RFQ 1333ND23QNB190143.pdf
PDF 13 MB Posted
- Attached to
- NOx Emission Stack Testing
- Solicitation number
- 1333ND23QNB190143
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1333ND23QNB1901430002.pdf | ||
| Amendment 1333ND23QNB1901430001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ IFB RFP
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODEFACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF.
DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
OFFER
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
17a CONTRACTOR/
OFFEROR.
CODE
8 (A)
SIZE STANDARD:
NAICS:
% FOR:SET ASIDE:UNRESTRICTED OR
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
10. THIS ACQUISITION IS
EDWOSB
SMALL BUSINESS PROGRAM
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Emission Stack Testing Project Coordination and
Protocol Deliverable to MDE.
PR NUMBER: NB193000-23-00963
DELIVERY DATE: 04/28/2023
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
FOB : Destination
1.00 LT
NTE NTE
0002 Travel in support of the Statement of Work
PR NUMBER: NB193000-23-00963
DELIVERY DATE: 04/28/2023
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
FOB : Destination
1.00 LT
0003 Emission Stack Testing of Boilers Onsite and Final
Report(s)
PR NUMBER: NB193000-23-00963
DELIVERY DATE: 04/28/2023
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
FOB : Destination
1.00 LT
PAGE 3 OF 294 1333ND23QNB190143
Table of Contents
Statement of Work
Boiler Stack 1, 2, 5 and 6 Photo
Potential Stack Test Staging Area Photo
Guidelines for Contractors Performing
NIST Suborders, Policies & Notices
Mitigating COVID-19 Exposure
52.202-1DEFINITIONS (JUN 2020)
52.203-7ANTI-KICKBACK PROCEDURES (JUN 2020)
52.204-6 UNIQUE ENTITY IDENTIFIER (OCT 2016)
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
52.204-12 UNIQUE ENTITY IDENTIFIER MAINTENANCE (OCT 2016)
52.204-13SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)
52.204-23PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY
KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021)
52.204-24REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT
(NOV 2021)
52.204-25PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR
EQUIPMENT (NOV 2021)
52.204-26COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (OCT 2020)
52.212-3OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC
2022)
52.212-4CONTRACT TERMS AND CONDITIONS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2022)
52.212-5CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES (DEC 2022)
52.216-24 LIMITATION OF GOVERNMENT LIABILITY (APR 1984)
52.219-1SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2022)
52.219-6NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)
52.219-14LIMITATIONS ON SUBCONTRACTING (OCT 2022)
52.219-28POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (OCT 2022)
52.225-25PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR TRANSACTIONS RELATING
TO IRAN--REPRESENTATION AND CERTIFICATIONS (JUN 2020)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)
52.232-40PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (NOV 2021)
52.233-3 PROTEST AFTER AWARD (AUG 1996)
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.244-6SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2022)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
NIST LOCAL-53CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS
NIST LOCAL-54ELECTRONIC BILLING INSTRUCTIONS
NIST LOCAL-56INVOICING PROCESSING PLATFORM-ALTERNATE I (DEC 2022)
1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)
Instructions to Quoters
Evaluation-Basis for Award
PAGE 4 OF 294 1333ND23QNB190143
CLAUSES
Statement of Work
PAGE 5 OF 294 1333ND23QNB190143
Project Title: CUP NOx Emission Stack Testing Boilers 1, 2, 5, and 6 Location: National Institute of Standards and Technology; 100 Bureau Road, Gaithersburg, MD Work Order No.: 23W2941-00 and 23W2943-00
1.0 Description of Work
1.1 Background Information
The purpose of this statement of work is to conduct stack testing on four (4) boilers at the National Institute of Standards and Technology (NIST) Steam and Chilled Water Generation Plant in Gaithersburg, Maryland, and produce findings report(s) to meet the requirements of NIST’s Title V Permit.
1.2 Purpose and Scope of Work
The contractor shall supply all labor, material, equipment, and transportation necessary to determine Nitrogen Oxide (NOx) emissions for boilers EU-1, EU-2, EU-5, and EU-6 via Boiler Stack tests in building 302 Steam and Chilled Water Generation Plant on the NIST Gaithersburg Campus. Please reference Attachment 1 and 2 for photos of the Boiler stacks and the Plant.
The boiler information and descriptions are below:
Boiler Name Boiler Description EU-1 55 million Btu/hour boiler. Primary fuel is natural gas with No. 2 fuel oil as a backup.
EU-2 55 million Btu/hour boiler. Primary fuel is natural gas with No. 2 fuel oil as a backup.
EU-5 99.8 million Btu/hour boiler with low NOx burners. Primary fuel is natural gas with No. 2 fuel oil as a backup.
EU -6 99.8 million Btu/hour boiler with low NOx burners. Primary fuel is natural gas with No. 2 fuel oil as a backup.
The scope of work shall include:
1.2.1 Preparation and submission of a stack test protocol that will be reviewed and approved by
NIST (Government) and the Maryland Department of the Environment (MDE) prior to start
1.2.2 Preparation of a project specific safety and health plan to be submitted as part of the stack test protocol
1.2.3 Conducting stack testing on the four (4) boilers listed above and located at the NIST’s (Gaithersburg, MD) Steam and Chilled Water Generation Plant, to determine the Nitrous Oxide (NOx) emission rates on natural gas and number 2 fuel oil
1.2.4 Preparation of Stack Test Report(s) that will be reviewed and approved by NIST and the Maryland Department of the Environment
The work performed shall be in accordance with:
US EPA Reference Method 1, “Sample and Velocity Traverses for Stationary Sources”
US EPA Reference Method 3A, “Gas Analysis of Dry Molecular Weight”; (for O2 and CO2 Concentrations)
US EPA Reference Method 4, “Determination of Moisture Content in Stack Gases”
PAGE 6 OF 294 1333ND23QNB190143
US EPA Reference Method 7E of Appendix A, 40 CFR 60, “Determination of Nitrogen Oxides Emissions from Stationary Sources (Instrumental Analyzer Procedure); for (NOx concentrations)
The Contractor shall conduct stack testing necessary to determine the NOx emission rate on each of the four (4) boilers while burning natural gas and while burning fuel oil. A total of eight (8) stack tests amounting to twenty-four (24) separate one (1) hour runs shall be completed, per the table below. NIST will facilitate the change in fuel from natural gas to fuel oil, which will require approximately one (1) hour.
Test # Boiler Fuel # Of Test Runs 1 EU-1 Natural Gas 3 2 EU-1 Fuel Oil 3 3 EU-2 Natural Gas 3 4 EU-2 Fuel Oil 3 5 EU-5 Natural Gas 3 6 EU-5 Fuel Oil 3 7 EU-6 Natural Gas 3 8 EU-6 Fuel Oil 3
The contractor shall submit the testing protocol to Maryland Department of the Environment (MDE) 30 days prior to testing for approval. Adjustments to the testing protocol shall be made based on MDE comments.
The contractor shall record or gather operational data, findings, observations, calibration data, field notes, and testing logs during the performance of the boiler stack tests and include in a comprehensive test report for submission to the NIST and MDE.
2.0 Period of Performance:
2.1 The work shall proceed promptly upon execution of this contract in coordination with the COR.
2.2 The actual performance of the work shall be in accordance with the project schedule (see section 6.0). The final required documents shall be in accordance with the project schedule and shall be provided within 28 days of the Stack Test.
3.0 General Requirements:
3.1 The Contractor shall:
3.1.1 Adhere to Project Management responsibilities as defined herein.
3.1.2 Appoint a Project Manager who shall be the Government’s primary point of contact and provide all necessary project representation for the successful accomplishment of the said work. The project manager shall be thoroughly familiar with all requirements and schedules. The project manager shall be identified in the firm’s proposal prior to contract award.
3.1.3 Coordinate all project related activities including documentation through the COR for approval unless otherwise denoted.
PAGE 7 OF 294 1333ND23QNB190143
3.1.4 Bring any questions and/or industry specification additions to the attention of the COR for direction.
3.1.5 Provide appropriate communication and coordination efforts with the facility group and the COR to avoid disruption of facility operations while performing contract work.
3.1.6 Provide (to the COR) a list of possible employees and sub-contractors who may require access to the NIST premises per the project being administered.
3.1.7 Comply with all associated project work in accordance with NIST Guidelines; Executive orders, EPACT, EISA, Federal Regulations (such as U.S. Clean Air Act); Local City, County, and State building codes, statues and regulations; NEC, ASME, NFPA, OSHA, UL, ANSI, and IEEE rules and regulations and standards; and all other applicable industry standards.
3.1.8 Restore all affected areas back to pre-project conditions or better by the completion of the specified project including necessary patching, repairing and/or replacing.
Provide all labor, material, and equipment necessary to accomplish the above specified tasks
4.0 Government Furnished Materials and Resources:
4.1 The Government will provide proper operation of the boilers during testing.
4.2 The Government will provide power, safe access, and test ports to all emission sources tested.
4.3 Point(s) of contact at the NIST Steam and Chilled Water Generation Plant
5.0 Submittals:
5.1 Deliverables: Provide all deliverables in accordance with the project schedule and to meet the submission requirements for the State of Maryland Title V Permit.
The initial submission for review and comments, shall be provided within three (3) weeks of the Stack Tests.
The final Submission shall be delivered within four (4) weeks of the Stack Tests.
5.1.1 Physical Deliverables (Format): The documentation process shall be compiled and provided per the following submission(s) unless otherwise denoted:
1. Five (5) copies of the Stack Test report(s) physically in binders and electronically.
The five (5) copies shall be provided to the Government once reviewed and finalized. The five (5) copies include a copy to MDE.
2. Non-Stick, Locking Slant D-Style, three ring view binders, 8 1/2x 11 inches.
3. Title, Emission Source location (NIST and Address), Submitted to (NIST and MDE;
and Addresses; and NIST COR and MDE Rep.), Prepared by (Stack Test company, Address and Preparer’s Name), and NIST Contract Number and Test Date shall be located on the front cover of the binder(s).
4. Title, and Date shall be located on the spine of binder(s).
5.1.2 Electronic Deliverables (Format): Provide electronic deliverables in the following format (where applicable) using the latest version of software unless otherwise denoted or agreed upon:
Reports: PDF
PAGE 8 OF 294 1333ND23QNB190143
Spreadsheets: PDF Schedule: MS Project (saved to PDF) or Word or Excel Drawings: PDF Catalog Cut Sheets: PDF
6.0 Project Schedule: The project shall be completed per the Period of Performance (or earlier) starting with the NTP, and per the following key milestones:
Submittal/Phase/Activity Task Time Interval Cumulative Duration
Kick-off Meeting 07 calendar days (from issuance of award) 07 days Schedule 07 calendar days (from Kick-off) 14 days Testing Protocol to MDE - 30 days prior to start 07 calendar days (from Kick-off) .14 days Safety Plan 07 calendar days (from Kick-off) 14 days NIST Review of Safety Plan 14 calendar days (Concurrent) 28 days MDE Protocol Review and Approval 30 calendar days 44 days Mobilization and Setup (at NIST) 07 calendar days 51 days Emission Stack Testing 04 calendar days 55 days Final Test Report - Four (4) week after testing 28 calendar days 83 days
These are estimated timeframes. Please note that several activities above can be performed concurrently.
7.0 Working Hours: All field work shall be performed Monday through Friday from 6:30 A.M. to 5 P.M. unless otherwise denoted or agreed upon. No work shall be performed on Saturday, Sunday, Federal holidays or on days that the Government is closed, unless otherwise denoted or agreed upon in writing at least five (5) business days in advance.
8.0 Project Contacts:
All technical questions shall be submitted to:
Raymond Byrd National Institute of Standards and Technology 100 Bureau Drive, Building 301, Room A-100 Gaithersburg, MD 20899
(301) 975-5297 phone
(301) 641-2774 cell
Boiler Stack 1, 2, 5 and 6 Photo
PAGE 9 OF 294 1333ND23QNB190143
Potential Stack Test Staging Area Photo
PAGE 10 OF 294 1333ND23QNB190143
PAGE 11 OF 294 1333ND23QNB190143
Guidelines for Contractors Performing...
PAGE 12 OF 294 1333ND23QNB190143
Facilities Engineering, OFPM/ Design and Construction Division
GUIDELINES FOR OFPM CONTRACTORS
AND
A/E FIRMS
PERFORMING SITE INVESTIGATIONS
AND
FIELDWORK (including construction)
AT THE
NATIONAL INSTITUTE OF STANDARDS AND
TECHNOLOGY
GAITHERSBURG, MD
Revised date: April 13, 2022
PAGE 13 OF 294 1333ND23QNB190143
TABLE OF CONTENTS
Title Page
1. Emergencies
2. Safety Equipment
3. Investigation Equipment
4. Mechanical/Electrical Rooms
5. Confined Space Entry
6. Utility Outages, Road Blockages
7. Hazards
8. Corridors
9. Operating Equipment
10. Fire Protection
11. Internal Combustion Equipment
12. Asbestos
13. Safety and Health Compliance
14. Work Safety
15. Site Access and Working Hours
16. Excavation and Trenching Activities
17. Environmental Management
18. Scrap Building Materials Disposal
19. Electrical Safety
20. Daily Reports
21. Adverse Weather
22. Grass within Contractor Area
23. Building 101 Restricted Activities
24. Exterior Construction Sites and Storage
25. Restoration of Exterior Construction Site
26. Tours of Construction Site
27. Ground Penetrating Radar in Existing Structures
28. As-Built and/or Red Line Drawings
29. Operations and Maintenance Equipment Manuals ……………………………………….11
30. Roof Access ……………………………………………………….………………………………..………. 11
31. Security Badges
32. Designer – Historical Requirements
33. Temporary Exterior Power
34. Security Plan 16
35. FAR Clause 48 CFR 1352.237-71 Security Processing Requirements –
Low Risk Contracts (APR 2010) 17
PAGE 14 OF 294 1333ND23QNB190143
1. Emergencies:
In case of emergency, call x2222 from a campus phone. State your name, building location, room number, and a description of the emergency. The NIST Fire Protection Group provides fire and ambulance service on site. If a phone other than NIST (975 exchange) is used, "911" should be used for emergency calls. The contractor shall state that he/she is located at NIST and give the details as described above. Contractors should become familiar with the NIST Gaithersburg Occupant Emergency Plan, issued September 2012.
2. Safety Equipment:
Personal Protective Equipment (PPE) such as head, eye, foot, respiratory, and ear protection shall be worn in identified areas. Hard hats, for example, shall be worn in mechanical rooms. Contractors and A/E firms to provide necessary PPE of the approved type to protect themselves against exposures encountered. NIST provided dosimeters (radiation exposure measurement) may be required to be worn when working in or around specific sections of Building 235 and Building 245.
Unique safety awareness training is mandatory for working in Buildings 235 and 245.
Contractor shall plan on 2 hours of training for each employee to complete this training.
3. Investigation Equipment:
Site investigations and field work may require the use of a stepladder and/or other investigative equipment (measuring tapes, flashlights, screwdrivers, etc.). Contractors and A/E firms shall provide their own stepladders and/or investigative equipment. The stepladders shall be Type I (industrial) or Type II (commercial).
4. Mechanical/Electrical Rooms:
Obtain authorization from the Contracting Officer’s Representative (COR) prior to working in electrical and/or mechanical rooms. Lock rooms after use. For work in high-voltage rooms, a NIST high-voltage electrician must be present the entire time. Do not operate any valves, switches, or breakers without prior approval from the COR.
5. Confined Space Entry:
If a contractor or A/E must enter a confined space on the NIST site, they shall follow the applicable provisions of the OSHA Permit-Required Confined Space Regulation (29CFR1910.146). The contractor or A/E shall be responsible for implementing and documenting an entry permit system as necessary, giving full consideration to personnel training, atmospheric testing, ventilation, PPE, and emergency procedures and equipment. Should the contractor or A/E have questions regarding any confined space
PAGE 15 OF 294 1333ND23QNB190143
to be entered on the NIST site, they are to contact the COR or the Plant Division's Safety Coordinator (x6999, Bldg. 428). Copies of the contractor entry permit system shall be submitted to the COR for approval in advance.
6. Utility Outages, Road Blockages:
Do not close or partially block any roads or cause utility outages (electrical, steam, chilled water, water, compressed air, gas, sewer, telephone, fire alarm, signal systems, etc.) without prior authorization from the COR. Provide a minimum of 21 days’ written notice for all utility systems outages. Complete building outages require a 50 days writing notice. Outages to more than one building require 190 days’ notice. All outages and road closures shall be on Saturdays unless noted otherwise within the specifications or statement of work.
Site Coordination Procedures:
All construction or investigation activities that require closure of sidewalks, roads, or other transportation ways, require the contractor to submit a request for closure 21 days in advance.
7. Hazards:
Storing, positioning, and use of equipment, tools, and materials, in a manner likely to present a hazard to the public or building occupants by its accidental shifting, ignition, or other hazardous qualities is prohibited.
8. Corridors:
No corridor, aisle, stairway, door, or exit shall be obstructed or used in such a manner as to encroach upon routes of ingress or egress utilized by the public or building occupants, or to present unsafe or unhealthy conditions to the public or building occupants.
9. Operating Equipment:
Do not turn off, on, or adjust any NIST operating equipment without prior authorization from the COR. Work carefully around rotating equipment. Loosely fitting clothing (neck ties, dangling jewelry, etc.) shall not be worn when working near rotating equipment.
Long hair shall be secured. Some equipment may start automatically. (Note: It may become necessary to implement appropriate lock-out, tag-out procedures to control hazardous energy sources to ensure that personnel do not activate equipment during investigation, servicing, or maintenance.) Provisions of NFPA 70E shall be followed when an arc flash hazard exists.
PAGE 16 OF 294 1333ND23QNB190143
10. Fire Protection:
The Contractor or A/E shall comply with all applicable fire protection/prevention requirements of the National Fire Protection Association (NFPA) and the NIST Fire Protection Group. Should any operations capable of providing a source of ignition (for example welding, cutting, burning, or heating) be performed within or adjacent to NIST buildings/structures/equipment, a hot work permit must be obtained from the NIST Fire Protection Group (301-975-6190) prior to such work. Covering of room smoke, heat, or other NFPA 72 defined initiating devices or notification devices is only allowed with advance written approval from the COR.
11. Internal Combustion Equipment:
Such equipment will not be allowed within any building without prior written approval.
Gasoline or diesel powered equipment (such as fork lifts, loaders, tractors, cutting saws, etc.) will not be authorized for use within any building in any circumstance.
12. Asbestos:
Some ductwork and piping may be insulated with asbestos containing materials (ACM).
Contact the Plant Division Safety Coordinator (x6999) prior to disturbing suspected ACM. ACM may also be present in floor tile, bench tops, and/or plaster ceilings.
1) If more than three (3) ceiling tiles must be removed at one time in a single location, the Plant Division Safety Coordinator must be notified beforehand so she can review the task to be performed and ensure all safety requirements are adhered to. Contractors shall provide 7 calendar days’ notice.
2) Whenever a ceiling tile of any kind is removed, it must be removed slowly and as level as possible. Workers need to check as soon as they can see on top of the tile if there is any debris laying on top, such as a piece of pipe insulation or other bldg materials in general. If there is debris, the worker should re-install the tile and notify his supervisor and COR so the proper measure can be taken to remove whatever debris is found.
3) All contractors at a minimum must wear the following Personnel Protective Equipment while working on/in/above the ceiling and/or removing ceiling tiles:
* Safety glasses with side shields or goggles
* Leather gloves or the Mechanics Red Gloves
4) It is strictly prohibited to perform any type of "aggressive activity" that could break the encapsulate seal or agitate the air above the hallway or concourse ceilings. Examples of "aggressive activity" include - dragging conduit or pipes over ceiling tiles; hammer drilling into the columns; removing numerous ceiling tiles at one
PAGE 17 OF 294 1333ND23QNB190143
time; striking against pipes or pipe insulation; dropping items on top of ceiling tiles; and numerous workers above the ceiling at one time performing various tasks.
13. Safety and Health Compliance:
Contractors and A/E firms shall adhere to all applicable OSHA, NFPA, NEC and NIST safety and occupational health regulations while on site. Federal OSHA (Baltimore area office) has safety jurisdiction at federal facilities in the State of Maryland. The NIST local contact is the OFPM Safety Coordinator (Bldg. 428 301-975-6999).
All contractors are required to wear safety glasses. All contractors working at Buildings 235 and/or 245 are subject to a 2 hour radiation awareness training session.
If any chemicals, hazardous materials, equipment or materials are found in a lab or other contract space, the contractor shall notify the COR so arrangement can be made to have the items removed. Work shall not continue until the items have been cleared by others; Contractors are not to move any chemicals, materials or equipment in any lab.
Contractors are required to submit health and safety plans within 15 days of solicitation award. Health and safety plans are to be specific to the solicitation requirements.
Safety plan shall be contract specific and follow activity hazard analysis (AHA) format.
All roof construction shall be in accordance with U.S. Army Corps USACE EM-385-1-1 “Safety and Health Requirements Manual“ (current edition).
14. Work Safety:
The contractor shall take all necessary precautions to prevent injury to personnel, the public, building occupants, and damage to property of others. If unsafe work practices are observed, unsafe work may be stopped by the NIST OFPM Safety Officer and/or COR until corrections are made.
15. Site Access and Working Hours:
NIST is a Federal facility and access is controlled at all entrances to the campus. Only Government employees may grant access to non-Government employees.
Vehicles Access:
Automobiles: Contractor personnel arriving in cars on their first day must check in at the visitor center to receive a temporary badge prior to proceeding to the project site to obtain permanent badge. Hours of operation of the visitor center are 0600-1700. Once in possession of a valid NIST badge, workers may enter via the Main Gate or Gate “C”
PAGE 18 OF 294 1333ND23QNB190143
and proceed to the project site. Note that all automobiles are subject to a random inspection.
Trucks: All Trucks are to enter NIST via “C” Gate along Quince Orchard Rd. between 6:00 am and 3:30 pm daily, and at the main gate off of W. Diamond Ave. between 3:30 pm and 4:30 pm. No deliveries will be allowed after 4:30 pm. “Trucks” include such vehicles as pick-ups with storage compartments, delivery trucks, delivery vans, and tractor trailers. Trucks arriving through Gate C will be directed to the Building 301 Truck Inspection Station. At Building 301, trucks will be registered, inspected, and the drivers will be granted access. Any truck which exits the installation will have to be re-inspected upon re-entry at Building 301. A vehicle dashboard placard will be placed within the truck. Placards change daily.
NIST Truck Inspection Stations hours are:
6:00am -3:30pm at Building 301 3:30 pm – 4:30pm at “A” Gate – (Main gate)
Parking: Loading docks are for loading and unloading equipment and materials. Do not park at or near loading docks or the space between buildings. All Contractors vehicles and personal vehicles are to use the building parking lots or parking lots designated by the Contracting Officer for construction contractors.
Speeding: NIST speed limit is posted on the campus. If a speeding ticket is issued, the offender may be required to appear in Federal Court.
Responsibility: When deliveries are made, the Contractor is responsible providing information and directions to the driver to proceed to the work area and for unloading.
NIST will not be responsible for delivering contractor materials to the project site or for unloading materials.
Hours of Operation: NIST opens at 6:00 am (sharp) until 6: 00 pm for Contractors who do not have 24-hour access privileges.
Normal work hours defined in the contract are 7:30 AM to 5:30 PM.
All work over 80 dBA measured at 15 feet shall occur after normal work hours.
Contractor shall have a meter on hand to measure dBA.
Painting Hours: All painting shall be per the SOW and/or specifications. If not stated, all painting shall be done from 5:30 PM to 11:00 PM Monday to Friday. Painting on weekends from 6 AM to 4 PM shall be scheduled through the COR, with at least seven days’ notice.
PAGE 19 OF 294 1333ND23QNB190143
16. Excavation and Trenching Activities:
Excavation and trenching activities are not permitted without prior written authorization from the COR. Contractor is responsible for locating and identifying all utilities via contract personnel with utility locating devices. Contractor shall turn over a utility marking report plotted on the appropriate construction drawings to the COR within 7 days.
17. Environmental Management:
NIST will conduct its operations in an environmentally sound manner. NIST’s Environmental Management System (EMS) has been established based on the requirements of the International Organization of Standards (ISO14001). All firms contracted by NIST shall review and be familiar with the NIST Environmental Policy and significant aspects of the NIST EMS, which may be accessed at http://www.nist.gov/public_affairs/envpolicy.cfm
All contractors who provide products and services to NIST shall comply with all applicable environmental regulations, conduct their work using environmentally sound practices, and assess options that will result in the least environmental impacts. The Maryland Department of Environment (MDE) will inspect and enforce sediment control and storm water management regulations and practices for projects at NIST.
18. Scrap Building Materials Disposal
In order to reduce disposal volumes of clean scrap wood based building materials taken to landfill dump, segregate such materials and dispose of the materials and dispose of the materials using one or a combination of the following methods.:
Arrange for recycling of materials or provide to companies that receive wood for disposal in biomass to energy facilities.
It is NIST Policy to recycle construction demolition materials and debris to the greatest extent practicable. All NIST contractors shall strive to meet the goal of recycling 50% of construction demolition materials and debris as specified in Executive Order 13514.
Contractor shall store recyclable waste in separate clearly marked containers.
Recyclable items include, wood, glass, aluminum, steel, gypsum, paper, cardboard, and plastics.
PAGE 20 OF 294 1333ND23QNB190143
19. Electrical Safety:
All contractors shall comply with current edition of NFPA 70E “Standard for Electrical Safety in the Workplace.” If the Contractor selects to work on energized equipment, Contractor shall have a documented permit system for working on energized electrical equipment.
20. Daily Reports
Contractor shall provide to COR a daily report of all major activities, personnel on site (includes all subcontractors), major deliveries, and major tools and equipment on site.
Contractor shall inform the COR in writing ten days in advance when painting, new carpet installation, glue applications, using a cleaning solvent, large amount of grinding or core drilling is planned.
21. Adverse Weather
To request an adverse weather time extension, the weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month. The Request must be made no more than 30 days after the event.
The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the contractor.
The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) at Ronald Reagan Airport and will constitute the base line for monthly weather time evaluations. The contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec 8 6 8 6 8 7 7 6 6 6 6 7
For roofing projects, contractors will be permitted to work on Saturdays (if the contractor elects to do so) providing they provide the COR four days’ notice. Rain on Saturdays and Sundays are not factored into adverse weather delays for any contract, PAGE 21 OF 294 1333ND23QNB190143 unless that contract explicitly required all work to be completed on Saturdays and/or Sundays.
22. Grass within Contractor Area
Grass within the contractor’s area of control (i.e. – lay down area, construction site, etc.)
shall be maintained to a height of no more than 18 inches.
23. Building 101 Restricted Activities
For two days (total of four (4)) in the months of October and April the contractor will be prevented from completing any work in the courtyards, streets, sidewalks in and around Building 101. In addition, service/construction or other related activities will be prevented from occurring. COR will provide the contractor two days’ notice of the implementation of this restriction.
24. Exterior Construction Sites and Storage
Exterior construction sites and storage areas shall have woven galvanized steel fabric fencing with steel posts installed during the construction period. Fencing shall surround the entire construction site the contractor is working within. Fencing shall be at a minimum 8 feet tall. Provide opaque fence slats. Slat color shall be dark green/forest green. Fencing sections shall be bound together with mechanical fasteners. Posts shall be suitable for setting in concrete footings, driving into ground, anchoring with base plates, or inserting in precast concrete blocks. Provide a minimum of 3 ft spacing around fire hydrants and/or hose connections. Provide a minimum 20 foot gate for emergency vehicle access.
25. Restoration of Exterior Construction Site
The contractor shall restore the entire construction site(s) at the completion of all contract work. This shall include removing all debris and stones of 2 inches or from the subsoil to a depth of 8 inches regardless of the condition the site was turned over to the contractor. Seeding shall be completed by the contractor once all debris and noted stones are removed from the topsoil.
26. Tours of Construction Site
Any tours or presentations related to a contract by the contractor shall be submitted at a minimum of 30 days in advance to the COR. The contractor shall provide the following the information for review:
a) Purpose of the Tour/Presentation
b) Time of tour/presentation
PAGE 22 OF 294 1333ND23QNB190143
c) Number of attendees
d) Names of each attendee
e) Name of each attendee’s employer
f) Address of each attendee’s employer
g) Indicate if US Citizen, US Permanent Resident Alien, or foreign national
27. Ground Penetrating Radar in Existing Structures
Prior to core boring, drilling, or otherwise penetrating existing floors or walls within facilities the contractor shall clear the area with ground penetrating radar. COR shall observe the test report and/or the identification prior to penetrating the floor, wall, or proposed penetration location.
28. As-Builts and/or Red Line Drawings
Contract specified as-builts and/or red line drawings shall be provided in the following form:
• hard copies on Arch D (24”x36”) format, electronic copies on CD disk (adobe PDF, AutoCAD).
29. Operation and Maintenance Equipment Manuals
Contract operation and maintenance equipment manuals must be provided in the following form:
• hard copies in bound or spiral binders. Any drawings supplied in the binders shall not be larger than 11” x 17” and shall be folded to fit inside the binders.
• electronic copies on CD disk (adobe PDF).
30. Roof Access
Roof access permits must be obtained in order to access any roof on a NIST campus, for work or investigation purposes. Request roof access permits from the COR or the construction representative five (5) days before roof access is required.
• Requires Fall Protection training documentation.
• May require the completion of a Health and Safety Plan if work is to be performed on the roof.
31. Security Badges
United States Department of Commerce Office of Security issues badges for contractor access to NIST.
PAGE 23 OF 294 1333ND23QNB190143
All foreign nationals shall comply with United States Department of Commerce DAO 2017-12 - http://www.osec.doc.gov/opog/dmp/daos/dao207_12.html
For US Citizens and Resident Aliens, the following badging applies
(Yellow) Limited Access PCards are issued for construction/service areas that meet the following criteria –
• Purely exterior construction with no requirement to enter Department of Commerce/NIST facilities
• Locations where work areas are partitioned and/or fully separated from occupied areas, with isolated entrances and exits for construction/maintenance contractors.
• COMPLETE Limited Access PCard badge application are approved/disapproved within 7 calendar days of submission to COR.
(Yellow) Limited Access Cards are available for contract personnel for 180 days every two years (24 months) commencing with the issuance of the Card. If a contract employee was issued a Limited Access Card and exceeds the 180 days access within 24 months, he/she would be denied a Limited Access Card until the next 24-month period.
Turnaround time for a (Yellow) Limited Access Card is 7 days from an accepted badge application.
(Green Badge) Site Card (Site Access Badge)/ Personal Identification (PIV) Card for those contract site that do not qualify for a (Yellow) Limited Access Card
• Site Cards will be issued to contract employees who will be on site for less than 30 days. These site cards maybe extended. The total “life” of this badge cannot exceed 179 days. After 179 days, the contractor has to apply for a PIV badge.
• PIV Cards or equivalent will be issued to contract employees who are expected to be on site for more than 30 days. PIV Cards maybe extended.
• A Site Card/PIV Card processing is broken into distinctive time periods once the COMPLETE badge application is submitted to the COR o Badge application is entered/processed into the “system” within 8 days of submission to COR o Contract employee is invited/emailed to complete the on-line security check application https://www.opm.gov/investigations/e-qip-application/ Contract employee must monitor his/her email for the invitation E-QIP invitation expires 14 days after it is emailed ** E-QIP invitation will be sent to the applicant within 16 days of submission to COR
PAGE 24 OF 294 1333ND23QNB190143
o Once the contract employee completes E-QIP application, Department of Commerce personnel will review the application within 8 days of EQIP being submitted. The contract employee will be notified if corrections are required.
o Once the application is accepted, the COR will notify the contractor that the individual is ready for fingerprints. A trip to Gaithersburg is needed to be fingerprinted.
o The COR will notify the contractor that employee is ready to be issued a badge at NIST.
Summarizing the Site Card/PIV Timeline (Error free badge applications)
COR submits badge application after award to contractor (NIST Action) Within 7 days Contractor submits badge application and OF306 to COR for each and all contract employees *
Within 14 days
Application is entered into the security system (NIST Action) Within 8 days Applicant is emailed E-QIP invitation (DoC/NIST Action) Within 8 days Applicant completes E-QIP prior to email link expiration ** Within 14 days E-QIP application is reviewed and approved for fingerprints at NIST (DoC/NIST Action)
Within 8 days
Applicant arranges with COR for visitor center access to obtain fingerprints Within 8 days Applicant’s fingerprints are reviewed; Applicant is approved for NIST badge (NIST Action)
Within 8 days
Applicant schedules a badge appointment and arrives for badge Within 7 days Total (Maximum) 82 days
* If contractor does not submit all badge applications at one time, the last badge application submission date will drive how long the badge process will take.
** If the applicant doesn’t complete E-QIP within the 14 days, contractor needs to notify COR to request another E-QIP invitation. Resent E-QIP invitation may take up to 4 days to be sent.
COR notifications are via a weekly report on badge status applications. In this report, it will indicate if the applicant is:
• Pending E-QIP
• Ready for Fingerprints
• Ready for Badge
(White – Paper) Visitor Paper Badge are issued to contractor employees who
PAGE 25 OF 294 1333ND23QNB190143
• Visiting NIST to complete aspects of the badging process to include badge issuance
• Delivery drivers (material, equipment, etc.)
• Concrete trucks
32. Designer Historical Requirements
The NIST Campus in its entirety has been determined eligible for and is in the process of being nominated to the National Register of Historic Places. As such, all campus projects (buildings, structures and grounds) other than routine maintenance and repair must conform to the Secretary of the Interior’s (SOI) Standards for the Treatment of Historic Properties.
Most changes to building exteriors and landscapes as well as Changes to certain building interiors and most landscape features are reviewed and approved at various stages by the NIST Architectural Design Review Board (ADRB), and, ultimately by the NIST federal preservation officer.
All designs for proposed additions and changes to facades, rooflines and building silhouettes other than in-kind repairs, must be reviewed and approved by the NIST Architectural Design Review Board (ADRB) and the Maryland Historical Trust (MHT). Project related communications with the MHT are only conducted by the NIST Federal Preservation Officer who may require technical information and graphic support from the design professional The design professional shall coordinate with the NIST COR to schedule any needed presentations to the ADRB and/or the MHT. The Design professional shall provide sufficient time in the project schedule to allow for these design reviews.
Because many of NISTs natural and landscape features have been determined to be character defining features and/or contributory resources to the NIST historic district, the design professional shall coordinate with the NIST NEPA coordinator and the FPO.
Any proposed laydown areas, staging areas and or enclosures related to proposed work need to be reviewed and approved with the NIST Site Selection panel. The design professional shall work through the NIST COR to assure review and approval of any such proposed enclosure or site usage prior to issuing construction documents.
Certain campus locations around the central core because of high traffic and high visibility may require enclosed fencing, such as painted plywood panels on structural framing. The Design Professional shall coordinate with the COR to incorporate the design specifications for such enclosure based upon recommendations from the NIST ADRB.
Building 101 Some ceiling tiles may be considered character defining features of buildings that are contributory to the NIST historic district and as such cannot be removed without first consulting
PAGE 26 OF 294 1333ND23QNB190143
the NIST Federal Preservation Officer (FPO). It is the contractor’s responsibility to verify with the FPO if concealed spline ceiling tiles are character defining
33. Temporary Exterior Power:
If the contractor requests exterior power for construction purposes, the contractor shall follow the requirements noted below. In addition, the contractor shall follow requirements identified in paragraph #6 (outages).
Contractor shall furnish the following to the COR
A) Requested tie-in point – identify the voltage, overcurrent protection, and existing equipment (switchboard, panel board, load center, etc) location
B) Provide a one-line diagram for the proposed system
a. Cable sizes
b. Overcurrent protection size(s) and type(s) (all devices)
c. Length of cabling and type of conduit
d. Transformer sizing to include ground rods and grounding electrode conductors
e. If any component is aerial, the contractor shall provide construction details on
i. Height of cables
ii. How the cables are supported
C) NIST will review the request. Within 17 days if the request is complete, COR via a NIST engineer will provide:
a. Arc flash labels which the contract shall affix to the one-line devices per NFPA 70E.
b. Date the outage is approved for the work
34. Security Plan, SP:
Contractor shall provide a security plan to the COR. If not specified in the SOW or specifications, a security plan must be submitted within 21 days of award.
Elements of a security plan must address (if applicable):
• Security of contract trailer/on-site office
• Security of the contract site to unauthorized personnel.
o For instance, physical barriers restricting access to unauthorized personnel;
construction area warning signs; locked construction access points, etc.
• Access control o Background checks for contractors and subcontractors, o Clearances (if identified in the contract documents as needed), o Alien status - https://www.e-verify.gov/employers/federal-contractors ).
PAGE 27 OF 294 1333ND23QNB190143
• Badging o Ensuring contractor employees display NIST badges while on campus o Processing badge applications to ensure contract employees submit complete and accurate badge applications, o Complying with NIST badge policy that contractors are not permitted to escort non-Green badged employees o Lost NIST badge procedures & investigation o Retrieving NIST badges from contractors who do not need to come on campus any longer
• Vehicular access o Contract employees parking in NIST marked parking spots/places o Vehicle loading and unloading.
o Limiting parking times at loading docks
• Internal security o Vehicle key control when vehicles are not in use o Securing equipment and tools to prevent theft o Securing Government equipment so it is not stolen o Control of Government keys if furnished to the contractor
• Movement of contract employees o Identify how the contractor will ensure contract employees remain on their work sites especially in occupied buildings with other Federal employees.
• Security of procurement drawings/plans (hard copy and electronic) if not posted on
Internet for bidding
• Maintaining security during HAZMAT, law enforcement, fire, or medical emergency response.
PAGE 28 OF 294 1333ND23QNB190143
35. FAR Clause 48 CFR 1352.237-71 Security Processing Requirements - Low Risk Contracts
(APR 2010)
(a) Investigative Requirements for Low Risk Contracts. All contractor (and subcontractor) personnel proposed to be employed under a Low Risk contract shall undergo security processing by the Department's Office of Security before being eligible to work on the premises of any Department of Commerce owned, leased, or controlled facility in the United States or overseas, or to obtain access to a Department of Commerce IT system. All Department of Commerce security processing pertinent to this contract will be conducted at no cost to the contractor.
(b) Investigative requirements for Non-IT Service Contracts are:
(1) Contracts more than 180 days - National Agency Check and Inquiries (NACI).
(2) Contracts less than 180 days - Special Agency Check (SAC).
(c) Investigative requirements for IT Service Contracts are:
(1) Contracts more than 180 days - National Agency Check and Inquiries (NACI).
(2) Contracts less than 180 days - National Agency Check and Inquiries (NACI).
(d) In addition to the investigations noted above, non-U.S. citizens must have a background check that includes an Immigration and Customs Enforcement agency check.
(e) Additional Requirements for Foreign Nationals (Non-U.S. Citizens). Non-U.S. citizens (lawful permanent residents) to be employed under this contract within the United States must have:
(1) Official legal status in the United States;
(2) Continuously resided in the United States for the last two years; and
(3) Obtained advance approval from the servicing Security Officer in consultation with the Office of Security headquarters.
(f) DOC Security Processing Requirements for Low Risk Non-IT Service Contracts. Processing requirements for Low Risk non-IT Service Contracts are as follows:
(1) Processing of a NACI is required for all contract employees employed in Low Risk non-IT service contracts for more than 180 days. The Contracting Officer's Representative (COR) will invite the prospective contractor into e-QIP to complete the SF-85. The contract employee must also complete fingerprinting.
PAGE 29 OF 294 1333ND23QNB190143
(2) Contract employees employed in Low Risk non-IT service contracts for less than 180 days require processing of Form OFI-86C Special Agreement Check (SAC), to be processed.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .