Summary of RFQ # 1249 - Vegetation Management - Weed Control

This Requests for Quote (RFQ) document is issued by the Idaho Department of Fish & Game for ground herbicide spraying services to support chemical weed control on a large aquatic habitat restoration project located on a private ranch near Baker, Idaho, within Ada County. The project requires biannual herbicide application services to be performed between April 1 and October 31 each year. The RFQ was released on March 10, 2026, with quotes due by March 24, 2026, providing interested vendors with a two-week submission window. The services are expected to be performed on a recurring seasonal basis with no specific contract term or renewal options detailed in the available documentation.

No specific pricing terms, budget ranges, or contract award amounts are identified in the solicitation materials. No set-asides for disadvantaged enterprises, women-owned small businesses, or other designated categories have been established for this procurement. No incumbent vendor information or existing contractor references are noted. Qualified vendors must demonstrate expertise in herbicide application, maintain proper licensing for pesticide application, and possess experience with large-scale habitat restoration projects. Vendors should consult the complete solicitation documents for detailed specifications regarding evaluation criteria, insurance requirements, performance standards, and other technical and administrative requirements applicable to this opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ # 1249 VEGETATION MANAGEMENT – WEED CONTROL Page 1 of 9

IDAHO DEPARTMENT OF FISH & GAME

RFQ # 1249 – VEGETATION MANAGEMENT – WEED CONTROL

ATTACHMENT 1 – SECTION 1

RFQ Title: Vegetation Management – Weed Control

RFQ Solicitation Contact: Eric Wagner – Purchasing Agent Eric.wagner@idfg.idaho.gov

(208) 287-2815

Submit Electronically via IPRO: Supplier Portal / Supplier Portal (inforgov.com)

Deadline to Receive Questions: See IPRO

RFQ Closing Date: See IPRO

Term: Initial three (3) year Term. Upon mutual, written agreement, the Contract may be renewed or extended. Total Contract not to exceed five (5) years.

A. Purpose The Idaho Department of Fish & Game (IDFG) is requesting Quotes from qualified Vendors for ground herbicide spraying for chemical weed control (Services) on a large aquatic habitat restoration project located on a private ranch, near Baker, Idaho, as further detailed below. Services will be performed on a biannual basis from April 1 to October 31.

B. General Information & Solicitation Instructions This Solicitation is issued by IDFG via IPRO: Supplier Portal / Supplier Portal (inforgov.com) . The RFQ Lead is the only contact for this Solicitation. All correspondence regarding this RFQ must be in writing. In the event that it becomes necessary to revise any part of this RFQ, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this RFQ will not be relied upon. All changes to this RFQ must be in writing and posted in IPRO to be valid. Alternate Bids are not allowed.

C. Submission Requirements Your response to this RFQ may be submitted electronically via IPRO or email (see below for additional details). IDFG will not be accepting manual submissions for this solicitation. Your submission must include the Required Submittals listed below and be received prior to the deadline established in IPRO. Failure to provide any of the documents or submission on a form different from those provided, may cause your submission to be found as non-responsive.

Electronic Submission:

IPRO – Enter your pricing in IPRO Supplier Portal / Supplier Portal (inforgov.com) and upload all Required Submittals.

When a Bidder has successfully submitted a response to IPRO, the Bidder should see a change in the system from “Draft Bid” (see Fig. 1) to “Submission confirmation email sent” (see Fig. 2). Bidders are encouraged to document notification of successful submission for their records. If you believe you have submitted your Bid, but have not received the “Bid Submitted” message, you are advised to contact the IPRO provider’s help desk (phone number available at https://purchasing.idaho.gov/ipro.html) and notify the solicitation lead prior to the solicitation End Time. Vendors are strongly encouraged to begin the process of submitting the response far enough in advance of the End Time to allow for resolution of technical difficulties. Be advised that the State is not responsible for a Vendor’s failure to timely submit a responsive submission due to any technical or technological difficulties. See

IDAPA 38.05.01.61.02.

mailto:Eric.wagner@idfg.idaho.gov https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA https://purchasing.idaho.gov/ipro.html

RFQ # 1249 VEGETATION MANAGEMENT – WEED CONTROL Page 2 of 9

Fig. 1

Fig. 2

If submitting via IPRO, be advised that that the Offeror for Proposal evaluation and award purposes is the entity profile under which the Proposal is submitted in IPRO, which must be the same legal entity presented in the uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Proposal in IPRO, the information provided on the Signature Page prevails.

While it is not mandatory to submit your Proposal electronically via IPRO, all Offerors participating in a Solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a Proposal manually outside of IPRO) as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free and only takes a few minutes.

Offerors are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows evaluators to efficiently navigate the Offeror’s response; as the State will print uploaded documents for evaluation in the manner received via IPRO

Email:

Send an email to the Solicitation Contact (listed above) and attach all Required Submittals.

D. Required Submittals As part of your response to this RFQ, you must provide the following information about your company. Please utilize Attachment 6 – Contractor Company Information.

Business Information:

• Provide a summary of your company explaining the size of your company, services provided, number of clients supported, list other government agencies supported.

• How many years has your company been in business performing similar services?

• Describe your company’s compliance and performance history for similar services.

• Provide reference information from three (3) clients other than IDFG (company name, contact name, contact phone number, contact email address) to support compliance history.

Staffing:

• Describe personnel stability and experience for those who will be working on this contract: i.e. how long they’ve been working for the company and job experience performing the scope of this RFQ.

• Provide proof of licenses and certifications for those who will be working on this Contract.

Idaho Professional Pesticide Applicator License

• Copy of valid license

Additional required submittals:

Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 – Insurance

RFQ # 1249 VEGETATION MANAGEMENT – WEED CONTROL Page 3 of 9

E. Award Award will be made, all or none, to the responsive, responsible bidder whose combined technical experience to support the requirements of the Contract, and lowest Total Cost, as determined to be in the best interest by IDFG.

F. Resulting Contract If IDFG awards a contract from this Solicitation, it will do so by issuing a Contract document from the State’s eProcurement system (IPRO), which will be an acceptance of the successful bid. The CPO will be comprised of the following documents; this RFQ, including any incorporated documents; the successful bid, including any clarifications requested by IDFG; and an artifact formalizing any requirements agreed upon through Contract discussions or negotiations, if applicable.

The following documents are incorporated into this RFQ as if set out in their entirety, whether or not they are attached in IPRO:

Solicitation Instructions for Vendors – State of Idaho Standard Contract Terms and Conditions – July 2024

If not attached in IPRO, the documents may be found on the “Information for Vendors” page of the State’s Division of Purchasing (DOP) (https://purchasing.idaho.gov/governing-laws-and-policies/ ). If multiple versions of any of these documents are available on the website, the version in effect on the day the RFQ is issued shall apply.

G. Records Maintenance Contractor must maintain or supervise the maintenance of all records necessary to properly account for all payments made to the Contractor pursuant to the Contract. These records must be retained by the Contractor for a period of no less than three (3) years after the Contract terminates, or until all audits initiated within the three (3) years have been completed, whichever is later.

H. Audit Rights Contractor agrees to allow State and Federal auditors and State purchasing staff access to all records relating to this Contract, for audit, inspections, and monitoring of services or performance. Such access will be during normal business hours or by appointment.

ATTACHMENT 1 – SECTION 2

The following special terms and conditions are incorporated into the resulting Contract to supplement or add to the State of Idaho Standard Contract Terms and Conditions.

A. Key Personnel The Contract Management Team (CMT) will consist of IDFG business personnel who are responsible for activities such as monitoring performance, documenting acceptance, documenting non-compliance, reviewing and approving invoices, requesting and approving minor changes (as defined within). The CMT will be the Contractor’s main contact for all day-to-day activities.

The Contract Administration Team (CAT) will consist of IDFG procurement personnel who are responsible for activities such as executing amendments to the Contract, renewing or extending the Contract, handing the formal dispute resolution process (including cure notices), assessing any remedies, and closing out/terminating the Contract.

The Contractor must designate a principal point of contact to serve as the Contractor’s Contract Manager. The Contractor’s Contract Manager will be responsible for overseeing the activities performed on the Contract, coordinating activities with the CMT, responding to notifications from the CMT and the CAT as appropriate.

All contact information will be provided and documented during the Contract Kickoff Meeting. Any changes to key personnel contact information must be updated per Section 2.E, Changes & Amendments.

https://purchasing.idaho.gov/governing-laws-and-policies/

RFQ # 1249 VEGETATION MANAGEMENT – WEED CONTROL Page 4 of 9

B. Contract Meetings Contract Kickoff Meeting - The Contractor must attend a Contract Kickoff Meeting in person, prior to performing any work specified.

This meeting will be used to introduce key personnel, review the Contract, review and approve schedule, and to address any questions or concerns. The meeting must take place within thirty (30) business days after Award of the Contract.

Compliance Review Meeting - IDFG may require the Contractor’s Contract Manager to attend Compliance Review Meetings. These meetings are typically held when the Contractor continues to fail to meet the requirements of the Contract. This is a way for IDFG and the Contractor to meet in person or over the phone (at IDFG’s discretion) to discuss discrepancies together in a constructive environment. The Contractor’s attendance is mandatory when required by IDFG and are at no additional cost to IDFG.

C. Acceptance See Section 2.2, Acceptance, of the State of Idaho Standard Contract Terms and Conditions.

D. Invoices & Payments Invoices – Invoices must be submitted as further detailed below. Invoices submitted prior to Acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission.

Invoices must be submitted as follows:

• One (1) invoice submitted after each application.

Invoices must include the following information:

• Contractor Company & Contact Information

• Contract Name & Number

• Invoice Number & Date

• Itemization of the service provided to include: description matching the contract, quantity, unit of measure, unit price, extended price, and total invoice amount.

Invoices must be submitted to:

Matt Belnap Fish Habitat Program Coordinator Idaho Department of Fish and Game 600 S. Walnut Street Boise, Idaho 83712 matt.belnap@idfg.idaho.gov

Payments - Payments for correctly submitted invoices will be made in accordance with Idaho Code 67-2302:

(https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/)

Payments will only be made on work that meets or exceeds the specifications in this contract. Deficient work will be deducted from the amount received on a percentage basis. The number of deficient sites will be calculated as a percentage of the total number of sites treated and this percentage will be subtracted from the final payment. No invoices will be approved for payment without all required reports submitted.

The Contractor could receive payment up to two months after an invoice has been submitted and approved by the Project Manager.

E. Changes & Amendments Either party may, at any time by a written request, request changes to the Contract. The party requesting the change must complete Attachment 7 - Change Request Form addressing all details for the change. The party receiving the Change Request Form must confirm receipt and provide feedback regarding any desired changes to the request.

Minor Changes - If the Change Request consists solely of plan, timeline, schedule, or key personnel changes; or changes which otherwise act to clarify the roles and responsibilities or modify the activities within the scope of the Contract, without an impact on cost, will be considered a Minor Change and the CMT is authorized to negotiate and execute the Change Request Form with the Contractor. Change requests for Minor Changes will be made effective by mutual written agreement of the Contractor and IDFG.

Other Changes - Any proposed changes to the Contract that are not considered to be Minor Changes must be agreed to in writing by the Contractor and the CAT. Such changes shall be formalized through an Amendment to the Contract.

https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/

RFQ # 1249 VEGETATION MANAGEMENT – WEED CONTROL Page 5 of 9

Material Changes – The CAT may determine, in its sole discretion, that material changes are prohibited by the State Procurement Act. Prohibited material changes shall be refused by the State.

Changes not executed in compliance with this section may be void pursuant to Idaho Code 67-9213, and may cause the entire Contract to be void.

F. Remedial Action In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to IDFG, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) terminate the Contract pursuant to Section 2.G, Termination of Contract, in addition to any remedies imposed by the State.

If IDFG must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, IDFG may withhold the actual cost to IDFG from the Contractor’s payment(s).

G. Termination of Contract For Cause - See Section 1.4, Termination, of the State of Idaho Standard Contract Terms and Conditions.

For Fiscal Necessity – See Section 1.18, Termination for Fiscal Necessity, of the State of Idaho Standard Contract Terms and Conditions.

For Sufficient Appropriation - It is understood and agreed that IDFG is a governmental agency, and the CONTRACT shall in no way be construed so as to bind or obligate the State of Idaho beyond the particular appropriation of funds by the State Legislature as may exist from time to time. IDFG reserves the right to terminate this Agreement if, in its sole judgment, the legislature of the State of Idaho fails, neglects or refuses to appropriate sufficient funds as may be required for IDFG to continue payments or requires any return or “give-back” of funds required for IDFG to continue payments, or if the executive branch of the State of Idaho mandates any cuts or holdback in IDFG’s spending. Any such termination shall take effect on ten (10) days prior notice and be otherwise effective as provided in the CONTRACT, For Convenience – Either party may terminate this Contract for its convenience at any time upon providing its written notification at least ninety (90) calendar days prior to the desired termination date.

H. Contract Closeout Upon completion of the Contract, either expiration or termination, the CAT will initiate its closeout procedures to ensure all obligations have been fulfilled, all disputes are resolved, and all payments have been completed.

Two (2) letters will be provided to the Contractor:

1) Initial Closure Letter – provided prior to expiration to serve as a reminder that the Contract is approaching its completion.

2) Final Closure Letter – provided after the expiration to confirm that all obligations have been met, disputes are resolved, all payments made, and the Contract is officially closed.

I. Price Adjustments All prices must be fully burdened and firm for one (1) year from the effective date of the Contract. A Price Adjustment may be considered on an annual basis thereafter. If a Price Adjustment is requested, the Contractor must notify IDFG in writing, thirty (30) calendar days prior to the anniversary date of the Contract. IDFG reserves the right to approve or deny the request.

RFQ # 1249 VEGETATION MANAGEMENT – WEED CONTROL Page 6 of 9

ATTACHMENT 1 – SECTION 3

A. General

1. The application location is a private ranch with an extensive aquatic habitat restoration project in progress, located near

Baker, Idaho. See Appendix A – map.

2. The area to be treated is approximately one hundred-eighty (180) acres total, though the actual area to be treated each year will vary depending on the progress of an ongoing active construction project. Bids for this work should assume that the total project area will be treated twice each year, though the exact treatment area will be coordinated with IDFG prior to each biannual application. Targeted treatments within that area are expected rather than total coverage by herbicides.

3. Qualified Contractors will hold a current Idaho Professional Pesticide Applicator License and will maintain a current license for the duration of the contract. The Contractor must also follow ISDA rules and regulations for the supervision of employees that don’t have an Idaho Applicator License. Treatment procedures and methods must follow guidance and recommendations in Bonneville Power Administration’s Habitat Improvement Programmatic Handbook https://www.bpa.gov/-/media/Aep/environmental-initiatives/habitat-improvement-program/habitat-improvement-program-handbook.pdf

4. The nature of the site requires that the licensed weed applicator follow Bonneville Power Administration’s Habitat Improvement Programmatic (HIP) requirements for herbicide application. Specifications from HIP are included. See Attachment 5 – HIP 4 Herbicide Conservation Measures.

5. The Contractor must be able to identify noxious weeds on the Idaho State Noxious Weed List and other species locally identified as non-native such as mullein and kochia and must be prepared to treat infestations of these species with herbicides.

6. The Contractor must conduct herbicide-spraying procedures safely and in accordance with applicable label restrictions of the herbicide, the Conservation Measures set forth by BPA, and the laws and regulations of the State of Idaho.

7. The Contractor must provide treatment to noxious and nonnative weed species including kochia, which may require more than one application (more than one site visit), per the direction of the Project Manager.

8. The Contractor must treat noxious weeds within the treatment areas. Additionally, noxious weeds will be treated if identified outside the treatment area and within a 100-ft. buffer of the treatment area at the discretion of the applicator.

9. The Contractor must record and submit treatment data on treatment forms provided.

B. Frequency and Duration

1. The Contractor must apply herbicide treatments twice per year, once in the spring and once in the fall. (April 1 to October 31). The Contract will span three (3) years initially with the option to extend two (2) additional years. Each year of the contract will include an option period to extend the contract by a year contingent on funding and appropriation.

C. Work Period

1. The Contractor must start the work in the spring of 2026 or as weather permits. The Contractor must attend a pre-work conference with the IDFG project manager before commencement of work, in order to obtain maps and discuss work plans and other considerations. The contractor work schedule must be acceptable to the IDFG project manager.

2. Spraying operations shall be permitted only within one half hour before sunrise to one half hour after sunset each day, in above freezing temperatures. Working on weekends and holidays is acceptable with IDFG project manager approval.

D. Locations

1. The Contractor must treat infestations of noxious weeds within the project areas. The project areas are generally bounded by property/project boundaries clearly marked on .kmz maps to be provided. Additional areas may be added as agreed to between the contractor, and IDFG project manager.

2. The Contractor, as approved by the IDFG Project Manager, will determine the order and progression of herbicide application within a treatment area. The IDFG reserves the right to determine the priority of treatment areas and the order of herbicide application.

https://www.bpa.gov/-/media/Aep/environmental-initiatives/habitat-improvement-program/habitat-improvement-program-handbook.pdf https://www.bpa.gov/-/media/Aep/environmental-initiatives/habitat-improvement-program/habitat-improvement-program-handbook.pdf

RFQ # 1249 VEGETATION MANAGEMENT – WEED CONTROL Page 7 of 9

E. Equipment

1. Contractor must have a chemical spill kit, including protective clothing, gloves, goggles, dust mask, absorbent material, plastic bags, broom and shovel available at the vehicle.

2. The Contractor must have personal protective equipment according to the most restrictive label requirements.

3. The Contractor must have an accurate wind and temperature gauge (e.g. Kestrel digital unit).

4. The Contractor must service and repair equipment as necessary to maintain satisfactory progress on work.

5. The Contractor will be responsible for all costs incidental to equipment move-in and move-out and travel between each work site.

F. Contractor Furnished Items

1. The Contractor must furnish all labor.

2. The Contractor must furnish all equipment, supervision, transportation, materials, operating supplies and incidentals necessary to treat noxious weed infestations with herbicides and inventory and map new or previously unknown infestations.

3. The Contractor must furnish herbicide, indicator dye, surfactants and other adjuvants as necessary.

G. Idaho Department of Fish and Game Furnished Items

1. The IDFG will provide the Contractor with digital maps (.kmz files) that show access to the project area, the location of project area boundaries.

2. The IDFG will provide access to the private ranch property.

H. Chemicals

1. The Contractor must only use the approved herbicides and adjuvants listed in Bonneville Power Administration’s Habitat Improvement Programmatic (HIP) Handbook. No other herbicides or adjuvants may be used by the Contractor. See Attachment 5 – HIP 4 Herbicide Conservation Measures.

2. Buffer widths and wind speed criteria for applications near live water or within wet riparian areas must be adhered too.

These are found in the HIP IV conservation measures in Attachment 5 – HIP 4 Herbicide Conservation Measures.

3. The Contractor must clean spray equipment, store herbicides and dispose of herbicide containers in accordance with State and Federal laws.

4. Herbicide must be added to the spray tank on site, in areas already devoid of vegetation, such as gravel pits or roads if possible, to reduce the potential loss of vegetation in case of an herbicide spill.

5. Avoiding contamination of the work site is the responsibility of the Contractor. All herbicide spills must be reported to the landowner and IDFG Project Manager.

6. All drift agents and indicator dyes shall be handled as chemicals for purposes of mixing, loading, disposing of and applying.

7. Herbicide applications, storage, containment and transport of herbicides and adjuvants, cleaning of spray equipment, and disposal of herbicide containers must be conducted in accordance with State and Federal laws. The Contractor must comply with any requirements of the manufacturer of the herbicide being applied.

8. The Contractor must use indicator dye for marking all sprayed areas, Bullseye Dye is the only acceptable indicator dye for this contract. This is intended to facilitate even coverage, eliminate missed strips or swaths and to assist in quality control inspections by the contractor and inspections by the contract administrator or assigned representative.

I. Environmental Conditions

1. The Contractor must perform services in a manner that minimize impacts to non-target vegetation. This includes proper use rates and application rates, use of appropriate herbicides, proper application techniques and familiarity with noxious weed species and native plant species that may resemble noxious weed species. Equipment must be properly maintained and calibrated at all times.

2. All water drafting and transport must be pre-approved by the IDFG Project Manager at the pre-work meeting. Impounding water, digging ditches, changing the course of stream channels, or modifying stream banks are not permitted.

3. The Contractor is responsible for considering equipment and weather-related factors when making application decisions.

4. Controlling drift shall be the responsibility of the Contractor.

5. No spraying shall be permitted under the following conditions:

a. During rain or snow

b. When there is obvious surface run-off at the work site

c. When wind speeds exceed label requirements for the herbicide being applied or as stated by state regulations.

RFQ # 1249 VEGETATION MANAGEMENT – WEED CONTROL Page 8 of 9

J. Safety

1. The Contractor is responsible for the safe transport of chemical herbicides used to fulfill the specifications of this contract.

The Contractor must transport herbicides in leak-proof, labeled containers. The Contractor must secure herbicide containers in vehicles to prevent spillage. The Contractor must load and transport herbicide from the pickup point to the work sites and be responsible for its protection from loss or damage due to weather, rodents, insects, theft, or any other hazard. Any herbicide damaged or lost must be replaced at the Contractor expense. The Contractor must not transport herbicide containers in vehicle cabs and must keep herbicides separate from food, feed, livestock, passengers, and pets.

2. The Contractor must have personal protective equipment that guarantees minimal exposure throughout the herbicide application process. The Contractor must follow all precautionary statements regarding personal protective equipment which appear on the most restrictive herbicide label.

3. The Contractor is responsible and liable if accidents and/or chemical spills occur. The Contractor must immediately report spills and accidents to the IDFG Project Manager, the landowner, and appropriate governmental entities. The Contractor must provide immediate treatment of contaminated or injured persons and seek professional medical attention when necessary. The Contractor must control chemical spills quickly and must secure additional help when the Contractor cannot effectively or safely handle spill cleanup. The contractor will bear all costs associated with control and/or cleanup of any spill or accident.

K. Records & Recording

1. The Contractor must maintain a pesticide application record form on a daily basis. This form shall be completed, be legible, and submitted at the end of the project. This form will be provided and the contractor may not substitute a different form.

2. All final records pertaining to the contract must be submitted to the Project Manager within one week of field work completion and before final payment can be awarded. Payment will not be made until these records have been received and approved for completeness by the Project Manager.

L. Inspection

1. Site inspections will be made by Project Manager or designated representatives during the life of this contract for treatment and inventory. These inspections will be made by visually inspecting treatment and inventory sites at random locations within the project area identified as completed by the contractor. Coverage inspections may be made the same day as herbicides are applied or before the indicator dye is no longer visible in treated areas.

2. Mortality inspections will generally be conducted no sooner than 5 days and no longer than 20 days after a site has been treated. This will provide time for the effects of the herbicide to become evident, as well as allow for corrections, if necessary, to be made in a timely manner.

3. Within a treated site, herbicide application must demonstrate a coverage rate of 95% of all target weed species located.

4. If inspections determine that work has not met these specifications, the Project Manager will meet with the Contractor onsite to discuss the deficiencies. The Contractor will be given one week to correct the deficiencies by treating sites that were missed and/or re spraying areas where mortality was inadequate. If the follow up inspection determines that the specifications have been met, then the deficiencies will not count against the Contractor and full payment will be made.

5. If the follow up inspection determines that one or both specifications have still not been met, the IDFG will pro rate payment. Pro rating shall be accomplished as follows: The number of infestations that are missed will be calculated as a percentage of the total number of infestations treated and this percentage will be subtracted from the final payment.

However, if coverage and/or mortality are less than 85%, no payment shall be made.

M. Contact Information

1. Project Manager Matt Belnap

Fish Habitat Program Coordinator Idaho Department of Fish and Game

600 S. Walnut Street Boise, Idaho 83712

Office: 208-287-2798 Cell: 208-569-1283 matt.belnap@idfg.idaho.gov mailto:matt.belnap@idfg.idaho.gov

RFQ # 1249 VEGETATION MANAGEMENT – WEED CONTROL Page 9 of 9

Appendix A – Lower Lemhi Rehabilitation Weed Sray Map

C. Submission Requirements