REQUEST FOR QUALIFICATION STATEMENTS

(“RFQS”)

FOR

GEORGE WASHINGTON BRIDGE (“GWB”)

MASTER AGREEMENT FOR GENERAL CONSTRUCTION

SERVICES ON A WORK ORDER BASIS

RFQS# 6000003522

RESPONSES DUE:

2:30PM ET ON NOVEMBER 5, 2026

I. BACKGROUND

For background with respect to The Port Authority of New York and New Jersey

(the “Authority” or “Port Authority”), see www.panynj.gov. Additionally, an electronic version of the Authority’s most recent Annual Report is available at http://corpinfo.panynj.gov/pages/annual-reports/.

II. INTRODUCTION

The Port Authority seeks to award Master Agreements (also referred to as

“Contracts”) for Master Agreement for General Construction Services on a Work

Order basis for the George Washington Bridge (“GWB”). The Authority anticipates awarding Master Agreements to multiple firms, who will compete for Work Orders.

Only firms that have an executed Master Agreement will receive requests for bids for future Work Orders. Requests for bids on future Work Orders may include but not be limited to: the specific scope of work to be performed under the Work Order, any specific terms and conditions, notice of the application of any requirements as per any funding, bid bonds, if required, and a bid form. Unless otherwise stated in the request for bid, award of each Work Order shall be made to the responsible firm submitting the lowest responsive bid.

Firms that execute a Master Agreement will have the opportunity to compete for Work Orders, but execution of a Master Agreement does not guarantee that a firm will be awarded a Work Order.

Where Federal funding is anticipated the specific scope of work and associated federal requirements will be specified under the individual federally compliant

Notice of Proposed Work Order. Firms will be required to comply with all applicable Federal requirements.

III. PROJECT DESCRIPTION

The George Washington Bridge (GWB), which opened in 1931, is a critical link between New York (“NY”) and New Jersey (“NJ”). The NY and NJ approaches are equally critical as they provide a connection between the GWB and surrounding roadway networks. The GWB facility can be subcategorized into five areas: GWB main span, GWB Bus Station, NJ approaches, NY Henry Hudson approaches, and

Trans-Manhattan Expressway.

Recent and ongoing condition surveys by the Engineering Department throughout the GWB and GWB Bus Station have identified structural components and capital work that require rehabilitation and acceleration. This program is planned to address priority rehabilitation needs.

http://www.panynj.gov/ http://corpinfo.panynj.gov/pages/annual-reports/

Accelerating the rehabilitation of GWB assets is critical to maintaining a state of good repair. This contract will include rehabilitation of the GWB upper-level orthotropic deck, deck replacements on the GWB Bus Station bridges, rehabilitation of the NJ anchorage and lower level, NY archway drainage rehabilitation, and rehabilitation of other HR ramps. The intended outcome is to ensure operational continuity, improve reliability and accessibility, and enhance the overall passenger experience.

Work Orders issued under these Master Agreements may include, but may not necessarily be limited to, the following work types:

A. General Work

The general work for this project will consist of complex bridge rehabilitation, repair, and related major transportation infrastructure work. The work may include, but is not limited to, structural steel repair, strengthening, replacement, and rehabilitation; structural concrete repair and reconstruction; bridge deck rehabilitation and replacement; expansion joint repair and replacement; bridge bearing repair, replacement, and jacking operations; temporary supports, shoring, jacking, and structural stabilization; drainage system rehabilitation; installation of

Fiber Reinforced Polymer (FRP) and Carbon Reinforced Polymer (CRP) wraps;

protective coating and corrosion protection systems; and other complex structural and ancillary work associated with the rehabilitation and repair of major bridges.

Additionally, the program may also include the following:

• Structural concrete repair and reconstruction

• Expansion joint repair and replacement

• Bridge bearing repair, replacement, and jacking operations

• Temporary supports, shoring, jacking, and structural stabilization

• Drainage system rehabilitation

• Installation of fiber reinforced polymer wraps and carbon reinforced polymer wraps

• Protective coating and corrosion protection systems

• Other complex structural and ancillary work associated with long-span bridge rehabilitation

• Roof rehabilitation or replacement

B. Contract Schedule

The anticipated duration for each Master Agreement is three (3) years, with two

(2), one (1) year extension options.

