This document is an addendum to Request for Quotes (RFQ) #2024-27 issued by Clackamas County, Oregon for on-call residential fiber drop construction services as part of the American Rescue Plan Act (ARPA) broadband expansion project. The RFQ seeks qualified local outside plant construction companies to perform all or part of the outside fiber optic cable construction to residential sites to enhance broadband speeds. This addendum updates the pricing sheet for the CBX Drop Costs, including unit costs for various construction methods such as boring, trenching, plowing, and aerial installation, as well as pull fiber cable, splicing, risers, and home installation.
The pricing sheet provides detailed unit costs for different construction activities, materials, and equipment required for the residential fiber drop installations. This includes costs for 1-inch and 2-inch conduit, rock trenching, fiber cable pulling, splicing, riser installations, and home installation coordination and entry work. Contractors are required to provide pricing on the updated CBX Drop Costs sheet as part of their quotes for this on-call contract opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PH: 503-742-5400 WWW.CLACKAMAS.US
REQUEST FOR QUOTES #2024-27
On-Call Clackamas Broadband Exchange (CBX), American Rescue Plan Act (ARPA) Residential Drop Construction
ADDENDUM NUMBER 1
April 18, 2024
On April 18, 2024, Clackamas County (“County”) published Request for Quotes #2024-27 (“RFQ”). The County has found that it is in its interest to amend the RFQ through the issuance of this Addendum #1. Except as expressly amended below, all other terms and conditions of the original RFQ and subsequent Addenda shall remain unchanged.
1. The following changes are hereby made to Section 4. Quote, Item C.
a. Remove and replace the CBX Drop Costs sheet with the following:
CBX Drop Costs Drop Construction cost per foot Boring 1 in rolled conduit 2 in rolled conduit 1 in rolled conduit rock 2 in rolled conduit rock Trenching 1 in conduit stick, 20 ft 1 in conduit stick, 10 ft 2 in conduit stick, 20 ft 2 in conduit stick, 10 ft Trench or Plow Rock 1” conduit Trench or Plow Rock 2” conduit Plow 1 in conduit 2 in conduit Aerial self support single fiber cable self support 12 count fiber cable strand & lash, single fiber cable Strand & lash, 12 count cable Vault (Unit Cost) 24x36x24 vault 24x36x36 vault 17x30x18 vault Pull Fiber Cable in conduit Pull fiber cable in 1" conduit Pull fiber cable in 2" conduit Splicing (Unit Cost) Fusion Splice (1-12 fibers)
PH: 503-742-5400 WWW.CLACKAMAS.US
Fusion Splice (13-96 fibers) Re-enter Existing Case Install New Aerial Case Install New Vault Case Risers Risers 1” Risers 2” Home Install (Unit Cost)
Unit cost to coordinate and perform a home install.
This would entail coordinating a time with the home owner, discussing location of building entry, performing the entry and coiling the new fiber drop in the house and mounting the ONT. All building penetrations need to be weather proof to ensure moister does not enter the home. CBX will provide the fiber cable and ONT. All other materials needed for the building entry will be the reasonability of the contractor.
Firm Name:____________________________________