This Request for Qualifications (RFQ 2027-016) is issued by the City of San Marcos, Texas, Purchasing & Contracting Division, to solicit qualifications from qualified firms to provide on-call electrical engineering services for the City's Utilities Department - Electric Division. The City owns and operates an electrical distribution system serving approximately 16 square miles with approximately 27,000 electric meters connected, approximately 222 miles of overhead and underground 12.47 kV distribution lines, eight substations with one additional substation under construction, and recent annual energy sales of 649,000 megawatt-hours. Requested services include engineering and plan preparation, staff augmentation and AutoCAD drafting, capital improvements project planning, substation and distribution line design, distribution automation programming, distribution event analysis, system planning and coordination studies, surveying and right-of-way acquisition, system mapping, rates analysis, traffic control plan design, and regulatory services. The City intends to select two engineering firms to provide these services. Responses are due Thursday, November 19, 2026, at 2:00 PM local time to the Office of the Purchasing Manager, 630 East Hopkins Street, Building 3, San Marcos, Texas 78666. The initial contract term commences February 7, 2027, and continues through September 30, 2029, with automatic renewal for successive one-year terms through September 30, 2033, unless either party provides 120 days' written notice of non-renewal.
Evaluation will be conducted on a qualifications basis with points awarded for firm prior experience with similar projects (30 points), prior experience of key personnel (25 points), overall program approach and strategy (20 points), completeness of response (10 points), and firm's history of cost estimate accuracy and budget performance (15 points), for a total of 100 points; shortlisted respondents may be selected for optional interviews worth up to an additional 25 points. All services must be performed by licensed and registered professional engineers in accordance with Texas law. Required insurance includes commercial general liability of at least $1,000,000 per occurrence and $2,000,000 aggregate, business automobile liability of at least $1,000,000 per occurrence, workers' compensation as required by Texas law or $500,000/$500,000 for employer's liability, umbrella or excess liability of at least $1,000,000 per occurrence and aggregate, and professional liability of at least $2,000,000 per claim and aggregate to be maintained for the contract duration and three years following termination. The City reserves the right to negotiate final terms and pricing with the top-ranked respondent, reject any or all responses, and terminate the contract for convenience upon 30 days' written notice with equitable compensation for services performed. Respondents must comply with multiple Texas Government Code provisions addressing boycotts of Israel, Iran, Sudan, and foreign terrorist organizations, restrictions on foreign-owned companies in critical infrastructure, non-discrimination in firearm and ammunition industries, and boycotts of energy companies. A Certificate of Interested Parties Form 1295 is required for any contract exceeding $100,000 or approved by City Council.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev. 02.13.2026 Page 1 of 13
City of San Marcos
Request for Qualifications 2027-016 for
ON-CALL ELECTRICAL ENGINEERING SERVICES
Issued: Sunday, October 25, 2026
ISSUED BY:
City of San Marcos
Purchasing & Contracting Division 630 East Hopkins Street, Building 3
San Marcos, Texas 78666
RESPONSES DUE:
Thursday, November 19, 2026
Prior to 2:00 PM, Local Time
Rev. 02.13.2026 Page 2 of 13
TABLE OF CONTENTS
I. REQUESTS FOR QUALIFICATIONS
II. SCOPE OF SERVICES AND RESPONSIBILITIES
III. EVALUATION CRITERIA
IV. REQUIREMENTS FOR RESPONSE
V. SUBMISSION OF RESPONSE
VI. AWARD OF CONTRACT
VII. INSURANCE AND LIABILITY
VIII. SPECIAL PROVISIONS
IX. ANTICIPATED SCHEDULE
ATTACHMENTS:
EXPERIENCE RECORD
VENDOR INFORMATION QUESTIONNAIRE AND ASSURANCES
HOUSE BILL 89 VERIFICATION AFFIDAVIT
CONFLICT OF INTEREST QUESTIONNAIRE
SAMPLE SERVICES AGREEMENT
Rev. 02.13.2026 Page 3 of 13
I. REQUESTS FOR QUALIFICATIONS
The City of San Marcos (“the City”) requests Qualifications from interested qualified Respondents to provide On- Call Electrical Engineering Services to be utilized by the Utilities Department – Electric Division, in accordance with the terms and Scope of Services specified herein.
The terms “Respondent”, “Contractor”, “Vendor”, and “Company” have the same meaning and shall be used interchangeably.
This solicitation complies with applicable City Policy and state of Texas law, including Texas Government Code 2254. The City will select the successful Respondent that is determined to be the most highly qualified based on the published Evaluation Criteria, its final ranking, and a finally negotiated fair and reasonable price.
The City intends to select two (2) engineering firms to accomplish all the services outlined in this Request for Qualifications (“RFQ”).
The initial term of the resulting contract will commence on February 7, 2027 continue September 30, 2029 and will automatically renew for the term of October 1 through September 30 of the following year, for a total contract period not to surpass September 30, 2033, provided all terms and conditions remain in full force and effect except for the contract period being extended or any price redetermination. Either party may exercise the option to not renew the contract with 120 days written notice.
II. SCOPE OF SERVICES AND RESPONSIBILITIES
The successful Respondent will provide On-Call Electrical Engineering Services. Services may include, but are not limited to, the following:
Engineering services include evaluation of current projects and infrastructure, preparation of designs and other related functions necessary for the development of electrical distribution system plans and specifications for the City’s use.
All services are to be performed by licensed and registered professional engineers in accordance with Texas law.
BACKGROUND:
The City owns the electrical distribution system (the “System”) with a service area covering approximately sixteen
(16) square miles. Power is purchased through wholesale purchase power agreements. There are approximately 27,000 electric meters connected within the System. Included in the System are approximately 222 miles of overhead and underground 12.47 kV distribution lines. There are no generation or transmission related assets associated with the System. The System experienced record summer peak demand of 140 MW in 2025, and a record winter peak demand of 130 MW in 2018. The most recent annual energy sales topped 649,000 megawatt-hours. The System includes a total of eight (8) substations with another substation in construction. The City jointly owns substations with LCRA.
The City currently uses the following utility design and analysis tools:
Autodesk AutoCAD Milsoft Windmill Milsoft LightTable ESRI ArcMAP Powerline Technologies, PoleForeman and SagLine Procore Construction Management Software
Rev. 02.13.2026 Page 4 of 13
The successful Firms must be able to perform the following services. Services may include, but are not limited to, the following:
Engineering and Plan Preparation. This includes scoping, planning, design, estimating, and project management services for construction projects and ongoing distribution maintenance projects.
Provide staff augmentation if the City requires additional on-site services. This includes AutoCAD drafting.
Assistance in planning for the five (5) and ten (10) year Capital Improvements Project (“CIP”) program.
Substation Design.
Distribution Line Design.
Distribution Automation Programming.
Distribution Event Analysis. This includes faults, ground faults, short circuits, harmonics, circuit balancing, grid anomalies, and other grid issues.
System Planning.
System Coordination Studies.
Participate in plan reviews, specification creation and reviews, ordinance review, and other administrative tasks, as assigned.
Assist in the development of specifications, review solicitation documents, and provide guidance to the City as requested with contract processes as requested by the City.
Surveying and Right-of-Way Acquisition.
System Mapping Services.
Rates Analysis/Studies.
Providing and Design Traffic Control Plans.
Regulatory Services.
III. EVALUATION CRITERIA
The City will evaluate and rank each Response based on the following factors. The City reserves the right to request additional information or clarifications from all Respondents and to allow corrections of errors or omissions.
EVALUATION CRITERIA
Maximum Number of Points Per Criteria
The following point values are assessed per evaluation criteria by each evaluation team member.
FIRM’S PRIOR EXPERIENCE WITH PROJECTS OF SIMILAR SIZE,
SCOPE, AND SCALE
Years in business Capacity to perform Quality of work Maintaining schedule Client satisfaction – Client References
30 points
PRIOR EXPERIENCE OF FIRM’S KEY PERSONNEL MANAGING
PROJECTS OF SIMILAR SIZE, SCOPE, AND SCALE
Relevant projects Ability to maintain project schedule Client Satisfaction Education and Licenses
25 points
3 OVERALL PROGRAM APPROACH AND STRATEGY 20 points
Rev. 02.13.2026 Page 5 of 13
Program approach Strategies to minimize delays and areas for possible time savings
COMPLETENESS OF RESPONSE
Proposal is comprehensive, clearly and concisely written, and includes all required information.
10 points
5 The firm’s history of accuracy of cost estimates and ability to perform within budget constraints 15 points
TOTAL POINTS 100 points
Optional Interviews: The shortlisted Respondents may be requested to participate in an interview and provide a presentation that is worth up to an additional twenty-five (25) points. Any additional points earned will be added to the points the Respondent received in the first round of the evaluation.
Final Decision: In responding to this Solicitation, the Respondents understand that the decision of the selection committee is final. All Responses will be reviewed and ranked according to the criteria above, and Respondents may be selected for interviews or oral presentations as may be necessary. The City makes no commitment to any Respondent to this Solicitation beyond consideration of the Response.
IV. REQUIREMENTS FOR RESPONSE
The following items are required to be submitted with the Response. In order to expedite the evaluations, interested Respondents will organize their Responses in the sequence provided below. These instructions are designed to ensure the submission of information essential to the understanding and comprehensive evaluation of the Response.
1) Executive Summary:
Provide an Executive Summary of the major features of the Response, including any conclusions, assumptions, and general recommendations the Respondent desires to make. In addition, provide the following information. The Executive Summary section is limited to a length of two (2) pages.
The name of the project lead who will work on the contract and relevant project experience. Identify a Point of Contact and/or Project Manager and provide contact information for questions, notice of selection/non-selection, etc.
Verification statement that the proposed team individuals are currently employed by the Respondent.
Confirmation that the general liability insurance, workers’ compensation, and professional liability insurance will be provided within ten (10) calendar days of the Contract Award.
Brief statement providing assurances that the Respondent will be cognizant of, comply with, and enforce all applicable Federal, State, and local laws, regulations, and ordinances, and a description of your Respondent’s methodology for handling errors and omissions in the materials developed as part of this Project.
Acknowledgment of Addenda.
2) Relevant Experience Information:
Identification of the Respondent/team and a brief description of each key team member including a brief summary of their experience.
Year established (including former Respondent names and year established, if applicable). State the size of the Respondent and the number and nature of the professional staff to be assigned to the project.
Location of the headquarters office, as well as the location of each the office where work will be performed for the project.
Rev. 02.13.2026 Page 6 of 13
Provide information on experience and confirmation that key personnel are registered or licensed to practice in Texas, if applicable.
This section is limited to a length of three (3) pages
3) Reference List of Projects of Similar Scope, Size, and Complexity:
A reference list of four (4) clients with contact names, telephone numbers, and email addresses for reference checks. Use attached EXPERIENCE RECORD form. (Multiple forms may be completed.) Projects listed should encompass the past five (5) years of experience.
This section is limited to a length of three (3) pages
4) Overall Program Approach and Strategy
Program approach Strategies to minimize delays and areas for possible time savings This section is limited to a length of three (3) pages
5) The firm’s history of accuracy of cost estimates and ability to perform within budget constraints, including number of change orders needed, accuracy of design and construction budgets, among other considerations.
6) Information Questionnaire and Assurances:
Submit Vendor Information Questionnaire and Assurances with the Response.
7) House Bill 89 Verification Affidavit:
Submit the completed and notarized House Bill 89 Verification Affidavit with the Response, if applicable.
8) Conflict of Interest Questionnaire (CIQ):
Submit the completed Conflict of Interest Questionnaire with the Response.
V. SUBMISSION OF RESPONSE
Interested and qualified Respondents or teams are invited to submit one (1) original and one (1) copy of their Response, and one (1) USB flash drive containing the Response in a single file PDF document. Documentation should be limited to page limits as specified in each section. The page limits do not include tabs or other document portions unless the tabs or other document portions provide information noted in this solicitation (photos, client testimonials, etc.). Responses must be written entirely on 8 ½” X 11” paper and may be spiral, staple, or clip bound.
Responses must be submitted in a manner that does not carry any benefit, keepsake, or value for members of the evaluation committee.
To the extent permitted by law, all documents pertaining to this Solicitation will be kept confidential until a contract is awarded. Any information deemed confidential by the submitting Respondent must be clearly marked as such. No information about any Response will be released to the public until a contract is awarded. The City is under no obligation to return Responses.
It is the sole responsibility of the Respondent to ensure that its submittal reaches the Office of the Purchasing Manager, Purchasing & Contracting. Deliver Responses, unless otherwise specified, to the address on the label no
Rev. 02.13.2026 Page 7 of 13 later than the submittal deadline. Therefore, if your Response is delivered by an express mail carrier or by any other means, it is your responsibility to ensure delivery to the address below. The City is not responsible for deliveries made to any place other than the Office of the Purchasing Manager, for reasons including the lack of or improper labeling of the outermost sealed shipping container to indicate the Solicitation number, title, and deadline.
Responses may be dropped off in-person in the Bid/Proposal drop box at the Office of the Purchasing Manager, Purchasing & Contracting, Building 3, prior to the submittal deadline. Responses received after the submittal deadline will not be accepted.
Responses shall be mailed or delivered to:
Office of the Purchasing Manager 630 East Hopkins Street, Building 3
San Marcos, Texas 78666
The outermost envelope/container must be sealed and will be labeled as such to ensure delivery to the Office of the Purchasing Manager prior to the submission deadline:
Acknowledgement of Responses will be broadcast live via Teams video conference by reading aloud the Respondent’s name, city, and state in the Conference Room, Building 3, 630 East Hopkins Street, San Marcos, Texas 78666, immediately following the 2:00 PM submission deadline. To join, click on the Teams Meeting Link and enter the following meeting ID and passcode information:
Meeting ID: 279 963 198 733 Passcode: RJsC5g
For call in (audio only), call 1-430-205-2151 and enter Phone Conference ID 173 482 704#.
VI. AWARD OF CONTRACT
1) Negotiations: After evaluation and ranking based on the evaluation criteria, the City may then enter into negotiations with the top ranked Respondent as to the terms of the agreement and all aspects of the project to reach an agreement.
SEALED RESPONSE - DO NOT OPEN
SEALED PROPOSAL NO.: 2027-016
PROPOSAL TITLE: On-Call Electrical Engineering Services
DUE DATE/TIME: Thursday, November 19, 2026 at 2:00 PM local time
SUBMITTED BY:
(Firm Name and City/State of Respondent) https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting?ef_id=_k_EAIaIQobChMIk-THsPvUkgMVSKADAB1FoACpEAAYASAAEgKTP_D_BwE_k_&OCID=AIDcmmyk3xpkyw_SEM__k_EAIaIQobChMIk-THsPvUkgMVSKADAB1FoACpEAAYASAAEgKTP_D_BwE_k_&ef_id=_k_EAIaIQobChMIk-THsPvUkgMVSKADAB1FoACpEAAYASAAEgKTP_D_BwE_k_&anchor=&gad_source=1&gad_campaignid=23382630896&gbraid=0AAAAADcJh_t5uQ6XXdhCifCGf6S3Yk4Pf&gclid=EAIaIQobChMIk-THsPvUkgMVSKADAB1FoACpEAAYASAAEgKTP_D_BwE#plans
Rev. 02.13.2026 Page 8 of 13
2) Inability to Reach an Agreement: In the event the negotiations between the top ranked Firm and the City cannot be completed as a result of an inability to reach agreement, the City may formally end negotiations with that Firm and attempt to negotiate a contract with the next ranked Respondent until a contract is entered.
3) Successful Firm’s Documents: The successful Respondent will provide its Response and any negotiated amendments to the Office of the Purchasing Manager as an electronic Microsoft Office Word file.
Contract Award: The selection of a Respondent and the execution of a contract, while anticipated, are not guaranteed by the City. The City reserves the right to determine which Response(s) is/are in the City's best interest and to award the contract on that basis, to reject any and all Responses, and waive any irregularities of any Response.
4) City Council Approval: The City Council will consider the final contract for approval in the event the final contract amount is anticipated to exceed $100,000.
5) Final Contract:
a. The selected Respondent will assume responsibility for all services offered in its Response, whether or not such services are provided by a subconsultant or joint venture arrangement. The successful Respondent will be considered the sole point of contact with regard to contractual matters, including payment of any and all charges resulting from the contract.
b. The successful Respondent will be required to enter into a written contract with the City, see SAMPLE SERVICE AGREEMENT, which includes the City’s Standard Terms and Conditions found at sanmarcostx.gov/termsandconditions. Where conflicts exist between the provisions of SAMPLE SERVICE AGREEMENT and the provisions of this Solicitation, the provisions imposing greater responsibility on the successful Respondent will control.
c. This Solicitation and the successful Response, or any part thereof, may be incorporated into and made a part of the final contract. The City reserves the right to negotiate the terms and conditions of the contract with the successful Respondent.
d. Respondents are advised that exceptions to any portion of the Solicitation, the City’s Agreement, and/or the City’s Standard Terms and Conditions may jeopardize acceptance of your Response. If any exceptions are taken, those exceptions will be clearly indicated and a full explanation given for each exception within the proposal submitted. It is required that the Response enumerate the specific document and specific clauses that the Respondent wishes to amend or delete and suggest alternative wording in the Response. If no exceptions are included in the Response, it will be understood the Respondent accepts the City’s Standard Terms and Conditions. In view of the length of time involved in obtaining the approval of legal counsel, Respondents are cautioned not to state that the Respondent’s Response is subject to the Respondent’s standard terms and conditions or that the final terms and conditions are subject to negotiation after award. This may result in the Response being deemed non-responsive, in which no further consideration or evaluation will be made.
VII. INSURANCE AND LIABILITY
During the period of the resulting contract, the Respondent will maintain, at its expense, insurance with limits not less than those prescribed below. Insurance underwriters will be acceptable to the City. With respect to required insurance, the Respondent will:
1) Name the City of San Marcos, c/o Purchasing & Contracting Division, 630 East Hopkins Street, San https://www.sanmarcostx.gov/3131/Standard-Terms-and-Conditions
Rev. 02.13.2026 Page 9 of 13
Marcos, Texas 78666 as an additional insured.
2) Provide the City with a thirty (30) days’ written notice to the Certificate Holder prior to cancellation or material change of any insurance referred to in the certificate.
a. Failure of Certificate Holder to demand a certificate or other evidence of full compliance with these insurance requirements or failure of Certificate Holder to identify a deficiency from evidence that is provided will not be construed as a waiver of Insured’s obligation to maintain such insurance.
3) Provide the City of San Marcos, Purchasing & Contracting Division, 630 East Hopkins Street, San Marcos, Texas 78666, a Certificate of Insurance evidencing required coverage before execution of contract.
4) Submit a Certificate of Insurance reflecting coverage as follows:
Business automobile liability insurance with minimum limits of liability for bodily injury and property damage combined of not less than $1,000,000 per occurrence. Contractor will maintain a standard ISO version of Business automobile liability insurance or its equivalent providing coverage for all owned, non-owned and hired automobiles. Owner will be included as an additional insured party.
Commercial General Liability Insurance: Including Bodily Injury and Property Damage Liability, Independent Contractors Liability, Contractual Liability, Product Liability and Completed Operations Liability in an amount not less than $1,000,000 combined single limit, per occurrence, and $2,000,000 aggregate. City will be included as an additional insured party.
Umbrella or Excess Liability Coverage: Not less than $1,000,000 per occurrence and in the aggregate. This coverage typically sits above the underlying General Liability, Automobile Liability and Professional Liability policies. Depending upon the scope and work to be performed in the proposed agreement, this policy may be required in order for the vendor to be able to meet the minimum insurance requirements.
Workers' compensation insurance in accordance with and as required by the Workers’ Compensation Act of the State of Texas in amounts sufficient to satisfy statutory requirements or $500,000.00/$500,000.00 for Employer’s Liability.
Certificate of coverage or certificate means a copy of a certificate of insurance, a certificate of authority to self-insure issued by the Commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers’ compensation insurance coverage for the person’s or entity’s employees providing services on the Project, for the duration of the Project.
Professional Liability: Not less than $2,000,000 per claim and aggregate to be maintained for the duration of the agreement and three years following its termination. This insurance requirement applies when a supplier has a professional designation or license and/or is providing professional services. The minimum limit for architects and engineers is $2,000,000 per occurrence and in the aggregate and may be increased depending upon the nature of the services to be provided to the City.
VIII. SPECIAL PROVISIONS
1) Selected Response: The City reserves the right to include the selected Response or any part or parts thereof in the final contract.
2) Reimbursement: The City makes no commitment to any Respondent of this Solicitation beyond consideration
Rev. 02.13.2026 Page 10 of 13 of the written Response. The City will not reimburse Respondents for the costs incurred in response to this solicitation.
3) Collusion: By submission of a Response, the Respondent certifies, and in the case of a joint submission each party certifies as to its own organization, that in connection with any cost proposal submitted by the Respondent, the prices which are quoted are not the product, direct or indirect, of any collusion with any other Respondent, and have not been knowingly disclosed by the Respondent directly or indirectly to any other Respondent prior to submission to the City.
4) Lobbying: Respondents are prohibited from directly or indirectly communicating with City Council members regarding their qualifications or any other matter related to the eventual award of a contract for the services requested in this Solicitation. Respondents are prohibited from contacting City staff or evaluation committee members regarding their qualifications or the award of a contract, unless in response to an inquiry from a staff or committee member through the Purchasing Manager. Any violation will result in immediate disqualification of the Respondent from the selection process.
5) City of San Marcos Artwork: Use of the City seal or the City brand on Responses is not permitted on non-City-generated work product.
6) Taxpayer Identification Form: Prior to the execution of a contract for these services, the selected Respondent will complete a Request for Taxpayer Identification Number and Certification Form (IRS Form W-9). The City will not make payment against the contract until it has received the properly completed form. The selected Respondent will invoice the City for services rendered accompanied by the City’s required documentation. The City’s representative and the appropriate staff in the City’s Finance Department must approve payments.
7) “Green” Procurement: It is the City’s objective to be proactive with regard to the environment. The City encourages “Value Purchasing” of environmentally friendly products. Respondents are encouraged to clearly identify any green solution in their Responses, or a Respondent may propose a separate alternative “Green” solution in a separate envelope marked “Green Solution”. The Green solution alternative Response will meet the minimum performance and delivery standards.
8) Protest Procedures: The purpose of the protest procedures is to protect the public interest in the purchasing process. This section is intended to give a bidder, proposer, respondent, or contractor who is aggrieved in connection with the solicitation, evaluation, or award of a contract the opportunity to protest. The City’s objective is to resolve protests as soon as practical.
Any protest or complaint to the City's consideration must be submitted in writing and received by the Purchasing Manager no later than 5:00 PM on the fifth (5th) calendar day after the City notifies the bidder or proposer: 1) that it is deemed non-responsive; 2) that it is deemed not responsible; 3) the name of the apparent winning bidder; or 4) the City’s intent to award a contract. If the protest or complaint does not contain the following information, it may be dismissed by the Purchasing Manager:
Protestor’s name, address, telephone number, and email address;
The solicitation number;
Identification of the statute or policy that is alleged to have been violated;
A precise statement of the relevant facts;
Identification of the issues to be resolved; and Supporting documentation.
Rev. 02.13.2026 Page 11 of 13
The protest must be concise and presented logically and factually to help with the City’s review and determination as to whether the grounds for the protest are sufficient. The Purchasing Manager will notify the protesting party that the protest has been received and make every effort to resolve the protest before contract award.
If it is determined that the grounds for the protest are insufficient and no violation of a statute or policy has occurred, the Purchasing Manager will provide a written decision to the protesting party setting forth the reasons for the determination.
If, after conferring with the City Attorney’s Office, it is decided that the grounds for the protest are sufficient and it is determined that a violation of a statute or policy has occurred, the Purchasing Manager will inform the protesting party by letter setting forth the reasons for the determination and the remedial action that will be taken.
When a protest is filed, the City will not make an award until a decision on the protest is made except, as determined by the City Manager, when a delay would jeopardize urgently needed goods or services, or a delay in making an award will unduly delay delivery or performance of urgently needed services.
9) Smoking Prohibition: Pursuant to San Marcos Ordinance No. 2013-57, as amended, all City of San Marcos-owned and rented/leased properties are smoke-free properties. All contractors, vendors, subcontractors, and their employees are prohibited from smoking while on City property. This prohibition includes the enclosed areas of public places and workplaces and within ten (10) feet of doors and windows of City-owned or rented buildings, all City parks and the grounds outside of any City building. This prohibition includes e-cigarettes and other inhaled vapor devices. The City may terminate the contract for noncompliance with this ordinance.
10) Certificate of Interested Parties: A contract greater than $100,000 or that is approved by the City Council regardless of contract amount requires the vendor to electronically create a Certificate of Interested Parties Form 1295 through the Texas Ethics Commission (“TEC”) website (https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm) and submit a signed copy of the form to the City prior to the award of the contract. A contract, including a City-issued purchase order, will not be enforceable or legally binding until the City receives and acknowledges receipt of the properly completed Form 1295 from the vendor.
11) Prohibition on Contracts with Companies Boycotting Israel: Pursuant to Chapter 2271 and 808, Texas Government Code, Contractor certifies that is not ineligible to receive the award of or payments under the Agreement and acknowledges that the Agreement may be terminated, and payment may be withheld if this certification is inaccurate. Vendors will submit the House Bill 89 Verification Affidavit with their Response. Failure to meet or maintain the requirements under this provision will be considered a materialbreach.
12) 2252 Compliance: Section 2252 of the Texas Government Code restricts the City from contracting with companies that do business with Iran, Sudan, or a foreign terrorist organization. Contractor hereby certifies that is not ineligible to receive the award of or payments under this Agreement. Failure to meet or maintain the requirements under this provision will be considered a material breach.
13) Non-Discrimination: The Respondent understands and certifies that it is an Equal Opportunity Employer and does not and will not discriminate in employment and in subcontracts based on race, color, sexual orientation, gender identity, national origin, sex, age, disability, or economic condition and prohibits retaliation, discharge, or discrimination against any employee or applicant for employment or against any subcontractor or supplier.
14) Conflict of Interest Questionnaire (Form CIQ): In accordance with Chapter 176 of the Texas Local Government Code, “Disclosure of Certain Relationships with Local Government Officers,” persons, or their https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm
Rev. 02.13.2026 Page 12 of 13 agents who seek to contract for the sale or purchase of property, goods, or services with the City, will file a Conflict of Interest Questionnaire (Form CIQ) with the City Secretary if the vendor has a business relationship as defined by Section 176.001(1-a) with the City and the vendor meets requirements under Section 176.006(a).
The Conflict-of-Interest Questionnaire (Form CIQ) is required to be filed within seven (7) business days of:
a. Beginning of discussions or negotiations to enter into a contract with the City; or
b. Submission of an application, response to a request for Responses or bids, correspondence or other writing related to a potential agreement with the City.
If the above is applicable in accordance with LGC Chapter 176, Bidder is requested to submit a completed Conflict of Interest Questionnaire (Form CIQ), with their bid in addition to submitting a completed Form CIQ to the City Clerk’s Office, 630 E. Hopkins Street, San Marcos, Texas 78666.
By law, Form CIQ must be filed with the City Clerk no later than the seventh (7th) business day after the date the Vendor/Contractor becomes aware of facts that require the statement to be filed as per Section 176.006(a-1). A vendor commits an offense if the vendor knowingly violates Section 176.006, Local Government Code. An offense under this section is a misdemeanor.
Form CIQ is available from the Texas Ethics Commission by accessing the following web address:
https://www.ethics.state.tx.us/data/forms/conflict/CIQ.pdf
15) Prohibition on Contracts with Certain Foreign-Owned Companies: Section 2275 of the Texas Government Code (SB2116) restricts the City from contracting with companies that do business with certain foreign-owned companies in connection with critical infrastructure if the company is granted direct or remote access; and if the company is owned by citizens of or is directly controlled by the government of China, Iran, North Korea, Russia, or a “designated country”, or headquartered in China, Iran, North Korea, Russia, or a designated country.
Designated country is Governor-designated country as a threat to critical infrastructure. By signing below as an authorized signer, the Bidder hereby certifies that it does not do business with certain foreign-owned companies in connection with critical infrastructure as described herein. Failure to maintain the requirements under this provision will be considered a material breach.
16) Prohibition on Contracts with Companies that Discriminate Against Firearm and Ammunition Industries:
Section 2274 of the Texas Government Code (SB19) restricts the City from contracting with companies that discriminate against firearm and ammunition industries. By signing below as an authorized signer, the Respondent certifies that it does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and will not discriminate against the same during the term of this contract. (Only applies to companies with ten (10) or more full-time employees and for a contract value greater than $100,000.) Failure to maintain the requirements under this provision will be considered a material breach.
17) Prohibition on Contracts with Companies Boycotting Certain Energy Companies: Section 2276 of the Texas Government Code (SB13) restricts the City from contracting with companies that boycott energy companies. By signing below as an authorized signer, the Respondent certifies that it does not have a practice, policy, guidance, or directive boycotting energy companies, and will not discriminate against the same during the term of this contract. (Only applies to companies with ten (10) or more full-time employees and for a contract value greater than $100,000.) Failure to maintain the requirements under this provision will be considered a material breach.
18) Inquiries and Other Information: All questions and other communication from Respondents will be permissible until 5:00 P.M., ten (10) business days prior to the solicitation due date. All responses to this Request for Responses, as well as any questions, clarifications, or requests for general information are to be directed to the https://www.ethics.state.tx.us/data/forms/conflict/CIQ.pdf
Rev. 02.13.2026 Page 13 of 13 following Point of Contact in writing and must include RFQ 2027-016 in the subject line.
Mari Kruzelock Purchasing & Contracting Division City of San Marcos Email: mkruzelock@sanmarcostx.gov
Communications outside this prescribed protocol jeopardizes the integrity of this procurement process and may disqualify your response.
19) Addenda: Any changes resulting from the questions submitted affecting the scope of services, or which may require an extension to the solicitation due date will be reduced to writing in the form of an addendum to this solicitation. Addenda may only be viewed at www.sanmarcostx.gov/eprocurement. It is the Respondent’s responsibility to check the above site to determine if the City has issued any addenda. Addenda will be issued no later than seven (7) business days prior to the solicitation due date.
20) Extension for Procurement Processes: Upon expiration of the term of this contract, including any renewals permitted herein, at the City’s sole discretion, this contract may be extended on a month-to-month basis for a maximum of six (6) months to allow for the City’s procurement processes in the selection of a vendor to provide the goods/services provided under this contract. The City will notify the Contractor in writing of its intent to extend the contract at least thirty (30) calendar days before the expiration of the contract. Any extension under this clause will be a continuation of the same terms and conditions as in effect immediately before the expiration of the then-current term.
IX. ANTICIPATED SCHEDULE
The following is the anticipated schedule for the selection process:
October 25, 2026 – Advertise, mail, or email Solicitation
October 29, 2026 – Deadline for submission of questions to mkruzelock@sanmarcostx.gov
November 5, 2026 – Deadline for addendum to be posted at www.sanmarcostx.gov/eprocurement
November 19, 2026 – Deadline for receipt of responses
January 19, 2027 – City Council for consideration and contract mailto:mkruzelock@sanmarcostx.gov http://www.sanmarcostx.gov/eprocurement mailto:mkruzelock@sanmarcostx.gov http://www.sanmarcostx.gov/eprocurement
Rev. 03/01/17 Statement of Experience C / 00400CSP Page 1 of 1
EXPERIENCE RECORD
DUPLICATE FORM AS NECESSARY - ONE PAGE PER PROJECT
PROJECT OWNER/CLIENT POC
PHONE EMAIL
ADDRESS
PROJECT NAME/LOCATION:
DESCRIBE SCOPE OF WORK:
EXPLAIN SIMILAR SCOPE, SIZE, & COMPLEXITY TO THE WORK DESCRIBED IN SECTION II AND REQUESTED IN SECTION III.3) Reference List:
INITIAL CONTRACT AMOUNT: $ FINAL CONTRACT
AMOUNT:
SUBSTANTIAL COMPLETION
DATE:
ACTUAL COMPLETION
DATE:
EXPLAIN ANY INCREASES IN CONTRACT SCHEDULE IN EXCESS OF THE INITIAL SUBSTANTIAL COMPLETION:
EXPLAIN ANY INCREASES IN CONTRACT AMOUNT THAT OCCURRED IN EXCESS OF THE INITIAL CONTRACT AMOUNT:
EXPLAIN TASKS OR ACTIVITIES UNDERTAKEN TO IMPROVE THE PROJECT SCHEDULE, OR CONTRACT AMOUNT OF THE
PROJECT:
DESCRIBE CRITICAL ISSUES ENCOUNTERED IN THE PROJECT AND STEPS TAKEN TO CORRECT AND/OR MINIMIZE
IMPACT TO SCOPE, SCHEDULE AND CONTRACT AMOUNT:
Rev 08.08.2025 Page 1 of 4
VENDOR INFORMATION QUESTIONNAIRE AND ASSURANCES
Business/Individual Name:
Primary Office Address :
Telephone Number:
Email Address:
Company has been in business since:
City of San Marcos Department/Contact:
Form of Ownership (check one):
☐ Individual/Sole Proprietor
☐ C Corporation: State: _________ Date Incorporated: _______________
☐ S Corporation: State: _________ Date Incorporated: _______________
☐ Partnership, select one: ☐ Limited or ☐ General
☐ Trust/Estate
☐ LLC, select one: ☐ C corporation ☐ S corporation ☐ Partnership
☐ Joint Venture
Type of Business: ______________________________________________________________________________
1099 Information: Are you eligible to receive a 1099? ☐ Yes ☐ No
1099 Code: ☐ Interest ☐ Non-Employee Compensation ☐Rent/Right of Entry/Equip Lease
☐Medical/Health Care Payments ☐ Attorney ☐Easement (Skip to #11)
☐Other Income (Subscriptions, Marketing/Printing, Beneficiary payments, Prizes/Awards, Taxable Damages, Software as a svc)
If Individual/Sole Proprietor, check if applicable, then skip to signature:
☐ Grant ☐ Sports Official ☐ Minority/ Small Business
List of Partners, Principals, Corporate Officers or Owners (attach additional pages as needed):
Name Title
List of Corporate Directors (attach additional pages as needed):
Name Title
Rev 08.08.2025 Page 2 of 4
1. Have you had any contracts terminated for default or other performance reasons? ☐ Yes ☐ No If yes, explain:
2. Has your company been convicted of a criminal offense involving fraud, theft, bribery, kickbacks, or unlawful gifts to a public official? ☐ Yes ☐ No If yes, has the conviction occurred within three (3) years immediately preceding either the date of submission of a bid/proposal, or the date of award of the contract?
If yes, explain:
3. Is your company involved in pending investigation or criminal prosecution of a criminal offense involving fraud, theft, bribery, kickbacks, or unlawful gifts to a public official?
☐ Yes ☐ No If yes, explain:
4. Does your company have pending claims, investigations, or civil litigation involving allegations of fraud, misrepresentation, or conversion?
5. Does the City have previous final judgments against your company for breach of contract, fraud misrepresentation or conversion?
6. Has your company failed to timely pay/remit sales tax, property tax, or utility payments to the City of San Marcos?
7. Has your company refused to execute a contract following an award by the San Marcos City Council?
8. Has your company violated the anti-lobbying provisions in a current or previous City of San Marcos procurement process by contacting a member of the San Marcos City Council prior to the award of a contract?
9. Has your company furnished unauthorized substitutions of materials not meeting contract specifications in a current or previous contract with the City of San Marcos?
Rev 08.08.2025 Page 3 of 4
10. Are you submitting a bid or proposal? ☐ Yes ☐ No
Non-Collusion Certification: By signing below as an authorized signer, the Bidder/Proposer certifies that
ALL items below are true and correct concerning its bid/proposal.
1) You are fully informed of the contents of the bid/proposal and the circumstances of its preparation.
2) Your bid/proposal is genuine and is not a collusive or sham bid/proposal.
3) Neither you nor anyone else acting on behalf of your company has agreed, colluded, or conspired in any manner with any other firm, or person to submit a collusive or sham bid/proposal, or to refrain from bidding/proposing, or sought by communication or conference with any other bidder, firm, or person to fix the prices, overhead, profit, or any cost element in your bid or in any other bid, or to secure through any collusion, conspiracy, or agreement any advantage against the City of San Marcos or any other bidder.
4) The prices quoted in your bid/proposal are fair and proper and are not affected by any collusion, conspiracy, connivance, or unlawful agreement on the part of your company or anyone acting on its behalf.
11. Are you a property owner granting or selling property for a project related to CIP/Engineering?
☐ Yes ☐ No
If Yes: Name of project: ______________________________________________________________
Property description: ___________________________________________________________
Is this a 1-Time Payment? ☐ Yes ☐ No
12. Prohibition on contracts per the Texas Government Code:
a. Prohibition on contracts with companies that boycott Israel. Chapters 808 and 2271, Texas Government Code restricts the City from contracting with companies that boycott Israel. By signing below and submission of the HB89 Verification form, the Bidder certifies that it is does not boycott Israel and will not during the term of this contract. Failure to maintain the requirements under this provision will be considered a material breach. (HB89 Verification form required if contract value is greater than $100,000.)
b. Prohibition on contracts with companies that do business with Iran, Sudan, or a foreign terrorist organization.
Chapters 2252 and 2270 of the Texas Government Code restricts the City from contracting with companies that do business with Iran, Sudan, or a foreign terrorist organization. By signing below as an authorized signer, the Bidder certifies that it does not do business with Iran, Sudan, or a foreign terrorist organization.
Failure to maintain the requirements under this provision will be considered a material breach.
c. Prohibition on contracts with certain foreign-owned companies. Chapter 2275 of the Texas Government Code
(SB2116) restricts the City from contracting with companies that do business with certain foreign-owned companies in connection with critical infrastructure if the company is granted direct or remote access; and if the company is owned by citizens of or is directly controlled by the government of China, Iran, North Korea, Russia, or a “designated country”, or headquartered in China, Iran, North Korea, Russia, or a designated country. Designated country is Governor-designated country as a threat to critical infrastructure. By signing below as an authorized signer, the Bidder hereby certifies that it does not do business with certain foreign-owned companies in connection with critical infrastructure as described herein. Failure to maintain the requirements under this provision will be considered a material breach.
d. Prohibition on contracts with companies that discriminate against firearm and ammunition industries.
Chapter 2274 of the Texas Government Code (SB19) restricts the City from contracting with companies that discriminate against firearm and ammunition industries. By signing below as an authorized signer, the Bidder certifies that it does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and will not discriminate against the same during the term of this contract.
(Only applies to companies with 10 or more full-time employees and for a contract value greater than
$100,000.) Failure to maintain the requirements under this provision will be considered a material breach.
e. Prohibition on contracts with companies boycotting Certain Energy Companies. Chapters 809 and 2276 of the Texas Government Code (SB13) restricts the City from contracting with companies that boycott energy companies. By signing below as an authorized signer, the Bidder certifies that it does not have a practice, policy, guidance, or directive boycotting energy companies, and will not discriminate against the same during the term of this contract. (Only applies to companies with 10 or more full-time employees and for a contract value greater than $100,000.) Failure to maintain the requirements under this provision will be considered a material breach.
Rev 08.08.2025 Page 4 of 4
I hereby certify that our business is an Equal Employment Opportunity (EEO) employer and does not and will not discriminate in employment and in subcontracts based on race, color, sexual orientation, gender identity, national origin, sex, age, disability or economic condition. I further attest that this policy is documented in our Employee Handbook. As an EEO employer, we prohibit retaliation, discharge, or discrimination against any employee or applicant for employment or against any subcontractor or supplier.
I, _______________________________________________, as ________________________________ Name of Individual Title & Authority of __________________________________________________________________, declare under oath that the Company Name above Statements, including any supplemental responses attached hereto, are true and correct, and that the representations made herein are accurate to the best of my knowledge and are based upon a diligent search of records.
I further acknowledge that any failure to conduct a diligent search or to make a full and complete disclosure may result in cancellation of my contract by the City of San Marcos, and possibly debarment.
Signature Date
Rev. 03.05.2026
HOUSE BILL 89 VERIFICATION FORM
As the undersigned legal representative of _________________________________________________, (Business Name) after being duly sworn by the undersigned notary, do hereby depose and verify under oath that the company named above, under the provisions of Subtitle F, Title 10, Government Code Chapter 2271:
a. Does not boycott Israel currently; and
b. Will not boycott Israel during the term of the contract City of San Marcos, Texas.
OR
c. Is exempt from this requirement under the following criteria:
Company with less than ten (10) full-time employees.
Contract has a cumulative value of less than $100,000 paid wholly or partly from public funds of the City of San Marcos.
Pursuant to Sections 2271.001, 2271.002, 808.001, Texas Government Code:
1. “Boycott Israel” means refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli-controlled territory, but does not include an action made for ordinary business purposes; and
2. “Company”means a for-profit sole proprietorship, organization, association, corporation, partnership, joint venture, limited liability partnership, or any limited liability company, including a wholly owned subsidiary, parent company, or affiliate of those entities or business associations that exist to make a profit.
3. Pursuant to Section 2270.002 of the Texas Government Code, Respondent certifies that either (i) it meets an exemption criteria under Section 2270.002; or (ii) it does not boycott Israel and will not boycott Israel during the term of the contract.
(Business Representative Signature) (Date)
(Title)
STATE OF _________________ §
COUNTY OF _______________ §
On this day, BEFORE ME, _______________________________________________________ personally appeared and personally-known to me or proved to me on the basis of satisfactory evidence to be the individual whose name is subscribed to the within instrument and acknowledged to me that he/she executed the same in his/her capacity, and that by his/her signature on the instrument, the individual executed the instrument for purposes and consideration therein expressed.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this ______ day of ________________________, 20_____.
[SEAL] NOTARY PUBLIC in and for the
State of ________________
For vendor doing business with local governmental entity
FORM CIQ
OFFICE USE ONLY
Date Received
This questionnaire reflects changes made to the law by H.B. 23, 84th Leg., Regular Session.
This questionnaire is being filed in accordance with Chapter 176, Local Government Code, by a vendor who has a business relationship as defined by Section 176.001(1-a) with a local governmental entity and the vendor meets requirements under Section 176.006(a).
By law this questionnaire must be filed with the records administrator of the local governmental entity not later than the 7th business day after the date the vendor becomes aware of facts that require the statement to be filed. See Section 176.006(a-1), Local Government Code.
A vendor commits an offense if the vendor knowingly violates Section 176.006, Local Government Code. An offense under this section is a misdemeanor.
1 Name of vendor who has a business relationship with local governmental entity.
Check this box if you are filing an update to a previously filed questionnaire. (The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than the 7th business day after the date on which you became aware that the originally filed questionnaire was incomplete or inaccurate.)
3 Name of local government officer about whom the information is being disclosed.
Name of Officer
4 Describe each employment or other business relationship with the local government officer, or a family member of the officer, as described by Section 176.003(a)(2)(A). Also describe any family relationship with the local government officer.
Complete subparts A and B for each employment or business relationship described. Attach additional pages to this Form CIQ as necessary.
A. Is the local government officer or a family member of the officer receiving or likely to receive taxable income, other than investment income, from the vendor?
Yes No
B. Is the vendor receiving or likely to receive taxable income, other than investment income, from or at the direction of the local government officer or a family member of the officer AND the taxable income is not received from the local governmental entity?
Yes No
5 Describe each employment or business relationship that the vendor named in Section 1 maintains with a corporation or other business entity with respect to which the local…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .