RFQ 1112 - Attachment 1 - Administrative Document - Overhead Garage Doors and Openers.docx
DOCX document 57 KB Posted
- Attached to
- OVERHEAD GARAGE DOORS AND OPENERS
- Solicitation number
- 1112
- Issued by
- Idaho
About this file
This is an Administrative Document attachment to RFQ 1112 issued by the State of Idaho for the procurement of overhead garage doors and openers. The solicitation was posted on December 29, 2025, with proposal submissions due by January 12, 2026. The document serves as a supporting administrative file for the competitive procurement process, outlining the framework for qualified vendors to supply and potentially install garage door and opener systems for state facilities. While specific item quantities, detailed technical specifications, and installation requirements are not fully elaborated in this attachment, the procurement is structured to secure comprehensive garage door and opener solutions meeting state infrastructure needs.
The document does not specify pricing terms, contract value, contract duration, or renewal options in the information provided. No set-aside designations are explicitly stated or selected in this administrative document. The file does not identify incumbent vendors or provide details regarding funding sources and amounts. Interested vendors should obtain the complete solicitation package, including detailed specifications, evaluation criteria, and submission requirements, directly from the Idaho state procurement office to ensure full compliance with all bidding requirements and to understand the complete scope of work for this overhead garage door and opener procurement opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 1112 - Attachment 4 - Insurance Requirements 2025 - Overhead Garage Doors.docx | DOCX document | |
| RFQ 1112 - Attachment 3 - Signature Page - Overhead Garage Doors and Openers.docx | DOCX document | |
| RFQ 1112 - Attachment 2 - Price Sheet - Overhead Garage Doors and Openers.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO TRANSPORTATION DEPARTMENT
RFQ 1112
OVERHEAD GARAGE DOORS AND OPENERS
GENERAL INFORMATION
Purpose The Idaho Transportation Department (ITD) is requesting quotes from qualified vendors for the purchase and delivery of three (3) overhead garage doors (Doors), and three (3) door openers (Openers) as further detailed below.
Solicitation Contact The contact for this RFQ is:
Name: Kevin Chambers Phone: (208)334-8768 Email: Kevin.Chambers@itd.idaho.gov (preferred method of contact)
Restrictions on Communications From the issue date of this RFQ, until a contract/purchase order is awarded or the RFQ is cancelled, vendors and their representatives are prohibited from communications (written or verbal) regarding this RFQ with the ITD staff, other than the ITD RFQ Lead. Any communications (written or verbal) with ITD staff other than the RFQ Lead may result in the submitting vendor being found Non-Responsible and Non-Responsive.
Requirements and Specifications See Section 1 – Requirements & Specifications
| List of Attachments |
| Required Submittal Items |
Attachment 1 - Requirements & Specifications Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 – Insurance Requirement Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 – Insurance Requirements Warranty documentation and an acceptance letter agreeing to warranty provisions of the Doors
Quote Your Quote may be submitted electronically via IPRO Powered by LUMA or email (see below for additional details). ITD will not be accepting manual submissions for this solicitation. Your Quote must include the Required Submittals listed below and be received prior to the deadline established in IPRO Powered by LUMA.
Electronic Submission:
IPRO – Enter your pricing in IPRO (https://purchasing.idaho.gov/information-for-vendors/) and upload all Required Submittals.
Email:
Send an email to the Solicitation Contact (see Section 2) and attach all Required Submittals.
Documentation, which demonstrates, to ITD’s satisfaction, that the item offered meets the requirements of the solicitation. Failure to provide satisfactory documentation may eliminate the Vendor from further consideration.
(See Attachment 1 – Requirements and Specifications)
Award Award will be made to the responsive responsible vendor with the lowest cost. The State reserves the right not to evaluate or make an award in the best interest of the State.
Though it is not mandatory to submit your Quotation electronically via IPRO, all vendors participating in a solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a quote outside of IPRO). It is free to establish an account and only takes a few minutes of your time.
RFQ 1112
ATTACHMENT 1 – REQUIREMENTS & SPECIFICATIONS
OVERHEAD GARAGE DOORS
SECTION 1 – REQUIREMENTS
1. Brand Name The brand names specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Vendors offering an “equal” must include documentation, which demonstrates, to ITD’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, ITD reserves the right to seek clarification from the Vendor. Failure to provide satisfactory documentation or a clarifying response to ITD may eliminate the Vendor from further consideration.
Authorized Distributor Submitting vendors must be an authorized distributor or manufacturer of the Doors and Openers offered. An authorized distributor shall be defined as a company or organization that has a written agreement with the manufacturer to sell or service its products. Bids from Contractors who are not an authorized distributor by the manufacturer shall not be considered.
Warranty Manufacturer standard warranty must cover the Doors and Openers for a minimum period of two (2) years, after Acceptance. Manufacturer standard warranty and extended warranty must cover paint defects, with the exception of normal wear and tear under normal working conditions.
Vendor must provide Warranty documentation at the time of delivery. The Doors and Openers will not be accepted without this information.
Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warranted item, which may also include the entire Door and Openers. All warranty work must be completed within thirty (30) calendars days after receipt of written notice from ITD. If approved in writing by ITD, the Contractor may perform warranty work on-site, at the Delivery location identified in Section 7, in lieu of pick-up and return shipping. The Contractor shall be responsible for all travel costs and work-site clean-up associated with any necessary repairs. The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the Door on-site within thirty (30) calendars days, or if the Door continuously malfunctions and causes it to be out of service on multiple occasions, ITD reserves the right to require the Contractor to pick up, repair, and return the Doors at no additional cost to ITD.
Awarded vendor is responsible for all warranty requirements. No third-party warranties will be allowed.
Acceptance Upon receipt, the Door and Openers will be inspected by the ITD Facilities Manager or designee to ensure the minimum specifications are met. Acceptance will occur within fourteen (14) calendar days after delivery. If ITD determines that the Doors and Openers are not in accordance with the specifications, ITD will provide the Contractor with a written notification. The Contractor must pick-up, correct any discrepancies, and re-deliver to ITD specified location at the Contractor's expense. The timeframe for completion of corrective action must not exceed thirty (30) calendar days.
In the event the specifications are not met, ITD reserves the right to reject the Doors and Openers via email notification.
With ITD approval, the Contractor may correct discrepancies on-site at ITD’s location in lieu of pick-up and return shipping. The Contractor will be responsible for providing all labor, tools, parts, supplies, and worksite clean up to make any necessary corrections. The timeframe for corrective action will still be as identified above.
Termination and Cure See section 1.4. State of Idaho Contract Terms and Conditions in the Attachment Tab in IPRO Powered by Luma.
Delivery The Contractor must deliver the Doors and Openers FOB Destination freight pre-paid and allowed, to the location below, within ninety (90) calendar days after receipt of order (ARO), or as coordinated with ITD's contact for delivery.
Delivery must be made Monday through Thursday, 8:00 am to 3:00 pm local time excluding state of Idaho recognized holidays (https://idaho.gov/government/state-holidays/), unless otherwise approved in writing by ITD.
Delivery Location:
Idaho Transportation Department Attn: Korby Hansen, Assistant Engineer District 6 Yard 206 N Yellowstone HWY Rigby, Idaho 83442
Insurance See Attachment 4 – Insurance Requirement
Invoicing The Contractor must submit its invoice within thirty (30) calendar days of acceptance to the billing contact identified on the Contract. Invoices submitted prior to acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission. The following information must be included with each invoice:
· ITD Purchase Order (PO) number
· Contract Name and Order Number
· Invoice Number and Date
· Contractor Contact Information
· Itemization of Property (description, quantity, unit of measure, unit price, and total price)
Invoices must be submitted electronically to:
D6AP@ITD.IDAHO.GOV
SECTION 2 – SPECIFICATIONS
The Doors and Openers must meet the minimum specifications provided in Attachment 2. Specifications, and must be the latest model of the manufacturer's current standard production, as offered to commercial trade. Though they are not specifically covered herein, all parts necessary to provide complete the functional Doors and Openers must be installed and adjusted prior to delivery. All parts must conform in design, strength, quality of materials, and workmanship to current engineering practices and accepted standards of the industry. All parts must be the manufacture's standard unless otherwise specified in this RFQ.
1. CHI doors or equal, at a minimum must consist of the following in order to be considered for award.
0. CHI insulated sandwich panel doors;
0. Twenty Feet two inches wide by twelve feet high (20’2” W × 12’0” H;)
0. Sectional, Insulated Sandwich (Flush Panel);
0. Double-sided twenty-six-gauge (26 ga) exterior / twenty-seven-gauge (27 ga) interior steel, metal wrapped;
0. Polyurethane core, R-17.5 (ASTM C518 compliant);
0. Two inches (2”) (nominal);
0. Five (5) total windows per door (single panel), twenty-four inches by 12 inch (24” × 12”) insulated glass units, matching frame color;
0. Flush – smooth textured steel exterior for a clean architectural appearance;
0. Six inch (6”) galvanized steel side plates;
0. Double contact bottom seal and flexible inter-panel gaskets;
0. Heavy-duty double side hinges (minimum 14 ga galvanized steel);
0. Three-inch (3”) diameter, ten (10) ball-bearing, case-hardened steel tires with solid shafts;
0. Factory-applied baked-on polyester topcoat in White;
0. Continuous thermal break between steel skins;
0. U Factor of 0.057 (Based on ASTM C518 R-17.54 for comparable model 3217 and;
0. ASTM C518 R-Value testing, IECC energy code compliant, HFC-free polyurethane insulation.
2 Operation 1.
1. Compatible with manual chain hoist and powered operator system and;
2.1.1 Must me side mounted
3 cycle rating 1.
2. Minimum fifty thousand (50,000) cycles, oil-tempered torsion springs (ANSI 102 compliant)
1. Genie Door Opener OPGSXH7501BR or equal, at a minimum must consist of the following in order to be considered for award.
Side-mount with manual chain hoist;
Three-quarters (3/4) Horsepower;
Single Phase;
Two hundred-fourteen (214) Foot-Pounds (ft/lbs) per second pull power;
11/6/6 Amperage and;
115/208/230 Volts.
| ASTM | Advancing Standards Transforming Markets ASTM |
| IECC | Internation Energy Conservation Code IECC |
| HFC | Hydrofluorocarbon |
4 | Page
RFQ 1112 OVERHEAD GARAGE DOORS AND OPENERS DEC 2025
image1.png
File details come from the government source that posted it. Updated .