This Request for Quote (RFQ 1506) is issued by the Idaho Department of Juvenile Corrections for fire protection system and equipment services at the Juvenile Correction Center in Saint Anthony, Idaho. The scope of work includes annual inspection and testing of the facility's fire alarm system, sprinkler system, fire pump, and approximately 120 fire extinguishers; twice-annual inspection of kitchen and canteen exhaust hood fire suppression systems; annual inspection of the fire backflow and bypass system; and a five-year fire alarm inspection if it occurs during the contract term. All inspection reports with findings and repair recommendations must be submitted within 30 calendar days of completion. A mandatory site visit is scheduled for Friday, November 20, 2026, at 9:00 a.m. Mountain time at 2220 E. 600 N., Saint Anthony, Idaho 83445, with RSVPs due by noon on Thursday, November 19, 2026. Written questions must be submitted by 11:59:59 p.m. Mountain time on December 2, 2026. Quotes are due by 5:00 p.m. Mountain time on December 11, 2026, and must be submitted via IPRO, email, fax, mail, or hand delivery. The initial contract term is one year, with renewal options by mutual written agreement for periods equal to the initial term, not to exceed five years total. Award will be made on an all-or-none basis to the responsive, responsible vendor with the lowest total cost.

Vendors must demonstrate at least five years of experience providing fire protection system and equipment services to commercial, residential, or combined customers, with written evidence of such experience. Pricing must be fully burdened and submitted on the provided Exhibit B Price Sheet with single dollar amounts for each line item. The contract contains no published set-asides or preferences. Insurance requirements include Commercial General Liability of not less than $1,000,000 per occurrence, Commercial Automobile Liability of not less than $1,000,000 per accident, and Workers Compensation and Employer's Liability, with certificates required within five business days of award. The State of Idaho, IDJC, and their divisions must be named as additional insured parties. All contractor personnel providing services must undergo criminal background checks and fingerprinting at IDJC's expense, wear distinctive uniform clothing with the company name, and comply with applicable federal, state, and local laws. Emergency services must be provided within one business day of notification, or IDJC reserves the right to procure services elsewhere. Quotes must remain firm for 90 days after the closing date. The contract document does not specify a contract value or funding source.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF IDAHO

Idaho Department of Juvenile Corrections

RFQ 1506

Fire Protection System and Equipment Services for JCC-Saint Anthony

REV 1

Note the insurance requirements within the attached Exhibit C – Insurance Requirements and make sure that you can obtain the required insurance and will obtain it if you are awarded a Contract.

Also, SUBMIT THE RFQ VENDOR RESPONSE CHECKLIST AS PART OF YOUR QUOTE.

Also note the Required Submittal Items below.

1. Purpose The Idaho Department of Juvenile Corrections (IDJC) is requesting quotes for fire protection system and equipment services to be provided at the Juvenile Correction Center in Saint Anthony, Idaho (JCC-Saint Anthony), as further detailed below.

The contact for this Request for Quote (RFQ) is:

Jason Urquhart, Purchasing Agent, IDJC Phone: 208-577-5426 Email: jason.urquhart@idjc.idaho.gov

2. Time Lines

2.1 Site Visit

We strongly encourage you to attend the site visit. The site visit will include a tour of the grounds to give a better understanding of the fire protection system and equipment services needs of JCC-Saint Anthony.

Vendors will be given the opportunity to ask questions and gain clarification; notes taken by IDJC staff will be distributed as part of an amendment to the RFQ.

2.1.1 Site visit at JCC-Saint Anthony: Friday, November 20, 2026 (9:00 a.m. Mountain time) (Address: 2220 E. 600 N., Saint Anthony, Idaho 83445)

2.1.2 RSVP to attend site visit at JCC-Saint Anthony due: 12:00 p.m. (noon) Mountain time, Thursday November 19, 2026 (RSVP via email to jason.urquhart@idjc.idaho.gov.)

2.2 Written questions due (by 11:59:59 p.m. Mountain time): December 2, 2026 mailto:jason.urquhart@idjc.idaho.gov mailto:jason.urquhart@idjc.idaho.gov

2.3 Quotes Due (by 5:00:00 p.m. Mountain time): December 11, 2026

3. Scope of Work See Exhibit A – Scope of Work.

4. Vendor’s Experience By the Quotes Due date in this RFQ, the Vendor submitting the quote must have been in the business of providing fire protection system and equipment services to commercial customers, residential customers or a combination of both for at least five (5) years.

Vendors must provide written evidence of this experience with their quotes.

