RFQ_19BR9325Q0007.pdf
PDF 4 MB Posted
- Solicitation number
- 19BR9325Q0007
- Issued by
-
Department of State
About this file
This is a Request for Quotes (RFQ) 19BR9325Q0007 for the US Consulate General in Sao Paulo's office improvement project. The solicitation seeks a general contractor to renovate the IRM Suite (154m²) in Building #2, involving comprehensive infrastructure upgrades across architectural, electrical, mechanical, civil, and telecom systems. Specific renovation activities include removing and constructing non-load bearing walls, replacing carpet and ceiling tiles, upgrading electrical and telecommunications infrastructure, improving HVAC systems, installing a service window, and painting.
Key submission requirements include providing a quote by June 27, 2025, electronically submitting documentation in English (MS Word, Excel, or PDF formats under 30MB), and being registered in the System for Award Management (SAM). The contract will be awarded to the lowest-priced, technically acceptable offeror with demonstrated construction experience, necessary licenses, insurance, and performance capabilities. Contractors must conduct a site visit, provide detailed technical proposals, performance schedules, and comply with specific technical specifications for office renovations, with work to be completed within 70 calendar days of contract award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dear Prospective Offeror:
Subject: Request for Quotes - 19BR9325Q0007
Enclosed is a Request for Quotes (RFQ) for DTO Office Improvement Project. If you would like to submit a quotation, follow the instructions in Section I of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard
Form that follows this letter.
The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial proposals, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.
Quotations are due by Jun 27, 2025, COB. No quotations will be accepted after this time.
Quotations must be in English and incomplete quotations will not be accepted.
Your quotation must be submitted electronically to SaoPauloProcurement@state.gov. It is important to make sure the submission is made in specific size and format; in MS-Word
2007/2010 or MS-Excel 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB. If the file size should exceed the 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.
In order for a quotation to be considered, you must also complete and submit the following:
1. SF-1449
2. Section A, Pricing
3. Section L Representations and Certifications
4. Additional information as required in Section J
5. Proof of SAM Registration
Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102.
Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.
Sincerely, Christine Bonds
Contracting Officer mailto:SaoPauloProcurement@state.gov https://www.sam.gov/
TABLE OF CONTENTS
A. PRICING
B. STATEMENT OF WORK
C. PACKAGING AND MARKING
D. INSPECTION AND ACCEPTANCE
E. DELIVERIES AND PERFORMANCE
F. CONTRACT ADMINISTRATION DATA
G. SPECIAL TERMS AND CONDITIONS
H. CLAUSES
I. INSTRUCTIONS ON HOW TO SUBMIT A QUOTATION
J. EVALUATION CRITERIA
K. REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS
SECTION A - PRICING
A. PRICE
The Contractor shall complete all work, including furnishing all labor, material, equipment, and services required under this purchase order for the following firm fixed price and within the time specified. This price shall include all labor, materials, all insurances, overhead and profit.
Total Price (including all labor, materials, overhead and profit)
A.1 VALUE ADDED TAX
VALUE ADDED TAX (VAT). The Government will not reimburse the Contractor for VAT under this contract. The Contractor shall not include a line for VAT on Invoices as the U.S.
Embassy has a tax exemption certificate with the host government.
SECTION B - STATEMENT OF WORK
The character and scope of the work are set forth in the contract. The Contractor shall furnish and install all materials required by this contract.
In case of differences between small and large-scale drawings, the latter will govern. Where a portion of the work is drawn in detail and the remainder of the work is indicated in outline, the parts drawn in detail shall apply also to all other portions of the work.
1.0 INTRODUCTION - PROJECT SYNOPSIS
1.1 The US Consulate General in São Paulo (USCG), located at 700 Henri Dunant Street
(ZIP 04709-110), makes public its intention to hire a general contractor (labor and material), with experience in construction remodeling projects and refurbishment of facilities (commercial offices, hospitals, universities, condominiums, etc.). The USCG wants to implement office improvements in the IRM Suite (154m²) making sure the supporting infrastructure for each office and workstation is available and operational (electrical, computer and telephone drops, light fixtures, HVAC, etc.). The statement of work (SOW) includes architectural, electrical, mechanical, civil, and telecom improvements. The improvements will be concentrated in rooms
2273, 2274, and 2275 inside the IRM section located in Building #2, level 2 (the three offices together are about 100 SQM). The SOW is described in Section 4. It covers but is not limited to construction activities such as removal/construction of a non-load bearing walls (GWB walls), replacement of carpet tiles, replacement of ceiling tiles, electrical upgrades, computer and telephone drops upgrades, improvements to the HVAC system, installation of a service window, wall painting, etc.
Figure 1 – IRM Suite - Building #2, Level 2 (current layout).
The current SOW does not call for repair, replacement, removal, or improvement in any of the following utilities running within or outside the refurbished area: fire system (sprinklers, fire hydrants, emergency lights, pull station, fire extinguishers, fire alarms, smoke detectors, announcers, etc.), potable or pluvial water lines, sewage lines, and natural gas lines. The scope of work does not cover any work, improvement, replacement, or repairs involving the external windows (W1 through W5 indicated in figure 2), roller shades, steel security grilles, and wood doors (hinges, locks, handles, kick plates, door closer, door stop, keys, gasket, strike plates, etc.)
except for door D7 that will be removed and discarded from the job site (see door D7 in figure
2). Contractor will be responsible to fix, repair, or replace any of these elements if they are damaged or broken by the contractor as result from the construction activities implemented at or nearby the job site.
1.2 All work and documentation shall be completed within 70 calendar days from NTP being issued and RSO Clearance issued.
1.3 The US Consulate complex is located at Henry Dunant Street, #700, in Santo Amaro district (Sao Paulo). All site visits shall be requested through the Consulate’s Facility Manager
[FM], Contracting Officer Representative [COR], or Procurement office.
