This is a Request for Quotations (RFQ) issued by the Idaho Department of Fish & Game for the purchase and delivery of one new semi-truck cab and chassis. The vehicle must be capable of accommodating a 3,000-gallon frame-mounted fish transportation tank and operating on varied road conditions including interstate highways and gravel mountain roads. The RFQ specifies detailed technical requirements including a Kenworth T880 or equal truck with a Cummins X15 565 diesel engine, 18 Endurant automated transmission, specific axles, suspension systems, brakes, wheels, and tires. The truck must be white with standard interior colors and include specified safety and operational equipment such as fire extinguishers, CB radios, GPS systems, and air horns. All responses must be submitted electronically through the IPRO Supplier Portal prior to the deadline specified in the system. The RFQ does not explicitly state a response deadline date or award date within the provided document; bidders are directed to monitor IPRO for this information and any amendments. Delivery must occur Monday through Thursday between 8:00 a.m. and 4:00 p.m. local time at the IDFG Nampa Regional Office, with the contractor providing seven business days' advance written notice.

Award will be made on an all-or-none basis to the responsive and responsible vendor submitting the lowest total cost. The contractor is responsible for all delivery costs (FOB destination, prepaid and allowed) and unloading. Payment will be made in accordance with Idaho Code 67-2302 following invoice submission and acceptance. The truck must include a minimum one-year warranty covering all parts, labor, equipment, and freight for repairs or replacement, with the frame warranted for three years against defects in workmanship. A factory-authorized repair and warranty service facility must be located within 100 miles of the delivery location. Required submittals include a price sheet, signature page, certificate of insurance, and manufacturer brochures or specification sheets. The contractor must provide one parts manual and one operation manual at delivery and demonstrate authorization from the manufacturer as a dealer or authorized reseller. The acceptance period following delivery is 30 calendar days, during which any discrepancies must be corrected by the contractor at no additional cost to IDFG.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ # 1430 SEMI-TRUCK & CHASSIS Page 1 of 6

IDAHO DEPARTMENT OF FISH & GAME

ATTACHMENT 1 – SECTION 1

RFQ Title: Semi-Truck Cab & Chassis

RFQ Number: RFQ # 1430

RFQ Solicitation Contact: Dana Jo McGee, Buyer danajomcgee@idfg.idaho.gov (208)-899-7667

Submit Electronically via IPRO: Supplier Portal / Supplier Portal (inforgov.com)

Deadline to Receive Questions: See IPRO

RFQ Closing Date: See IPRO

Award: Award will be made, all or none, to the responsive responsible vendor with the lowest Total Cost.

A. Purpose The Idaho Department of Fish & Game (IDFG) is requesting Quotes from qualified vendors for the purchase and delivery of a Semi Truck Cab & Chassis as further detailed below. Truck must accommodate a 3,000-gallon frame mounted fish transportation tank for the purpose of transporting live fish around the state of Idaho. Truck will operate on a variety of roads and road conditions including interstate highways and gravel mountain roads.

B. General Information & Solicitation Instructions This Solicitation is issued by IDFG via IPRO - Supplier Portal / Supplier Portal (inforgov.com) The RFQ Lead is the only contact for this Solicitation. All correspondence regarding this RFQ must be in writing. In the event that it becomes necessary to revise any part of this RFQ, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this RFQ will not be relied upon. All changes to this RFQ must be in writing and posted in IPRO to be valid. Alternate Bids are not allowed.

C. Submission Requirements Your response to this RFQ may be submitted electronically via IPRO or email. IDFG will not be accepting manual submissions for this solicitation. Your submission must include the Required Submittals listed below and be received prior to the deadline noted below.

Failure to provide any of the documents or submission on a form different from those provided, may cause your submission to be found as non-responsive.

Electronic Submission:

IPRO – Enter your pricing in IPRO- Supplier Portal / Supplier Portal (inforgov.com)` . and upload all Required Submittals.

When a Bidder has successfully submitted a response to IPRO, the Bidder should see a change in the system from “Draft Bid” (see Fig. 1) to “Submission confirmation email sent” (see Fig. 2). Bidders are encouraged to document notification of successful submission for their records. If you believe you have submitted your Bid, but have not received the “Bid Submitted” message, you are advised to contact the IPRO provider’s help desk (phone number available at https://purchasing.idaho.gov/ipro.html) and notify the solicitation lead prior to the solicitation End Time. Vendors are strongly encouraged to begin the process of submitting the response far enough in advance of the End Time to allow for resolution of technical difficulties. Be advised that the State is not responsible for a Vendor’s failure to timely submit a responsive submission due to any technical or technological difficulties. See

IDAPA 38.05.01.61.02.

https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA https://purchasing.idaho.gov/ipro.html

RFQ # 1430 SEMI-TRUCK & CHASSIS Page 2 of 6

Fig. 1

Fig. 2

If submitting via IPRO, be advised that that the Offeror for Proposal evaluation and award purposes is the entity profile under which the Proposal is submitted in IPRO, which must be the same legal entity presented in the uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Proposal in IPRO, the information provided on the Signature Page prevails.

While it is not mandatory to submit your Proposal electronically via IPRO, all Offerors participating in a Solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a Proposal manually outside of IPRO) as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free and only takes a few minutes.

Offerors are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows evaluators to efficiently navigate the Offeror’s response; as the State will print uploaded documents for evaluation in the manner received via IPRO

Email:

Send an email to the Solicitation Contact (listed above) and attach all Required Submittals.

D. Required Submittals As part of your response to this RFQ, the following documents are required.

Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 – Certificate of Insurance Brochures and/or specifications sheet detailing the Semi Truck & Chassis being submitted for this solicitation.

E. Award Award may be all to one or by line item (if applicable) to the responsive responsible Bidder with the lowest fully burdened cost, as provided on the Price Sheet in IPRO, as determined to be in the best interest of the State.

F. Resulting Contract If IDFG awards a contract from this Solicitation, it will do so by issuing a Purchase Order (PO) document, which will be an acceptance of the successful bid. The PO will be comprised of the following documents; this RFQ, including any incorporated documents; the successful bid, including any clarifications requested by IDFG; and an artifact formalizing any requirements agreed upon through Contract discussions or negotiations, if applicable.

The following documents are incorporated into this RFQ as if set out in their entirety:

Solicitation Instructions for Vendors – January 2017 State of Idaho Standard Contract Terms and Conditions – July 2024

RFQ # 1430 SEMI-TRUCK & CHASSIS Page 3 of 6

The documents may be found on the “Information for Vendors” page of the State’s Division of Purchasing (DOP) website ( https://purchasing.idaho.gov/governing-laws-and-policies/ ). If multiple versions of any of these documents are available on the website, the version in effect on the day the RFQ is issued shall apply.

ATTACHMENT 1 – SECTION 2

The following special terms and conditions are incorporated into the resulting Contract to supplement or add to the State of Idaho Standard Contract Terms and Conditions.

A. Delivery Contractor must provide an estimated Delivery date on Attachment 2 – Price Sheet. The Contractor is responsible for the unloading of the Semi-Truck Cab & Chassis. Freight FOB destination, prepaid and allowed.

Delivery must be made Monday through Thursday, 8:00 am to 4:00 pm local time excluding state of Idaho recognized holidays (https://www.idaho.gov/government/holidays.html), unless otherwise approved in writing by IDFG. Contractor must notify IDFG, in writing, no less than seven (7) business days prior to delivery. IDFG delivery contact information will be provided upon Award.

Delivery Location Idaho Department of Fish and Game Nampa Regional Office 15950 N Gate Blvd

Nampa, ID 83687

B. Acceptance Upon receipt of the Semi-Truck Cab & Chassis, per the delivery location, the Semi-Truck Cab & Chassis will be inspected by the delivery contact (or approved designee) to ensure the requirements and specifications are met. The Acceptance period will be for thirty (30) calendar days from the date the Semi-Truck Cab & Chassis is delivered.

In the event the specifications are not met, the Contractor must pick-up, correct any discrepancies, and re-deliver within thirty (30) calendar days after notification from IDFG, at no additional cost to IDFG. In the event that the Semi-Truck Cab & Chassis does not meet the specifications or is found with discrepancies that are not fixed by the Contractor during the Acceptance period, IDFG reserves the right to reject the Semi-Truck Cab & Chassis via official notification.

If approved by IDFG, the Contractor may correct discrepancies on-site at IDFG’s location in lieu of pick-up and return shipping. The Contractor will be responsible for providing all labor; tools, parts, supplies, and worksite clean up to make any necessary corrections.

The timeframe for corrective action will still be as identified above.

C. Invoicing & Payments Invoices – Invoices must be submitted as further detailed below. Invoices submitted prior to Acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission.

Invoices must include the following information:

• Contractor Company Name & Contact Information

• Contract Name & Number (PO #)

• Invoice Number & Date

• Itemization of the purchased goods to include: description matching the contract, quantity, unit of measure, unit price, extended price, and total invoiced amount.

Payments – Payment for correctly submitted invoices will be made in accordance with Idaho Code 67-2302:

https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/

D. Warranty Warranty must be for a minimum period of one (1) year, for the entire Semi-Truck Cab & Chassis, after Acceptance. Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warrantied item, which may include the entire Semi-Truck Cab & Chassis.

https://purchasing.idaho.gov/governing-laws-and-policies/ https://www.idaho.gov/government/holidays.html https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/

RFQ # 1430 SEMI-TRUCK & CHASSIS Page 4 of 6

The frame must be warranted against defects in workmanship including the main frame, bottom rails, cross members, and the sub frame for three (3) years after acceptance.

A factory authorized repair and warranty service facility must be located within a one hundred (100) mile radius of delivery location listed above to provide full Semi-Truck Cab & Chassis service, repairs, factory support and full warranty repair.

Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warranted item, which may also include the entire Semi-Truck Cab & Chassis. All warranty work must be complete within thirty (30) calendars days after receipt of written notice from IDFG. If approved by IDFG, the Contractor may perform warranty work on-site, at the Delivery location, in lieu of pick-up and return shipping. The Contractor will be responsible for all travel costs and work-site clean-up associated with any necessary repairs. The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the Semi- Truck Cab & Chassis on-site within thirty (30) calendars days, or if the Semi-Truck Cab & Chassis continuously malfunctions and causes it to be out of service on multiple occasions, IDFG reserves the right to require the Contractor to pick-up, repair, and return the Semi-Truck Cab & Chassis at no additional cost to IDFG.

Contractor is responsible for all warranty requirements. No third-party warranties will be allowed.

E. Vendor Requirement Vendor must have a current and signed written agreement with the manufacturer stating that the vendor is an authorized dealer or authorized re-seller for the product(s) being quoted in this solicitation.

F. Remedial Action In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to IDFG, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) terminate the Contract pursuant to Section 2.F, Termination of Contract, in addition to any remedies imposed by the State.

If IDFG must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, IDFG may withhold the actual cost to IDFG from the Contractor’s payment(s).

G. Termination of Contract For Cause - See Section 1.4, Termination, of the State of Idaho Standard Contract Terms and Conditions – July 2024.

For Fiscal Necessity – See Section 1.18, Termination for Fiscal Necessity, of the State of Idaho Standard Contract Terms and Conditions – July 2024.

For Convenience – Either party may terminate this Contract for its convenience at any time upon providing its written notification at least ninety (90) calendar days prior to the desired termination date.

ATTACHMENT 1 – SECTION 3

A. Requirements The Semi-Truck Cab & Chassis must meet the minimum specifications provided below and must be the latest model produced and sold to commercial trade. The Semi-Truck Cab & Chassis must be new, not used. Though they are not specifically covered herein, all parts necessary to provide a complete and functional Semi-Truck Cab & Chassis must be included. All parts must conform in design, strength, quality of materials, and workmanship to meet or exceed current engineering practices and accepted standards of the industry. All parts must be the manufacturers standard unless otherwise specified in this RFQ.

B. Brand Name The brand name(s) specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Contractor offering an “equal” must include documentation, which demonstrates, to IDFG’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, IDFG reserves the right to seek clarification from the Contractor. Failure to provide satisfactory documentation or a clarifying response to IDFG may eliminate the Contractor from further consideration.

C. Manuals

RFQ # 1430 SEMI-TRUCK & CHASSIS Page 5 of 6

The Contractor must provide one (1) parts manual (Manual) and one (1) operation Manual for the Semi-Truck Cab & Chassis at the time of Delivery. The manuals must include all components and exploded view drawings with both parts’ identification and parts list.

The manuals must be in either paper (book) format or portable document format (PDF) via universal serial bus (USB) drive.

D. Semi-Truck & Chassis – General Specifications Truck must accommodate a 3,000-gallon frame mounted fish transportation tank for the purpose of transporting live fish around the state of Idaho. Truck will operate on a variety of roads and road conditions including interstate highways and gravel mountain roads.

The following Specifications are the minimum that IDFG is willing to accept.

1. General & Performance

1.1 Truck must be a new Kenworth T880, or equal.

1.2 Front axle to rear of cab, must be seventy-four (74) inches.

1.3 Back of cab to rear axle must be one-hundred and sixty-one (161) inches.

1.4 Center of rear axle to end of frame must be one-hundred (100) inches.

2. Cab

2.1 The Truck must have a cab of steel reinforced aluminum, with no rear cab glass, hood opening assist with locking strut, assist handles, C-Bar mirror system, gauges (speedometer, coolant temp, etc.), seats (fully adjustable high-back), adjustable steering column, and equipment/accessories as specified (HVAC, backup alarm, radio, GPS, etc.), all with “or equal” for brand-specific items (e.g., Uniden Bearcat CB radio).

2.2 Cab & body must be white. Color chip must be supplied & approved by the IDFG designee upon award.

2.3 Interior color must be a standard color with rubber floor mats.

2.4 No sleeper cab.

2.5 Required safety items including 5 lb. fire extinguisher mounted on the inside of the cab.

2.6 Kenworth Radio DEA710, or equal.

2.7 CB radio – Cobra 29, or equal.

2.8 Non-self-canceling turn signal mounted on column.

2.9 Long grab handles mounted to the right and left side of the cab.

2.10 Dual air horn mounted to the right & left side of the cab.

2.11 Wheel well fender flairs two-and-a-half (2.5) inches.

3. Frame

3.1 Constructed of heat treated 10 ¾ x 3 ½ x ⅜ steel.

3.2 Inside rail to inside rail width must be 33 ⅞ inches.

3.3 Minimum of 14.80 section modules per rail.

3.4 One million, six-hundred thousand (1,600,000) pound resistance bending moment.

3.5 Tapered chrome steel front bumper.

4. Axles, Suspension & Brakes

4.1 Front axle must be Meritor MFS20K 3.74in. Drop Wide Track, or equal, with a minimum capacity of twenty-thousand (20,000) pounds.

4.2 Rear axel must be Dual Dana Spicer D46-172H, or equal, with a minimum capacity of forty-six-thousand

(46,000) pounds.

4.3 Chassis must be aligned at manufacturer’s facility, and prior to delivery. The alignment sheet must be provided upon delivery.

4.4 Front suspension must have twenty thousand (20,000) rated capacity or greater, taper leaf design with shock absorbers & maintenance free pin bushings.

4.5 Rear suspension must be Tandem Neway ADZ246, or equal, with a forty-six-thousand (46,000) pound capacity with fifty-four (54) inch axle spacing & ten-and-a-half (10.5) inch ride height.

4.6 Front brakes must be 14,601-22K Bendix Air Disc Brakes, or equal.

4.7 Rear brakes must be must be Dual Rear Bendix Rear Air Disc Brakes, or equal.

4.8 1 steerable pusher, Watson-Chalin 13.5k SL13, or equal.

4.9 1 steerable pusher brakes, Bendix Non-RSD 15x4, or equal.

4.10 1 steerable pusher brake drum 15x4, or equal

4.11 1 Steerable pusher hubs aluminum pilot, or equal.

5. Wheels & Tires

RFQ # 1430 SEMI-TRUCK & CHASSIS Page 6 of 6

5.1 Front wheels must be Alcoa 82362 22.5 x 12.25, or equal, aluminum hub-pilot mount with maximum rating of eleven-thousand four-hundred (11,400) pound, air disc compatible.

5.2 Rear wheels must be Alcoa 88067 22.5 x 8.25, or equal, hub-pilot mount with maximum rating of seven-thousand four-hundred (7,400) pounds, air disc compatible.

5.3 Front tires must be Bridgestone M864 385/65R22.5 18PR, or equal.

5.4 Rear tires must be Bridgestone M771 11R22.5 14PR, or equal.

6. Diesel Engine

6.1 Cummins X15 565, or equal, with maximum operation at two-thousand (2,000) rpm.

6.2 The Truck must deliver a minimum of five hundred (500) horsepower at nineteen hundred (1,900) revolutions per minute (RPM) and a minimum of sixteen thousand foot-pounds (1,600 FT-LB) torque at fourteen hundred (1,400) revolutions per minute (RPM).

6.3 The Truck must have a cooling system protected to minus thirty degrees (-30°F) ambient temperature with extended life antifreeze, designed to prevent overheating at maximum output in one hundred ten degrees (110°F) ambient temperature.

6.4 All coolant hoses, radiator and heater, must be made of Ethylene Propylene Diene Monomer (EPDM) or silicone type approved for diesel engine cooling system applications.

6.5 Fan drive must be mechanically driven through a belt or electronically driven.

6.6 Engine air intake system must have the capability to pull in air from both inside and outside the engine compartment or be equipped with a separator cyclone. Air filter must be composite firewall mounted.

6.7 Oil filters must be full flow, replaceable cartridges or spin-on type.

6.8 The Truck must include compression engine brake. Exhaust brake is not acceptable.

6.9 Engine must include REPTO drive with the output drive flange located in the 1 or 2 o’clock position as viewed from the rear of the Truck chassis.

6.10 The Truck must have engine oil drain, oil sample fitting, fuel filter, block heater, warning system, shutdown protection, engine brake, starter interlock, skid plate & radiator screen, aftertreatment device, and fuel tanks as specified in the original, with “or equal” where brand names are used (e.g., Phillips-Temro block heater).

7. Transmission

7.1 The Truck must have an 18 Endurant automated transmission, or equal.

7.2 Transmission must have a torque of one-thousand eight-hundred and fifty (1,850) pounds or greater.

C. Submission Requirements
6.10 The Truck must have engine oil drain, oil sample fitting, fuel filter, block heater, warning system, shutdown protection, engine brake, starter interlock, skid plate & radiator screen, aftertreatment device, and fuel tanks as specified in the ori...