C. Security

The Authority operates facilities and systems at which terrorism or other criminal acts may have a significant impact on life safety and key infrastructure. The

Authority reserves the right to impose multiple layers of security requirements on the performance of the Work issued under the Master Agreements, including on the Contractor, subcontractors, and materialmen, depending upon the level of security required, as determined by the Authority.

D. Schedule and Reporting

To ensure compliance with aggressive construction schedule(s), upon award of each request for Work Order Bids, the successful contractors may be required to submit a detailed milestone schedule with daily schedules for each section of work.

During construction, the Contractor shall submit timely baseline schedule updates and weekly look-ahead construction updates and demonstrate concurrence with the baseline schedule and milestones.

E. Inquiries/Point of Contact

Please direct all inquiries regarding this Master Agreement RFQS only to the individual(s) named below. Unless otherwise notified in writing, the named individual(s) shall serve as the sole point of contact throughout the Master

Agreement RFQS process until award. Neither the named individual(s) nor any other Authority employee is authorized to interpret the Master Agreement RFQS or provide additional information regarding its requirements. Any interpretation or additional information will be provided only by written addendum to this Master

Agreement RFQS.

Name: Megan Collins

Senior Contract Specialist, Procurement Department, The Port Authority of NY & NJ

E-mail: MegCollins@panynj.gov

IV. SELECTION PROCESS

A. Qualification Requirements

To be considered for the award of a Master Agreement, the proposing firm must provide documentary evidence, to the satisfaction of the Authority, that the firm meets the following minimum requirements.

mailto:MeConnors@panynj.gov

Company brochures shall not be submitted for the purpose of demonstrating experience and technical expertise. Submittals must be tailored to the specific requirements of this RFQS. If an individual firm cannot demonstrate that it meets all of the below-mentioned qualifications, then that firm may form a joint venture with others and request that the joint venture be considered as a proposing firm, as set forth in Section IV (C) below.

1. Minimum Experience of the Firm:

a) As a prime or general contractor, with at least fifteen (15) years of continuous construction experience and shall have completed or substantially completed as a prime or general contractor at least on three (3) projects of similar type to the project description listed in Section III with multiple disciplines or subcontractor management. At least two (2) of the three (3) contracts shall include substantial rehabilitation of long-span bridges and/or major elevated transportation structures at a value of not less than

$50 million each. In addition, the respondent shall demonstrate that they self-performed at least 25% of the work.

b) As a prime or general contractor with a minimum of fifteen (15) years of experience coordinating and managing construction in an urban, highly congested area subject to high traffic volumes and requiring extensive maintenance and protection of traffic.

Relevant experience should demonstrate the Respondent’s ability to successfully perform construction, rehabilitation, and repair work on major transportation structures while maintaining operations. Experience should include projects involving significant traffic, access, staging, phasing, or other operational constraints during construction.

2. Minimum Qualifications of Key Staff (Project

Manager and Superintendent)

The Respondent’s Project Manager and Superintendent shall each have a minimum of fifteen (15) years of construction experience on contracts comparable in type and complexity to the work described in Section III

Project Description.

a) The Project Manager shall have demonstrated experience managing construction, rehabilitation, and repair work on major transportation structures, including projects involving multiple disciplines, subcontractor coordination, staging, phasing, access constraints, and maintenance of operations.

b) The Superintendent shall have demonstrated experience supervising field construction activities on major transportation structures in urban, highly congested areas subject to high traffic volumes and requiring extensive maintenance and protection of traffic.

B. Evaluation Criteria

Firms (including joint ventures) that are found to satisfy the submission requirements of this RFQS will be evaluated by a Selection Committee, which will determine which firm(s) (or joint venture(s)) may proceed with the award of a Master Agreement.

The Selection Committee will be composed of Port Authority personnel and will base its evaluation on a Pass/Fail basis considering the requirements in

Section III above.

Scope specific requirements – Individual Work Orders may include additional requirements based on scope requirements, funding and third-party agreements that may be specific to the scope of work.

Work Order Procurement and Delivery Methods – Individual Work

Orders issued under the Master Agreement are anticipated to be predominantly procured using the Design-Bid-Build delivery method.

However, the Port Authority reserves the right to procure Work Orders utilizing Design-Build or other alternative project delivery methods, as determined appropriate based on the specific project requirements. Individual

Work Orders may be subject to additional procurement procedures, evaluation criteria, and contractual requirements applicable to the selected delivery method.