1.4 Work shall be completed as expeditiously as possible. CONTRACTOR shall coordinate with Contracting Officer Representative [COR] for work phasing and job sequencing with work commencing and completing in each part in a sequential manner. CONTRACTOR must submit a construction schedule for review and approval by COR prior to commencement of work at the site.
1.5 CONTRACTOR may be allowed to overlap phases upon exhibition of sufficient capability to execute the project simultaneously with the approval of the Contracting Officer
Representative [COR].
2.0 GENERAL REQUIREMENTS
2.1 The CONTRACTOR must provide construction personnel, equipment, materials, tools, and supervision as needed to complete the services that meet the technical requirements in this
Statement of Work [SOW].
2.2 The work shall be executed in a diligent manner in accordance with a negotiated firm fixed price and performance period. The period of performance for all Phases of the project shall be completed in accordance with construction schedule unless agreed to and authorized by COR.
2.3 The CONTRACTOR shall have limited access into any structure outside the areas designated for the project, except with permission from the COR. The CONTRACTOR shall minimize the impact of disruption and provide accommodation for a continuing level of operation during construction.
2.4 The CONTRACTOR shall be required to prepare and submit reports, bill of materials, product literature, drawings, specifications, quality control schedules, safety plan and construction costs. These documents shall provide the necessary interfaces, coordination, and communication between the US Consulate and CONTRACTOR for the delivery of a completed project.
2.5 CONTRACTOR is responsible for the design, fabrication, delivery, and installation of all materials, other than those identified and listed in section 3 of this document, used in meeting the requirements of this SOW. All materials and designs must be approved by the COR prior to installation.
2.6 CONTRACTOR is required to submit a detailed construction plan with a timeline for completion of the project. The timeline table shall be submitted for the review and approval of the COR prior from buying any material or starting any work activity in the construction site.
2.7 CONTRACTOR is responsible for providing all required CAD drawings (scaled latest version CAD files) including architectural, electrical, mechanical, and ceiling grid drawings
(plan view, elevation view, riser diagrams, isometric diagrams, etc.). All drawings require the review and approval of the COR before implementing any work at the construction site.
2.8 The technical proposal shall be itemized covering all construction activities, materials, quantities, unit costs, labor cost, insurance, bonds, warranties, removal of construction debris, cleaning, etc.
2.9 Construction debris should be hauled daily to a landfill or waste transfer station licensed by PMSP (São Paulo City Hall Authority - AMLURB).
2.10 Office furniture layouts must provide appropriate clearances per OBO Building Code
ICC A117.1.
2.11 CONTRACTOR shall develop existing electrical conditions drawings to identify all elements of the electrical system to include panel board/circuit number feeding each device.
2.12 Structure shall not be damaged, or core drilled without express approval, and that any attachment to structure shall not interfere or touch internal reinforcing within the structure.
3.0 GOVERNMENT MATERIAL (GM)
3.1 Pursuant to Contract Clause FAR 52-245-2, Government-Furnished Property (Short
Form), if applicable the Government will furnish the following materials and equipment for the
CONTRACTOR’s temporary use: tools and materials will be furnished to the CONTRATOR only on exceptional non-recurring emergency cases involving basic manual tools “if” the tools are available in the Maintenance Shops (gloves, ladders, pliers, nails, shovels, buckets, hammers, caulking gun, wrench, nail, bolt, nuts, screwdriver, handsaw, etc.) or “if” basic materials are needed in small quantities (brick, sand, paint, conduits, electrical wires, caulk, sealants, cables, face plates, ceramic tiles, carpet tiles, etc.). CONTRACTOR shall replace the furnished material
(new ones) and return the tools to the Maintenance Shop within one-week period.
3.2 The Government Furnished Material (GFM) is stored at Warehouse and Maintenance
Shops. The Contractor shall move, uncrate, assemble, and install the GFM. GM shall be uncrated and inspected by the Contractor in the presence of the Contracting Officer’s
Representative [COR] to determine any damaged or missing parts. The Contractor shall be responsible for damage or loss occurring after this inspection. The Contractor shall notify the
COR ten (10) days in advance of the date the GFM is needed. Any GM not incorporated in the work shall be returned to the Government and placed in storage at Warehouse as directed by the
COR.
3.3 CONTRACTOR shall provide adequate quantities of materials in addition to the inventory of materials currently stored at the site to provide a complete the project as specified.
Items provided at the job site include but is not limited to water sources, energy source (110/220 electricity), and bathrooms (without lockers).
4.0 STATEMENT OF WORK (SOW)
This document provides guidelines on the refurbishment process of the IRM office space
(154m²) located in Building#2, level 2. The improvements are required to accommodate the furniture layout shown in figure 2 (rOBO office will supply the new office furniture requested and approved by the head of the IRM section in Sao Paulo, Brazil). The current office furniture layout seats eight (8) IRM employees. The proposed office furniture layout will seat thirteen (13) local IRM staff (an increment of five additional employees).
Office space 2275 (Server room) will be reduced in size (from 34.76m² to 15.48m²) to accommodate room 2275 (Server room, 15.48m²) and room 2274 (19.28m²) in the same space.
Offices 2274 and 2275 will be divided by a non-loadbearing GWB wall (L1) with acoustic treatment and double gypsum board panels (double layer panels) placed on both sides of the wall to reduce vibration and noise levels (see wall L1 in figure 5). Office space 2273 (31.70m²) will remain with the same size but a different furniture layout to accommodate three additional workstations. Offices 2277 (13.34m²), 2278 (25.00m²), and 2279 (18.90m²) will remain with the same size and a small modification involving the office furniture layout in room 2279 (see figure
2). Light fixtures, power outlets, light switches, and computer drops shall be upgraded within the refurbished area as per guidelines covered in sections 4.5 (Electrical) and 4.6 (Telephone &
Computer Drops) to serve the new workstation furniture floor plan. Wall, ceiling, and window demolition required for room 2274 is covered in section 4.1 (Demolition). Dividing walls (GWB
L1 and L2 wall) separating rooms 2275, 2274, and 2273 (GWB L3 wall) is covered in section
4.2 (non-loadbearing walls).
Figure 2 – Architectural layout IRM office space (current vs. proposed).
This project also covers the replacement of floor and ceiling tiles within the IRM refurbished area (section 4.8 - Ceiling Tiles and section 4.10 – Floor Tiles). Upgrades of the existing HVAC system (rooms 2275) is covered in section 4.7 (HVAC). Further instructions on the IRM wall treatment and painting guidelines are covered in section 4.12 (Wall Paint).
Companies interested in the bidding process must check and confirm, during the site visit, if the measurements described in the SOW (figure 3) match the measurements computed in the job site. The information provided in the SOW (drawings and sketches) does not necessarily reflect the most updated as-built version of the job site conditions. Offerors may find small discrepancies between the information provided in this document and the existing infrastructure available in the IRM suite. Companies interested in the bidding process are responsible to verify, get familiar with, and confirm measurements, dimensions, and utilities running within the refurbished area prior from submitting the proposal.
It is also recommended the companies to attend the site visit and a conduct a preliminary site survey and site inspection in the refurbished area. The site survey will help the offerors to get familiar with the construction site and identify complexities, obstructions, or interferences that may affect the logistic of the job or cost of the project. The bidding companies should also identify and get familiar with the existing infrastructure fixed, hanging, running, or concealed inside the walls and ceiling (electrical conduits, air ducts, sprinkler heads, cable trays, smoke detectors, strobe/emergency lights, light fixtures, light switches, power outlets, electrical wires, dampers, announcers, cable trays, sensors, etc.). Companies will not be able to ask for additional funds or file a claim later during construction arguing ignorance, lack of knowledge, or insufficiency of information on the existing site conditions and on the utilities infrastructure.
That sord of a claim will be denied and ignored.
Figure 3 – Office dimensions in SQM (m²) – proposed floor plan.
Cost to replace, repair, demolish, remove, treat, sand, render, paint, move, and install items not covered in the SOW but verbally discussed and agreed upon during the site visit among the site visitors and the USCG will be confirmed on written after the site visit is over. The same guidelines apply to inquiries submitted, on written, by the due date and answered by the USCG via e-mail to all bidders. Items confirmed on written by the USCG will be considered part of the
SOW. It is the contractor’s duty to implement it in the job site and additional costs shall be addressed in the bid proposal.
Contractor will be responsible (and therefore should incorporate expenses related to labor costs) for assembling, disassembling, and transporting to designated areas, office furniture and equipment standing or stored within the refurbished area (tables, chairs, bookshelves, sofas, appliances, cabinets, printers, scanners, lamps, computers, files, boxes, dolly carts, etc.).
Samples of materials requested in the SOW must be submitted to the USCG with the technical specification or data sheet before the contractor procures or install any material or equipment in the job site. Contractor (offerors) shall proceed with the acquisition process only after review and approval from the USCG (CO or COR written approval).
The list of assignments and construction activities involved with the IRM refurbishment project is described as follow:
4.1 Demolition
4.2 Non-Loadbearing Walls (L1, L2, and L3)
4.3 Acoustic Insulation
4.4 Windows (W6 and W7)
4.5 Electrical
4.6 Telephone & Computer Drops
4.7 HVAC (Splits S1 and S2 / Diffuser D1 and D2).
4.8 Ceiling Tiles & Ceiling Grid
4.9 Sprinkler System
4.10 Floor Tiles
4.11 Wall Base (Baseboard)
4.12 Wall Paint
4.13 Disposal of Construction Debris and Site Cleaning
4.14 Architectural and As-Built Drawings
4.15 Security (RSO) & Safety Forms (POSHO)
4.1 Demolition
List of items to be removed or demolished in the IRM Suite:
- Server room GWB dividing wall (7 linear meters of non-loadbearing wall).
- Server room internal glass widow (6,000mm long x 1,100mm high).
- Wall opening (service window 1,000mm x 1,100mm).
- Carpet tiles (119 SQM) and PVC tiles (35 SQM).
- Door D7 (removal)
- PVC wall base (approx. 130 linear meters).
- Suspended ceiling tiles and ceiling grids (2274 = 19 SQM & 2275 = 17 SQM).
- Electrical infrastructure mounted or running within the demolished wall and wall openings to attend the workstation demand in rooms 2273 and 2274 (rough-ins).
- Telecom drops mounted or running inside the demolished wall and wall openings to attend the workstation demand in rooms 2273 and 2274 (computer and phone drops, jacks, and cables).
- Light fixtures (L15, L16, L17, and L18).
- Suspended cable tray (abandoned) attached to the ceiling (room 2275).
- Fan coil unit (2- FCU -203) and fan coil components (room 2275)
Contractor shall remove and discard a non-loadbearing wall (drywall); vinyl wall base; floor tiles
(carpet and PVC tiles); acoustic ceiling tiles and ceiling grids (server room); wall opening for the installation of service window (1,000mm x 1,100mm); and light fixtures (L15, L16, L17, and
L18, see step 8, figure 4). Contractor will also remove the infrastructure running inside the demolished wall including adjacent infrastructure in the nearby areas that may be connected or affected by the drywall removal process (acoustic ceiling tiles, light fixtures, floors tiles, electrical wires, telecom cables, power outlets, conduits, cable trays, etc.). Contractor cannot start any work within the refurbished area till the current infrastructure running through the job site (electrical, telecom, fire, HVAC, etc.) are thoroughly inspected, identified, and shut down or turned off (switches, power outlets, light fixtures, fire alarms system, dumpers, smoke detectors, etc.). The demolition process shall be authorized by CO or COR, on written, and only after the
USCG technical team shuts down or turn off the main power sources that keeps the IRM offices running.
