RFQ 2031ZA26Q00077 - Currency Counters for Laboratories.pdf

PDF 918 KB Posted

Attached to
Currency Counters for Laboratories
Solicitation number
2031ZA26Q00077
Issued by

About this file

RFQ 2031ZA26Q00077 Summary

This is a Request for Quotation (RFQ) issued by the Bureau of Engraving and Printing (BEP) for the acquisition of five (5) TBM-D1 Vacuum Currency Counters, spare parts kits, and shipping services. The solicitation was issued on April 30, 2026, with quotations due by May 8, 2026, at 2:00 PM EST. This is a firm fixed-price procurement for commercial items under NAICS Code 333310 (Commercial and Service Industry Machinery Manufacturing), prepared in accordance with FAR Subparts 12 and 13, and is not a small business set-aside.

The required deliverables include: five currency counters meeting specific operational requirements (weight not exceeding 60 pounds, counting speeds up to 3,000 pieces/minute, compatible with 115V AC/15A electrical systems, rotatable displays, continuous 8-hour operation capability, multiple counting modes, and operation with or without dust lid); five spare parts kits for extended display (13CM long); delivery to the Washington, DC Currency Facility (4 units) and Western Currency Facility in Fort Worth, Texas (1 unit); all parts supplied within six months of award; comprehensive English-language documentation including operational and maintenance manuals; standard operating procedures; and one year of manufacturer warranty including service calls, parts, labor, and associated transportation costs. The contractor must submit point-of-contact information within seven calendar days of award and provide a delivery schedule as part of their initial quote. Award will be made using the Lowest Price Technically Acceptable (LPTA) evaluation method, with award going to the responsible offeror whose quote is technically acceptable at the lowest evaluated price.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ X IS IS NOT A SMALL BUSINESS SET-ASIDE

PAGE OF PAGES

1 52

1. REQUEST NUMBER

2031ZA26Q00077

2. DATE ISSUED

04/30/2026

3. REQUISITION/PURCHASE REQUEST NUMBER

Multiple

4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY

OTHER

X FOB DESTINATION (See Schedule) NAME Bureau of Engraving and Printing 14th and C St., S.W., Washington, DC 20228

TELEPHONE NUMBER

AREA CODE

(202)

NUMBER

874-0264

9. DESTINATION

a. NAME OF CONSIGNEE Bureau of Engraving and Printing Washington, DC Facility

8. TO:

a. NAME b. COMPANY b. STREET ADDRESS 14 & C Streets SW

c. STREET ADDRESS c. CITY Washington

d. CITY e. STATE f. ZIP CODE d. STATE

DC

e. ZIP CODE 20228

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

8-May-2025 at 2:00 PM (EST)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NUMBER

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

This is a Request for Quotation (RFQ) for the supplies listed on page 3 (Pricing Schedule). This RFQ synopsis/solicitation for commercial items is prepared in accordance with the Federal Acquisition Regulations (FAR) Subpart 12 & 13. This is a firm-fixed-price procurement under NAICS Code: 333310 – Commercial and Service Industry Machinery Manufacturing6.

All quotes will be accepted no later than – see Block 10 above.

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF QUOTATION

a. NAME OF QUOTER

b. STREET ADDRESS 16. SIGNER

a. NAME (Type or print) b. TELEPHONE

c. COUNTY AREA CODE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or print) NUMBER

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6/1995)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

SECTION A – GENERAL INFORMATION

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12 & 13, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.

A. This solicitation document and incorporated provisions and clauses are those in effect through

Federal Acquisition Circular FAC 2026-01/effective date of 13 March 2026.

B. This procurement falls under NAICS code 333310, Commercial and Service Industry Machinery

Manufacturing6.

C. The Defense Priorities and Allocations System (DPAS) and assigned rating are not applicable to this procurement.

[END OF SECTION]

2 Bureau of Engraving and Printing 2031ZA26Q00077

SECTION B - PRICING SCHEDULE

[END OF SECTION]

CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL

TBM-D1 Vacuum Currency Counter

(12-months manufacturer warranty included)

5 EA $ $

Spare Parts Kit for Extended Display –

13CM Long

(12-months manufacturer warranty included)

5 EA $ $

Shipping to Washington, DC Currency

Facility (DCF)

4 EA $ $

Shipping to Western Currency Facility

(WCF)

1 EA $ $

3 Bureau of Engraving and Printing 2031ZA26Q00077

SECTION C – STATEMENT OF WORK (SOW)

C.1

C.2

C.3

Introduction/Background:

The Bureau of Engraving and Printing (BEP) is a component of the Department of the Treasury that designs, engraves, and prints U.S. banknote currency and other U.S. security products. In support of these operations at BEP’s Eastern Currency Facility (ECF) located in Washington, DC, the BEP Office of Quality Operations (OQO) has a need for five (5) new Currency

Counters.

The BEP, OQO seeks to add to its existing capabilities with five (5) new Currency Counters that meets or exceeds the specified requirements. The counters will be used for inventory purposes.

Objective/Scope/Purpose:

The Contractor shall provide the BEP, OQO with Currency Counters that are new and shall include at a minimum all sub-systems and major components listed in the technical requirements below. Under this requirement, the contractor shall provide delivery, installation instructions and operating instructions. No prototypes, refurbished, one-of-a-kind, or two-of-a-kind systems will be considered.

