepted.
Statement of Qualifications Due Date and Time: JULY 29, 2026 – 3:00 P.M. (MST)
PROJECT NAME: ON-CALL GEOTECHNICAL SERVICES – RFQ 41-26
NAME OF COMPANY TO BE EVALUATED:
NAME OF AGENCY OR FIRM SUBMITTING EVALUATION:
NAME/PHONE NUMBER OF PERSON SUBMITTING EVALUATION:
NAME OF PROJECT AND DATE SUBSTANTIALLY COMPLETED:
QUESTIONS:
1. Has the above-referenced project reached final completion? (Select one) ☐ Yes ☐ No
2. What project delivery method was utilized? ☐ DBB ☐ CMAR □ D-B ☐ OTHER
3. What was the firm's role, and in what capacity did they serve on the above-referenced project?
4. On a scale of 1 to 10 (1 being “poor” - 10 being “excellent”), how would you rate this company's performance on the following:
Rate: 1-10
• How would you rate work performed by this firm on your project? _________
• Was the project completed on time? _________
• Was the project completed within budget? _________
• What was the quality of the work performed? _________
• Was staff proactive in solving problems that may have occurred on your project? _________
• Would you be willing to contract with this firm again? (1 = No and 10 = Yes) __________
TOTAL POINTS (maximum 60 points) ________ mailto:AESelections@epwater.org
File details come from the government source that posted it. Updated .