Figure 4 – Demolition / removal plan (walls, wall base, carpet tiles, drop down acoustic ceiling, etc.).
Wall Opening
Contractor will remove and discard seven (7) linear meters of the GWB wall dividing rooms
2275 and 2273. A glass window with black aluminum frames also dividing rooms 2275 and 2273 shall be removed with the lower GWB wall (6,000 x1,100mm) – see steps 1 and 2 in figure 4.
Contractor will remove and re-use (relocate) all electrical and telecom infrastructure running inside the GWB wall (electrical conduits, power outlets, telecom jacks, telecom conduits, junction boxes, electrical wires, etc.). Contractor will also be responsible for removing and discarding 130 linear meters of vinyl wall base running within the IRM Suite (all offices) – see step 5 in figure 4.
Electrical wires and telecom cables running within the demolished wall will be temporarily pulled and rolled up into the plenum area within the ceiling as per verbal guidelines provided by the electrical and Telecom CORs in the job site.
Contractor will cut a window opening (W7) in the wall (see step #1 in figure 4, room 2274) with opening dimensions large enough to fit a service window with dimensions of 1,000mm (large) by 1,100mm (high). Contractor will remove 35m² of ceiling tiles, ceiling grids, hanger rods, angles, etc. located inside the Server Room area (see step 4 in figure 4).
Remove carpet tiles from offices 2273, 2276, 2277. 2278, and 2279 (119m²) and replace them by new carpet tiles. Also, remove vinylic floor tiles from office 2275 (35m²) and replaced it by fabric floor tiles (see section 4.9 for carpet tile details). Door number D7 (see step 3 in figure 4) will be removed and discarded from the IRM Suite.
Remove a fan coil unit (2- FCU -203) including air diffusers, air ducts, connections, power cables, cooper pipes, and central unit. Fan coil unit 2- FCU -203 locates in office 2275 and all items highlighted in red at figure 5 shall be removed.
Figure 5 – Fan coil unit (2-FCU-203).
4.2 Non-Loadbearing Walls (L1, L2, and L3)
Contractor will provide materials (plasterboard panels, runners, studs, anchors, joint tapes, brackets, screws, etc.); and appropriated working tools to build GWB internal non-loadbearing drywall within the refurbished area (see walls L1, L2, and L3 in figure 6). There are two sections within the IRM Suite that require the installation of GWB wall. One section locates inside room
2275 with 8 linear meters long by 2.7 meters high has an L-shape (walls L1 and L2). The other section locates in the corner of room 2274 with 0.7 linear meters long by 2.7 meters high (L3).
Figure 6 – Drywall installation guidelines - Room 2275.
The plasterboard panels must be anchored into vertical studs, horizontal tracks, guides, and runners made of zinc coated (galvanized by hot dip process) following the installation guidelines recommended by the drywall manufacturer. The GWB walls, in L-shape (L1 and L2 walls), enclosing room 2275 shall be built with double layer plasterboard panels (both sides) and isolated with mineral wool fiber insulation (2 inches thick) for noise reduction. Plasterboard shall be delivered and installed in panels with minimum gage of 12.5 mm thick (STM-12.5) – see figure 7.
The GWB wall, serving room 2274 (L3 wall) shall be built with one layer of plasterboard panel on each side delivered and installed with minimum gage of 12.5 mm thick (STM-12.5). Acoustic treatment is not required at GWB wall section in room 2274.
Figure 7 – IRM drywall standards – sections L1, L2, and L3.
Wall openings, gaps, joints, and spaces reported on the surface of the plasterboard panels shall be treated (closed, sealed, and sanded) after the installation process is completed with specific compound material designed for drywalls (plaster, wall putty, tape, and jointing materials). The surface should be leveled, sanded, and delivered free of burrs, bumps, wrinkles, or imperfections.
The outer edges of the walls shall be protected with perforated reinforcing channels (L-shape angle beads) to absorb impacts and reduce wall damages against IRM pushcart crashes.
Contractor shall reroute and fix the internal or suspended infrastructure above the ceiling
(plenum) that might be interfering with the installation process or alignment of the new interior walls dividing rooms 2275, 2274, and 2273 (cable trays, ceiling tiles, electrical conduits, light fixtures, receptacles, HVAC flexible ducts, raceway, hanger wires, etc.).
Contractor shall observe and comply with the most stringent international construction codes for the drywall fabrication and installation process (2022 OBO Design Standards; International
Building Codes – IBC; International Organization for Standardization – ISO; BOCA; ASTM, The Brazilian Standards for Construction and Building Codes (ABNT/NBR), on drywall fabrication and installation process, will be also observe as long as the NBRs are compatible to the international building codes (NBRs 15758-1 (2009) 15758-2, 15758-3, 15758-3 (2009), 14.715- (2010), 14715-2 (2010), 15217 (2010), 9575, 15884). Contractor shall indicate in the proposal the construction and/or material codes the proposal complies with.
Figure 8 – Drywall semi rigid acoustic insulation (L1 and L2 walls).
4.3 Acoustic Insulation
The L-shape GWB drywall enclosing room 2275 (sections L1 and L2 in figure 6) shall be treated with fire-resistant eco-friendly soundproof batt insulation or similar products. The sound barrier shall have equal or similar specification to the specifications adopted by the USCG for acoustic
Room 2275 (L1 and L2
Walls) insulation products (semi rigid mineral wool panels, PA products, 75mm thickness, size
1200x600, 48KG/m³ density, ASTM C-665).
4.4 Bi-Fold Transaction Service Window (W7) and Fixed Window (W6)
Contractor shall procure and install a bi-fold transaction aluminum service window (W7) in the wall separating rooms 2274 and the external hallway outside the IRM Suite. The service window
(W7) shall follow similar or higher standards of the windows installed in the Cashiers office
(room 2355), Mini-Branch Bank (room 2125), and Health Unit (room 2137). The window frame shall be built 1,100mm high by 1,000mm wide (window leaves furnished with hinges and lock);
laminated or tempered transparent glaze (3mm); black aluminum jambs and window frames
(black matte color painted electrostatically); and MDF wood countertop (solid surface 90mm thick, 1,200mm long, and 680mm wide) covered with smooth laminated Formica (light green color).