5. References IDJC reserves the right to require a list of references. If IDJC identifies to the Vendor that this is required, in order to be considered for award (in part), the Vendor must provide a list of no more than five (5) references for which the Vendor has provided fire protection system and equipment services within the last two (2) years. The list must include the client’s business name, the name of a contact that currently works for the client that is familiar with Vendor’s work, and that client’s current business phone number and email address.

Additionally, in order to be considered for award (in part) if IDJC requires a reference list, the Vendor’s references must provide feedback to IDJC that, in its sole discretion, is satisfactory, in particular regarding the Vendor’s quality of work, ability to meet schedules, communications and interactions with customers.

6. Changes to Solicitation Instructions to Vendors

6.1 References to “State of Idaho Standard Terms and Conditions” in section 6, Administrative Fee of the Solicitation Instructions to Vendors are changed to read “State of Idaho Contract Terms and Conditions”.

6.2 The reference to “State of Idaho Standard Contract Terms and Conditions” in section 15.1 (Submission Forms) of the Solicitation Instructions to Vendors is changed to read “State of Idaho Contract Terms and Conditions”.

6.3 References to “State of Idaho Standard Contract Terms and Conditions” in section 18, Terms and Conditions of Ensuing Contract of the Solicitation Instructions to Vendors are changed to read “State of Idaho Contract Terms and Conditions”.

7. Award Basis Award will be made ALL OR NONE to the responsive responsible Vendor with the lowest Total Cost, as provided on Exhibit B - Price Sheet.

8. Response Complete Exhibit A – Specifications, Exhibit B – Price Sheet and the signature page, and email, fax, mail, hand-deliver/courier* or submit your quote (Quotation as defined in the Solicitation Instructions to Vendors) via IPRO (IPRO LOGIN) so that it is received at the location specified on the Signature Page prior to the deadline established above. (*If you hand-deliver/courier your quote, you will need to deliver it here:

Idaho Department of Juvenile Corrections 11351 W Chinden Blvd https://purchasing.idaho.gov/information-for-vendors/

Building 6 Boise, ID 83714)

Quotes must be accompanied by a signed Signature Page. Quotes must include all Required Submittal Items (See below).

If submitting via IPRO complete Exhibit B – Price Sheet AND in enter the Total Cost from Exhibit B – Price Sheet in IPRO, and UPLOAD all Required Submittal Items.

List of Attachments Required Submittal Items

• Exhibit A – Scope of Work

• Exhibit B – Price Sheet

• Exhibit C – Insurance Requirements

• Signature Page

• Solicitation Instructions to Vendors

• State of Idaho Contract Terms and Conditions

• No Public Funds for Abortion Act Letter

Sample (see section 1.21.4 in the State of Idaho Contract Terms and Conditions)

• RFQ Vendor Response Checklist

• Completed Exhibit B – Price Sheet

• Evidence of the Vendor’s experience (see section 4, Vendor’s Experience)

• Completed Signature Page

• RFQ Vendor Response Checklist

Exhibit A – Scope of Work

RFQ 1506

Fire Protection System and Equipment Services for JCC-Saint Anthony

(Below is the Scope of Work for this RFQ. Provision of services must meet the requirements of this Scope of Work in its entirety for each JCC under the Contract(s). If you cannot meet any of these requirements, you may submit a question in writing to the contact for this RFQ several days before quotes are due. After the quotes are due and before the contract is awarded, IDJC will not entertain requests for changes to the Scope of Work and will not accept quotes that don’t meet all of the requirements of the Scope of Work.)

Scope of Work:

A.1 Unique Considerations

A.1.1 All juvenile identities must be kept confidential, and;

A.1.2 All individuals that will provide services at JCC-Saint Anthony must submit to criminal background checks and fingerprinting. IDJC will bear the cost for these checks. Schedule and coordination will be discussed after contract award.

A.2 No Storage at JCCs The Contractor must not store anything at JCC-Saint Anthony.

A.3 Compliance with Laws All fire protection system and equipment services provided by the Contractor to JCC-Saint Anthony must comply with applicable federal, state and local laws.

A.4 Contractor’s Employees Requirements All employees of the Contractor providing fire protection system and equipment services to IDJC shall wear distinctive uniform clothing (a shirt with the Contractor’s company name on the front, the back or both at a minimum) while on IDJC property. The Contractor shall determine the need for and provide any necessary personal protective items required for the safety of its employees.

A.5 Emergencies On an emergency basis, if the Contractor cannot have a technician on-site by 1 p.m. the next business day after the Contractor’s customer service has been contacted by JCC-Saint Anthony, JCC-Saint Anthony reserves the right to purchase fire protection system and equipment services outside of the Contract. In such cases, what constitutes an emergency is in the sole discretion of JCC-Saint Anthony.