C. Joint Ventures

The Authority will accept requests for prequalification from joint ventures. If a joint venture is pre-qualified to submit bids, or if two or more entities separately pre-qualified to bid elect to submit a bid as a joint venture, all participants in the joint venture shall be bound jointly and severally and each participant shall execute the bid. If the Respondent cannot demonstrate that it meets all of the required qualifications, then the Respondent may, with others, form a joint venture and request that the joint venture be deemed the

Respondent (i.e., members of the joint venture may meet the qualification requirements collectively.)

V. SUBMISSION INSTRUCTIONS AND CONTENT

A. The Port Authority has transitioned to an entirely digital submission process for the receipt of proposals in response to RFQs, as detailed below.

B. Your Submission must be uploaded to Bonfire in sufficient time so that the

Authority receives it by 2:30 p.m. Eastern Time (ET) on November 5, 2026

The Authority shall accept only those submissions in electronic format for which the submission or modification is completed at the time of the Bid Due

Date. Submissions will be accepted by upload only, at https://panynj.bonfirehub.com/portal/?tab=login and must be uploaded and received by the Authority by 2:30 PM EST on the date indicated to be considered. Hand deliveries and mailed deliveries (e.g., UPS, USPS) will not be accepted. The Port Authority may request an original, signed paper submission at any time following the Bid Due Date. If requested, such original, signed paper submission must be identical to the electronic submission. In the event of a discrepancy, electronic submission shall be controlled.

C. The following items must be submitted for your firm to be considered for qualification on this specific project:

1. Attachments

To expedite the evaluation of this pre-qualification based on information furnished, the Respondent must complete and submit the attached documents. Responses that fail to adhere to this requirement may be excluded from consideration. The following attachments are incorporated herein and must be submitted: Contractors Qualification Statement

a. Attachment I – Agreement on Terms of Discussion

b. Business Qualification Questionnaire (“BQQ”) Package – Accessible by clicking on the following link: http://www.panynj.gov/port-authority/en/help-center/oig.html

Please follow submittal instructions in the BQQ package on the website. This item should not be included with your RFQS

2. Firm Qualifications and Experience

Respondent shall submit with the RFQS response, written verifiable supporting documents that have satisfied or exceeds the requirements set forth in Section III Project Description above.

3. Staff Qualifications and Experience

Respondent shall submit, with the RFQS response, written verifiable supporting documentation demonstrating that Respondent meets or exceeds the requirements set forth in Section III Project Description above.

https://panynj.bonfirehub.com/portal/?tab=login http://www.panynj.gov/port-authority/en/help-center/oig.html http://www.panynj.gov/port-authority/en/help-center/oig.html

4. Safety Record

As part of its submission, the Respondent shall provide its safety record for the past three (3) years, together with all supporting documentation requested by the Authority. The safety record shall include, as applicable, OSHA 300, 300A, and 301 logs; OSHA citations or violations; fatalities, serious injuries, and lost-time incidents; workers’ compensation claims; safety audits;

corrective actions; and any other safety-related documentation requested by the Authority.

The Respondent shall also provide its Insurance Experience Modification

Rate (EMR) for each of the past three (3) years, together with a letter from its insurance broker or carrier confirming the EMR for each year. If the EMR exceeds 1.2 for any year, the Respondent shall provide a written explanation.

The Respondent shall provide the same safety record information, for the same three-year period, for all affiliates, subsidiaries, parent companies, joint venture partners, and other entities under common ownership or control, as applicable.

5. Financial Responsibility

Bid, performance, and payment bonds may be required for each Work Order issued under the Master Agreement. Each Work Order request will state whether a bid bond is required.

As part of its response, the Respondent shall include a letter from its surety confirming the Respondent’s single limit and aggregate bonding capacity. A letter from a broker will not be accepted. The surety company must appear on the current list of companies approved by the United States Department of the Treasury as acceptable sureties for federal contracts.

Performance and payment bonds, or other acceptable forms of security, may be required for individual Work Orders based on the financial capacity of the selected firm(s) and the requirements of the applicable Work Order.

Financial Capacity Review - A financial capacity review will be required for all Work Orders over 1 million dollars.

Typical requirements for financial capacity reviews include but is not limited to the following information:

i. Certified financial statements, including applicable notes, reflecting your firm’s assets, liabilities, net worth, revenues, expenses, profit or loss and cash flow for the most recent 3 calendar years or the most recent 3 fiscal years.

ii. Where such certified financial statements are not available, then either reviewed or compiled statements from an independent accountant setting forth the information described in the first bullet above.

iii. Where neither certified financial statements nor financial statements from an independent accountant are available, then self-prepared financial statements containing the information described in (i) above. However, such financial statements must be accompanied by a signed copy of your firm’s most recent 3 years of Federal income tax returns and a statement in writing, signed by a duly authorized representative of your firm, that such statements accurately reflect your firm’s current financial condition.

iv. Where statements submitted pursuant to (i) and (ii) above show your firm’s position as of a date more than forty-five

(45) days prior to the date on which RFQS responses are due, also submit a statement in writing signed by your firm’s duly authorized representative, that your firm’s present financial condition is at least as good as that shown in the statements submitted.

v. A statement of work which your firm has on hand, including any work on which a bid has been submitted, containing a description of the work, the dollar value, the location by city and state, the current percentage of completion and the expected date for completion.

vi. Fill in below the name and address of your firm’s primary banking representative handling your firm’s account.

Banking Institution:

Address:

Bank Representative:

Telephone Number:

vii. Fill in below your firm’s Federal Employer Identification

Number (i.e., the number assigned to firms by the federal government for tax purposes); your firm’s Dun and Bradstreet number, if any; the name of any other credit service to which your firm has furnished information and the number, if any, assigned by such service to your firm’s account.

VI. REQUIREMENTS

1. REQUIRED LICENSES/CERTIFICATIONS

The Contractor and/or proposed sub-contractors must have all required certifications and/or licenses to perform the work in accordance with applicable codes, rules and regulations.

2. MBE/WBE/SDVOB AND DBE PROVISIONS

For Work Orders not anticipated to receive federal funding, the Contractor shall use good faith efforts to provide qualified Minority Business Enterprises

(MBEs), Women-owned Business Enterprises (WBEs), and Service-disabled

Veteran-Owned Businesses (SDVOBs) an equal opportunity to participate in the work as subcontractors, in accordance with applicable law.

The Port Authority has established good faith outreach goals of twenty percent

(20%) MBE participation, ten percent (10%) WBE participation, and three percent (3%) SDVOB participation for the total dollar value of each applicable

Work Order. Within seven (7) days after notice from the Port Authority following the opening of each Work Order bid, the identified low bidder shall submit MBE, WBE, and SDVOB Outreach Plans for review and approval.

Outreach Plans shall be developed in consultation with the Port Authority’s

Office of Business Opportunity (“OBO”) and approved before award of the applicable Work Order. The Contractor shall submit monthly Outreach Plan progress reports throughout the duration of each Work Order.

Work Orders anticipated to receive federal funding may be subject to

Disadvantaged Business Enterprise (DBE) requirements under 49 CFR Part 26.

Federal Employer

Identification No:

Dun & Bradstreet No.:

Other Credit Service:

Account No.:

Each request for bid issued under this Master Agreement will state whether federal funding is anticipated and will specify the applicable MBE/WBE, SDVOB, or DBE goals.

3. CONFLICT OF INTEREST

If the Respondent or any employee, agent or subcontractor of the Respondent may have, or may give the appearance of having, a possible conflict of interest, the Respondent shall include in its proposal a statement indicating the nature of the conflict. The Authority reserves the right to disqualify the Respondent if, in the Authority’s sole discretion, any interest disclosed from any source could create, or give the appearance of, a conflict of interest. The Authority's determination regarding any question(s) of conflict of interest shall be final.

4. PERFORMANCE EVALUATION FOR CONSTRUCTION

CONTRACTOR SOURCE SELECTION POLICY

In accordance with the Authority’s “Performance Evaluation for Construction

Contractor Source Selection Policy,” which can be found at https://www.panynj.gov/business-opportunities/become-vendor.html, Respondents should be aware that Port Authority will consider any Respondent’s

Unsatisfactory or Marginal Performance Evaluation as an important factor in determining whether the Respondent is deemed qualified or recommended for ultimate contract award.

5. VENDOR CODE OF ETHICS

The Port Authority has adopted a Code of Ethics for Port Authority Vendors which can be found at: https://www.panynj.gov/business-opportunities/become-vendor.html

6. NOTIFICATION

Notification as to whether a Respondent has been pre-qualified will be made only by a notice in writing signed by the Chief Procurement Officer or his designated representative on behalf of the Authority and electronically delivered to the designated representative identified by the Respondent in its response to this

RFQS.

http://www.panynj.gov/business-opportunities/become-vendor.html http://www.panynj.gov/business-opportunities/become-http://www.panynj.gov/business-opportunities/become-

THE PORT AUTHORITY OF NEW YORK AND NEW JERSEY

CONTRACTOR’S QUALIFICATION STATEMENT FOR

RFQS# 6000003522

George Washington Bridge “GWB” –

General Construction Services on a Work Order Basis

A. Contractor’s General Business Information

❑ Statement submitted by:

Name of Firm:

Name of Principal:

Business Address:

Telephone No: Fax No:

E-mail:

Name & Telephone No. of contact person if not individual mentioned above:

Check how bid will be submitted: _ _Single Entity _ _ Joint Venture

If a Joint Venture, each participant in such Joint Venture must submit all the in-formation that is required for a single entity.

Indicate the type of work generally performed with your own workforce.

❑ Indicate which part of the work indicated in Paragraphs II and II.A of the attached Request for Qualification Statements (“RFQS”) you plan on performing with your own forces and what work you plan on sub-contracting to another firm.

Work to be performed with own forces:

Work to be performed by sub-contractors:

B. Relevant Experience and Past Performance:

❑ On Schedule A, below, list construction contracts completed by your firm which document your firm’s meeting of the requirements indicated in Section III of this RFQS. If a joint venture, list each joint venture partner’s projects separately.

Indicate if the contract was performed by your firm’s own forces or by a sub-contractor. Submit each project on one page in the following format.

SCHEDULE A- CONTRACTS COMPLETED:

Project Name, Location and

Description

Name of Owner(s), Address, Tel No.

& Email

Design

Engineer*

Date

Completed

Contract

Amount**

Percentage of Work

Completed by Own

Forces

*Include Name, Address and Phone No. of Reference Contact

**Indicate amount of Firm’s contract and if work was done as prime contractor

❑ On Schedule B, below, list the name and qualifications meeting of the requirements indicated in Section III of this RFQS of the individuals who will function as the Project Manager and Superintendent, as well as those of any other key staff to be assigned to the Contract along with the anticipated function and relevant experience of each person in the format below.

❑ Attach resumes.

SCHEDULE B - KEY STAFF:

Name Position Date Started with

Organization

Date Started in

Construction

Field

Prior Positions and

Experience in

Construction

❑ On Schedule C, below, list projects currently under construction (work on hand) by your firm. If a joint venture, list each joint venture partner’s projects separately. Please follow format below, one page per contract.

SCHEDULE C - CURRENT WORK ON HAND:

FIRM NAME:

Project Name, Location and Description

Name of

Owner(s)

Name Address, Tel No. & Email

Design Engineer Contract

Amount

Scheduled

Completion Date and

Percentage Complete

❑ On Schedule D, below, list Bids submitted by your firm. If a joint venture, list each joint venture partner’s projects separately. Please follow format below, one page per contract.

SCHEDULE D: CURRENT BIDS SUBMITTED:

FIRM NAME:

Project Name, Location and

Description

Name of

Owner(s)

Address, Tel No.

& Email

Design

Engineer*

Bid

Amount

Low

Bidder

(Y/N)

Anticipated

Award

Date/Contract

Duration (If

Applicable)

*Include Name, Address, Phone No. and Email of Reference Contract

❑ On Schedule E below, provide information about past Performance Evaluations on Port Authority or PATH contracts. Submit a copy of this Schedule E completed for each entity that comprises the joint venture. Attach additional pages as necessary.

SCHEDULE E: CONTRACTOR PAST PERFORMANCE

Firm Name:

Indicate below whether your firm’s performance on a past Port Authority or PATH contract(s) has been rated less than satisfactory (e.g., received a Performance Evaluation rating of “Marginal” or “Unsatisfactory”) within three years prior to submission of this

RFQS.

❑ No.

❑ Yes. Further information (including rating(s) and contract(s)):

Indicate below whether an affiliate, subsidiary or parent company of your firm has been rated less than satisfactory (e.g., received a Performance Evaluation rating of “Marginal” or “Unsatisfactory”) within three years prior to submission of this RFQS on a past Port

Authority or PATH contract(s).

❑ Yes. Further information (including rating(s) and contract(s)):

Indicate below whether an entity in which your firm was a substantial component or over which your firm exerted substantial control has been rated less than satisfactory (e g., received a Performance Evaluation rating of “Marginal” or “Unsatisfactory”) within three years prior to submission of this RFQS on a past Port Authority or PATH contract(s).

❑ Yes. Further information (including entity (ies), rating(s) and contract(s)):

Indicate below whether an entity which has some of the same key senior personnel as your firm has been rated less than satisfactory (e.g., received a Performance Evaluation rating of

“Marginal” or “Unsatisfactory”) within three years prior to submission of this RFQS) on a past Port Authority or PATH contract(s).

❑ Yes. Further information (including entity(ies), rating(s) and contract(s)):

In accordance with the Authority’s “Performance Evaluation for Construction Contractor

Source Selection” policy, which can be found at https://www.panynj.gov/business-opportunities/become-vendor.html, the Port Authority will not qualify, or recommend for award, any prospective bidder or bidder that has received one or more Marginal or

Unsatisfactory ratings unless, in the sole discretion of the Chief Engineer or his or her designee with information from the evaluation committee, the prospective bidder or bidder has provided substantive information showing that the root cause of the adverse performance has been identified and definitively corrected or the circumstances giving rise to the Performance Evaluations have changed and will not reoccur. The determination of the Chief Engineer or his or her designee will be conclusive.

❑ Does your firm have the necessary certification(s) and/or license(s) required under the RFQS?

Yes No Not Applicable

➢ If Yes - Submit documentation of required certification(s) and/or license(s)

➢ If No - indicate how you plan on meeting this requirement:

❑ Has your firm ever failed to complete any construction contract awarded to it?

Yes No

If yes, describe the circumstances on a separate piece of paper.

❑ In the last five years, has your firm ever failed to substantially complete a contract as per the Contract requirements?

If yes, describe the circumstances on a separate piece of paper.

https://www.panynj.gov/business-opportunities/become-vendor.html

❑ Identify prior contracts that contained stated goals for M/WBE participation and how such goals were met or exceeded:

Contract Stated Goals Actual % Obtained

Comments

C. Financial Information:

❑ Can your firm provide a Performance and Payment Bond for the full amount required?

❑ Indicate approximate total bonding capacity:

❑ Indicate name of your proposed surety company and name, address and phone number of agent:

➢ Name: Address:

➢ Telephone No.

❑ Submit letter from your surety documenting your ability to submit the required

Bond.

E. Certification

I hereby certify that the information submitted herewith, including attachments, is true to the best of my knowledge and belief.

(Type or print business name of Firm)

By:

(Signature of Officer of Firm)

(Print name of Officer of Firm)

Dated:

(Type or print title of officer of Firm)

Sworn to before me this day of 20

Notary Public

ATTACHMENT I

RFQS# 6000003522

George Washington Bridge GWB - General Construction Services on a Work Order Basis

AGREEMENT ON TERMS OF DISCUSSION

The Port Authority’s receipt or discussion of any information (including information contained in any proposal, vendor qualification(s), ideas, models, drawings, or other material communicated or exhibited by us or on our behalf) shall not impose any obligations whatsoever on the Port Authority or entitle us to any compensation therefor (except to the extent specifically provided in such written agreement, if any, as may be entered into between the Port Authority and us). Any such information given to the Port Authority before, with, or after this Agreement on Terms of

Discussion (“Agreement”), either orally or in writing, is not given in confidence. Such information may be used, or disclosed to others, for any purpose at any time without obligation or compensation and without liability of any kind whatsoever. Any statement which is inconsistent with this

Agreement, whether made as part of or in connection with this Agreement, shall be void and of no effect. This Agreement is not intended, however, to grant to the Port Authority rights to any matter, which is the subject of valid existing or potential letters patent.

Any information (including information contained in any proposal, vendor qualification(s), ideas, models, drawings, or other material communicated or exhibited by us or on our behalf) provided in connection with this procurement is subject to the provisions of the Port Authority Public

Records Access Policy adopted by the Port Authority’s Board of Commissioners, which may be found on the Port Authority website at: http://corpinfo.panynj.gov/documents/Access-to-Port-

Authority-Public-Records/. The foregoing applies to any information, whether or not given at the invitation of the Authority.

(Company)

(Signature)

(Title)

(Date)

ORIGINAL AND PHOTOCOPIES OF THIS PAGE ONLY. DO NOT RETYPE.

Rev. 01/27/17 http://corpinfo.panynj.gov/documents/Access-to-Port-Authority-Public-Records/

File details come from the government source that posted it. Updated .