The contractor shall provide all personnel for the required labor, equipment and materials, transportation, and supervision to deliver. The contractor shall provide technical support and a warranty for this requirement herein. Technical support and warranty will be required for one year.

Tasks/Requirements:

C.10.I The following represents the operational capability, functionality, and performance characteristics of the listed major sub-systems and major components of the Currency Counter.

The Contractor shall supply the Currency Counter with the following characteristics:

C.3.1.1 The Currency Counter shall weigh no more than 60 pounds.

C.3.1.2 The Currency Counter shall have selectable counting speeds up to 3,000 pcs/min

C.3.1.3 The Currency Counter electricals must be compatible with 115V AC/ 15A.

C.3.1.4 A display to visually present the quantity of banknotes counted.

C.3.1.5 The display requires rotation and elevation for increased visibility.

C.3.1.6 The Currency Counter must operate continuously for up to 8 hours without over-heating or shutting down.

C.3.1.7 The Currency Counter shall operate in multiple modes: to verify a known quantity;

continuous counting; and sum the quantities counted.

C.3.1.8 The ability to perform counting functions with or without a dust-lid closed.

C.3.1.9 All parts shall be new. The above listing must be provided to specification without replacement. If any supply is unavailable, Contractor shall notify the BEP technical representative with recommended parts.

4 Bureau of Engraving and Printing 2031ZA26Q00077

C.3.1.10 Contractor shall supply all parts within 6 months of award. Preference will be given for an earlier delivery date.

C.3.1.11 Contractor shall provide a point of contact for warranty concerns and/or issues.

C.3.1.12 Contractor shall provide standard operating procedures for operation.

C.3.1.13 The contractor shall ensure all necessary components are installed, connected, and fully functional.

C.3.1.14 The Contractor shall submit point of contact along with their contact information including name, phone number, email address. The instrument deliverable is to be provided within seven (7) calendar days after award.

C.3.1.15 The Contractor shall provide a delivery schedule as part of their initial quote. If any item is deemed insufficient or damaged, the Contracting Officer Representative

(COR) shall notify the Contracting Officer (CO) and the Contractor.

C.3.1.16 The Currency Counter shall meet all Federal, State, and local safety requirements.

C.4 Deliverables:

SOW#

Deliverable

Frequency

Medium/Format

Submit to

C.3.1.14

Contact Information NLT 7 days after award

PDF/Email/MS

Word 2003 (or higher) format

COR

C.10 Warranty Completion of full acceptance

PDF/Email/MS

Word 2003 (or higher) format

COR

C.5 Government Furnished Resource and Information:

C.5.1 Safeguarding Government Furnished Materials:

Under the performance of this contract, the BEP shall provide Government Furnished Materials that are considered items of security. The Contractor shall abide by all requirements and instructions of the BEP’s Office of Security during the performance of this contract.

C.6 Applicable Documents:

The contractor shall provide English-language documentation that describes accurate and current technical information for the Currency Counter. The documentation shall include operational manuals, maintenance manuals, training manuals, and technical contact information.

C.7 Place of Performance:

C.7.1 Washington, DC Currency Facility (DCF)

301 14th and C Streets SW

Washington, DC 20228

5 Bureau of Engraving and Printing 2031ZA26Q00077

Contractor must call the appointment hotline at (202) 874-2333 twenty-four (24) hours in advance to schedule approximate delivery times. The hotline is manned from 6:30 am to 2:15 pm

Monday through Friday. A voicemail message maybe left after normal working hours. Deliveries are accepted between 8:00 am and 2:15 pm, Monday through Friday, excluding holidays.

Over the road vehicles having an overall height exceeding 12’6” (3.8 meters) empty, or an overall length exceeding 42’ (12.2 meters) cannot be accommodated at our receiving platform.

To resolve any delivery issue, please contact Shipping & Receiving at (202) 874-1149 care of

Material Handler/Leader

C.7.2 Western Currency Facility (WCF)

9100 Blue Mound Rd

Fort Worth, TX 76131

Contractor must contact WCF General Stores/Receiving at (817) 231-4168 or (817) 847-3664 at least twenty-four (24) hours in advance to notify of approximate delivery time & date. Deliveries are accepted during the operating hours of 7:00 am to 2:00 PM. After hours contact numbers are

(817) 231-4168 or (817) 847-3855 (voicemail). WCF General Stores/Receiving operating hours are from 6:00 am to 2:30 pm local time, Monday through Friday, excluding holidays.

To resolve any delivery issue, please contact WCF General Stores/Receiving management at

(817) 231-4167 or (817) 847-3855.

C.8 Performance/Delivery Period:

The period of performance for this requirement is a one-year base manufacturer’s warranty, and the Contractor shall provide the equipment to DCF and WCF within 90 days of contract award.

C.9 Final Acceptance:

The system shall be utilized by BEP for a minimum of fifteen (15) calendar days without any problems or issues being noted prior to final acceptance by the BEP.

C.10 Warranty:

C.10.1 Contractor shall provide one (1) year (12 calendar months) warranty on the Currency Counter, associated accessories and for all replacement parts and components.