A.6 JCC-Saint Anthony’s Requirements for Services

The Contractor must provide all labor, tools, equipment, parts, materials, transportation and supervision necessary to perform the following:

A.6.1 Inspect and test the facility’s fire alarm system and sprinkler system once annually.

A.6.1.1 No later than thirty (30) calendar days after each inspection and testing of the facility’s fire alarm system and sprinkler system is complete, the Contractor must provide a written report of findings.

If the Contractor finds that there are repairs, replacement parts or both needed, the Contractor must provide its repair and replacement part recommendations, and, if the Contractor can provide the repairs and replacement parts itself, the Contractor must include with the report the costs and timeframe after receipt of order for the Contractor to provide the replacement parts and make the repairs.

A.6.1.1.1 IDJC is under no obligation to obtain repairs or replacement parts from the Contractor and may purchase these from other sources.

A.6.2 Inspect and test the facility’s kitchen and canteen exhaust hood fire suppression systems twice annually.

A.6.2.1 No later than thirty (30) calendar days after each inspection and testing of the facility’s kitchen and canteen exhaust hoods is complete, the Contractor must provide a written report of findings. If the Contractor finds that there are repairs, replacement parts or both needed, the Contractor must provide its repair and replacement part recommendations, and, if the Contractor can provide the repairs and replacement parts itself, the Contractor must include with the report the costs and timeframe after

A.6.2.1.1 IDJC is under no obligation to obtain repairs or replacement parts from the Contractor

A.6.3 Inspect and test the facility’s fire pump once annually.

A.6.3.1 No later than thirty (30) calendar days after each inspection and testing of the facility’s fire pump is complete, the Contractor must provide a written report of findings. If the Contractor finds that there are repairs, replacement parts or both needed, the Contractor must provide its repair and replacement part recommendations, and, if the Contractor can provide the repairs and replacement parts itself, the Contractor must include with the report the costs and timeframe after receipt of order for the Contractor to provide the replacement parts and make the repairs.

A.6.3.1.1 IDJC is under no obligation to obtain repairs or replacement parts from the Contractor

A.6.4 Inspect and test all of the facility’s fire extinguishers once annually.

A.6.4.1 (The facility has approximately one hundred twenty (120) fire extinguishers.) No later than thirty (30) calendar days after each inspection and testing of the facility’s fire extinguishers is complete, the Contractor must provide a written report of findings. If the Contractor finds that there are repairs, replacement of extinguishers or both needed, the Contractor must provide its repair and replacement extinguisher recommendations, and, if the Contractor can provide the repairs replacement extinguishers itself, the Contractor must include with the report the costs and timeframe after receipt of order for the Contractor to provide the replacement parts and make the repairs.

A.6.4.1.1 IDJC is under no obligation to obtain repairs or replacement extinguishers from the Contractor and may purchase these from other sources.

A.6.5 Perform a five (5) year inspection and testing of the facility’s fire alarm system once (if the timing of the five (5) year inspection occurs during the term of the Contract).

A.6.5.1 No later than thirty (30) calendar days after the five (5) year inspection and testing of the facility’s fire alarm system is complete, the Contractor must provide a written report of findings. If the Contractor finds that there are repairs, replacement parts or both needed, the Contractor must provide its repair and replacement part recommendations, and, if the Contractor can provide the repairs and replacement parts itself, the Contractor must include with the report the costs and timeframe after

A.6.5.1.1 IDJC is under no obligation to obtain repairs or replacement parts from the Contractor

A.6.6 Inspect and test the fire backflow and bypass once annually.

A.6.6.1 No later than thirty (30) calendar days after each inspection and testing of the fire backflow and bypass is complete, the Contractor must provide a written report of findings. If the Contractor finds that there are repairs, replacement parts or both needed, the Contractor must provide its repair and replacement part recommendations, and, if the Contractor can provide the repairs and replacement parts itself, the Contractor must include with the report the costs and timeframe after receipt of order for the Contractor to provide the replacement parts and make the repairs.

A.6.6.1.1 IDJC is under no obligation to obtain repairs or replacement parts from the Contractor

Exhibit B – Price Sheet

Fire Protection System and Equipment Services for JCC-Saint Anthony

This Exhibit B - Price Sheet must be completed and submitted as part of your quote.

Your price(s) must be fully burdened to include all costs associated with providing fire protection system and equipment services meeting the requirements specified in Exhibit A – Scope of Work. All prices must be single dollar amounts, not ranges.