Figure 9 – Bi-fold service window – room 2274.
The wood countertop (with rounded corners) shall be mounted on both sides of the window
(inside and outside the wall) and supported by heavy duty steel brackets anchored into the GWB steel studs. Contractor shall provide architectural scaled detail drawings showing the bi-fold transaction service window, wood countertop, and the window’s anchorage system in both DWG and PDF files. The drawings shall be submitted, in advance, for review and approval (CO/COR) before the contractor acquires the service window or proceeds with the fabrication/installation process of it. Contractor is authorized to proceed with the service window fabrication/acquisition process after a written approval is issued by the CO or COR.
Window’s jamb, sill, sash, head, and window’s frames shall be made of aluminum (18 gauge);
bolted or welded to the drywall vertical structural studs. Window lintel and lateral studs (cripple studs) shall be built with double studs (including sill and trimmers) to enhance structural strength and provide secure anchorage to the service window and wood counter as well. All elements forming the service window shall be furnished in aluminum painted in black matte color
(electrostatically) following same or similar standards as the standards used for service windows installed inside the US Consulate facilities.
Figure10 – Detail window W7 (countertop, brackets, screws, anchors, etc.).
Samples of all window materials must be submitted to CO or COR approval with the technical specification of it (catalogs, brochures, or data sheets). Contractor shall proceed with the acquisition process after the CO or COR written approval.
Same guideline applies for the internal fixed window requested for room 2275 (W6). Window
W6 has a rectangular shape (1,450mm x 1,100mm); made of aluminum (18 gauge); anchored to the drywall steel frames (both sill and trimers built with double studs in drywall L3). Contractor shall follow the same window standards as the former windows removed from room 2275
(window’s frame in aluminum 60mm large; smooth surface; electrostatically painted in black matte color; 3mm colorless transparent glass; etc.) – details on figure 11.
Figure 11 – Detail window W6 room 2275 (dimensions, frames, location,
4.5 Electrical
4.5.1 Electrical Cables
CONTRACTOR will be responsible for all new cabling required for the refurbishment of the
IRM offices. The minimum size of the wire gauge is 4mm², and the minimum quality accepted for the cables is:
- Conductor: Metal - Bare copper wires, soft temper, extra flexible stranding (class 5).
- Insulation - Thermofix compound in double layer of rubber HEPR (EPR / B - High module).
- Filling - Non-halogenated polyolefin compound.
- Coverage - Thermoplastic compound with non-halogenated polyolfinic base.
All wire sized 6 mm2 and smaller shall be solid copper. Use THHN insulation or the Brazilian equivalent.
CONTRACTOR must revise all circuits in project locations that could be affected duo the wall removal. GC must ensure that all circuits must be revised and tested, in all rooms affected
(include the other areas not related to this scope.
4.5.2 Conduits EMT and FMC (Electrical Metal Tubing and Flexible Metal Conduits) and
Condulets.
The new infrastructures (conduits and curves) required for the execution of this step, will be the
CONTRACTOR´s responsibility that shall comply with:
4.5.2.1 EMT Conduits and curves must be rigid metal (heavy-duty galvanized steel tubing), minimum size – 3/4 inch.
4.5.2.2 FMC Conduits (for short distances and for locations that’s required curves or moving parts) – PVC cover that provides waterproof to most liquids (electrical cable protection against water), dust, corrosive fumes, abrasion, moderate crushing strength and UV protection:
Conforms to UL-1581 / ASTM-D638.
4.5.3 All requested boxes must be 4”x 4” for outlets power, 4 "x 2" for lights switches and telecom, installed in compliance with the Brazilian code NBR 5410.
4.5.4 Condulets - Category V - Fixed outlet (heavy) conduit with thread Line DN and Line DG
- For use in standards conduits that complies with the following Brazilian codes: NBR 5597 and
NBR 5598.
Figure 12 – IRM light fixtures.
4.5.5 Light Switches / Light Fixtures
CONTRACTOR will be responsible for the following tasks or assignments:
- Replace light fixtures following the proposed office layout.
- Select/procure the same existing light fixture standards used within the USCG. The existing standards calls for high performance recessed luminaire with double straight fins, with three T8 tubular LED bulbs, 120cm, 19W (replaces 32W fluorescent lights) and/or T8 tubular LED, 60cm, 10W (replaces 16W fluorescent lights).
- Contractor is responsible to calculate the number of Light Fixture according with the new layout of each office.
Contractor must install a light switch control for each office according with the following codes.
Each IRM office shall have at least one light control switch (on/off). For the offices with more than one entrance Contractor must install two parallels Light control switch. The light switches must be installed observing the architectural layout proposed in the SOW following guidelines from items 4.5.1 and 4.5.3. The light switch must comply with the existing standard (IRIEL –
Imperia or equivalent).
- INDOOR OCCUPANCY SENSORS
- Ceiling-mounting, solid-state units with separate relay unit as required to switch lighting load.
- Unless otherwise indicated, turn lights on when covered area is occupied and off when unoccupied; with a time, delay for turning lights off, adjustable over a minimum range of 1 to 15 minutes.
CONTRACTOR will be responsible to install new occupancy sensors according with the Layout proposed. The occupancy sensors must follow item 4.5.1 and 4.5.3. The occupancy sensors must follow the existing standards.
4.5.6 Outlet Power
New Power Outlets - In the case of the positions of the power outlets, CONTRACTOR is responsible for installing double outlets (4”x4” electrical boxes) per point demonstrated.
CONTRACTOR must follow the size of the openings as shown. Moreover, it is a responsibility of the CONTRACTOR to connect the outlets power to existing circuits that will be determined by FAC (Electrical Engineer).
CONTRACTOR will be responsible for the following tasks or assignments:
- CONTRACTOR must provide all Calculations for the new outlet powers according with the new space requested in scope.
The outlets powers must comply with the existing standard (IRIEL – Imperia or similar).
Figure 13 – New outlet power serving the workstations 2, 5, and 9.
We will provide the existing drawing with all Electrical Outlets and circuits detailed to GC.
CONTRACTOR must supply electrical products and perform the installations process observing the Brazilian guidelines and U.S. Electrical codes that includes (but is not limited to):
The Brazilian standard NBR 14136 eliminates the other existing types of outlets, and determines only two N-type models, up to 10 A and up to 20 A. Therefore, in Brazil it is prohibited to manufacture, import, or sell outlets of other models.
- ABNT – 5410:2004 - Instalações elétricas de baixa tensão
- ABNT NBR 16205 -1 - Lâmpadas LED sem dispositivo de controle incorporado de base única
- Parte 2: Requisitos de desempenho
- ABNT IEC/ PAS 62612:2013 - Lâmpadas LED com dispositivo de controle incorporado para serviços de iluminação geral — Requisitos de desempenho
- ABNT NBR 5461: 1991 - Iluminação
- ABNT NBR IEC 62560:2013 - Dispositivo de controle da lâmpada
- NFPA 70 NEC - National Electrical Code
4.6 Telephone & Computer Drops
This Section includes materials but not limited to wires, connecting devices, electronics switches, other incidental and miscellaneous equipment, and installation as required for a fully operational, certified, compliant with all applicable codes and standards telecommunication cabling systems.
Cable labels will be self-laminating, smear resistant, and permanent. Labels will be machine lettered (not handwritten).
All cables will be labeled at both ends.
All cable labeling will include alphanumeric for designation, origin, destination, and cable type.
All fiber optic cabinets will contain caution or warning labels indicating use or fiber optic cabling.
Labeling convention shall be in accordance with TIA 606A.
Cables shall be home run to TR with no splices permitted.
Figure 14 – Cable tray & telecom room 2266.
Contractor must perform pre-qualification tests of cables, terminals etc., prior to Government acceptance testing.
Contractor shall provide a structured cabling system (including material and labor) to connect the office workstations and peripherals to the telecom room (including computers, digital center, printers, scanners, telephones, etc.). The required infrastructure includes but is not limited to telephone cables, faceplates, patch cables, conduits, junction boxes, etc. The cabling infrastructure will run either inside the drywalls (rigid conduits) or over the dropdown acoustic ceiling within the hallways (existing cable trays).
Contractor shall procure and install:
- Space #1 - 4 x CAT6/60 meters (Blue/Red/Green/Yellow) from the telecom room
#2266 to the IRM office #2273
- Space #2 - 4 x CAT6/60 metros (Blue/Red/Green/Yellow) from the telecom room
#2266 to the IRM office #2273
- Space #3 - 4 x CAT6/60 metros (Blue/Red/Green/Yellow) from the telecom room
#2266 to the IRM office #2273
- Space #4 - 4 x CAT6/60 metros (Blue/Red/Green/Yellow) from the telecom room
#2266 to the IRM office #2273
- Spaces #1,2,3,4 will be required a Conduit with diameter of 1 inch (minimum) made of heavy-duty galvanized steel tubing going to the cable tray and it estimates around
15 meters.
Figure 15 – Office furniture architectural layout (3D).
- Space #5 - 4 x CAT6/50 meters (Blue/Red/Green/Yellow) from the telecom room
#2266 to the IRM office #2274 Space #5 will be required a Conduit with diameter of
1 inch (minimum) made of heavy-duty galvanized steel tubing going to the cable tray and it estimates around 04 meters.
- Space #6 - 4 x CAT6/80 metros (Blue/Red/Green/Yellow) from the telecom room
#2266 to the IRM office #2278 Spaces #6 will be required a Conduit with diameter of
1 inch (minimum) made of heavy-duty galvanized steel tubing going to the cable tray and it estimates around 21 meters.
- Space #7 - 4 x CAT6/80 metros (Blue/Red/Green/Yellow) from the telecom room
#2266 to the IRM office #2277 Spaces #7 will be required a Conduit with diameter of
1 inch (minimum) made of heavy-duty galvanized steel tubing going to the cable tray and it estimates around 21 meters.
The old connection #266-016x shall be relocated outside the drywall (in the hallway) to be used by visitors accessing the service window.
The distance provided in the SOW was over estimated (60-80 linear meters) for precaution.
Contractor may find small discrepancies between the distance measured at the job site and the distance provided in the SOW. The bidding companies are required to double check and make sure the correct distance is computed during the site visit.
The telecom infrastructure (TI, computer, and telephone drops) shall be installed observing the proposed architectural layout for the IRM office furniture indicated in figure 15.
The list of telecom materials required for each office includes (but is not limited to):
- Conduits with diameter of 1 inch (minimum) made of heavy-duty galvanized steel tubing (see item 4.6.2).
- Four legs of CAT6 cables (minimum) per box in the following color code: green, blue, yellow, and orange.
i. Blue Color = Phone desk
ii. Red Color = OpenNet1
iii. Green Color = OpenNet2
iv. Yellow = NeN (Non-Enterprise)
Each telecom jack shall be supplied and installed with 4 cable legs (CAT6 cables) as per illustration indicated in figures 16 and 18.
Figure 16 – Telecom jack, cable color code, telecom rack and cable tray
(room 2266).
Inside the refurbished area the telecom cables (CAT 6) will be wired inside rigid metallic conduits running inside the drywalls. Outside the refurbished area (hallways), CAT6 cables will run within the drop-down ceiling tiles using the existing cable trays leading to the telecom room at office 2266.
Figure 17 – IRM computer and telephone drops (current vs. proposed).
Contractor will be responsible for the installation of:
- four (4) PVC flush boxes 4" x 2" in office 2273 and each box should be connected to the rigid metallic conduits running to the existing cable trays.
- one (1) PVC flush boxes 4" x 2" in office 2274 and this box should be connected to
- one (1) PVC flush boxes 4" x 2" in office 2277 and this box should be connected to
- one (1) PVC flush boxes 4" x 2" in office 2278 and this box should be connected to
Blue cables should be in telephone blocks (block outside the rack located at room 2266).
The USCG IT technical team will be responsible for making all the end connections (inside the
IRM workstations and inside the telecom room). However, all CAT6 cables shall be identified and labeled (in both ends) by the Contractor indicating the room.
Contractor will test new CAT 6 cables in accordance with ANSI/TIA 568.2-D using a Level IV or higher tester such as the FLUKE DSX5000/8000.
Contractor shall label, new cables, faceplates, and patch panels to match existing labeling.
It is also the Contractor’s responsibility to ensure:
a. All new cabling is rated for the environment it is installed. For example, plenum cable in a plenum ceiling.
b. Cabling is supported per code.
c. Abandoned cabling is removed from the ceiling and walls, from source to destination.
d. Take precaution working around active Telecom and other cabling during demolition and new installation.
Figure 18 – Ethernet wall plate.
It is also the Contractor’s responsibility to:
1. fire stop all penetrations (new or existing) which their cable, conduits, pathways or systems pass through.
2 fire stop and restore all penetrations to rating of the wall, floor slab, etc.
3. utilize fire stopping materials from the same manufacturer.
4. identify the manufacturer's fire stopping system numbers they intend to utilize.
5. be trained by the manufacturer of the fire stop system they intend to use.
6. submit the manufacturer certificates of completion of the technicians they intend to utilize for the fire stop installation. Should personnel change, contractor shall submit a certificate for replacement personnel prior to commencing work.
Contractor must provide all telecom products and perform the installations process in compliance with the Brazilian guidelines and U.S. Electrical codes that includes (but is not limited to):
- NBR 14565 – Procedimento básico para elaboração de projetos de cabeamento de telecomunicações para rede interna estruturada
- ANSI/TIA-568.0-E Generic Telecommunications Cabling for Customer Premises
- ANSI/TIA-568.1-E Commercial Building Telecommunications Infrastructure Standard
- ANSI/TIA-568.2-D (CM)
- ISO/IEC 11801
- UL 444
- ABNT NBR 14703
- ABNT NBR 14705
4.7 HVAC
Contractor shall upgrade the HVAC system within the refurbished area. figure 19 shows the schematics of the IRM HVAC infrastructure currently serving the IRM suite.
The IRM HVAC system proposed upgrades, shall be implemented in compliance with specifications and guidelines described next (offices 2274 and 2275).
Figure 19 – HVAC system serving the IRM suite.
- Relocate split unit S1.
Relocate split unit evaporator S1 (evaporator model AVNW36GM1P0, LG manufacturer) and correspondent components highlighted in red at figure 20.
Figure 20 – Split unit S1 (before).
Evaporator (S1) will be placed inside room 2275 hanging in the new partition wall (L1) separating offices 2274 and 2275 as per schematics provided in figure 21.
(Before)
Contractor shall furnish all HVAC materials, including cooper pipes, power cables, refrigerant gas (R410-A), nuts, steel supports, electrical conduits, and certified labor to perform this work.
Figure 21 – Split unit S1 (after).
The steps below shall be observed and performed at the job site:
1. Turn off the power supply to the AC unit.
2. Remove the indoor unit (S1) from its wall-mounted bracket or stand.
3. Disconnect the refrigerant pipes and electrical connections from the indoor unit.
4. Move the indoor unit (S1) to the new location indicated in figure 21 (wall L1).
5. Install the indoor unit on a new wall-mounted bracket or stand.
6. Connect the refrigerant pipes and the electrical connections to the indoor unit.
7. Fill up the line with refrigerant gas R 410A.
8. Test the AC unit to ensure it is working properly.
Figure 22 –HVAC system: existing vs. proposed layout.
(After)
- Air duct / air diffuser modification (room 2275).
The IRM air duct structure has two air diffusers (D1 and D2) to attend the existing demand in office 2275 (server room). Contractor shall provide material and labor to modify the existing structure as per guidelines indicated in figure 23 (see components highlighted in red).
The steps listed below shall be observed at the job site:
1- Relocate air diffuser D1 to the center of the office 2274.
2- Remove and discard air diffuser D2 and its components.
3- Close the air duct 300 x 300 after the air diffuser D2 removal.
Contractor shall use ecological refrigerant gas according to the standard ANSI / A SHRAE 34 –
2013 – Designation and safety classification of refrigerants and the work must be performed according the standards: ANSI / ACCA 5 QI – 2015 - HVAC Quality installation, ABNT NBR
16401-1:2008; NBR 16402-1:2008; NBR 16401-3:2008; NBR 16655-1:2018; NBR 16655-
2:2018; NBR 16655-3:2018 and NBR 5410 (electrical installation). Contractor is responsible for the refrigerant gas removal and disposal process, and it must comply with NBR 15960:2011 standards and local laws. The recovery equipment must be in accordance with ISO 11650:1999.
4.8 Ceiling Tiles & Ceiling Grid
The current acoustic ceiling tiles and ceiling grids for the IRM section (rooms 2274 and 2275 in figure 24) will be removed and replaced by new ceiling tiles and ceiling grids with equal or similar standards (35m²).
Contractor will procure, install, and adjust the CGF (ceiling grid framework) after the light fixtures are positioned as per instructions from the electrical guidelines (section 4.6); the HVAC system is upgraded (as per guidelines from section 4.8); and the dry wall installation splitting rooms 2274 and 2275 is completed.
Figure 23 – Air duct and airr difuser modification (office 2275).
The existing acoustic ceiling tiles and ceiling grids within the IRM offices will be removed and replaced by new ceiling tiles and new ceiling grids (35m²) with equal or equivalent standards used within the US Mission Sao Paulo (color, texture, size, thickness, pattern, profile, angles, tie rods, suspension clips, braces, etc.).
Figure 24 – Acoustic ceiling tiles and ceiling grids.
The existing ceiling tile infrastructure shall be removed and discarded. The former infrastructure and leftovers cannot be reused but discarded from the refurbished area (ceiling tiles, grids, hangers, clips, suspended rods, etc.).
Contractor must appraise all interferences reported within the ceiling and implement any adjustment that may be required to eliminate conflicts of the new acoustic ceiling tiles with the fixed elements running within the open space (plenum) above the ceiling tiles (light fixtures, sprinkler heads, air supply and return ducts, drainage pipes, fire hydrant lines, air ducts, etc.).
The standard ceiling tiles used by the USCG is the Armstrong mineral fiber liner (white color), size 19 x 625 x 625 mm, white pattern 3412-A, with treatment against moisture, mold, fungi, and bacteria. Scaled drawings showing the layout of the ceiling (tiles and grids) shall be provided by the contractor (architectural drawing indicating sprinkler heads, light fixtures, ceiling grids, walls, doors, etc.) and submitted for the COR’s approval before the installation process starts
(modular pattern).
The Armstrong mineral fiber ceiling tiles and ceiling grid parts (angles, tie rods, suspension clips, braces, metal grids, hangers, bolts, fasteners, clip, cross T, main T, etc.) shall be procured and installed as per manufacturer’s instructions. All costs involving material and labor for the ceiling tile and ceiling grid installation process shall considered in the proposal (work shall be performed by qualified skilled labor only).
The most stringent international construction codes will be observed for matters involving ceiling tiles made of gypsum boards or inorganic mineral fibers (2022 OBO Design Standards;
International Building Codes – IBC; International Organization for Standardization – ISO;
BOCA; ASTM, etc.). The Brazilian Standards for Construction and Building Codes
(ABNT/NBR) for ceiling tiles made of gypsum boards or inorganic mineral fibers will be observe if the NBRs are compatible to the international building codes (NBRs: 11681, 11683, 13867, 15253, 15758-1 (2009), 15758-2, 15758-3, 15758-3 (2009), 14715 (2010), 14715-2
(2010), 15217 (2010), 9575, 9574, 9971, 15885). Contractor shall indicate in the proposal the construction and/or material codes the proposed improvements will be complying with.
4.9 Sprinkler System
No work is involved with the IRM sprinkler system in this project. No work required to remove, relocate, or suppress sprinkler lines or sprinkler heads will be authorized (see figure D1, in
Annex D, for further details on the IRM sprinkler system).
4.10 Floor Tiles
Contractor shall replace floor tiles and baseboards within the refurbished area. It is about 35 square meters of vinylic PVC floor tiles in rooms 2274 and 2275; and 119 square meters of fabric floor tiles in rooms 2272, 2273, 2276, 2277, 2278 and 2278.
Contractor will be responsible to price material and labor for the installation of carpet tiles. All preparation involving the ground floor and sub-floor required for the carpet tile installation is the contractor’s responsibility (fixing cracks; leveling the floor; repairing subfloor; plaster displacement; cleaning/removing caulk; etc.).
Contractor shall procure floor tile products with equal or similar specification as the carpet tiles standards used within the US Mission Sao Paulo described as follow:
1. Mfg: Mannington Commercial
2. Pattern: Bar Code
3. Color: Atkinson (ATKI)
4. Install: Quarter Turn
5. Construction: Accutuft Pattern Loop
6. Pile Fiber: 100% DuPont Antron Lumena
7. Pile Type: Type 6.6 BCF Nylon with Dura Tech
8. Dye Method: Solution Dyed
9. Gage: 50.39 per 10cm
10. Stitch Rate: 43.30 per 10cm
11. Plie Thickness: 3.76mm
12.Tuffed Yarn Weight: 949.3 Grams per Square Meter
13.Average Density: 253.04 Kg/m³
14. Modular Size: 45.72cm x 45.72cm Quarter Turn
15.Modular Baking: Macro-Tec Reinforced Vinyl Composite Closed Cell
Polymer
16. Pattern Repeat: 47.62cm x 44.45cm
17. AACHEN Test: Passes
18. Methenamine Pill Test: CPSC-FF-1-70 (Test Method – ASTM D2859) – Passes
19.Flooring Radiant Panel: NPFA 253 (Test Method – ASTM E648) – Direct Glue
Down Mode – Class I
20. NBS Smoke Chamber: NFPA 258 (Test Method – ASTM E662) – Flamming
Mode – 450 or Less
21. Static Propensity: 3.0 KV or Less as Tested in Accordance with AATCC-134
(70 deg F. 20% RH).
Carpet tiles shall match the existing tile installation pattern as well as the type, color, dimensions, thickness, etc. within the IRM refurbished area. It is also accepted carpet tiles Milliken Model
Centro, customize, 50cm x 50cm color/number #2 with the following specifications:
- Brookfield Viscosity (RVT 4/20) mPas at 23°C: 4000-5000 cps
- Solubility: water
- Solids (%): 52 (±1)
- Can: 25/50 kg
- Consumption per SQM: 100 grams per SQM for concrete floors.
Acrylic carpet glue/caulk shall be applied only in the absence of moisture and alkalinity.
The following guidelines are recommended for the carpet tiles replacement proces:
a) Remove the existing carpet tiles indicated in figure 4, steps 6 and 7.
b) Remove substrate residual materials sticking to the concrete floor that are incompatible with floor covering adhesives (coatings, curing compounds, and other substances that contain soap, wax, oil, or silicone).