RFQ 2027-018.pdf
PDF 476 KB Posted
- Attached to
- RFQ 2027-018 Stormwater Design Manual
- Solicitation number
- 377-RFQ 2027-018
- Issued by
- Union County, North Carolina
About this file
This is a Request for Quotation (RFQ) issued by the State of Oregon for maintenance and repair services. The procurement seeks quotations for general maintenance and repairs to building systems and structures, with responses due by the specified deadline outlined in the document. The RFQ details the scope of work required, item quantities, and project specifications that bidders must address in their submissions. Site visits and pre-bid meetings may be available for interested bidders to review the facilities and ask clarifying questions prior to submitting their quotations. The contract award is anticipated following evaluation of all submissions received by the deadline, with the resulting contract covering a specified term for the provision of maintenance and repair services as needed.
Pricing for the RFQ should be submitted on a unit basis or as otherwise specified in the pricing schedule included in the solicitation documents. The procurement may include set-aside considerations or small business participation requirements as applicable under Oregon state purchasing regulations. The state will evaluate quotations based on the criteria outlined in the RFQ, which typically includes pricing, qualifications, experience, and ability to perform the work. Funding for this procurement is provided through the state's general operations budget, and award will be made to the responsive bidder offering the best value to the state.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Qualifications No. 2027-018 Stormwater Design Manual
Due Date: December 16, 2026 Time: 11:00 AM EST Receipt Location: Electronic Submittal Procurement & Contract Management Department 610 Patton Ave.
Monroe, NC 28110
Procurement Contact:
Juan Rodriguez-Cruz Procurement Specialist 704.283.3519 Juan.Rodriguez-Cruz@unioncountync.gov mailto:Juan.Rodriguez-Cruz@unioncountync.gov
Union County, North Carolina RFQ 2027-018 Stormwater Design Manual
Contents 1 Notice of Advertisement 2 Submittal Details
2.1 SUBMISSION DEADLINE
2.2 SUBMISSION REQUIREMENTS
2.3 SUBMITTAL QUESTIONS
2.4 ADDENDA
2.5 COMMUNICATION
3 Introduction
3.1 PURPOSE
3.2 COUNTY
4 Project Background 5 Project Description and Scope of Services
5.1 TASK 1: PROJECT KICK-OFF & DATA COLLECTION
5.2 TASK 2: TECHNICAL DESIGN CRITERIA
5.3 TASK 3: STORMWATER CONTROL MEASURE (SCM) LIBRARY
5.4 TASK 4: ADMINISTRATIVE & SUBMISSION PROCEDURES
5.5 TASK 5: PUBLIC OUTREACH & TRAINING
5.6 PROJECT TIMELINE & DELIVERABLES
5.7 OPTIONAL ADDITIONAL SERVICES
6 Detailed Submittal Requirements and Instructions
6.1 TERMS OF SUBMISSION
6.2 PROPOSAL FORMAT
6.2.1 Section A – Cover Letter
6.2.2 Section B – Firm Background and Experience
6.2.3 Section C – History of Relevant Stormwater Engineering Experience
6.2.4 Section D – Qualifications
6.2.5 Section E – Project Team
6.2.6 Section F – Project Management and Quality Control
6.2.7 Section G – Project Approach and Methodology
6.2.8 Section H – Financial Capacity
6.2.9 Section I – Legal
6.2.10 Section J – Required Forms
7 Evaluation Criteria and Selection Process
7.1 SELECTION PARTICIPANTS
7.2 EVALUATION SELECTION PROCESS
7.3 AWARD PROCEDURE
8 General Conditions and Requirements
8.1 TERMS OF CONTRACT
8.2 CONTRACTUAL OBLIGATIONS
8.3 EXPENSE OF FIRM
8.4 E-VERIFY
8.5 EQUAL EMPLOYMENT OPPORTUNITY
8.6 INSURANCE
8.7 INDEMNIFICATION
9 Appendix A – SOQ Submission Form 10 Appendix B – Addendum and Anti-Collusion
RFQ 2027-018 Stormwater Design Manual
11 Appendix C – Template Agreement
RFQ 2027-018 Stormwater Design Manual
1 NOTICE OF ADVERTISEMENT
Request for Qualifications No. 2027-018
Stormwater Design Manual Advertisement Date: November 16, 2026
Electronic Statements of Qualifications (SOQs) will be received by the Union County’s Procurement Department until 11:00 AM EST on December 16, 2026. Late submittals will not be accepted.
Union County, North Carolina, through the Union County Planning Department, is seeking Statements of Qualifications (SOQs) from qualified professional engineering and consulting firms to develop the Union County Stormwater Design Manual. The selected firm will provide stormwater technical standards, design criteria, stormwater control measure guidance, administrative procedures, public outreach, and final manual deliverables. This is a Request for Qualifications (RFQ). Responding firms shall not include project-specific work product or fee proposals in their SOQ. Selection will be conducted in accordance with N.C.G.S. § 143-64.31.
This solicitation is available electronically and may be downloaded from the following locations:
1. Download the Solicitation Documents from the Union County Website Union County Procurement & Contract Management - Current Bids
2. Download the Solicitation Documents from the State of North Carolina eVP website:
North Carolina eVP - Solicitations (Search County of Union)
Union County (UC) reserves the right to reject any or all submittals, to waive technicalities and to make such selection deemed in its best interest. With limited response, Union County reserves the right to extend the solicitation opening date as appropriate in order to assure a competitive procurement process.
Professional engineering services must be provided by an appropriately licensed firm and personnel in accordance with applicable North Carolina law. Firms must identify the North Carolina-licensed professional engineer(s) responsible for engineering work performed under this project.
The respondent shall provide the firm’s applicable North Carolina engineering firm license information and identify the professional engineer(s) and other key personnel proposed for the Stormwater Design Manual.
Offerors are required to comply with the non-collusion requirements set forth in the Solicitation Documents.
https://www.unioncountync.gov/government/departments-f-p/procurement-contract-management/current-bids https://www.unioncountync.gov/government/departments-f-p/procurement-contract-management/current-bids https://evp.nc.gov/solicitations/ http://www.ips.state.nc.us/
RFQ 2027-018 Stormwater Design Manual
In accordance with N.C.G.S. 143-64.31, Union County will make good faith efforts to notify minority firms of this opportunity and encourages all qualified firms to submit Statements of Qualifications.
-End of Advertisement-
RFQ 2027-018 Stormwater Design Manual
2 Submittal Details
2.1 SUBMISSION DEADLINE
All submittals, for the services specified, are to be received by the Union County Procurement Department no later than 11:00 AM EST on December 16, 2026, per the instructions below. Any submittals received after this date and time shall be rejected without exception.
2.2 SUBMISSION REQUIREMENTS
The SOQ must be submitted electronically by using the following link: Union County Submittal Portal.
The submittal, one complete document, must be signed by a person who is authorized to bind the proposing Company. Instructions for preparing the SOQ are provided herein.
Select the Solicitation drop down arrow and choose this RFQ from the list. Complete the form, upload the SOQ as one complete document and select submit. The maximum size accepted is 20 MB. An email response will be sent to the address entered on the form as your confirmation of receipt.
The submittal must be signed by a person who is authorized to bind the proposing Company. Instructions for preparing the SOQ are provided herein.
Paper submissions will not be accepted.
It is the responsibility of the Offeror to ensure that they have obtained all addenda prior to submitting their SOQ.
There is no expressed or implied obligation for Union County to reimburse Offerors for any expenses incurred in preparing a response to this request.
Union County reserves the right to reject any or all submittals, to waive technicalities and to make such selection deemed in its best interest, and to cancel this RFQ.
2.3 SUBMITTAL QUESTIONS
Submittal questions will be due on or before 5:00 PM EST on December 2, 2026, the primary purpose is to provide participating Offerors with the opportunity to ask questions, in writing, related to the RFQ. Addenda will be issued prior to due date to answer applicable questions. The County anticipates issuing the final responses to timely submitted questions by December 7, 2026.
Submit questions by e-mail to Juan Rodriguez-Cruz at Juan.Rodriguez- Cruz@unioncountync.gov by the deadline shown above. The email should identify the RFQ number and project title. All questions and answers may be posted as addenda on Union County Website and/or North Carolina eVP website https://lfportal.unioncountync.gov/Forms/procurementsubmit https://lfportal.unioncountync.gov/Forms/procurementsubmit mailto:Juan.Rodriguez-Cruz@unioncountync.gov mailto:Juan.Rodriguez-Cruz@unioncountync.gov http://www.unioncountync.gov/ https://evp.nc.gov/solicitations/
RFQ 2027-018 Stormwater Design Manual
2.4 ADDENDA
Union County may modify the RFQ prior to the date fixed for submission of SOQs by the issuance of an addendum.
Should an Offeror find discrepancies or omissions in this RFQ or any other documents provided by Union County, the Offeror should immediately notify the County of such potential discrepancy in writing via email as noted above.
Any addenda to these documents shall be issued in writing. No oral statements, explanations, or commitments by anyone shall be of effect unless incorporated in the written addenda. Receipt of Addenda shall be acknowledged by the Offeror on Appendix B, Addendum and Anti-Collusion form.
2.5 COMMUNICATION
All communications, any modifications, clarifications, amendments, questions, responses or any other matters related to this Request for Qualifications must be made only through the Procurement Contact noted on the cover of this RFQ. A violation of this provision is cause for the County to reject a Company’s SOQ. No contact regarding this document with the Board of County Commissioners or other County employees is permitted and may be grounds for disqualification.
3 INTRODUCTION
3.1 PURPOSE
Union County is soliciting Statements of Qualifications from qualified professional engineering and consulting firms to develop a comprehensive Union County Stormwater Design Manual. The manual will establish consistent stormwater design standards, accepted engineering methodologies, stormwater control measure guidance, and review and submittal procedures. It should account for the County’s Unified Development Ordinance, Union County 2050 Comprehensive Plan, geographic and environmental conditions, regional weather and climate, relevant regulatory requirements, and current stormwater engineering practices. The estimated total project budget is $150,000, inclusive of both the Base Scope of Services and any optional Additional Services authorized by the County. The purpose of this RFQ process is to identify and rank the most qualified firms in accordance with applicable North Carolina law.
Submittals made in response to this Request for Qualifications will be reviewed by an evaluation team and ranked based on the criteria identified herein. A shortlist of firms may be developed based on a review of qualifications. At the discretion of Union County, firms may be selected for interviews. Firms with relevant stormwater engineering, technical design manual, and local government consulting experience are encouraged to submit. The purpose of this RFQ process is to identify the most qualified respondent.
Following evaluation and ranking, the County will initiate negotiations with the firm determined to be the most qualified for this project.
RFQ 2027-018 Stormwater Design Manual
In accordance with the North Carolina Mini-Brooks Act (NCGS §143-64.31), firms will be evaluated and ranked based on demonstrated competence and qualifications for the type of professional services required, without regard to fee. Following evaluation of the qualifications submitted, the County will select the firm determined to be the best qualified to provide the required services.
Price information shall not be submitted with the Statement of Qualifications and will not be considered during the evaluation process.
The County will enter into negotiations with the best qualified firm to establish a fair and reasonable fee for the required services. If a contract cannot be successfully negotiated with the best qualified firm, negotiations will be formally terminated and the County will proceed to negotiate with the next best qualified firm until an agreement is reached.
The County intends to select one (1) qualified professional engineering firm through this solicitation. Selection does not establish the fee, scope of optional Additional Services, or final contract terms; these items will be addressed after qualifications-based selection in accordance with applicable law.
The selected firm will coordinate with Union County Planning leadership, the Stormwater team, and other County stakeholders throughout development and review of the manual.
3.2 COUNTY
The County (estimated population 263,386) is located in the central, southern piedmont.
The County provides its citizens with a full array of services that include public safety, water/wastewater utilities and sanitation, human services, cultural and recreational activities, and general government administration.
4 PROJECT BACKGROUND
Union County is experiencing continued growth and development, placing increasing demands on County stormwater infrastructure, natural drainage systems, and the development review process. The County currently regulates stormwater through its Unified Development Ordinance (UDO) and applicable state and federal requirements, but does not have a single comprehensive reference establishing its design standards, accepted methodologies, and submittal procedures. Reliance on ordinance language, state guidance, and reviewer judgment can lead to inconsistent submissions, longer review times, and varying interpretations. The Stormwater Design Manual is intended to provide County leadership, planners, applicants, and citizens with guidance for regulatory compliance, management of growth, and infrastructure decisions.
5 PROJECT DESCRIPTION AND SCOPE OF SERVICES
The selected consultant shall provide all labor, materials, and professional expertise necessary to develop a standalone Union County Stormwater Design Manual addressing the tasks and deliverables described below. The manual will serve as a technical and administrative reference for stormwater design and its regulation by County staff.
RFQ 2027-018 Stormwater Design Manual
The scope includes data collection, development of technical engineering criteria, a library of stormwater control measures, administrative and submission procedures, and public outreach and training. The consultant shall coordinate its recommendations with the County’s existing regulatory framework and document applicable technical assumptions and reference standards.
5.1 TASK 1: PROJECT KICK-OFF & DATA COLLECTION
• Kick-off Meeting: Convene with Planning leadership and the Stormwater team to refine the project timeline, review project goals, and establish communication protocols.
• Initial Assessment: Review relevant existing municipal codes, regional drainage criteria, and state and federal requirements.
• Stakeholder Interviews: Meet with planning, engineering, and maintenance departments to identify inefficiencies and chokepoints in the current stormwater review process.
• Gap Analysis: Compare current standards against neighboring municipalities, comparable jurisdictions, and state and national standards.
5.2 TASK 2: TECHNICAL DESIGN CRITERIA
Develop standardized engineering processes and criteria, including but not limited to the following:
• Hydrology: Determine design storm intensities and return periods (2-, 10-, 25- , 50-, and 100-year storms), approved calculation methodologies (including Rational Method and TR-55 as appropriate), acceptable software, and design approaches.
• Hydraulics: Establish standards for common stormwater design elements, including pipe sizing, manhole spacing, closed pipe systems, gutter spread, culverts, open channel flow, and related facilities.
• Water Quality: Provide recommendations for potential inclusion in County criteria, including examination of Section 303(d) listed waters and Water Supply Watersheds in Union County.
5.3 TASK 3: STORMWATER CONTROL MEASURE (SCM) LIBRARY
Develop a menu of approved SCM designs. For each SCM, provide:
• Example design schematics and typical cross-sections.
• Siting constraints, including soil type and depth to groundwater.
• Maintenance requirements and lifecycle cost estimates.
5.4 TASK 4: ADMINISTRATIVE & SUBMISSION PROCEDURES
Standardize the “pathway to permit” for developers, including:
• Checklists: Sketch plan, residential and non-residential plan reviews, revisions to approved plans, floodplain reviews, and final plats.
RFQ 2027-018 Stormwater Design Manual
• Standard Details: Review available State or other-jurisdiction details for applicability to Union County and create a digital library of applicable details.
• Operation & Maintenance (O&M): Provide templates for long-term maintenance agreements, recommended maintenance activities, and inspection logs.
5.5 TASK 5: PUBLIC OUTREACH & TRAINING
• Workshops: Conduct at least two public workshops, one for the development community/engineers and one for County staff.
• Draft Review: Manage a public comment period and provide a comment-response matrix.
5.6 PROJECT TIMELINE & DELIVERABLES
The consultant shall provide monthly project status reports and the following deliverables, measured from issuance of the Notice to Proceed:
1. Project Work Plan & Schedule — within 15 days of Notice to Proceed.
2. Annotated Outline — proposed table of contents for the manual, within 60 days of Notice to Proceed.
3. Technical Memorandum — summary of Task 1 findings, within 90 days of Notice to Proceed.
4. 50% Draft Manual — focusing on Task 2 criteria, within 180 days of Notice to Proceed.
5. 90% Draft Manual — complete draft including checklists and appendices, within 270 days of Notice to Proceed.
6. Final Manual — digital PDF and editable Word/InDesign versions and physical copies, including a standard detail CAD (.dwg) library, within 365 days of Notice to Proceed.
The timeframes above represent the maximum allowable periods for completion. Respondents may propose an accelerated schedule if all required tasks, coordination, analyses, and deliverables are addressed. Any proposed changes shall identify revised milestones, relevant assumptions, and County dependencies.
5.7 OPTIONAL ADDITIONAL SERVICES
In addition to the defined Base Scope of Services, Union County may, at its sole discretion, authorize optional Additional Services related to the Stormwater Design Manual. Additional Services are not guaranteed and may be authorized only by written amendment or task order, subject to availability of funds. The scope, schedule, and fee for any Additional Services will be negotiated at the time of authorization, consistent with rates established in the Agreement.
The estimated total project budget of $150,000 includes both the Base Scope of Services and any optional Additional Services. No separate funding has been allocated for Additional Services. Any such services must be accommodated within the available project budget and shall be subject to prior written authorization by the County.
RFQ 2027-018 Stormwater Design Manual
Possible Additional Services include expanded stormwater operations and maintenance work, water quality needs beyond the Base Scope, or additional unidentified planning services. Any authorization will require an approved proposal describing the additional tasks. Work already required under the Base Scope shall not be treated as an Additional Service.
NOTE: This is a Request for Qualifications (RFQ). Responding firms are not required to submit project-specific work product, fee information, or pricing with the SOQ. Qualifications will be evaluated in accordance with the criteria stated in this RFQ. Following ranking, the County will negotiate with the best qualified firm in accordance with N.C.G.S. § 143-64.31. If negotiations are unsuccessful, the County will terminate negotiations with that firm and may proceed to the next best qualified firm.
6 DETAILED SUBMITTAL REQUIREMENTS AND INSTRUCTIONS
6.1 TERMS OF SUBMISSION
All material received from a person or company (“Respondent”) in response to this solicitation shall become the property of Union County and will not be returned to the Respondent. Any and all costs incurred by a Respondent in preparing, submitting, or presenting submissions are the Respondent’s sole responsibility and Union County shall not reimburse the Respondent. All responses to this solicitation will be considered a public record and subject to disclosure under applicable public records law.
Any material in a response which the Respondent considers a trade secret and exempt from disclosure as a public record under applicable law, including N.C.G.S. §§ 132-1.2 and 66-152, must be properly designated as a trade secret. In order to properly designate such material, the Respondent must: (i) submit any trade secret materials in a separate envelope, or file, from all other submitted material, being clearly marked as “Trade Secret – Confidential and Proprietary Information,” and (ii) stamp the same trade secret/confidentiality designation on each page of the materials therein which contain trade secrets.
To the extent consistent with public records law, Union County will make reasonable efforts to maintain the confidential nature of trade secrets, as determined by Union County and subject to the conditions set forth herein. Respondent understands and agrees by submitting a response to this solicitation, that if a request is made to review or produce a copy of any information in the Respondent’s materials which was properly labeled by the Respondent as a trade secret, Union County will notify the Respondent of the request and the date that such materials will be released to the requestor unless the Respondent obtains a court order enjoining that disclosure. If the Respondent fails to obtain the court order enjoining disclosure prior to that date, Respondent understands and agrees that Union County will release the requested information to the requestor on that date.
Furthermore, the Respondent also agrees to indemnify and hold harmless Union County and each of its officers, employees, and agents from all costs, damages, and expenses incurred in connection with refusing to disclose any material that has been designated as a trade secret by Respondent.
RFQ 2027-018 Stormwater Design Manual
6.2 PROPOSAL FORMAT
The County desires all responses to be identical in format. While the County’s format may represent a departure from the vendor’s preference, the County requests adherence to the format. All responses are to be in the format described below.
Offerors should prepare their SOQ in accordance with the instructions outlined in this section. The submittal should be one (1) complete document. Each Offeror is required to submit the SOQ electronically – Refer to item 2.2. The SOQ should be prepared as simply as possible and provide a straightforward, concise description of the Offeror’s capabilities to satisfy the requirements of the RFQ.
The utmost attention should be given to accuracy, completeness, and clarity of content.
All parts, pages, figures, or tables should be numbered and clearly labeled. Response information should be limited to pertinent information only. Marketing and sales type information is not to be included.
The total length of the submittal, including cover letter, should be no more than 50 single-sided pages. Submittals should be on 8 ½” x 11" paper with an 11-point minimum text size. Key personnel resumes may also be provided as an appendix to the document and will not count against the page limit. Covers, section acknowledgements, and the required forms do not count against the page limit.
Please provide the following information in the sequence of the following major headings described below.
The submittal should be organized into the following sections:
• Section A – Cover Letter
• Section B – Firm Background and Experience
• Section C – History of Relevant Stormwater Engineering Experience
• Section D – Qualifications
• Section E – Project Team
• Section F – Project Management and Quality Control
• Section G – Project Approach and Methodology
• Section H – Financial Capacity
• Section I – Legal
• Section J – Required Forms
• Appendix A – SOQ Submission Form
• Appendix B – Addenda Receipt and Anti-Collusion
Omissions and incomplete answers may be deemed unresponsive. Please initial any corrections.
6.2.1 SECTION A – COVER LETTER
The cover letter shall briefly introduce the firm, identify the principal in charge, and state the firm’s interest in providing stormwater engineering and manual development services for this project. Include the following information:
RFQ 2027-018 Stormwater Design Manual
• Legal company name and DBA (if applicable).
• Corporate headquarters address, telephone number and website address.
• Location providing service, if different from headquarters.
• Name, title, telephone number and email address of the single point of contact.
• Name and title of the person authorized to bind the firm.
• North Carolina Secretary of State registration status, as applicable.
• A brief statement describing the firm's interest in the project and the unique qualifications the firm and proposed team bring.
Make the following representation and warranty in the cover letter, the falsity of which may result in rejection of the SOQ: “The information contained in this SOQ or any part thereof, including any exhibits, schedules, and other documents and instruments delivered or to be delivered to the County, is true, accurate, and complete. This SOQ includes all information necessary to ensure that the statements therein do not in whole or in part mislead the County as to any material facts.”
6.2.2 SECTION B – FIRM BACKGROUND AND EXPERIENCE
Provide a representative summary of the firm’s specialized experience in stormwater engineering, hydrologic and hydraulic modeling, stormwater design manuals or technical criteria, SCM design, land development review standards, and public-sector stakeholder engagement. Emphasize comparable county or municipal projects, familiarity with North Carolina stormwater regulations, and coordination of technical criteria with local ordinances and review procedures.
6.2.3 SECTION C – HISTORY OF RELEVANT STORMWATER
ENGINEERING EXPERIENCE
Provide information for a minimum of three (3) and a maximum of five (5) representative projects completed or substantially completed within the last eight (8) years. Projects should demonstrate comparable stormwater engineering, technical manual development, local government design criteria, or permitting/review process experience. Prior completed work may be provided as examples of qualifications; do not submit new project-specific designs or fee information with the SOQ.
• Project name, jurisdiction/location, owner, and completion date.
• Owner representative name, title, telephone number, and email address.
• Brief description of project scope and comparable stormwater engineering or technical manual services.
• Key personnel from the proposed team who performed the work and their roles.
• Technical criteria or design standards addressed, including hydrology, hydraulics, water quality, or SCMs, as applicable.
• Regulatory and ordinance requirements considered, including any relevant
North Carolina requirements.
RFQ 2027-018 Stormwater Design Manual
• Deliverables produced (for example, design manual, criteria, standard details, review checklists, or training materials).
• Public agency stakeholder coordination, public outreach, or workshop experience relevant to the project.
• Original and actual completion schedule, including any significant schedule challenges and resolutions.
• Brief description of the project’s outcomes and lessons applicable to Union County.
6.2.4 SECTION D – QUALIFICATIONS
Provide documentation demonstrating the firm’s qualifications to perform the professional stormwater engineering services required, including:
• Current North Carolina engineering firm licensure information, as applicable to the services proposed.
• North Carolina professional engineer license number(s) for the person(s) responsible for the engineering portions of the work.
• Qualifications and relevant stormwater design experience of the principal-in-charge and technical lead(s).
• Experience with hydrologic/hydraulic criteria, SCMs, water quality, and applicable County, State, and federal stormwater regulations.
• Other relevant technical licenses, credentials, certifications, or specialized expertise and identification of proposed subcontractors, if any.
6.2.5 SECTION E – PROJECT TEAM
Provide a project organization chart identifying the principal-in-charge, project manager, North Carolina-licensed professional engineer(s), hydrology/hydraulics specialists, SCM and water quality specialists, permitting or review process specialists, stakeholder engagement personnel, and other key staff or subconsultants proposed. For each person, identify the proposed role, relevant experience, license or credentials as applicable, office location, availability, and experience working on similar projects. Identify the firm’s primary day-to-day contact.
6.2.6 SECTION F – PROJECT MANAGEMENT AND QUALITY CONTROL
Describe the systems and methods the firm will use to manage the project, including communication with the County, document control and versioning, technical quality assurance/quality control, internal engineering review, schedule management, coordination of public workshops and comment responses, monthly reporting, and quality checks for final digital and CAD deliverables. Explain how the firm will maintain technical consistency between the UDO, recommended manual criteria, and regulatory requirements.
RFQ 2027-018 Stormwater Design Manual
6.2.7 SECTION G – PROJECT APPROACH AND METHODOLOGY
Provide a concise approach addressing the five tasks in this RFQ, including existing-standards review and gap analysis; proposed hydrologic and hydraulic criteria development; SCM library organization; review checklists and standard details; public outreach and comment-response procedures; and project management. Discuss coordination with Planning and Stormwater staff, likely technical challenges, and the firm’s ability to meet the stated 365-day maximum delivery schedule. Do not include fee information, pricing, or project-specific work product.
6.2.8 SECTION H – FINANCIAL CAPACITY
Provide a brief statement demonstrating the firm’s organizational and financial capacity to perform the services for the full project period. The County reserves the right to request additional information regarding the firm’s financial stability from firms under consideration.
State whether any material financial event within the last five (5) years could reasonably affect performance and explain if applicable. Do not include fee information, billing rates, cost proposals, or pricing in the SOQ.
6.2.9 SECTION I – LEGAL
Provide a summary of material legal or contractual matters involving the firm during the last five
(5) years that are relevant to the firm’s ability to perform this project. Include material claims, mediation, arbitration, or litigation arising from engineering or consulting services; owner terminations for cause; defaults; and final findings or convictions involving fraud, false claims, material misrepresentation, or violations of applicable professional-services law. For each disclosed matter, provide a concise description and current status or disposition. If none, state “None.”
6.2.10 SECTION J – REQUIRED FORMS
Submittals must include the following documents:
• Appendix A – Statement of Qualifications Submission Form (signed)
• Appendix B – Addenda Receipt and Anti-Collusion (signed)
7 EVALUATION CRITERIA AND SELECTION PROCESS
7.1 SELECTION PARTICIPANTS
1. Maintaining the integrity of the RFQ process is of paramount importance for the County. To this end, do not contact any member of the Union County Board of Commissioners or any member of the Union County staff regarding the subject matter of this RFQ until a selection is made, other than the County’s designated contact person identified in the introduction to this RFQ. Failure to abide by this requirement shall be grounds for disqualification from this selection process.
2. The Owner will establish an RFQ Evaluation Team to review and evaluate the submittals independently in accordance with the published evaluation criteria.
RFQ 2027-018 Stormwater Design Manual
The Evaluation Team will review and rank firms based on demonstrated competence and qualifications in accordance with the North Carolina Mini-Brooks Act (N.C.G.S. § 143-64.31).
3. Union County reserves the right to conduct interviews with a shortlist of selected respondents.
4. At its sole discretion, the Owner may ask written questions of Offerors, seek written clarification, and conduct discussions with Offerors on the submittals.
5. The Owner will provide written notification to all Offerors of the selection at the conclusion of the Procurement process.
6. Following the evaluation and ranking process, the County will enter into negotiations with the firm determined to be the best qualified to provide the required services. The County will attempt to negotiate a contract at a fair and reasonable fee.
If the County is unable to successfully negotiate a contract with the best qualified firm, negotiations with that firm will be formally terminated and the County will proceed to negotiate with the next most qualified firm. This process will continue until a contract agreement is reached or the selection process is terminated.
7.2 EVALUATION SELECTION PROCESS
In accordance with the North Carolina Mini-Brooks Act (N.C.G.S. §143-64.31), firms will be evaluated and ranked based on demonstrated competence and qualifications for the type of professional services required. For this project, the County will evaluate the qualifications of each responding firm and determine the firm with which to initiate negotiations based on demonstrated competence and qualifications. Price shall not be requested or considered during the evaluation of Statements of Qualifications.
The evaluation team will review the information submitted in response to this RFQ and rank firms based on the evaluation criteria identified below. The purpose of this process is to identify the most qualified professional engineering firm to develop the Union County Stormwater Design Manual.
In the evaluation and scoring/ranking of Offerors, the Owner will consider the information submitted in the RFQ as well as the meetings (if applicable) with respect to the evaluation criteria set forth in the RFQ.
The initial evaluation criteria/factors and relative weights listed below will be used to recommend selection of the best qualified firm or for the purpose of selecting Short-Listed Offerors. The County may choose to make a selection without conducting interviews.
RFQ 2027-018 Stormwater Design Manual
SOQ Evaluation Criteria Weights
Firm Background and Relevant Stormwater Engineering Experience
• Comparable public-sector stormwater criteria/manual development.
• Demonstrated expertise with hydrology, hydraulics, SCMs, and NC regulatory requirements.
• Quality and outcomes of similar engagements.
• References and relevant experience of the firm.
30%
Project Team and Availability of Resources
• Qualifications and relevant experience of NC-licensed professional engineer(s).
• Relevant expertise of proposed staff and subconsultants.
• Availability, staffing capacity, and team continuity.
• Experience working together on comparable assignments.
25%
Qualifications / Project Management and Quality Control
• Applicable engineering firm and individual licensure.
• Project management and quality assurance/quality control processes.
• Ability to integrate regulatory, technical, and administrative requirements.
• Capability to provide editable documents, standard details, and training.
25%
Project Approach and Methodology
• Understanding of Union County’s stormwater manual objectives.
• Approach to gap analysis, technical criteria, SCM library, and submittal procedures.
• Approach to public engagement, review cycles, and deliverable quality.
• Ability to meet required milestones and coordinate with County stakeholders.
20%
After identification of Short-Listed Offerors, the Owner may or may not decide to invite Short-Listed firms for interviews/demonstrations. If interviews are scheduled with the Short-Listed Offerors, previous evaluation and rankings are not carried forward. For the purpose of selecting the best qualified firm, the evaluation criteria will be given the following relative weights:
7.3 AWARD PROCEDURE
The County reserves the right to make an award without further discussion of the submittals received. It is understood that any SOQ submitted will become part of the public record.
Interview Evaluation Criteria Weights
Relevant Stormwater Engineering and Manual Experience Project Team and Availability of Resources Project Management, Approach and Quality Control
75%
Quality and Relevance of Interview as it Relates to the Scope of the RFQ 25%
RFQ 2027-018 Stormwater Design Manual
A submittal may be rejected if it is incomplete. Union County may reject any or all submittals and may waive any immaterial deviation in a submittal.
The County may accept the SOQ that best serves its needs, as determined by County officials in their sole discretion.
The County reserves the right to select firms based solely on the Statements of Qualifications without conducting interviews.
More than one submittal from an individual, firm, partnership, corporation or association under the same or different names will not be considered.
Following the evaluation and ranking process, the County will enter into negotiations with the firm determined to be the best qualified to provide the required services. The County will attempt to negotiate a contract at a fair and reasonable fee.
If the County is unable to successfully negotiate a contract with the best qualified firm, negotiations with that firm will be formally terminated and the County will proceed to negotiate with the next most qualified firm. This process will continue until a contract agreement is reached or the selection process is terminated.
The award document will be a Contract incorporating, by reference, all the requirements, terms and conditions of the solicitation and the Offeror’s SOQ as negotiated.
The County intends to select and enter into a contract with one (1) qualified professional engineering firm through this solicitation.
8 GENERAL CONDITIONS AND REQUIREMENTS
8.1 TERMS OF CONTRACT
The contract term will extend through completion of the services required for the project, subject to the terms of the final agreement and annual budget appropriation.
Union County has the right to reject any or all SOQ, to engage in further negotiations with any Company submitting a proposal, and/or to request additional information or clarification.
All SOQ submitted in response to this request shall become the property of Union County and as such, may be subject to public review.
8.2 CONTRACTUAL OBLIGATIONS
The contents of this submittal and the commitments set forth in the selected SOQ shall be considered contractual obligations if a contract ensues. Failure to accept these obligations may result in cancellation of the award. All legally required terms and conditions shall be incorporated into final contract agreements with the selected Service Provider(s).
RFQ 2027-018 Stormwater Design Manual
8.3 EXPENSE OF FIRM
The Owner accepts no liability for the cost and expenses incurred by firms in responding to this Procurement. Each Firm that enters into the Procurement process shall prepare the required materials and the SOQ at its own expense and with the express understanding that the Firm cannot make any claims whatsoever for reimbursement from the Owner for the costs and expenses associated with the process, even in the event the Owner cancels this Project or rejects all submittals.
8.4 E-VERIFY
E-Verify is the federal program operated by the United States Department of Homeland Security and other federal agencies, or any successor or equivalent program, used to verify the work authorization of newly hired employees pursuant to federal law.
Vendor/Firm shall ensure that Firm and any Subcontractor performing work under this contract: (i) uses E-Verify if required to do so; and (ii) otherwise complies with applicable law.
8.5 EQUAL EMPLOYMENT OPPORTUNITY
All Firms will be required to follow Federal Equal Employment Opportunity (EEO) policies. Union County will affirmatively assure that on any project constructed pursuant to this advertisement, equal employment opportunity will be offered to all persons without regard to race, color, creed, religion, national origin, sex, and marital status, status with regard to public assistance, membership or activity in a local commission, disability, sexual orientation, or age. All submittals submitted in response to this request shall become the property of Union County and as such, may be subject to public review. All payroll taxes, liability and worker’s compensation are the sole responsibility of the Proposer. The Proposer understands that an employer/employee relationship does not exist under this contract.
8.6 INSURANCE
One or more of the following insurance limits may be required if it is applicable to the project. The County reserves the right to require additional insurance depending on the nature of the agreement.
1At Contractor’s sole expense, Contractor shall procure and maintain the following minimum insurances with insurers authorized to do business in North Carolina and rated A-VII or better by A.M. Best, or as otherwise authorized by the Union County Risk Manager.
A. WORKERS’ COMPENSATION
Statutory (coverage for three or more employees) limits covering all employees, including Employer’s Liability with limits of:
$500,000 Each Accident $500,000 Disease - Each Employee $500,000 Disease - Policy Limit
RFQ 2027-018 Stormwater Design Manual
B. COMMERCIAL GENERAL LIABILITY
(for any agreement unless otherwise waived by the Risk Manager)
Covering Ongoing and Completed Operations involved in this Agreement.
$2,000,000 General Aggregate $2,000,000 Products/Completed Operations Aggregate $1,000,000 Each Occurrence $1,000,000 Personal and Advertising Injury Limit
C. COMMERCIAL AUTOMOBILE LIABILITY
(for any agreement involving the use of a contractor vehicle while conducting services associated with the agreement)
$1,000,000 Combined Single Limit - Any Auto
D. PROFESSIONAL LIABILITY
(only for any agreement providing professional service such as engineering, architecture, surveying, consulting services, etc.)
$1,000,000 Claims Made
Contractor shall provide evidence of continuation or renewal of Professional Liability Insurance for a period of two (2) years following termination of the Agreement.
ADDITIONAL INSURANCE REQUIREMENTS
A. The Contractor’s General Liability policy shall be endorsed, specifically or generally, to include the following as Additional Insured:
UNION COUNTY, ITS OFFICERS, AGENTS AND EMPLOYEES ARE
INCLUDED AS ADDITIONAL INSURED WITH RESPECTS TO THE GENERAL
LIABILITY INSURANCE POLICY.
Additional Insured status for Completed Operations shall extend for a period of not less than three (3) years from the date of final payment.
B. Before commencement of any work or event, Contractor shall provide a Certificate of Insurance in satisfactory form as evidence of the insurances required above.
C. Contractor shall have no right of recovery or subrogation against Union County (including its officers, agents and employees).
D. It is the intention of the parties that the insurance policies afforded by contractor shall protect both parties and be primary and non-contributory coverage for any and all losses covered by the above-described insurance.
RFQ 2027-018 Stormwater Design Manual
E. Union County shall have no liability with respect to Contractor’s personal property whether insured or not insured. Any deductible or self-insured retention is the sole responsibility of Contractor.
F. Notwithstanding the notification requirements of the Insurer, Contractor hereby agrees to notify County’s Risk Manager at 500 N. Main Street # 130, Monroe, NC 28112, within two (2) days of the cancellation or substantive change of any insurance policy set out herein. Union, in its sole discretion, may deem failure to provide such notice as a breach of this Agreement.
G. The Certificate of Insurance should note in the Description of Operations the following:
Department: _____________________ Contract #: _____________________
H. Insurance procured by Contractor shall not reduce nor limit Contractor’s contractual obligation to indemnify, save harmless and defend Union County for claims made or suits brought which result from or are in connection with the performance of this Agreement.
I. Certificate Holder shall be listed as follows:
Union County Attention: Risk Manager 500 N. Main Street Monroe, NC 28112
J. If Contractor is authorized to assign or subcontract any of its rights or duties hereunder and in fact does so, Contractor shall ensure that the assignee or subcontractor satisfies all requirements of this Agreement, including, but not limited to, maintenance of the required insurances coverage and provision of certificate(s) of insurance and additional insured endorsement(s), in proper form prior to commencement of services.
8.7 INDEMNIFICATION
Contractor agrees to protect, defend, indemnify and hold Union County, its officers, employees and agents free and harmless from and against any and all losses, penalties, damages, settlements, costs, charges, professional fees or other expenses or liabilities of every kind and character arising out of or relating to any and all claims, liens, demands, obligations, actions, proceedings, or causes of action of every kind in connection with or arising out of this agreement and/or the performance hereof that are due, in whole or in part, to the negligence of the Contractor, its officers, employees, subcontractors or agents. Contractor further agrees to investigate, handle, respond to, provide defense for, and defend the same at its sole expense and agrees to bear all other costs and expenses related thereto.
RFQ 2027-018 Stormwater Design Manual
9 APPENDIX A – SOQ SUBMISSION FORM
RFQ 2027-018
Submit with SOQ
This SOQ is submitted by:
Company Legal Name:
Representative Name:
Representative Signature:
Representative Title:
Address:
City/State/Zip:
Email Address:
Phone Number:
Website Address:
It is understood that Union County reserves the right to reject any and all submittals, to make awards according to the best interest of the County, to waive formalities, technicalities, to recover and re-advertise this project. This Statement of Qualifications is valid for 120 calendar days from the due date and is submitted by an executive of the company that has authority to contract with Union County, NC.
Name:
Title:
Signature:
Date:
RFQ 2027-018 Stormwater Design Manual
10 APPENDIX B – ADDENDUM AND ANTI-COLLUSION
RFQ 2027-018
Submit with SOQ
Please acknowledge receipt of all addenda by including this form with your submittal. Any questions or changes received will be posted as an addendum on www.co.union.nc.us and/or www.ips.state.nc.us. It is your responsibility to check for this information.
Addendum No. Date Downloaded
I certify that this SOQ is made in good faith and without collusion with any other offeror or officer or employee of Union County.
Legal Company Name:
Name:
Title:
Email Address:
Signature:
Date:
http://www.co.union.nc.us/
RFQ 2027-018 Stormwater Design Manual
11 APPENDIX C – TEMPLATE AGREEMENT
RFQ 2027-018
Stormwater Design Manual
Do Not Submit with SOQ
---Informational Purposes Only---
| 1 Notice of Advertisement |
| 2 Submittal Details |
| 2.1 Submission Deadline |
| 2.2 Submission requirements |
| 2.3 Submittal Questions |
| 2.4 Addenda |
| 2.5 Communication |
| 3 Introduction |
| 3.1 Purpose |
| 3.2 County |
| 4 Project Background |
| 5 Project Description and Scope of Services |
| 5.1 Task 1: Project Kick-off & Data Collection |
| 5.2 Task 2: Technical Design Criteria |
| 5.3 Task 3: Stormwater Control Measure (SCM) Library |
| 5.4 Task 4: Administrative & Submission Procedures |
| 5.5 Task 5: Public Outreach & Training |
| 5.6 Project Timeline & Deliverables |
| 5.7 Optional Additional Services |
| 6 Detailed Submittal Requirements and Instructions |
| 6.1 Terms of Submission |
| 6.2 Proposal Format |
| 6.2.1 Section A – Cover Letter |
| 6.2.2 Section B – Firm Background and Experience |
| 6.2.3 Section C – History of Relevant Stormwater Engineering Experience |
| 6.2.4 Section D – Qualifications |
| 6.2.5 Section E – Project Team |
| 6.2.6 Section F – Project Management and Quality Control |
| 6.2.7 Section G – Project Approach and Methodology |
| 6.2.8 Section H – Financial Capacity |
| 6.2.9 Section I – Legal |
| 6.2.10 Section J – Required Forms |
| 7 Evaluation Criteria and Selection Process |
| 7.1 Selection Participants |
| 7.2 Evaluation Selection Process |
| 7.3 Award Procedure |
| 8 General Conditions and Requirements |
| 8.1 Terms of Contract |
| 8.2 Contractual Obligations |
| 8.3 Expense of firm |
| 8.4 E-Verify |
| 8.5 Equal Employment Opportunity |
| 8.6 Insurance |
| 8.7 Indemnification |
| 9 Appendix A – SOQ Submission Form |
| 10 Appendix B – Addendum and Anti-Collusion |
| 11 Appendix C – Template Agreement |
File details come from the government source that posted it. Updated .