The Annual Total for each service and the Total Cost are for evaluation purposes only. Contract usage will be based on each JCC’s needs, and so IDJC makes no guarantees as to the amount of services it will order under the Contract.

JCC-Saint Anthony Line Item 1: See sections A.6.1 through A.6.1.1 in Exhibit A – Scope of Work. Cost per inspection and testing of the fire alarm system and sprinkler system (includes the costs for providing the requirements of both sections A.6.1 and A.6.1.1):

$ (this is the Annual Total for Line Item 1)

Line Item 2: See section A.6.2 through A.6.2.1 in Exhibit A – Scope of Work. Cost per inspection and testing of the facility’s kitchen and canteen exhaust hood fire suppressions systems (includes the costs for providing the requirements of both sections A.6.2 and A.6.2.1):

$ (each semi-annual inspection and testing)

TIMES two (2) exhaust hood fire suppressions systems

= $ (this is the semi-annual total)

TIMES two (2) times per year

= $ (this is the Annual Total for Line Item 2)

Line Item 3: See section A.6.3 through A.6.3.1 in Exhibit A – Scope of Work. Cost per inspection and testing of the fire pump (includes the costs for providing the requirements of both sections A.6.3 and A.6.3.1):

$ (this is the Annual Total for Line Item 3)

Line Item 4: See section A.6.4 through A.6.4.1 in Exhibit A – Scope of Work. Cost per inspection and testing of each fire extinguisher (includes the costs for providing the requirements of both sections A.6.4 and A.6.4.1):

$ (cost for inspection and testing per fire extinguisher, once annually)

TIMES one hundred twenty (120) fire extinguishers (this is the current number of extinguishers the facility has as of the issuance of the RFQ)

= $ (this is the Annual Total for Line Item 4)

(The number of fire extinguishers that the facility has may fluctuate over the term of the Contract. The Contractor must invoice only for the actual number of fire extinguishers inspected and tested.)

Line Item 5: See section A.6.5 through A.6.5.1 in Exhibit A – Scope of Work. Cost per five (5) year inspection and testing of the facility’s fire alarm system (includes the costs for providing the requirements of both sections A.6.5 and A.6.5.1):

= $ (this is the Annual Total for Line Item 5)

(As identified in section A.6.5 in Exhibit A – Scope of Work, this may or may not occur during the term of the Contract. “Annual Total” used for Line Item 5 is for quoting purposes only. The five (5) year inspection, if it happens during the term of the Contract at all, will only occur once.)

Line Item 6: See sections A.6.6 through A.6.6.1 in Exhibit A – Scope of Work. Cost per inspection and testing of the fire backflow and bypass (includes the costs for providing the requirements of both sections A.6.6 and A.6.6.1):

$ (this is the Annual Total for Line Item 6)

Total Cost (for all services required in this RFQ): $ (The Total Cost is the sum of all Annual Totals.)

Do not alter this Exhibit B - Price Sheet. Altering this Exhibit B - Price Sheet may be cause for your quote to not be considered for award.

Do not submit pricing on any form or in any document other than this Exhibit B - Price Sheet. Providing your pricing on any form or in any document other than this Exhibit B - Price Sheet may be cause for your quote to not be considered for award. (The pricing you attach in response to the fifth paragraph of this Exhibit B – Price Sheet is acceptable, though.)

The Contractor shall not assess any other fees or charges other than those listed as the on this Exhibit B - Price Sheet.

Company Name (Vendor Name):

Contact Name/Phone:

Contact Email:

Exhibit C – Insurance Requirements

Fire Protection System and Equipment Services for JCC-Saint Anthony

C.1 Within five (5) business days of award of the Contract (or such other time as designated by the Purchasing Activity), the Contractor must provide certificates of insurance required herein and must maintain the insurance for the entire term of the Contract, including any renewal and extension terms.

There are no provisions for exceptions to this requirement. Failure to provide the certificates of insurance within the five (5) business day period may be cause for the Contract to be terminated.

C.2 The Contractor shall carry liability and property damage insurance that will protect it and the state of Idaho from claims for damages for bodily injury, including accidental death, as well as for claims for property damages, which may arise from operations under the Contract whether such operations be by themselves or by anyone directly or indirectly employed by either of them.

C.3 The Contractor shall not commence work under the Contract until it obtains all insurance required under this provision and furnishes a certificate or other form showing proof of current coverage to the state of Idaho. All insurance policies and certificates must be signed copies.

C.4 Commercial General and Umbrella Liability Insurance. The Contractor shall maintain Commercial General Liability (CGL) and, if necessary, Commercial Umbrella insurance with a limit of not less than $1,000,000 each occurrence. If such CGL insurance contains a general aggregate limit, it shall apply separately to the Contract.

C.4.1 CGL insurance shall be written on ISO occurrence form CG 00 01 (or a substitute form providing equivalent coverage) and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal and advertising injury, and liability assumed under an insured contract (including the tort liability of another assumed in a business contract).

C.5 Commercial Automobile and Commercial Umbrella Liability Insurance. The Contractor shall maintain Commercial Automobile Liability and, if necessary, Commercial Umbrella Liability insurance with a limit of not less than $1,000,000 each accident. Such insurance shall cover liability arising out of any auto (including owned, hired, and non-owned autos).

C.5.1 Vendor may request a waiver from providing Commercial Automobile and Commercial Umbrella Liability Insurance in its quote if the Vendor will not use any owned, hired or non-owned vehicles to conduct business under the Contract, if it is awarded the Contract, and the state of Idaho will consider the request. If the Vendor submits a request to waive the provision of Commercial Automobile and Commercial Umbrella Liability Insurance after the due date and time for receipt of quotes, the state of Idaho may not consider the request.

C.6 Workers Compensation Insurance and Employer's Liability. The Contractor shall maintain workers compensation and employer's liability. The employer's liability shall have limits not less than $1,000,000 each accident for bodily insurance by accident, $1,000,000 disease policy limit, and $1,000,000 disease, each employee.

C.6.1 The Contractor must provide either a certificate of workers compensation insurance issued by a surety licensed to write workers compensation insurance in the state of Idaho, as evidence that the Contractor has in effect a current Idaho workers compensation insurance policy, or an extraterritorial certificate approved by the Idaho Industrial Commission from a state that has a current reciprocity agreement with the Idaho Industrial Commission.

C.7 State of Idaho as Additional Insured: The liability insurance coverage required for performance of the Contract shall include the state of Idaho, IDJC and their divisions, officers and employees as additional insured, but only with respect to the Contractor’s activities to be performed under the Contract.

C.7.1 The Contractor must provide proof of the state of Idaho, IDJC and their divisions, officers and employees being additional insured by providing endorsements to the liability insurance policies showing the state of Idaho, IDJC and their divisions, officers and employees as additional insured. The endorsements must also show the policy numbers and the policy effective dates.

C.7.2 If a liability insurance policy provides for automatically endorsing additional insured when required by contract, then, in that case, the Contractor must provide proof of the state of Idaho, IDJC and their divisions, officers and employees being additional insured by providing copies of the policy pages that clearly identify the blanket endorsement.

C.8 Notice of Cancellation or Change: The Contractor shall ensure that should any of the above described policies be cancelled before the expiration date thereof, or if there is a material change, potential exhaustion of aggregate limits or intent not to renew insurance coverage(s), that written notice will be delivered to the Division of Purchasing (if the Contract was issued by the Division) or to the Purchasing Activity (contracting state agency) in accordance with the policy provisions.

C.9 The Contractor shall further ensure that all policies of insurance are endorsed to read that any failure to comply with the reporting provisions of this insurance, except for the potential exhaustion of aggregate limits, shall not affect the coverage(s) provided to the state of Idaho, IDJC and their divisions, officers and employees.

C.10 Acceptable Insurers and Deductibles: Insurance coverage required under the Contract shall be obtained from insurers rated A-VII or better in the latest Bests Rating Guide and in good standing and authorized to transact business in Idaho. The Contractor shall be financially responsible for all deductibles, self-insured retention’s and/or self-insurance included hereunder. The coverage provided by such policy will be primary to any coverage of the state of Idaho on or related to the Contract and shall provide that the insurance afforded applies separately to each insured against whom a claim is made, except with respect to the limitation of liability.

C.11 Waiver of Subrogation: All policies shall contain waivers of subrogation. The Contractor waives all rights against the state of Idaho, IDJC and their divisions, officers and employees for recovery of damages to the extent these damages are covered by the required policies. Policies may contain deductibles but such deductibles will not be deducted from any damages due to the state of Idaho.

1. Purpose
2. Time Lines
We strongly encourage you to attend the site visit. The site visit will include a tour of the grounds to give a better understanding of the fire protection system and equipment services needs of JCC-Saint Anthony. Vendors will be given the opportuni...
3. Scope of Work
4. Vendor’s Experience
5. References
6. Changes to Solicitation Instructions to Vendors
7. Award Basis
8. Response

File details come from the government source that posted it. Updated .