This is an Amended Administrative Document for RFQ 1309 issued by the State of Idaho for the procurement of corrugated metal pipe and accessories. The solicitation applies across state agencies and jurisdictions within Idaho and encompasses the supply of corrugated metal pipe products along with related accessories necessary for infrastructure applications. The proposal submission deadline is May 11, 2026, with the opportunity having been posted on April 28, 2026, providing interested vendors approximately thirteen days to prepare and submit their responses. The detailed specifications, quantities, technical requirements, site visits, and bidders' meetings have not been detailed in the available documentation.

No specific pricing terms, award value, or budget range has been disclosed in the posted opportunity information. The documentation does not specify any particular set-aside designations for disadvantaged enterprises, minority-owned businesses, women-owned businesses, or other restricted vendor categories, nor does it identify any incumbent vendors or current contractors holding existing agreements for these materials. Bidders are expected to meet standard vendor qualifications for supplying materials to state entities, which typically include proper licensing, insurance, and demonstrated experience in supplying similar products to government agencies. Interested vendors should obtain the complete solicitation documents directly from the State of Idaho's procurement office to access comprehensive specifications, evaluation criteria, terms and conditions, and any additional requirements necessary to submit a competitive bid.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDAHO TRANSPORTATION DEPARTMENT

RFQ 1309

CORRUGATED METAL PIPE

GENERAL INFORMATION

AMENDED 2

PURPOSE

The Idaho Transportation Department (ITD) is requesting quotes from qualified vendors for the purchase and delivery of corrugated metal pipe (CMP). The materials procured under this RFQ will support the construction, maintenance, and rehabilitation of roadway drainage systems and related infrastructure on the state highway network and associated right-of-way.

SOLICITATION CONTACT

Name: Caylie Hansen Email: Caylie.Hansen@itd.idaho.gov (preferred method of contact) Phone: (208)334-8088

RESTRICTIONS ON COMMUNICATIONS

From the issue date of this RFQ, until a contract/purchase order is awarded or the RFQ is cancelled, vendors and their representatives are prohibited from communications (written or verbal) regarding this RFQ with the ITD staff, other than the ITD RFQ Lead. Any communications (written or verbal) with ITD staff other than the RFQ Lead may result in the submitting vendor being found Non-Responsible and Non-Responsive.

REQUIREMENTS AND SPECIFICATIONS

See Attachment 1 – Requirements & Specifications Documentation, which demonstrates, to ITD’s satisfaction, that the items offered meet the requirements of the solicitation. Failure to provide satisfactory documentation may eliminate the Vendor from further consideration.

QUOTE

Your Quote must be submitted electronically via IPRO Powered by LUMA or email (see below for additional details). ITD will not be accepting manual submissions for this solicitation. Your Quote must include the Required Submittals listed below and be received prior to the deadline established in IPRO Powered by LUMA.

Electronic Submission:

IPRO – Enter your pricing in IPRO Supplier Portal and upload all Required Submittals.

Email:

Send an email to the Solicitation Contact (see Section 2) and attach all Required Submittals.

List of Attachments
Required Submittal Items

Attachment 1 - Requirements & Specifications Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 – Insurance Requirement Attachment 2 – Price Sheet Attachment 3 – Signature Page Product Specification or Drawing Sheet

SPECIFICATIONS

See Attachment 1, Requirements and Specifications.

QUANTITY

See Attachment 2, Price Sheet

COST

Provide your fully burdened total cost on Attachment 2, Price Sheet.

AWARD

Award may be made by the line items.to the responsible Bidder providing the lowest total cost, as provided on Attachment 2, Price Sheet.

The State reserves the right not to evaluate or make an award in the best interest of the State.

Though it is not mandatory to submit your Quotation electronically via IPRO, all vendors participating in a solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a quote outside of IPRO). It is free to establish an account and only takes a few minutes of your time.

RFQ 1309

ATTACHMENT 1 – REQUIREMENTS & SPECIFICATIONS

CORRUGATED METAL PIPE

SECTION 1 – REQUIREMENTS

1. AUTHORIZED DISTRIBUTOR/MANUFACTURER

Submitting vendors must be an authorized distributor or manufacturer of the CMP offered. An authorized distributor shall be defined as a company or organization that has a written agreement with the manufacturer to sell or service its products. Bids from Contractors who are not an authorized distributor by the manufacturer shall not be considered.

ITD reserves the right to request Authorized Distributor/Manufacturer documentation from the submitting vendors.

WARRANTY

Manufacturer standard warranty must cover the CMP for a minimum period of typically one (1) year after Acceptance. Manufacturer standard warranty must cover defects in material and workmanship under normal use, with the exception of damage from improper installation, excessive loading, abrasion, and improper maintenance.

Vendor must provide Warranty documentation at the time of delivery. The CMP will not be accepted without this information.

During the warranty period, the Contractor shall, at no additional cost to the State, promptly repair or replace any materials determined by ITD to be defective or nonconforming. Replacement materials shall meet all requirements of the original specifications and shall be delivered within thirty (30) days as approved by the Department.

Awarded vendor is responsible for all warranty requirements. No third-party warranties will be allowed.

ACCEPTANCE

Upon receipt, the CMP will be inspected by the ITD Maintenance Services Manager or designee to ensure the minimum specifications are met. Acceptance will occur within fourteen (14) calendar days after delivery. If ITD determines that the CMP is not in accordance with the specifications, ITD will provide the Contractor with a written notification. The Contractor must pick-up, correct any discrepancies, and re-deliver to ITD specified location at the Contractor's expense. The timeframe for completion of corrective action must not exceed thirty (30) calendar days.

In the event the specifications are not met, ITD reserves the right to reject the CMP via email notification.

TERMINATION AND CURE

See section 1.4. State of Idaho Contract Terms and Conditions in the Attachment Tab in IPRO Powered by Luma.

DELIVERY

Upon delivery, the CMP manufacturer shall certify in writing that the CMP, complies with all applicable regulatory, dimensional, and safety requirements. Failure to meet these requirements shall constitute grounds for rejection.

The Contractor must deliver the CMP Freight on Board (FOB) Destination pre-paid and allowed to the location below, within ninety (90) calendar days after receipt of order (ARO), or as coordinated with ITD's contact for delivery. ITD will be responsible for unloading the CMP.

Delivery must be made Monday through Thursday, 8:00 am to 3:00 pm local time excluding state of Idaho recognized holidays (https://idaho.gov/government/state-holidays/), unless otherwise approved in writing by ITD.

Delivery Location:

D1 Idaho Transportation Department Attn: District 1 Supply 600 W. Prairie Coeur d'Alene, ID 83815

INSURANCE

See Attachment 4, Insurance Requirement

INVOICING

The Contractor must submit its invoice within thirty (30) calendar days of acceptance to the billing contact identified on the Contract. Invoices submitted prior to acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission. The following information must be included with each invoice:

· ITD Purchase Order (PO) number

· Contract Name and Order Number

· Invoice Number and Date

· Contractor Contact Information

· Itemization of Property (description, quantity, unit of measure, unit price, and total price) Invoices must be submitted electronically to:

D1AP@itd.idaho.gov

SECTION 2 – SPECIFICATIONS

1. CORRUGATED METAL PIPE (CMP) MUST CONFORM TO THE FOLLOWING:

All corrugated metal pipe (CMP), coupling bands, and accessories/attachments furnished under this RFQ must conform to the latest edition of the Idaho Transportation Department (ITD) Standard Specifications for Highway Construction, Section 706.06. https://itd.idaho.gov/business/?target=construction-resources#standard-specifications-for-highway-construction, Materials must also comply with applicable standards of the American Association of State Highway and Transportation Officials, specifically AASHTO M 36 or M 196. https://www.transportation.org/ All materials must be new, unused, and free from defects in material and workmanship.

All parts must conform in design, strength, quality of materials, and workmanship to current engineering practices and accepted standards of the industry. All parts must be the manufacture's standard unless otherwise specified in this RFQ.

CORRUGATED METAL PIPE (CMP)

Pipe must meet the following minimum requirements:

Type - Type 1, round corrugated metal pipe;

Material - Galvanized steel;

Gauge - Sixteen (16) gauge;

Diameter - Twenty-four (24) inches;

Length - Twenty (20) feet per section;

Corrugation - Two and two-thirds (2 ⅔) inch by one-half (½) inch corrugations;

Design - Helical (spiral) configuration;

Seams - Lock seam or welded seam construction and;

Pipe Ends - Ends shall be reformed into annular corrugations to ensure proper engagement with coupling bands.

COUPLING BANDS

Coupling bands must meet the following requirements:

Type - Steel, wrap-around bands;

Corrugation - Two and two-thirds (2 ⅔) inch by one-half (½) inch annular corrugations;

Gauge - Sixteen (16) gauge minimum;

Finish - Galvanized to match pipe;

Hardware - Furnished complete with all three-eighths (3/8) inch nuts, bolts, and washers necessary for installation;

Gaskets - Include neoprene sleeve gaskets, minimum three-eighths (3/8) inch thickness and;

Compliance - Shall conform to ITD Standard Drawing 706-6_0305-1.

SAFETY APRONS

Safety aprons must meet the following requirements:

Designed for use with twenty-four (24) inch diameter round metal pipe;

4:01 Slope Cross Drainage Apron Shall conform to ITD Standard Drawing 608-1_0305s 608-3_0516-1and;

Materials and fabrication must meet all applicable ITD specifications.

ATTACHMENT 2 – PRICE SHEET – ATTACHED SEPARATELY

ATTACHMENT 3 – SIGNATURE PAGE – ATTACHED SEPARATELY

ATTACHMENT 4 – INSURANCE REQUIREMENTS – ATTACHED SEPARATELY