This is an Idaho Department of Labor Request for Quotation (RFQ) for full-range landscaping and snow removal services at the Pocatello local office located at 430 N. 5th Avenue, Pocatello, ID 83205. The RFQ seeks qualified and experienced firms to provide year-round grounds maintenance including mowing, edging, trimming, weed control, pest control, pruning, sprinkler system monitoring, debris control, and snow/ice removal. Quotations must be submitted via IPRO prior to 5:00 p.m. MT on Thursday, May 7, 2026, with late submissions not accepted. The contract term is one year with an anticipated total contract term of five years upon mutual written agreement for renewal, extension, or amendment. No site visit or bidders conference is mentioned in the documentation.
Award will be made to the responsive responsible bidder with the lowest fully burdened total cost as provided on Submittal Form B. Bidders must submit Submittal Form A (Background, Declarations, and Certifications), Submittal Form B (Price Sheet), Attachment 1 (Reference Sheet with a minimum of three references from similar projects within the last five years), and a copy of a Professional Pesticide Applicator license from the Idaho State Department of Agriculture. The contractor must furnish all labor, equipment, supplies, tools, materials, and OSHA-compliant personal protective equipment. Monthly invoicing is required with detailed service records submitted by email after each weekly service visit. No specific funding amount, set-asides, or incumbent contractor information is disclosed in the RFQ documentation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Idaho Request For Quote
| RFQ Title: |
| Pocatello Landscaping |
| RFQ Number: |
| 1268 |
1. Purpose: The Idaho Department of Labor (“IDOL”) is issuing this Request For Quote (“RFQ”) to solicit Quotes from qualified and experienced firms (“Bidders”), that can provide a full range of year-round landscaping and snow removal services for the Pocatello local office.
2. RFQ Lead: The individual listed below (referred to as “RFQ Lead”) is the sole point of contact for this solicitation. All questions, clarification, or other correspondence must be submitted in writing via email to the RFQ Lead. Bidders are prohibited from communicating with any State employee or Official regarding this RFQ or procurement.
| Name |
| Kevin Jarrett |
| Title & Agency |
| Purchasing Officer, Division of Purchasing |
| Phone |
| 208-332-1615 |
| Kevin.Jarrett@adm.idaho.gov |
3. Timeline: Quotes are due by 5:00 p.m. MT on: Thursday, May 7th, 2026.
Late Quotes must not be accepted or considered.
4. Required Submittals: Bidders must complete and submit the following Submittal Forms as part of their Quote:
4.1 Submittal Form A – Background, Declarations, & Certifications
4.2 Submittal Form B – Price Sheet
4.3 Attachment 1 – Reference Sheet
4.4 A copy of a Professional Pesticide Applicator license provided by the Idaho State Department of Agriculture (ISDA)
5. Basis of Award: Award will be made to the responsive responsible Bidder with the lowest Fully Burdened Total Cost, as provided on Submittal Form B. The RFQ Lead may, in the State’s sole discretion, require the Bidder to provide documentation to demonstrate its responsibility. Failure to provide the requested documentation may result in the Bidder not being considered for an award.
6. Submission Instructions The Quote must be submitted via IPRO (Click Here) prior to the deadline. Upload all required Submittal Forms (including Submittal Form A, Submittal Form B, and any other Forms listed in Section 4). Enter your Fully Burdened Total Cost in IPRO.
Table of Contents
| Exhibit 1 – Background Information |
| Page 3 |
| Exhibit 2 – General Requirements |
| Page 4 |
| Exhibit 3 – Scope of Work (SOW) |
| Page 6 |
| Submittal Form A - Background, Declarations, and Certifications |
| Page 9 |
| Submittal Form B - Price Sheet |
| Page 10 |
Attachment 1 – Reference Sheet Page 11
EXHIBIT 1
Background Information
1. Background Information The Idaho Department of Labor (IDOL) through the Division of Purchasing (DOP) is requesting quotes for a qualified lawn care provider to service the Pocatello local office, located at 430 N. 5th Avenue, Pocatello ID 83205, with a full range of year-round grounds maintenance and snow removal services, as further detailed below.
2. Current Challenges IDOL has plans to resurface the parking lot of the Pocatello local office at some point later this calendar year. While an exact date has not been set, this will have an impact on landscaping access. IDOL will notify the Contractor accordingly of plans, schedules, accessibility, etc.
EXHIBIT 2
General Requirements
1. Objectives and Expectations Landscape and grounds are to be maintained with the public’s safety in mind and in professional, presentable conditions.
2. Contract Term The term of this Contract will be for one (1) year. Upon mutual, written agreement, the Contract may be renewed, extended or amended. The anticipated total Contract term is five (5) years.
3. Contractor Responsibilities
3.1 The Contractor and all personnel must be trained in industry-standard landscaping techniques and procedures, with knowledge of local area soil and climate requirements for all grass, shrubs, and plants; proper use of chemicals and insecticides; and proper procedures for cutting, trimming, watering and cultivating shrubs and trees.
3.2 Contractor must furnish all labor, equipment, supplies, tools and materials necessary to perform the required landscaping services. The Contractor must provide all personal protective equipment (PPE) including, but not limited to, gloves, protective eye wear, masks, and any other safety gear which must be Occupational Safety and Health Administration (OSHA) compliant to perform the landscaping services required below. General landscaping services will be mowing, edging, trimming, weed control, pest control, pruning, monitor sprinkler systems, debris control, snow removal, and overall landscape care for the Pocatello local office as identified in Exhibit 3, Section 2, Scope of Work.
3.3 Contractor must immediately notify the IDOL Office Manager or designated staff of any issues or concerns with any of the facilities on the IDOL premises. Contractor must address problems including, but not limited to, damaged sprinkler heads and issues related to the sprinkler system, watering issues, pest infestation, damaged or destroyed shrubbery, any damage to the buildings, and any other facilities maintenance or repair concerns that arise. Contractor must replace or repair the property to its original condition, at the Contractor’s expense, any property damaged by the Contractor or any of the Contractors employees.
3.4 Contractor must provide detailed records of all services performed to the IDOL Office Manager or designated staff by email (service records will be provided to the Contractor by IDOL prior to Contract start date) after each weekly service. All records must be submitted in a format designated by IDOL post-award.
3.5 Contractor’s Supervisor must schedule a monthly inspection of all areas designated for landscaping, together with the IDOL Office Manager or designated staff. The purpose of the inspection is to verify the landscaping services are being performed in accordance with IDOL’s quality standards.
3.6 Contractor must maintain and keep the Safety Data Sheet (SDS) current on all chemicals (hazardous or non-hazardous substances) used at this location. A copy must be provided to the IDOL Office Manager or designated staff prior to first initial application of chemical.
3.7 All Contractor personnel must wear a “uniform” shirt while performing landscaping services at this location. The “uniform” shirt must clearly identify the individual as an employee of the Contractor.
3.8 No persons, other than the Contractor or employees of the Contractor, shall accompany the Contractor’s personnel while performing work under the Contract.
3.9 The Contractor must report any service discrepancies by email indicating why the service was not performed. This includes but is not limited to illness, injury, and equipment failure. The Contractor must also document and report any damage, site issues, or abnormalities related to the landscape and grounds upon first observation. All emails must be sent to the IDOL Office Manager within twenty-four (24) hours of the occurrence.
3.9.1 If the Contractor or their delegates, subcontractors, or otherwise become injured while on site for the work described below, notification must occur within a reasonable and practical amount of time, but no less than two (2) hours after the event.
4. Response Requirements To respond to this RFQ, the Bidder must supply with their quote the following submittal documents, which will be assessed on a pass/fail basis. Any response from a Bidder that does not include all of the required documents may cause their bid to not be considered for award.
4.1 Provide a minimum of three (3) references from companies or agencies (See Attachment 1, Reference Sheet) for whom your company has performed services that are similar in scope and size within the last five (5) years (IDOL must not be used as a reference).
4.1.1 IDOL reserves the right to call and verify each reference that is provided.
4.1.2 Vendors who do not provide at least three (3) references will not be considered for award.
4.2 The Bidder must have a Professional Pesticide Applicator license provided by the Idaho State Department of Agriculture (ISDA). A copy of the license must be submitted with the Bid and kept current throughout the contract term. If the Professional Pesticide Applicator license is renewed during the term of the contract, the Contractor must notify IDOL of the renewal and email a copy of the renewed license to the IDOL Office Manager or designee within forty-eight (48) hours. In the event of a licensed applicator change, IDOL must be notified and provided with an updated license within forty-eight (48) hours.
4.3 Submittal Form B – Price Sheet
5. Billing Contractor must invoice monthly, preferably on or before the 15th day of each month, for work performed. Any invoices submitted without the below-listed information will be rejected until a corrected invoice is submitted.
The invoice must include, but not limited to:
- Detailed form/checklist (must include at minimum: names of Contractor staff performing the work, and a description of the work performed)
- Dates of Service
- Total amount billed for the billing period
- Contractor name, address, phone number, and e-mail address
- Contract Number
- Invoice Date
Invoices must be submitted by United States Mail to:
Idaho Department of Labor Attn: Accounts Payable 317 W. Main St.
Boise, ID 83735-0610
Or sent as an Adobe PDF e-mail attachment to:
Accounts.Payable@labor.idaho.gov AND Facility.Requests@labor.idaho.gov
**Final invoices must be submitted to IDOL no later than thirty (30) calendar days after the contract expiration date.
EXHIBIT 3
Scope of Work
1. Summary of Scope
1.1 The Department seeks to secure the services of a Contractor that provides general landscaping services in addition to snow and ice removal services during the winter season.
2. Scope of Work The Contractor must perform the services below and meet the requirements as identified for each service.
2.1 Mowing
2.1.1 Grass must be cut between one and one half (1 1/2”) inches to two (2”) inches in the spring and fall and between one and one half (1 1/2") inches to two and one half (2 1/2”) inches in the summer.
2.1.2 The only exception to the height stated above is during extreme heat and little rainfall. If such conditions occur, the IDOL Office Manager or designee will notify the Contractor in writing of any changes to grass height.
2.1.3 Any bare ground areas that may become populated with grass or weeds through natural spread (i.e. not artificially planted), these areas must be cut.
2.1.4 Grass cutting must be done such that it is free of scalping, rutting, bruising, uneven and rough cutting.
2.2 Trimming
2.2.1 All grass under and around trees, shrubbery, fences, poles, walls, sprinkler heads, valves, asphalt or concrete paved areas including sidewalks, walkways, shrubs or any other permanent structure must be trimmed to match the height and appearance of the surrounding mowed grass.
2.2.2 Trimming must be done on the same day that mowing occurs. Mowing will not be considered complete until all trimming operations have been fully completed.
2.3 Fertilization
2.3.1 Fertilization must be done in accordance to the predominant grass type for that area.
2.3.2 An application rate must be selected that will prevent the grass from damage due to over fertilization.
2.3.3 Contractor must mitigate and/or repair any damage caused by over fertilization. Mitigation and/or repair must begin immediately upon identification of the damage, at no cost to the State.
2.4 Weed Control
2.4.1 Pre-emergent herbicide must be applied in accordance with all label directions to control both annual and perennial grassy and broadleaf weeds.
2.4.2 If weeds appear, control must be provided with post-emergence herbicides in accordance with all label directions.
2.4.3 The Contractor must use non-selective and/or pre-emergent herbicides as necessary for expansion joints and cracks of paved surfaces.
2.4.4 The Contractor must remove all annual grasses and weeds from expansion joints and cracks of hard surfaces once they have been sprayed and are dead.
2.4.5 Tree collars, flowering beds, and any additional bed areas must be maintained in weed free condition using herbicides and hand labor.
2.4.6 Where commercial herbicides may cause damage to sensitive plants including seasonal color, bulbs, ground covers, the Contractor must pull weeds by hand to minimize plant loss or damage.
2.5 Pruning (less than 15 ft. in height)
2.5.1 The Contractor must prune deciduous trees and shrubs during their dormant season to promote open framework in the crown and to remove suckers, dead branches and leaves.
2.5.2 Pruning must be performed in the appropriate season for each plant species to ensure that blooms are not removed or damaged.
2.5.3 Every effort must be made to maintain the natural growth form for each plant species during all pruning and maintenance activities.
2.5.4 New growth must be pruned to maintain the overall size and shape of each plant as needed during the growing season.
2.6 Sprinkler System Startup and Blow Out
2.6.1 The Contractor must perform spring sprinkler system startups and fall blow outs to prevent frozen water lines and to support the health and longevity of the natural vegetation.
2.6.2 Sprinkler system startups must be performed in the Spring once consistent freezing temperatures of thirty-two (32 F) degrees Fahrenheit have concluded.
2.6.3 Sprinkler system blow outs must be accomplished in the Fall prior to freezing temperatures of thirty-two (32 F) degrees Fahrenheit becoming consistent. All damage to the sprinkler system caused by the Contractor not performing the Fall blow out must be repaired or replaced at the Contractor’s expense.
2.6.4 Exact dates for sprinkler system start-ups and blowouts will be mutually agreed upon between Contractor and IDOL.
2.7 Monitoring Sprinkler System
2.7.1 Sprinkler systems supporting natural vegetation must be monitored regularly for appropriate water application for the specific time of year.
2.7.2 If the Contractor determines that an adjustment of the sprinkler system is necessary such as increasing the duration of water application, the Contractor must notify the IDOL Office Manager or designee of the recommended modifications. Any adjustments must be approved, in writing, by the IDOL Office Manager or designee prior to implementing any changes.
2.8 Pest Control
2.8.1 The Contractor must apply approved pest control chemicals, as necessary, to evergreen trees, deciduous trees and shrubs in leaf, groundcovers, and perennials. All applications must be performed only as directed by the IDOL Office Manager or designee and must comply with all federal, state, and local regulations, including ISDA and EPA requirements.
2.8.2 All pest control chemicals used must be applied by, or applied under the direct supervision of, the on-site Certified Pesticide Applicator.
2.9 Debris Control
2.9.1 Debris generated from any landscaping service, including pruning, trimming, mowing, or similar activities, must be collected and removed from the site on the same day the work is performed.
2.9.2 All natural vegetation debris, including leaves, branches, grass clippings, trimmings, etc. must be removed from the maintained areas, including, but not limited to: sidewalks, parking areas, and any paved areas surrounding the location.
2.9.3 All inorganic debris including plastic, glass, metal, paper, loose rocks, etc. must be removed from the site during each service visit. This includes, but not limited to: sidewalks, parking areas, and any paved areas, as well as all other maintained areas.
2.9.4 All materials, trash, and debris generated from the landscaping services must be collected and discarded off-site at a proper solid waste or compost disposal facility meeting all applicable federal, state, and local requirements. The Contractor is responsible for all disposal costs and may not leave debris on-site overnight.
2.10 Snow and/or Ice Removal
2.10.1 Snow and/or ice must be removed using an ice melt product when accumulation on sidewalks and entrances reaches one half (½”) inch and parking lots and driveways reach one (1”) inch. Ice melt must be applied as needed to ensure safe pedestrian and vehicle access.
2.10.1.1 It is the Contractor’s preference to determine what kind of ice melt product, including liquid or granular, they will utilize.
2.10.2 Snow and/or ice removal must be performed when accumulation meets the thresholds in Section 2.10.1, snow and/or ice removal must be completed on weekdays prior to 8:00 a.m., with additional clearing performed as conditions require or requested by the IDOL Office Manager or designee.
2.10.3 Priority must first be given to keeping accessible spaces, ingress, egress, and fire lanes clear of snow and/or ice; second to customer and employee parking areas; and third to overflow parking areas.
2.10.4 Snow and/or ice must be moved to areas designated by the IDOL Office Manager or designee and may not be piled in locations that obstruct drainage, fire hydrants, signage, or visibility.
2.10.5 Snow and/or ice removal must be performed on sidewalks and parking lots at the Pocatello local office on the weekends and on State recognized holidays (State Holidays - Idaho Secretary of State) when accumulation reaches two (2”) inches.
2.10.6 Contractor response time must not exceed two (2) hours, defined as arrival on site, from the time the IDOL Office Manager or designee contacts the Contractor Supervisor.
2.10.7 Any snow and ice melt chemicals which were allowed to get into contact with vegetation and cause any chemical ‘burns’ must be repaired or replaced during the growing season at no cost to IDOL.
2.10.8 If the Contractor is unable to complete snow or deicing operations as scheduled, the Contractor must notify the IDOL Office Manager or designee immediately, and no later than two (2) hours after the scheduled start time, the Contractor must provide the reason and an updated estimated time of anticipated completion.
2.10.9 If the Contractor identifies that they cannot arrive and begin snow removal within the two (2) hour period or an earlier requested timeframe, and IDOL determines that its snow removal services are emergent, IDOL reserves the right to obtain snow removal services outside of this contract. (Determination of emergent needs is in the sole discretion of the IDOL).
SUBMITTAL FORM A
Background, Declarations, & Certifications
All information requested in this Submittal Form is Mandatory.
Failure to complete or respond to each question, failure to sign this Form, and failure to submit this Form may result in your Quote not being accepted.
PROJECT INFORMATION
| RFQ Number: |
| 1268 |
| Project Name: |
| Pocatello Landscaping |
BIDDER INFORMATION
Company Name:
Company Address:
Tax Identification Number (EIN):
DUNS Number:
| Legal Status: |
| ☐ Corporation |
☐ Limited Liability Corporation (LLC) ☐ Limited Liability Partnership ☐ Sole Proprietorship ☐ Other (specify)
CONTACT INFORMATION
Individual responsible for preparing this Proposal, and who can be contacted for clarification on this Proposal
Contact Name:
Title:
Email:
Telephone:
ATTESTATION AND SIGNATURE
This Submittal must be dated and signed by an officer or agent (“Representative”) duly authorized to execute contracts for the Bidder. By my signature I accept the terms, conditions and requirements contained in the solicitation, including, but not limited to, the State of Idaho Standard Contract Terms and Conditions, and the solicitation instructions in effect at the time this RFQ was issued, as incorporated by reference into this solicitation; as well as any special terms and conditions incorporated in the solicitation documents. As the undersigned, I certify I am authorized to sign and submit this response for the named Bidder. I further acknowledge I am responsible for reviewing and acknowledging any addendums that have been issued for this solicitation.
Printed Name of Representative
Signature
Date
SUBMITTAL FORM B
Price Sheet
Submittal Form B is an Excel document located in the Questions section of the event in IPRO.
ATTACHMENT 1
Reference Sheet
Reference #1
Project Length (EX: April 2024- Oct 2025)
Contact Information:
Name:
Telephone:
Email:
Postal Address:
Reference #2
Project Length (EX: April 2024- Oct 2025)
Contact Information
Name:
Telephone:
Email:
Postal Address:
Reference #3
Project Length (EX: April 2024- Oct 2025)
Contact Information
Name:
Telephone:
Email:
Postal Address: