RFQ # 1267 - Attachment 1 - Admin. Info - Perforated Plate.pdf

PDF 248 KB Posted

Attached to
Perforated Stainless Steel Plate (v2)
Solicitation number
1267
Issued by
Idaho

About this file

This is an administrative information and requirements document for Request for Quote (RFQ) #1267 issued by the Idaho Department of Fish & Game (IDFG) for the purchase and delivery of perforated stainless-steel plate. The RFQ solicits quotes from qualified vendors for new, cold-rolled 18-gauge 304 stainless-steel coils with specific perforation characteristics (3/32" diameter holes on 9/64" staggered centers). The coils must measure 100 to 200 lineal feet in length, be mounted on half-inch cardboard spools with an inside diameter between 20 and 24 inches, and comply with Build America, Buy America Act (BABAA) requirements. Delivery must occur by June 30, 2026, to the IDFG Anadromous Screen Shop in Salmon, Idaho, with delivery restricted to Monday through Thursday, 8:00 a.m. to 4:00 p.m. local time, excluding state holidays. The solicitation contact is Eric Wagner (Eric.wagner@idfg.idaho.gov, 208-287-2815), with submissions required electronically via the IPRO Supplier Portal or email prior to the stated deadline.

Pricing shall be fully burdened and include freight costs on a freight prepaid, FOB destination basis, with award made to the responsive, responsible vendor with the lowest total cost. Required submittals include a completed price sheet, signature page, proof of current insurance, BABAA Contractor Self-Certification, and product brochures or specifications sheets. Vendors must possess a current, signed written agreement with the manufacturer confirming authorized dealer or re-seller status. The metal will be inspected upon delivery with a 30-calendar-day acceptance period; any discrepancies must be corrected and re-delivered within 30 calendar days at no additional cost to IDFG. Contractor warranty must cover all tools, parts, equipment, labor, and freight for repairs or replacement, with warranty work completed within 30 calendar days of written notice. No set-asides are identified in this solicitation. Either party may terminate the contract for convenience with 90 calendar days' written notice, and the State reserves termination rights for cause and fiscal necessity under standard Idaho contract terms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ # 1267 Perforated Stainless Steel Plate (v2) Page 1 of 5

IDAHO DEPARTMENT OF FISH & GAME

ATTACHMENT 1 – SECTION 1

RFQ Title: Perforated Stainless Steel Plate (v2)

RFQ Number: RFQ # 1267

RFQ Solicitation Contact: Eric Wagner Eric.wagner@idfg.idaho.gov 208-287-2815

Submit Electronically via IPRO: Supplier Portal / Supplier Portal (inforgov.com)

Deadline to Receive Questions: See IPRO

RFQ Closing Date: See IPRO

Award: Award will be made, all or none, to the responsive responsible vendor with the lowest Total Cost.

A. Purpose The Idaho Department of Fish & Game (IDFG) is requesting Quotes from qualified vendors for the purchase and delivery of perforated stainless-steel plate (Metal) as further detailed below.

B. General Information & Solicitation Instructions This Solicitation is issued by IDFG via IPRO - Supplier Portal / Supplier Portal (inforgov.com) The RFQ Lead is the only contact for this Solicitation. All correspondence regarding this RFQ must be in writing. In the event that it becomes necessary to revise any part of this RFQ, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this RFQ will not be relied upon. All changes to this RFQ must be in writing and posted in IPRO to be valid. Alternate Bids are not allowed.

C. Submission Requirements Your response to this RFQ may be submitted electronically via IPRO or email. IDFG will not be accepting manual submissions for this solicitation. Your submission must include the Required Submittals listed below and be received prior to the deadline noted below.

Failure to provide any of the documents or submission on a form different from those provided, may cause your submission to be found as non-responsive.

Electronic Submission:

IPRO – Enter your pricing in IPRO- Supplier Portal / Supplier Portal (inforgov.com)` . and upload all Required Submittals.

When a Bidder has successfully submitted a response to IPRO, the Bidder should see a change in the system from “Draft Bid” (see Fig. 1) to “Submission confirmation email sent” (see Fig. 2). Bidders are encouraged to document notification of successful submission for their records. If you believe you have submitted your Bid, but have not received the “Bid Submitted” message, you are advised to contact the IPRO provider’s help desk (phone number available at https://purchasing.idaho.gov/ipro.html) and notify the solicitation lead prior to the solicitation End Time. Vendors are strongly encouraged to begin the process of submitting the response far enough in advance of the End Time to allow for resolution of technical difficulties. Be advised that the State is not responsible for a Vendor’s failure to timely submit a responsive submission due to any technical or technological difficulties. See

IDAPA 38.05.01.61.02.

mailto:Eric.wagner@idfg.idaho.gov https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA https://purchasing.idaho.gov/ipro.html

RFQ # 1267 Perforated Stainless Steel Plate (v2) Page 2 of 5

Fig. 1

Fig. 2

If submitting via IPRO, be advised that that the Offeror for Proposal evaluation and award purposes is the entity profile under which the Proposal is submitted in IPRO, which must be the same legal entity presented in the uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Proposal in IPRO, the information provided on the Signature Page prevails.

While it is not mandatory to submit your Proposal electronically via IPRO, all Offerors participating in a Solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a Proposal manually outside of IPRO) as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free and only takes a few minutes.

Offerors are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows evaluators to efficiently navigate the Offeror’s response; as the State will print uploaded documents for evaluation in the manner received via IPRO

Optional - Email:

Send an email to the Solicitation Contact (listed above) and attach all Required Submittals.

D. Required Submittals As part of your response to this RFQ, the following documents are required.

Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 – Insurance Requirements BABAA Contractor Self Certification Brochures and/or specifications sheet detailing the metal being submitted for this solicitation.

E. Award Award may be all to one or by line item (if applicable) to the responsive responsible Bidder with the lowest fully burdened cost per metal in the best interest of the State, as provided in Attachment 2 in IPRO.

F. Resulting Contract If IDFG awards a contract from this Solicitation, it will do so by issuing a Purchase Order (PO) document, which will be an acceptance of the successful bid. The PO will be comprised of the following documents; this RFQ, including any incorporated documents; the successful bid, including any clarifications requested by IDFG; and an artifact formalizing any requirements agreed upon through Contract discussions or negotiations, if applicable.

The following documents are incorporated into this RFQ as if set out in their entirety:

Solicitation Instructions for Vendors – January 2017 State of Idaho Standard Contract Terms and Conditions – July 2024

RFQ # 1267 Perforated Stainless Steel Plate (v2) Page 3 of 5

The documents may be found on the “Information for Vendors” page of the State’s Division of Purchasing (DOP) website ( https://purchasing.idaho.gov/governing-laws-and-policies/ ). If multiple versions of any of these documents are available on the website, the version in effect on the day the RFQ is issued shall apply.

ATTACHMENT 1 – SECTION 2

The following special terms and conditions are incorporated into the resulting Contract to supplement or add to the State of Idaho Standard Contract Terms and Conditions.

A. Delivery Contractor must provide an estimated delivery date on Attachment 2 – Price Sheet. The Contractor is responsible for the unloading of the metal. Freight FOB destination, prepaid and allowed.

The Metal must be delivered by June 30th, 2026.

Delivery must be made Monday through Thursday, 8:00 am to 4:00 pm local time excluding state of Idaho recognized holidays (https://www.idaho.gov/government/holidays.html), unless otherwise approved in writing by IDFG. Contractor must notify IDFG, in writing, no less than seven (7) business days prior to delivery. IDFG delivery contact information will be provided upon Award.

Delivery Location Idaho Department of Fish and Game Anadromous Screen Shop 97 Highway 93 North Salmon, Idaho 83467

B. Acceptance Upon receipt of the metal, per the delivery location, the metal will be inspected by the delivery contact (or approved designee) to ensure the requirements and specifications are met. The Acceptance period will be for thirty (30) calendar days from the date the metal is delivered.

In the event the specifications are not met, the Contractor must pick-up, correct any discrepancies, and re-deliver within thirty (30) calendar days after notification from IDFG, at no additional cost to IDFG. In the event that the metal does not meet the specifications or is found with discrepancies that are not fixed by the Contractor during the Acceptance period, IDFG reserves the right to reject the metal via official notification.

If approved by IDFG, the Contractor may correct discrepancies on-site at IDFG’s location in lieu of pick-up and return shipping. The Contractor will be responsible for providing all labor; tools, parts, supplies, and worksite clean up to make any necessary corrections.

The timeframe for corrective action will still be as identified above.

C. Invoicing & Payments Invoices – Invoices must be submitted as further detailed below. Invoices submitted prior to Acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission.

Invoices must include the following information:

• Contractor Company Name & Contact Information

• Contract Name & Number (PO #)

• Invoice Number & Date

• Itemization of the purchased goods to include: description matching the contract, quantity, unit of measure, unit price, extended price, and total invoiced amount.

Payments – Payment for correctly submitted invoices will be made in accordance with Idaho Code 67-2302:

https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/ https://purchasing.idaho.gov/governing-laws-and-policies/ https://www.idaho.gov/government/holidays.html https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/

RFQ # 1267 Perforated Stainless Steel Plate (v2) Page 4 of 5

D. Warranty Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warranted item, which may also include the entire order of metal. All warranty work must be completed within thirty (30) calendars days after receipt of written notice from IDFG. If approved by IDFG, the Contractor may perform warranty work on-site, at the Delivery location, in lieu of pick-up and return shipping. The Contractor will be responsible for all travel costs and work-site clean-up associated with any necessary repairs. The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the metal on-site within thirty (30) calendars days, or if the metal continuously malfunctions and causes it to be out of service on multiple occasions, IDFG reserves the right to require the Contractor to pick-up, repair, and return the metal at no additional cost to IDFG.

Contractor is responsible for all warranty requirements. No third-party warranties will be allowed.

E. Vendor Requirement Vendor must have a current and signed written agreement with the manufacturer stating that the vendor is an authorized dealer or authorized re-seller for the product(s) being quoted in this solicitation.

F. Build America, Buy America The Build America, Buy America Act (BABAA) requires that IDFG award recipients and subrecipients subject to BABAA comply with the following domestic preference requirements in their infrastructure projects:

1. All iron and steel items used in the project must be produced in the United States. This means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.

2. All manufactured products used in projects must be produced in the United States. For a manufactured product to be considered produced in the United States, the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States must be greater than 55% of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation.

3. All construction materials used in projects must be manufactured in the United States. This means all manufacturing processes for the construction material occurred in the United States.

BABAA Contract Level Compliance: Buy America Preference in Federal Financial Assistance Programs for Infrastructure, all recipient and subrecipient contracts under Federal financial assistance awards for infrastructure, issued on or after Jan. 2, 2023, must include a contract provision explaining the BABAA requirements and a self-certification where contractors can certify compliance with domestic preference requirements outlined in BABAA, unless IDFG waives the BABAA requirement.

G. Remedial Action In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to IDFG, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) terminate the Contract pursuant to Section 2.F, Termination of Contract, in addition to any remedies imposed by the State.

If IDFG must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, IDFG may withhold the actual cost to IDFG from the Contractor’s payment(s).

H. Termination of Contract For Cause - See Section 1.4, Termination, of the State of Idaho Standard Contract Terms and Conditions – July 2024.

For Fiscal Necessity – See Section 1.18, Termination for Fiscal Necessity, of the State of Idaho Standard Contract Terms and Conditions – July 2024.

For Convenience – Either party may terminate this Contract for its convenience at any time upon providing its written notification at least ninety (90) calendar days prior to the desired termination date.

RFQ # 1267 Perforated Stainless Steel Plate (v2) Page 5 of 5

ATTACHMENT 1 – SECTION 3

A. Requirements The metal must meet the minimum specifications provided below and must be the latest model produced and sold to commercial trade. The metal must be new, not used. Though they are not specifically covered herein, all parts necessary to provide a complete and functional metal must be included. All parts must conform in design, strength, quality of materials, and workmanship to meet or exceed current engineering practices and accepted standards of the industry. All parts must be the manufacturer’s standard unless otherwise specified in this RFQ.

B. Brand Name The brand name(s) specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Contractor offering an “equal” must include documentation, which demonstrates, to IDFG’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, IDFG reserves the right to seek clarification from the Contractor. Failure to provide satisfactory documentation or a clarifying response to IDFG may eliminate the Contractor from further consideration.

C. Perforated Stainless Steel Plate– General Specifications The following Specifications are the minimum that IDFG is willing to accept.

1. Metal must be Build American, Buy American (BABA) Act certified. (Pub. L. No. 117-58, §§ 70901-52 and OMB M-22-11)

2. Metal must be manufactured from cold rolled eighteen (18) gauge 304 stainless steel. 1.26 millimeters or .0495 inches.

3. The hole diameter must be 3/32” on 9/64” staggered centers. AKA .094 round on .140 staggered 18 gauge (.045/.051).

4. Edge margin must be ½” (0.5”) along the full length of the material on both sides.

5. Metal must be rolled into coils with the smooth side to the outside of the roll.

6. Coil rolls are to be one hundred (100) lineal feet (LF) to two hundred (200) lineal feet (LF) long and continuous.

7. Coil rolls must be shipped on a pallet that is larger than the finished coil to prevent shipping damage.

8. Coil rolls must be shipped with the open end vertical (eye to the sky).

9. Inside diameter of finished coil must be between twenty (20”) and twenty-four (24”) inches.

10. Coils must be mounted on a half inch (1/2”) thick cardboard spool.

11. Metal should be clean and free of oil residue. Degreasing is preferred when possible.

12. Metal must be manufactured to conform to the Industrial Perforators Association for Superior Quality in widths, openings, camber, and squareness.

13. Full quantity must be delivered by June 30th, 2026.

14. Delivery to Salmon, Idaho must be included in the fully burdened cost on the Price Page – Attachment 2.

C. Submission Requirements

File details come from the government source that posted it. Updated .