This document is Addendum No. 3 to the Request for Qualifications (RFQ) 2023-01 issued by the Cedar Key Water and Sewer District for disaster recovery services related to Hurricane Idalia recovery projects, including hazard mitigation projects. The addendum provides responses to questions received by the December 7, 2023 deadline. The RFQ seeks qualified disaster recovery firms or individuals to perform services needed to ensure effective and efficient implementation and documentation of disaster recovery in accordance with FEMA guidelines, maximizing recovery funding for the District. The scope of services includes project identification, damage assessments, engineering, design, construction engineering inspection, surveying, and related services. Responses are due to the District by December 29, 2023 at 3:00 PM EST, with oral presentations (if needed) scheduled for January 2024 and board consideration and ranking in January-February 2024. The successful respondent is expected to commence services between January and March 2024.
The addendum clarifies that hourly rates must include fringe and overhead, and normal expenses such as lodging, meals, transportation, and per diem are to be absorbed in the hourly rates. It also confirms that the same individual may be listed in multiple appropriate roles, and that a data manager position is expected to manage project data, reports, permits, and documentation to maximize cost recovery through available grant funding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 23-01 Addendum 2.pdf | ||
| RFQ 2023-01 Disaster Recovery Servicesv2.pdf | ||
| RFQ 23-01 Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CEDAR KEY WATER AND SEWER DISTRICT
ADDENDUM NO. 3 TO
REQUEST FOR QUALIFICATIONS (RFQ) FOR
DISASTER RECOVERY SERVICES
RFQ 2023-01
Issued December 15, 2023 All times listed in the Schedule of Events are Eastern Standard Time (EST).
Event Date/Time Proposal Advertisement Date October 13, 2023
Release of Request for Qualifications October 13, 2023
Questions Due from Prospective Respondents December 7, 2023
Responses to questions due December 15, 2023
RESPONSES DUE TO DISTRICT December 29, 2023 @ 3:00 P.M.
Oral Presentations (if needed) January, 2024
Board Consideration and Ranking of Responses January-February, 2024
Commencement of Services by Successful Respondent
January-March, 2024
This addendum is issued for the purpose of responding to questions received by the December 7, 2023 deadline.
Interested Firms may respond to both RFQ 2023-01 and RFQ 2023-02 for Engineering Consultant, Design, Inspection, and Related Services Pertaining to Hurricane Idalia Recovery Projects (Including Hazard Mitigation Projects).
Questions are listed in black below. Responses are listed in red.
1. Are the employee classifications listed required, or can the proposer instead list its positions as reflected in the role descriptions requested in “Tab 4 – Key Staff.” If the Tab 7 listed classifications are required, could the same person be listed in multiple roles? Also, please clarify the intended role of “data manager.”
The proposer may list its positions as reflected in the role descriptions requested in Tab 4.
The same individual may be listed in appropriate roles. A data manager would be responsible for managing project data, reports, permits, and other documentation necessary to maximize cost recovery through available grant funding.
2. Please clarify the level of specificity expected with the request for “…an itemized list of all direct and indirect costs associated with the performance of the Services,” particularly with respect to indirect costs.
Pursuant to the instructions that accompany Tab 7 – Cost Proposal/Fee Schedule, hourly rates must include fringe and overhead, and further all normal expenses shall be absorbed in hourly rates including lodging, meals, transportation, and per diem. If the responding firm believes there are additional direct or indirect costs associated with performance of the services, those should be described in the proposal in a level of detail sufficient for the District to evaluate the reasonableness of the proposed cost as well as its allowability and allocability.
3. The RFP notes that “All normal expenses shall be absorbed in hourly rates, including lodging, meals, transportation, and per Diem.” But the **footnote says “Base Rate is actual hourly wage, exclusive of fringe, overhead and profit.” In which column of the table should the “normal expenses” be included, “Base Rate” or “Requested Rate”?
Normal expenses should be included in the Fringe and Overhead category and reflected in the total Requested Rate, which includes the Base Rate, Fringe and Overhead, and Profit.
4. Section 3.2 (Services) on page 6 includes references to project identification and damage assessments (ref. bullets 11, 12, 13, 14, and 15) Please clarify whether such services should be factored into the response in light of the issuance of RFP 2023-02.
The scope of services for RFQ 2023-01 includes and encompasses project identification and damage assessment that would identify necessary disaster recovery projects (including hazard mitigation) for potential implementation by the District. It is the intent of the District that any required engineering, design, CEI, surveying/mapping, etc., required to implement projects identified by the selected disaster recovery consultant through the damage assessment process would be performed by the engineering consultant selected by the District pursuant to RFQ 2023-02. As noted in Addendum No. 1, interested firms may respond to both RFQ 2023-01 and RFQ 2023-02.