C.10.2 Contractor’s warranty shall begin after completion of the equipment’s installation and full acceptance of the system by the Government.

C.10.3 Contractor warranty shall also include materials, labor, and associated transportation and shipping costs to correct any latent defects that prevent BEP for being able to attain the capabilities in Section C.3.

C.10.4 During the warranty period, the Contractor shall correct or re-perform any defective or nonconforming services within seventy-two (72) hours or less.

C.10.5 Contractor shall provide a POC for any warranty issues or concerns.

6 Bureau of Engraving and Printing 2031ZA26Q00077

C.10.6 Contractor shall provide information for extended warranty on the Currency Counter and its major components.

C.11 Environmental, Health, and Safety:

C.11.1 All Contractors must comply with the requirements and procedures established through the BEP

Environmental, Health, and Safety (EHS) document(s): 75D-07.0-04 EHS Contractor

Requirements, 75D-07.0-.06 EHS Requirements for Large Equipment Purchases, and 75D-05.0-

.01 Radiation and Laser Safety. The applicable contents of the document(s) must be adhered to.

The BEP shall furnish the document(s) as part of the contract.

C.11.2 The Contractor shall be required to attend a safety orientation to review the emergency response requirement established by the BEP EHS office. Any chemicals that shall be used must be EHS approved prior to the chemicals being brought on site. The COR shall coordinate all BEP EHS requirements.

C.12 Access to Government Facilities:

C.12.1 The BEP is a secure facility, and all instructions of the BEP Police must be obeyed:

C.12.1.1 Weapons, cameras, and alcohol or illegal drugs are not allowed on site and are subject to seizure.

C.12.1.2 During the life of the contract, access to the Government facility for the Contractor, its subcontractors, and suppliers shall be made available as required.

C.12.1.3 During all operations on Government premises, personnel for whom the Contractor is responsible shall comply with the rules and regulations governing the conduct of personnel and the operation of the facility.

C.12.1.4 The Government reserves the right to require the Contractor's employees to sign in and/or sign out of the Government facility.

C.12.2 The BEP shall not provide parking for the BEP DCF.

C.13 On-site Work Restrictions:

C.13.1 When performing services at the place of installation such work must be performed without:

C.13.1.1 Interfering with Government business.

C.13.1.2 Unduly restricting traffic.

C.13.1.3 Causing unsafe conditions for employees and visitors.

C.13.1.4 Adversely affecting the operation of the BEP facility.

C.13.1.5 Non-compliance with security regulations.

C.13.1.6 Failure to adhere to this requirement can be considered grounds for termination.

7 Bureau of Engraving and Printing 2031ZA26Q00077

SECTION D – PACKAGING AND HANDLING

The following instructions are required for any shipments to the BEP:

D.1 Notice of Packaging Slip Requirements:

The following outlines the Bureau of Engraving and Printing’s packaging slip requirements to ensure efficient processing of shipments:

• The Bureau of Engraving and Printing requires that all packaging slips be placed in a self-adhesive pack list envelope and affixed to the outside a shipment.

• Must be durable, in English, and printed on or affixed to the surface of a package or on a label, tag, or sign.

• Must not be unobscured by labels or attachments; and

• Must be located away from any other marking (such as advertising) that could substantially reduce its effectiveness:

D.2 General Items – Information Required for Each Shipment:

• Contract Number – The contract number BEP assigned to this purchase.

• Shipping Address – Point from which the merchandise was shipped.

• Telephone Number – The telephone number of the vendor contact to be called for inquires related to the merchandise.

• Customer Information – The name and telephone number of the party to which the merchandise is being shipped.

• Total Weight of Packages, Item number and the total number of items within the current shipment.

• If items are drop shipped from a supplier, you must ensure the proper contract number is written on the packaging slip by your supplier.

D.3 Line Items – Information Required for Each Line Item Included in the Shipment:

• Manufacturer Product Identification – Item Number assigned by manufacturer/supplier.

• Quantity Ordered – Quantity on the purchase order or unit of measurement.

• Quantity Shipped – With the packing slip.

• Quantity Back-ordered, where applicable.

D.4 Notice of Shipping Label Requirements:

Every box/skid must have at least one shipping label applied to it. The label is to include, at minimum, the following information:

• Manufacturer or Supplier – Name of Manufacturer or supplier/and

• Shipping Address – Point from which the merchandise was shipped/and

• BEP Contract Number – PO# or CC order #/and

• Customer Name & Telephone Number – First and last name, building and room #.

8 Bureau of Engraving and Printing 2031ZA26Q00077

The Contractor shall ensure that all items shipped to the BEP are properly labeled. Items may include but not be limited to closed containers, sealed boxes, wrapped packages, or strapped palettes. Failure to adhere to the packing slip and shipping label requirements could result in shipment rejection, processing delay, and payment delay. **

9 Bureau of Engraving and Printing 2031ZA26Q00077

SECTION E – INSPECTION AND ACCEPTANCE

The Inspection and Acceptance will be performed based on commercial practices per FAR 52.214-4

10 Bureau of Engraving and Printing 2031ZA26Q00077

SECTION F – DELIVERY OR PERFORMANCE

F.1 FAR Clause 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be assessed electronically at this/these address(es):

www.acquisition.gov/ (End of Clause)

CLAUSE

NUMBER

TITLE DATE

52.247-34 F.o.b. Destination JAN 1991

F.2 Place of Delivery:

Deliverables as required during the performance of this contract shall be delivered to F.O.B.

destination. The equipment and supplies identified shall be delivered and installed through the life of the contract to the following address:

Washington, DC Currency Facility (DCF)

301 14th and C Streets SW

Washington, DC 20228

Contractor must call the appointment hotline at (202) 874-2333 twenty-four (24) hours in advance to schedule approximate delivery times. The hotline is manned from 6:30 am to 2:15 pm

Monday through Friday. A voicemail message maybe left after normal working hours. Deliveries are accepted between 8:00 am and 2:15 pm, Monday through Friday, excluding holidays.

Over the road vehicles having an overall height exceeding 12’6” (3.8 meters) empty, or an overall length exceeding 42’ (12.2 meters) cannot be accommodated at our receiving platform.

To resolve any delivery issue, please contact Shipping & Receiving at (202) 874-1149 care of

Material Handler/Leader.

Western Currency Facility (WCF)

9100 Blue Mound Rd

Fort Worth, TX 76131

Contractor must contact WCF General Stores/Receiving at (817) 231-4168 or (817) 847-3664 at least twenty-four (24) hours in advance to notify of approximate delivery time & date. Deliveries are accepted during the operating hours of 7:00 am to 2:00 PM. After hours contact numbers are

(817) 231-4168 or (817) 847-3855 (voicemail). WCF General Stores/Receiving operating hours are from 6:00 am to 2:30 pm local time, Monday through Friday, excluding holidays.

To resolve any delivery issue, please contact WCF General Stores/Receiving management at

(817) 231-4167 or (817) 847-3855.

http://www.acquisition.gov/

11 Bureau of Engraving and Printing 2031ZA26Q00077

F.3 Notification of Delivery:

The contractor shall be responsible for providing all materials and services required for the delivery and placement of the equipment, all support equipment and supplies at the designated installation site(s) within the BEP. The delivery services shall also include all freight, rigging, unpacking, and removal of packing materials from BEP premises. The BEP will not provide any assistance during deliveries.

The contractor shall notify the COR seven (7) days prior to scheduling equipment deliveries.

Copies of the packing lists shall be included with this notification and a list of contractor employees who will need access to the BEP to perform installation and testing of the equipment.

F.4 BEP Year End Shutdown Period and Federal Holidays:

(a) BEP observes the federal holidays that are listed on the Office of Personnel website at:

https://www.opm.gov/fedhol/. The Presidential Inauguration Day is applicable only to the

Washington, DC Currency Facility (DCF).

(b) BEP’s Y.E.S. Period typically occurs December 25th through January 1st of each calendar year.

https://www.opm.gov/fedhol/

12 Bureau of Engraving and Printing 2031ZA26Q00077

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CONTRACT ADMINISTRATION OFFICE

(a) This contract will be administered by:

Bureau of Engraving and Printing (BEP)

Office of Chief Procurement Officer (OCPO)

14th and C Streets, S.W.

Washington, D.C. 20228-0001

(b) Written communication to the Contracting Officer shall make reference to the contract number.

G.2 DTAR 1052.201-70, Contracting Officer’s Representative (COR) Appointment and

Authority (APR 2015)

(a) The COR WILL BE APPOINTED AT CONTRACT AWARD.

(b) Performance of work under this contract is subject to the technical direction of the COR identified above, or a representative designated in writing. The term “technical direction” includes, without limitation, direction to the Contractor that directs or redirects the labor effort, shifts the work between work areas or locations, and/or fills in details and otherwise serves to ensure that tasks outlined in the work statement are accomplished satisfactorily.

(c) Technical direction must be within the scope of the contract specification(s)/work statement. The

COR does not have authority to issue technical direction that:

(1) Constitutes a change of assignment or additional work outside the contract specification(s)/work statement;

(2) Constitutes a change as defined in the clause entitled “Changes”;

(3) In any manner causes an increase or decrease in the contract price, or the time required for contract performance;

(4) Changes any of the terms, conditions, or specification(s)/work statement of the contract;

(5) Interferes with the Contractor's right to perform under the terms and conditions of the contract; or

(6) Directs, supervises or otherwise controls the actions of the Contractor's employees.

(d) Technical direction may be oral or in writing. The COR must confirm oral direction in writing within five workdays, with a copy to the Contracting Officer.

(e) The Contractor shall proceed promptly with performance resulting from the technical direction issued by the COR. If, in the opinion of the Contractor, any direction of the COR or the designated representative falls within the limitations of (c) above, the Contractor shall immediately notify the

Contracting Officer no later than the beginning of the next Government work day.

(f) Failure of the Contractor and the Contracting Officer to agree that technical direction is within the scope of the contract shall be subject to the terms of the clause entitled “Disputes.”

(End of clause)

13 Bureau of Engraving and Printing 2031ZA26Q00077

G.3 DTAR 1052-232-7003, Electronic Submission of Payment Requests (APR 2015)

(a) Definitions. As used in this clause—

(1) “Payment request” means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must comply with the requirements identified in FAR 32.905(b), “Content of Invoices” and the applicable Payment clause included in this contract.

(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP). Information regarding IPP, including

IPP Customer Support contact information, is available atwww.ipp.gov or any successor site.

(c) The Contractor may submit payment requests using other than IPP only when the Contracting

Officer authorizes alternate procedures in writing in accordance with Treasury procedures.

(a) If alternate payment procedures are authorized, the Contractor shall include a copy of the

Contracting Officer's written authorization with each payment request. (End of clause)

14 Bureau of Engraving and Printing 2031ZA26Q00077

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 Type of Contract:

This is a Firm Fixed-Price type contract.

H.2 Identification of Contract Employees:

All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. All contractor personnel shall clearly identify themselves as a contractor and shall be required to wear identification (ID) badges in a visible location on the front of exterior clothing, above the waist, (except when safety or health reasons prevent such placement). ID badges shall be worn at all times when performing work. ID badges shall have an identification picture and shall state the name of the individual and the company they represent.

Contractor personnel are prohibited from possessing weapons, firearms or ammunition, on themselves or within their Contractor-owned or privately owned vehicle while on BEP premises.

H.3 Notice to the Government of Delays:

In the event the contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the contractor shall immediately notify the CO and the

COR, in writing, giving pertinent details, provided, however, that this data shall be informational only in character and that this provision shall not be construed as a waiver by BEP of any delivery schedule or date or of any rights or remedies provided by law or under this contract.

H.4 Non-Disclosure of Non Public Information and Data:

During the period of performance of the contract, the contractor may be granted access to Non

Public information and data, which is the sole property of BEP, as well as proprietary information and data, which is the sole property of entities other than the contracting parties. In particular, the contractor agrees that all information provided by representatives of BEP, either before or after contract award, concerning the design, manufacture, processing or transporting of

United States currency is nonpublic. Such information will be shared only with employees or agents of the company having a need to know, and will not be disclosed to other persons without the written consent of the CO.

Further, the contractor agrees to maintain the confidentiality of all such information and data and shall not disclose any information and data, interpretations of, and/or derivatives of, such information and data to any unauthorized party without the express written approval of the CO, or of the party in which title is wholly vested. The Contractor hereby agrees to include this clause in all subcontracts or consulting agreements relating to work under this contract. The Contractor shall be required to sign a Non-Disclosure Agreement.

15 Bureau of Engraving and Printing 2031ZA26Q00077

H.5 Indemnification

(a) Responsibility for Government Property: The contractor assumes full responsibility for and shall indemnify the Government against any and all losses or damage of whatsoever kind and nature to any and all Government property, including any equipment, supplies, accessories, or parts furnished, while in his custody and care for storage, repairs, or service to be performed under the terms of this contract, resulting in whole or in part from the negligent acts or omissions of the contractor, any subcontractor, or any employee, agent or representative of the contractor or subcontractor.

If due to the fault, negligent acts (whether of commission or omission) and/or dishonesty of the contractor or its employees, any Government-owned or controlled property is lost or damaged as a result of the contractor's performance of this contract, the contractor shall be responsible to the

Government for such loss or damage, and the Government, at its option, may in lieu of payment thereof, require the contractor to replace at his own expense, all property lost or damaged.

(b) Hold Harmless and Indemnification Agreement: The contractor shall save and hold harmless and indemnify the Government against any and all liability claims, and cost of whatsoever kind and nature for injury to or death of any person or persons and for loss or damage to any contractor property or property owned by a third party occurring in connection with or in any way incident to or arising out of the occupancy, use, service, operation, or performance of work under the terms of this contract, resulting in whole or in part from the acts or omissions of the contractor, any subcontractor, or any employee, agent, or representative of the Contractor or subcontractor.

(c) Government's Right of Recovery: Nothing in the above paragraphs shall be considered to preclude the Government from receiving the benefits of any insurance the Contractor may carry which provides for the indemnification of any loss or destruction of, or damages to property in the custody and care of the contractor where such loss, destruction or damage is to Government property. The Contractor shall do nothing to prejudice the Government's right to recover against third parties for any loss, destruction of, or damage to Government property, and upon the request of the Contracting Officer shall, at the Government's expense, furnish to the Government all reasonable assistance and cooperation (including assistance in the prosecution of suit and the execution of instruments of assignment in favor of the Government) in obtaining recovery.

(d) Government Liability: The Government shall not be liable for any injury to the Contractor's personnel or damage to the Contractor's property unless such injury or damage is due to negligence on the part of the Government and is recoverable under the Federal Torts Claims Act, or pursuant to other Federal statutory authority.

H.6 Organizational Conflicts of Interest

(a) The contractor warrants that, to the best of the contractor’s knowledge and belief, there are no relevant facts or circumstances which could give rise to an organizational conflict of interest

(OCI), as defined in FAR 9.5, Organizational and Consultants Conflicts of Interest, or that the

Contractor has disclosed all such relevant information.

16 Bureau of Engraving and Printing 2031ZA26Q00077

(b) The Contractor agrees that if an actual or potential OCI is discovered after award, the contractor shall make a full disclosure in writing to the Contracting Officer. This disclosure must include a description of actions, which the contractor has taken or proposes to take, after consultation with the Contracting Officer, to avoid, mitigate, or neutralize the actual or potential conflict.

(c) The Contracting Officer may terminate this contract for convenience, in whole or in part, if it deems such termination necessary to avoid an OCI. If the Contractor was aware of a potential

OCI prior to award or discovered an actual or potential conflict after award and did not disclose or misrepresented relevant information to the Contacting Office, the Government may terminate the contract for default, debar the Contractor from Government contracting, or pursue such other remedies as may be permitted by law or this contract.

(d) The contractor must include this clause in all subcontracts and in lower tier subcontracts unless a waiver is requested from, and granted by, the Contracting Officer.

(e) In the event that a requirement changes in such a way as to create a potential conflict of interest for the contractor, the Contractor must:

1) Notify the Contracting Officer of a potential conflict, and;

2) Recommend to the Government an alternate approach which would avoid the potential conflict, or

3) Present for approval a conflict of interest mitigation plan that will:

• Describe in detail the changed requirement that creates the potential conflict of interest;

and

• Outline in detail the actions to be taken by the Contractor or the Government in the performance of the task to mitigate the conflict, division of subcontractor effort, and limited access to information, or other acceptable means.

4) The Contractor must not commence work on a changed requirement related to a potential conflict of interest until specifically notified by the Contracting Officer to proceed.

5) If the Contracting Officer determines that it is in the best interest of the Government to proceed with work, notwithstanding a conflict of interest, a request for waiver must be submitted in accordance with FAR 9.503.

H.7 Disclosure of Conflicts of Interest

It is the BEP policy to award contracts to only those Offerors whose objectivity is not impaired because of any related past, present, or planned interest, financial or otherwise, in organizations regulated by BEP or in organizations whose interests may be substantially affected by

Departmental activities. Based on this policy, if at any time during the performance of this contract the contractor knows of any Conflict of Interest situation affecting the organization, any of its officers or Key Persons working under this contract, has reason to believe that a conflict of interest situation might arise, or is made aware of an actual or potential conflict of interest situation:

17 Bureau of Engraving and Printing 2031ZA26Q00077

(a) The contractor shall immediately provide to the Contracting Officer a written statement which describes in a concise manner all past, present or planned organizational, financial, contractual or other interest(s) with that organization regulated by BEP, or with that organization or individual whose interests may be substantially affected by Departmental activities, and which is related to the work under this contract. The interest(s) described shall include those of the contractor, its affiliates, consultants, Subcontractors and key personnel of any of the above. Past interest shall be limited to within one year of the date of the offeror's technical quote. Key personnel shall include any person owning more than 20% interest in the organization, and the organization's corporate officers, its senior managers and any employee who is responsible for making a decision or taking an action on this contract where the decision or action can have an economic or other impact on the interests of a regulated or affected organization.

(b) The contractor shall describe in detail when it became aware of the actual or potential conflict of interest, what action the organization has taken or proposes to take to mitigate and / or rectify the situation, and why it believes, in light of the interest(s) identified in (a) above, that performance of the contract can still be accomplished in an impartial and objective manner.

(c) In the absence of any relevant interest identified in (a) above, the contractor shall certify in its statement that to its best knowledge and belief no affiliation exists relevant to possible conflicts of interest. The contractor must obtain the same information from any potential

Subcontractors prior to award of a subcontract.

(d) The Contracting Officer will review the statement submitted and may require additional relevant information from the contractor. All such information, and any other relevant information known to BEP, will be used to determine whether a conflict of interest exists or a situation exists that may create a conflict of interest. If any such conflict of interest is found to exist, the Contracting Officer may (1) terminate the contract, or (2) determine that it is otherwise in the best interest of the United States to continue the contract with the Contractor and (3) modify the contract to include appropriate provisions to mitigate or avoid such conflicts in the contract.

(e) If the contractor refuses to provide the written statement called for in paragraph (a), or any additional information that the Contracting Officer may require, the Contracting Officer may terminate the Contract for convenience if he or she deems that termination is in the best interest of the Government.

H.8 Evaluation of Contractor Performance:

(a) Interim and final evaluations of contractor performance will be prepared for this contract in accordance with FAR 42.1503. The final performance evaluations will be prepared at the time of completion of work.

(b) The Contractor can elect to review the evaluation and submit additional information or a rebuttal statement. The contractor will be permitted 60 calendar days to respond. Contractor response is voluntary. If the contractor does not respond within 60 days, the Government will presume that the contractor has no comment. Any disagreement between the parties regarding an evaluation will be referred to an individual at a level above the Contracting

Officer, whose decision is final.

18 Bureau of Engraving and Printing 2031ZA26Q00077

(c) Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file, and may be used to support future award decisions.

Bureau of Engraving and Printing utilizes the Contractor Performance Assessment Reporting

System (CPARS) and the Federal Awarded Performance and Integrity Information System

(FAPIIS) to record and maintain past performance information. The past performance systems hosts a suite of web-enabled applications that are used to document Contractor performance information that is required by Federal Regulations.

The CPARS module assesses performance on contracts for Systems, Services, Information

Technology, and Operations Support, Architect-Engineer contracts and performance on

Construction contracts. CPARS reference material can be accessed at https://cpars.cpars.gov/cpars/app/home.do

Federal Awarded Performance and Integrity Information System (FAPIIS) http://www.fapiis.gov/fapiis/govt/datareports.jsp

The registration process requires the Contractor to identify an individual that will serve as a primary contact. This individual will be authorized access to the evaluation for review and comment. In addition, the Contractor is encouraged to identify a secondary contact in the event the primary contact is unavailable to process the evaluation within the required 60-day time period. After the BEP Contract Specialist registers the contract in one of the systems listed above, the Contractor will receive a system generated e-mail notifying him/her that the contract is registered. A system generated e-mail will also provide the Contractor with a User ID if the person does not already have a system User ID.

Once a performance evaluation has been prepared and is ready for comment, the Contractor representative will receive a system generated e-mail notification that the performance evaluation is electronically available for review and comment. The Contractor representative will receive an automated e-mail whenever an assessment is completed and can subsequently retrieve the completed assessment from system. Contractors may access evaluations at one of the website listed above for review and comment in CPARS.

H.9 Safety:

State “Right to Know” laws and 29 CFR 1910.1200, Employees Hazard Communication

Program, require manufacturers, importers and suppliers to label containers of toxic substances or hazardous chemicals with the chemical name and appropriate hazard warning and to provide

Material Safety Data Sheets (MSDS) for these substances. Hazard Material Information not meeting the requirement will not be accepted (off-loaded) by the BEP.

All machinery delivered under this contract shall be in accordance with the BEP’s Safety, Health and Environmental requirements.

https://cpars.cpars.gov/cpars/app/home.do

19 Bureau of Engraving and Printing 2031ZA26Q00077

H.10 Accident Prevention:

The contractor shall comply with safety practices as may be deemed necessary by the Bureau

Safety Manager to ensure the safety and health of contractor and Bureau employees.

When the contractor’s performance requires the use of power-activated devices for welding, cutting or burning using open-flame or electric-arc equipment, the contractor shall provide no less than three (3) days advanced written notice to the COR requesting approval for the use of the power-activated devices. The COR shall obtain clearance of such use through the Bureau

Safety Manager and provide written confirmation of approval or disposal to the Contractor.

The Contractor shall take any other precautions necessary to protect all persons against injury at the work site and shall be held responsible for all damages to persons and property that occur as a result of his fault or negligence in performing the contract work.

Any Contractor personnel that are deemed to be working in an unsafe manner or endangering their own or others health may be removed from the Bureau under order of the Contracting

Officer. Any Contractor personnel removed for failure to maintain a safe and healthy work environment may not be allowed to return to the Bureau’s property.

H.11 Bureau Working Restrictions:

When the project specifications permit the undertaking of contract work during Bureau working hours, such work must be performed without:

• Interfering with Government business;

• Unduly restricting traffic;

• Causing unsafe conditions for employees and visitors; and

• Adversely affecting the operation of Bureau equipment.

When, the Contracting Officer has determined that the Contractor’s work is in violation of any of the four restrictions above, the Contractor shall be required to perform the work at such time and under such conditions as are in the best interest of the Bureau. In this connection, the directions of the Contracting Officer shall be binding and shall be executed by the Contractor at no additional cost to the Government.

H.12 Parking:

All vehicles entering the facility are subject to inspection. There is no available parking at the

DCF.

H.13 Bureau’s Regulations:

All persons working on Bureau premises under the terms of the Contract shall, while on the premises, be under the administrative direction of the Contracting Officer and shall be subject to all general rules and regulations governing the Bureau and, in particular, all applicable security regulations. If the contract requires contract employees to work on Bureau premises for a period of time exceeding five calendar days, such employees will be subject to an appropriate preliminary personnel security check to be conducted by the Bureau's Office of Security. Such

20 Bureau of Engraving and Printing 2031ZA26Q00077 employees shall be approved by the Contracting Officer prior to commencing work on the premises. Employees who do not meet established security criteria shall not be permitted to work on the premises.

H.14 Permits and Licenses – General:

In the performance of work hereunder, the Contractor shall obtain and maintain in effect all necessary permits and licenses required by Federal, State, or local government, or subdivision thereof, or of any other duly constituted public authority. The Contractor shall comply with all laws and regulations applicable to work to be performed hereunder.

H.15 Compliance with Occupational Safety and Health Act of 1980 Government Owned

Facilities/Equipment:

Performance of work hereunder shall comply with the provisions of the Occupational Health and

Safety Act of 1980, as amended (OSHA). If at any time during the performance of this contract, the Government - furnished facilities and/or equipment do not conform to OSHA standards, the

Contractor must so notify the Contracting Officer, in writing, including a recommendation of the corrective action needed.

H.16 Security Requirements:

BEP’s facilities are considered to be secure government facilities; therefore visitors to BEP may be given a visitor’s security badge by security personnel and escorted by Government authorized personnel. Visitor security badges shall be worn above the waist, clearly visible, with picture or front side front forward at all times. Visitor security badges are to be returned upon leaving the site.

H.17 Personnel Security Requirements:

Personnel Security Clearance. Contractor and subcontractor employees involved in the repair, maintenance, installation, modification, inspection, or any other capacity requiring access to the

BEP, access to the BEP computer systems or information contained therein, or other information pertinent to BEP personnel or security operations shall be subjected to suitability investigations, conducted by the BEP, before assignment to perform work under this contract.

All Contractor and subcontractor personnel requiring access to the BEP or working on the BEP contract will be required to complete and submit, to the COR, all security forms furnished by the

Personnel Security Division, commensurate with the sensitivity of their positions.

Upon receipt of the Performance Work Statement, the Office of Security will provide an assessment of access level and the type of background investigation that will be granted as well as the appropriate Position Sensitivity Levels which will be assigned to all positions occupied by

Contractor and Subcontractor employees. The position sensitivity of all positions occupied by

Contractor and Subcontractor employees, which involve access to the Personal Computer function, including those involved in the inspection of the work are designated as Low Risk.

Should other positions be identified, requiring a higher sensitivity, the position sensitivity shall be designated as High Risk. Access to the BEP and placement in these positions require that the

21 Bureau of Engraving and Printing 2031ZA26Q00077

BEP conduct a Full Field Background investigation, and that it be favorably completed.

Required security packets are required to be submitted to the COR, within ten (10) working days, for use by Personnel Security Division, Office of Security. The Contractor shall submit packages of all personnel expected to be present at the Bureau for extended periods of time in excess of ten

(10) working days no later than ninety (90) days prior to the delivery of the equipment to the

Bureaus.

The BEP reserves the right to deny access to its facilities and/or security systems, following adjudicative guidelines set forth in Executive Order 10450 and applicable supplemental directives, to any individual about which an adverse suitability determination is made. Failure to submit the required security investigation packet or to truthfully answer all questions contained in security investigation packets shall constitute grounds for denial of access clearance.

The selected Contractor shall not provide access to employees, or subcontract employees, until written access clearance is provided by the Personnel Security Branch, office of Security, BEP.

Contractors and subcontractors are responsible for reporting all changes to the COR within five

(5) days of the occurrence of the change concerning any of their employees, which may affect the suitability of their employees for access to the BEP or placement in any of these positions including additions, or deletions.

The COR shall maintain a current listing of access requirements and provide that information to the Personnel Security Division, BEP. The Personnel Security Division will inform the COR of all access denials. The reason for the denial will not be provided to the company contact in accordance with the Privacy Act of 1974. Denial of access to the BEP does not preclude employment of the individual concerned, by the Contractor, in any capacity not associated with the contract. Reinvestigation may be required throughout the life of the contract to adhere to

Government security requirements.

H.18 Contractor Clearance through U.S. Customs and Border Protection:

In the event the Contractor is to provide equipment of foreign manufacture, which must be imported into the United States, it shall be the responsibility of the Contractor to make entry through United States Customs and Border Protection and pay all duties and charges appurtenant thereto. Imports guidelines, questions and answers can be found at http://www.cbp.gov/trade.

H.19 Contract Performance Information:

Dissemination of Contract Performance Information: The Contractor must not publish, permit to be published, or distribute for public consumption, any information, oral or written, concerning the results or conclusions made pursuant to the performance of this contract, without the prior written consent of the Contracting Officer. Two copies of any material proposed to be published or distributed must be submitted to the Contracting Officer for approval.

Contractor Testimony: All requests for the testimony of the Contractor or its employees, and any intention to testify as an expert witness relating to: (a) any work required by, and or performed under, this contract; or (b) any information provided by any party to assist the Contractor in the performance of this contract must be immediately reported to the Contracting Officer. Neither http://www.cbp.gov/trade

22 Bureau of Engraving and Printing 2031ZA26Q00077 the Contractor nor its employees must testify on a matter related to work performed or information provided under this contract, either voluntarily or pursuant to a request, in any judicial or administrative proceeding unless approved by the Contracting Officer or required by a judge in a final court order.

23 Bureau of Engraving and Printing 2031ZA26Q00077

SECTION I – CONTRACT CLAUSES

NUMBER TITLE DATE

52.203-17 Contractor Employee Whistleblower Rights NOV 2023

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-12 Unique Entity Identifier Maintenance OCT 2016

52.204-13 System for Award Management Maintenance OCT 2018

52.204-18 Commercial and Government Entity Code Maintenance AUG 2020

52.204-19 Incorporation by Reference of Representations and Certifications DEC 2014

52.204-21 Basic Safeguarding of Covered Contractor Information Systems NOV 2021

52.204-23 Prohibition on Contracting for Hardware, Software, and Services

Developed or Provided by Kaspersky Lab Covered Entities

DEC 2023

52.204.25 Prohibition on Contracting for Certain Telecommunications and

Video Surveillance Services or Equipment

NOV 2021

52.204-27 Prohibition on a ByteDance Covered Application JUN 2023

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations NOV 2015

52.212-4 Contract Terms and Conditions—Commercial Items NOV 2023

52.222-19 Child Labor-Cooperation with Authorities and Remedies MAR 2026

52.222-20 Contracts for Materials, Supplies, Articles, and Equipment JUN 2020

52.222-50 Combating Trafficking in Persons NOV 2021

52.225-5 Trade Agreements NOV 2023

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While

Driving

MAY 2024

52.228-5 Insurance-Work on a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .