Summary of RFQ 1081-27-CG JOC for Manhole Rehabilitation
This Request for Qualifications is issued by the City of Arizona for a Joint Occupancy Contract (JOC) to provide comprehensive manhole assessment, rehabilitation, coating, lining, structural repair, replacement, and related construction services for existing sanitary sewer manholes throughout the City's wastewater collection system. The Project encompasses a variety of services tailored to the condition of existing manholes, ranging from simple cleaning and inspection to coating, structural rehabilitation, frame and cover adjustments, concrete repairs, or complete removal and replacement. The solicitation seeks qualified firms capable of performing these diverse services as required across the City's collection system. Specific response dates, due dates, site visits, bidder conference schedules, and award dates are referenced within the document structure, though detailed timeline information would be contained in the complete RFQ package.
The RFQ establishes a JOC framework designed to provide multiple contract award opportunities for qualified firms meeting specified qualifications and capability requirements. Pricing terms, set-asides, incumbent information, and specific funding sources and amounts would be detailed in the complete solicitation documents. This structure allows the City to engage multiple qualified contractors for manhole rehabilitation projects as work demands arise throughout the wastewater collection system, providing flexibility in managing the varying scope and frequency of rehabilitation needs across the City's infrastructure.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUALIFICATIONS
FOR
JOB-ORDER CONSTRUCTION SERVICES
FOR
MANHOLE REHABILITATION PROGRAM
Solicitation Number: 1081-27-CG
October 2026
CITY OF CASA GRANDE, ARIZONA
NOTICE OF REQUEST FOR STATEMENT OF QUALIFICATIONS
The City of Casa Grande is soliciting Statements of Qualifications (SOQ) for the following:
Job-Order Construction Services for Manhole Rehabilitation Program
The City requests SOQs from qualified firms to provide manhole assessment, rehabilitation, coating, lining, structural repair, replacement, and related construction services for existing sanitary sewer manholes throughout the City's wastewater collection system. Each interested Contractor/Firm is invited to submit a
Statement of Qualifications detailing the firms relevant capabilities and experience in accordance with the instructions included in the request for statement of qualifications document.
Each response shall be in accordance with the RFQ instructions and scope of work package on file with the
City Clerk at City Hall, 510 East Florence Boulevard, Casa Grande, Arizona, 85122, where copies can be obtained by contacting the City Clerk’s Office at (520) 421-8600. All responses must be submitted by 2:00 pm
City time on Tuesday, November 24, 2026 to the City Clerk. Responses must be addressed and submitted to:
OFFICE OF THE CITY CLERK
CITY OF CASA GRANDE
510 EAST FLORENCE BOULEVARD
CASA GRANDE, AZ 85122
The envelope must be boldly marked with this information:
STATEMENT OF QUALIFICATIONS
Job-Order Construction Services for
Manhole Rehabilitation Program
SOLICITATION #1081-27-CG
The City of Casa Grande reserves the right to waive any informalities or irregularities in this RFQ, reject any or all responses, and to be the sole judge of the suitability of the services offered. The City may award a contract deemed to be in the best interest of the City.
Procurement of technical registrants for public works shall be conducted in accordance with A.R.S. Section 34-
103, including provisions for short-listing and direct selection.
City of Casa Grande
Adriana Carpio-Solis
City Clerk
Contents
SECTION 1: PROJECT DESCRIPTION
SECTION 2: JOC DESCRIPTION
SECTION 3: SCOPE OF WORK
SECTION 4: SUBMITTAL ELEMENTS
SECTION 5: SELECTION PROCESS
SECTION 6: GENERAL TERMS, CONDITIONS, AND INSTRUCTIONS
EXHIBIT A: REQUIRED FORMS
EXHIBIT B: SAMPLE CONTRACT
SECTION 1: PROJECT DESCRIPTION
The City of Casa Grande owns, operates, and maintains a sanitary sewer gravity collection system consisting of approximately 1.75 million linear feet of pipelines and approximately 6,000 sewer manholes. To support proper operation, system reliability, inflow and infiltration control, and long-term asset management, the City has developed a manhole rehabilitation program.
At this time, the City is seeking one (1) qualified contractor to provide manhole rehabilitation services on a job-order basis under the City's Manhole Rehabilitation Program (hereinafter referred to as the "Project").
The Project is intended to provide a variety of services as may be required to assess, repair, rehabilitate, or replace existing sanitary sewer manholes. Due to the varying condition of existing manholes within the City's collection system, services may range from simple cleaning and inspection to coating, structural rehabilitation, frame and cover adjustments, concrete repairs, or complete removal and replacement.
This Project is intended to provide services for Fiscal Year 2027 and may be extended annually, at the
City's sole discretion, for up to four (4) additional one-year terms. The City anticipates an annual budget of approximately $750,000 for this program.
Proposals that demonstrate the ability to fully meet the scope of work will be given strong consideration. The
City reserves the right, at its sole discretion, to enter into agreements with one or more qualified firms to perform the required services.
SECTION 2: JOC DESCRIPTION
The City has elected to use the JOC delivery method for these projects as outlines under A.R.S Title 34
Section 603. The guiding principles behind the projects will be cost-effective construction in the shortest possible time frame and within the City’s tolerance of financial risk.
The maximum total amount of JOC work each fiscal year is contractually limited to the approved City budget amount for this type of work.
Renewal of the contract will be based on the successful performance by the JOC Contractor and the needs of the City. During the contract period, the City will identify construction tasks required to complete each specific job and will issue individual Job Orders to the Contractor to complete those jobs. Each job order assignment, initiated by the City, is defined cooperatively by the City and the Contractor.
The Contractor shall be required to furnish all materials, equipment, and personnel necessary to manage and accomplish the Job Orders. The Contractor shall be required to maintain a management staff in order to receive Requests for Proposal (RFP), prepare and negotiate proposals, receive signed Job Orders (JO) and
Notices-to-Proceed (NTP), receive and initiate contract correspondence and provide other construction services to accomplish individual Job Orders. Job Orders will vary in size, with the majority expected to be of a small to medium size.
A scope, schedule, and price are negotiated and agreed upon for each job order assignment. It is the City’s intent to enter into a cost-plus fee structure contract for each job order assignment unless otherwise mutually agreed upon. After the purchase order for the work has been issued, the JOC contractor is then directed to proceed with the work. The schedule for the job order contract will start after award and will be ongoing over the life of the contract.
Work Authorization
Any work required under this Contract shall be authorized by issuance of formal written Job Order Purchase
Order as follows:
a. When the City determines the need for transportation construction services for performance under the terms of the JOC, the City will notify the selected JOC Contractor of the current need and requirements.
b. For any project determined by the City to be appropriate for this Job Order Contract, the City will request that the contractor prepare a:
• Scope of work
• Cost proposal
• Project schedule
• Back-up supporting documentation.
c. Upon the receipt of this notification, Contractor shall respond within three (3) working days, or as otherwise agreed upon, by:
• Visiting the proposed site in the company of City staff, and
• Establishing contact with the City to further define the scope of the requirement.
d. After mutual agreement on the scope of the individual requirement, Contractor shall then prepare a cost proposal for accomplishment of the task. The Contractor, at their sole discretion, may elect not to undertake the job order assignment work. If the Work is declined, the Contractor will so notify the City no later than five
(5) working days of the City notification. In this event, the City may elect to assign the work to another
Contractor or advertise the project for competitive bidding.
e. The agreed upon price matrix for the job order shall serve as the basis for establishing the value of the work to be performed.
f. Contractor’s proposal shall be submitted within ten (10) working days, unless otherwise agreed to.
g. Upon receipt of the Contractor’s proposal, the City will review the proposal for completeness, negotiate the scope, cost, and schedule for the work as needed, and will reach agreement with Contractor on pricing, schedule, and all other terms.
h. Once an agreement has been reached, the City will issue the Job Order Purchase Order.
i. In the event the City does not issue a Job Order Purchase Order after receipt of the Contractor’s proposal, the City is not obligated to reimburse the Contractor for any costs incurred in the preparation of the proposal.
The City reserves the right and will issue job order assignments based on the ability of the contractor to meet the City’s work schedule and the availability of trades and expertise in relation to each project.
Although the City anticipates that the JOC Contractor will be issued work, the Contractor is neither guaranteed a minimum amount of work nor any jobs at all.
Scheduling and Commencement of the Work
a. For each Job Order Purchase Order, the City will issue a Notice to Proceed. The first day of performance under a Job Order shall be the effective date specified in the Notice to Proceed.
b. Any preliminary work started, or materials ordered or purchased before receipt of the Notice to Proceed shall be at the sole risk and expense of the Contractor.
c. Contractor shall diligently prosecute the work to completion within the time set forth in the Job Order
Purchase Order.
d. The agreed upon period of performance includes allowances for mobilization, holidays, weekend days, normal inclement weather, and cleanup. Therefore, claims for delay based on these elements will not be allowed.
e. Placement of materials and equipment shall be made with a minimum of interference to City operations and personnel.
f. Contractor shall take all precautions to ensure that no damage will result from its operations to private or public property. Any and all such damages shall be repaired or replaced by Contractor at no cost to the City.
g. Contractor shall be responsible for providing all necessary traffic control, such as street blockages, detours, traffic cones, flagmen, etc., as required for each Job Order Purchase Order. Proposed traffic control methods and plans shall be submitted to the City for approval prior to the start of construction.
h. When the Contractor considers the work complete and ready for its intended use, the Contractor shall request the City to inspect the Work to determine the status of its completion.
i. A minimum of ten (10) working days prior to final completion, the Contractor, in conjunction with the City shall prepare a comprehensive list of Punch List items, which the City may edit and supplement.
j. The Contractor shall proceed promptly to complete and correct punch list items.
• Failure by the Contractor and the City to include an item on the punch list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.
• Items on the punch list must be completed or corrected prior to final payment for the Job Order.
Contractor shall proceed promptly to complete and correct items on the list
SECTION 3: SCOPE OF WORK
The selected Contractor(s) shall be responsible for providing a range of services required to assess, repair, rehabilitate, and replace existing sanitary sewer manholes at various locations throughout the City of Casa
Grande's wastewater collection system.
Contractor(s) will coordinate with City staff to perform evaluations, identify appropriate rehabilitation methods, schedule work, and complete construction activities in accordance with the City's annual maintenance cycle and as otherwise directed.
Anticipated Tasks Include:
• Performance of manhole evaluations and assessments, including investigation, photo documentation, reporting of existing conditions, and recommendations for appropriate repairs.
• Cleaning of existing manholes, including removal and proper disposal of debris.
• Repair of existing concrete substrate and/or preparation for coating or lining.
• Application of approved systems designed for structural rehabilitation of concrete manholes.
• Application of approved manhole coating systems.
• Installation and/or application of structural liner systems.
• Repairs to concrete manhole bases, benches, channels, walls, and related structures.
• Removal and replacement of existing manholes, including excavation, bypass or flow control where required, backfill, compaction, and surface restoration.
• Removal and replacement or adjustment of frames, covers, rings, and concrete collars.
• Pavement removal and replacement, concrete restoration, and other surface restoration as required.
• Preparation and implementation of traffic control plans and on-site traffic control setup as required by the work area and in compliance with applicable standards.
• Documentation of completed work, including asset identification, work quantities, photographs, and other information necessary to update City records and GIS-based asset data.
Contractors shall submit, as part of their Statement of Qualifications (SOQ) package, product literature and specifications for all systems, products, materials, and components proposed for use in the execution of this project. Emphasis should be placed on proposed coating systems, structural rehabilitation systems, liner systems, repair materials, and associated surface preparation requirements.
Important Notice:
Prospective Contractors should be aware that elevated levels of hydrogen sulfide (H2S) gas may be present throughout the sewer collection system. Manholes and related structures may also constitute permit-required confined spaces. It is the Contractor's sole responsibility to ensure appropriate safety measures, procedures, training, and equipment are in place to address these and other related hazards in accordance with OSHA regulations and industry standards.
SECTION 4: SUBMITTAL ELEMENTS
The Contractor will be selected through a qualifications-based selection process. Firms interested in providing the required services must submit a Statement of Qualifications (SOQ) that addresses all criteria outlined in this section. The information provided in the SOQ will be used to evaluate each firm's capabilities, regardless of where it appears in the response. Additionally, the City reserves the right to use information obtained through independent investigation in the evaluation process.
Detailed submittal instructions are provided in Section 6 of this solicitation. To be considered, each SOQ must address the following elements:
1. Experience and Qualifications of the Firm (25 Points Possible)
1.1. Provide a general description of the firm and/or team proposing to provide the required services. Include the legal organization of the firm and an organizational chart identifying key personnel.
1.2. Provide the following firm-specific information:
• 1.2.1. List Arizona contractor licenses held by the firm/team, including license numbers and whether held by an individual or the firm.
• 1.2.2. Identify any contracts or subcontracts terminated within the past five (5) years and any claims resulting in litigation or arbitration within the last three (3) years. Provide brief descriptions and outcomes.
• 1.2.3. If selected as a finalist, the firm will be required to provide a statement from an A- or better rated surety company verifying the firm's bonding capacity.
1.3. Identify at least three (3) comparable projects where the firm provided services similar to those required for this project. For each project, include:
• 1.3.1. Project description
• 1.3.2. Firm's role (identify if job-order contract, on-call, or general contract; include percent of work self-performed)
• 1.3.3. Original contracted cost and final project cost
• 1.3.4. Construction or service dates
• 1.3.5. Project owner and contact information (include at least one current contact per project with phone and/or email)
2. Approach to Performing the Required Services (25 Points Possible)
2.1. Discuss the firm's approach to major project issues, including:
• Scheduling and job-order work prioritization
• Communication and coordination with City staff
• Staff and equipment availability
• Jobsite safety, confined space entry, and safe work practices
• Traffic control and work in public rights-of-way
• Flow control, bypass needs, odor control, and public impact mitigation
• Quality control and warranty/repair follow-up
2.2. Describe your project management approach and team organization, including how you will address anticipated challenges. Include experience related to quality control, dispute resolution, safety management, documentation, and coordination with subcontractors and suppliers.
3. Proposed Products, Systems, and Materials (25 Points Possible)
Provide detailed cut sheets and product literature for all materials, systems, components, and equipment proposed to be used for this project. Emphasis should be placed on coating systems, structural rehabilitation methods and systems, liner systems, concrete repair materials, corrosion resistance, surface preparation requirements, curing requirements, expected service life, and applicable certifications or standards.
4. Experience of Key Personnel Assigned to the Project (15 Points Possible)
4.1. Identify all key personnel proposed for the project. For each individual, provide their tenure with the firm and list at least two (2) comparable projects in which they played a primary role.
For duplicate projects already listed under Section 1.3, list only the project name and the individual's role. For all other projects, include:
• 4.1.1. Project description
• 4.1.2. Role of the individual
• 4.1.3. Original and final construction cost
• 4.1.4. Construction dates
• 4.1.5. Project owner
• 4.1.6. Reference information (two current contacts with phone numbers per project)
5. Principal Office Location and Local Participation (5 Points Possible)
The City encourages strong local participation. Describe your firm's plan to maximize the use of local resources, including suppliers, equipment providers, subcontractors, and laborers. Also provide:
• The firm's principal office location
• Home office locations for key staff
• Identification of local vs. non-local staff, including their percentage of work to be completed locally
6. Subcontractor Selection Plan (5 Points Possible)
Provide a Subcontractor Selection Plan describing how subcontractors will be selected. The plan must not base selection solely on price but instead must consider qualifications alone or a combination of qualifications and price.
SECTION 5: SELECTION PROCESS
The selection of qualified Contractor(s) will be conducted through a qualifications-based selection process.
Interviews will not be held.
An appropriate Selection Committee, comprised of representatives from the City of Casa Grande, will be formed to evaluate all submitted Statements of Qualifications (SOQs). Each committee member will independently read, review, and score the submittals based on the evaluation criteria outlined in this RFQ.
A point-based scoring system will be used to rank the SOQs. Based on these scores, a "final list" of the highest-rated firms will be created. While the City may request clarifying information during the review process, firms should ensure that all relevant information is clearly addressed in the original submittal.
A short list of no fewer than three (3) and no more than five (5) firms will be selected from the final list for further consideration. These firms will be ranked, and the City will initiate negotiations with the highest-ranked firm.
Upon completion of negotiations, the City will proceed to execute a contract with the selected firm(s), subject to successful negotiation of fees and any contract terms. Final contract approval is subject to City Council consideration and approval.
A sample contract to be used for this project is included as Appendix "B" of this solicitation package.
SECTION 6: GENERAL TERMS, CONDITIONS, AND INSTRUCTIONS
1. Definition of Terms Used in These Instructions
As used in these instructions, the following terms have the following meanings:
• A. "Attachments" - All items required of the Submitter as part of the submittal.
• B. "Days" - Calendar days unless otherwise specified.
• C. "Exhibits" - All items attached to the solicitation.
• D. "Submittal" - Includes bid, qualifications, quote, or proposal.
• E. "Submitter" - Any vendor or provider responding to the solicitation.
• F. "Contracts Manager" - The person authorized to administer contracts and make determinations. For this project, this is the Project Manager.
• G. "Solicitation" - An invitation for bids (IFB), request for proposals (RFP), request for quotes (RFQ), or request for qualifications (RFQ).
2. Preparation of Submittal
A. Copies Required:
Submit one (1) original and one (1) copy. The submittal must be sealed, clearly labeled with the project title, and received by the deadline. The original must bear the signature of an authorized representative.
B. Forms - No Facsimile or Telegraphic Submittals:
All forms must be either those provided in the solicitation or their clear equivalents. Faxed, telegraphed, or mailgram submittals will not be accepted.
C. Typed or Inked Corrections:
Any erasures or corrections must be initialed in ink. No modifications are allowed after the due date unless permitted by law.
D. Duty to Examine:
Submitters must review the entire solicitation and check their submittal for completeness. Errors will not justify submittal withdrawal after the deadline.
E. Amendments:
All amendments must be signed and returned by the submittal deadline. Failure to include a signed copy of a material amendment may result in rejection.
F. Amendment or Withdrawal:
No submittal may be amended or withdrawn after the deadline except as provided by applicable law.
G. Public Record:
Submittals become public after contract award unless deemed confidential by the City. Submitters must mark confidential material and justify nondisclosure.
H. Exceptions:
Material exceptions to the terms or conditions may result in disqualification. Any exceptions must be clearly noted in an attachment.
I. Release of Information:
All public communications regarding the project must be approved in writing by the City.
J. Grounds for Rejection:
The following deficiencies will result in disqualification:
• Missed deadline
• Wrong location
• Incorrect number or format of copies
• Missing original signature on required forms
K. City Rights:
The City may reject any or all submittals and waive informalities. The City reserves sole discretion in evaluating submittals.
3. Inquiries
A. Contact Person:
All inquiries must be directed to the City of Casa Grande Contract Manager identified below. Submitters shall not contact or direct inquiries concerning this solicitation to any other City employee unless the solicitation specifically identifies that person as an authorized contact. All firms interested in this project, including employees, representatives, agents, lobbyists, attorneys, and subcontractors, shall refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process, including the evaluation panel, City Manager, Deputy City Manager, Department Heads, and other staff. This policy is intended to create a level playing field for all potential firms, assure that contract decisions are made in public, and protect the integrity of the selection process.
The Contract Manager/Contact Person for this solicitation shall be:
Clifton Sanders
Chief Wastewater Operator
1194 W. Kortsen Road, Casa Grande, AZ 85122
Email: csanders@casagrandeaz.gov
B. Submission Method:
Inquiries must be submitted via email only, with the solicitation name in the subject line. Responses will be posted on the City's website no later than seven (7) days before the submittal deadline.
C. Timeliness:
Inquiries must be submitted at least ten (10) calendar days before the submittal deadline to ensure a response.
D. No Verbal Reliance:
Only written responses issued via formal amendment are binding. Submitters may not rely on verbal answers.
4. Submittal Acceptance Period
Unless otherwise stated, all submittals must remain valid for 120 calendar days from the submittal due date.
5. Cost of Submittal Preparation
The City will not reimburse costs associated with the preparation or submission of a submittal.
6. Certifications, Disclosure, and Disqualification
A. Certification:
By signing the submittal, the Submitter certifies:
• No collusion or anti-competitive conduct
• Compliance with non-discrimination laws
B. Disclosure of Debarment:
Submitters must disclose past or pending suspensions or debarments and include a statement detailing the relevant circumstances.
C. Disqualification:
Any submitter currently suspended or debarred from public procurement will be disqualified.
7. Incorporation by Reference
The Uniform General Terms and Conditions are incorporated by reference and are available from the
Contracts Manager upon request.
8. Award of Contract
A. Multiple Awards:
The city will award one (1) contract to the contractor/firm deemed qualified as outlined in this request for qualifications.
B. Contract Formation:
Submittal alone does not create a contract. Contracts are formed only upon City Council approval and execution by the City Manager and the selected firm.
9. Protests
All protests must comply with Casa Grande City Code Section 3.04.170. A protest must be filed within three
(3) days of the event prompting the protest and must include:
• Protester's name, address, phone
• Signature
• Identification of the solicitation
• Legal and factual basis
• Relief sought
10. Solicitation Order of Precedence
In case of conflict, the order of precedence is as follows:
• 1. Solicitation;
• 2. Special Terms and Conditions, if any;
• 3. Uniform General Terms and Conditions, if any;
• 4. Specifications, if any;
• 5. Exhibits, if any;
• 6. Special Instructions to Submitters, if any;
• 7. Uniform Instructions to Submitters, if any;
11. Persons with Disabilities
The City will provide reasonable accommodation upon request. Submitters requiring accommodation should contact the solicitation contact listed above as early as possible.
SUBMITTAL DEADLINE FOR STATEMENT OF QUALIFICATIONS
Submittals must be delivered in a sealed package clearly labeled with the project title. Late submissions will not be considered and will be discarded.
Submit sealed submittals to:
TITLE:
STATEMENT OF QUALIFICATIONS
JOB-ORDER CONSTRUCTION SERVICES FOR
MANHOLE REHABILITATION PROGRAM
DUE DATE:
Tuesday, November 24, 2026 - 2:00 PM (Local Time)
SUBMIT TO:
Office of the City Clerk
City of Casa Grande
510 E. Florence Boulevard
Casa Grande, Arizona 85122
APPENDIX "A"
REQUIRED FORM
THESE FORMS MUST BE SIGNED AND RETURNED WITH SUBMITTAL
SUBMITTAL ACKNOWLEDGMENT
To the City of Casa Grande:
The undersigned hereby submits this proposal and agrees to furnish all services and materials fully in compliance with the terms, conditions, specifications, and amendments set forth in this Solicitation. By signing below, the undersigned also certifies understanding of and compliance with the City of Casa Grande's
Standard Terms and Conditions.
COMPANY NAME: __________________________________________________________
ADDRESS: __________________________________________________________
CITY/STATE/ZIP: _____________________________________________
PHONE: __________________________________________________________
FAX: __________________________________________________________
CONTACT PERSON: _____________________________________________
EMAIL: __________________________________________________________
AUTHORIZED COMPANY SIGNATURE: _____________________________________________
PRINTED NAME / TITLE: _____________________________________________
DATE: __________________________________________________________
THIS FORM MUST BE COMPLETED, SIGNED, AND RETURNED WITH SUBMITTAL. FAILURE TO DO SO
MAY RESULT IN DISQUALIFICATION.
NON-COLLUSION AFFIDAVIT
State of __________________________ )
) ss.
County of _________________________ )
______________________________, affiant, the ______________________________ of
______________________________ (Contractor/Bidder), who is the person or other entity that makes the accompanying Submittal, having first been duly sworn, deposes and says:
That such Submittal is genuine and not sham or collusive, nor made in the interest of, or on behalf of, any persons not herein named, and that the Submitter has not directly or indirectly induced or solicited any other
Submitter to put in a sham bid, or any other person, firm, company or corporation to refrain from making a submittal, and that the Submitter has not in any manner sought by collusion to secure for itself an advantage over any other Submitter.
Name: _______________________________________________________
Title: _______________________________________________________
Name of Business: _______________________________________________________
Subscribed and sworn to before me this ______ day of ____________________, 20__.
Notary Public: ______________________________________________________
My Commission Expires: _______________________________________________
DATE: __________________________________________________________
Authorization for Release of Performance Information and Waiver
I, ______________________________, the undersigned, on behalf of ______________________________
(the company), being duly authorized to do so, do hereby consent and authorize all those companies and government entities listed in my Submittal to the City of Casa Grande, and any other government entity for whom this company has performed pre-construction and/or construction services, to disclose and release to the City of Casa Grande, or its representatives, information, records and opinions concerning this company's performance.
The purpose of this disclosure is to provide references and background material to the City of Casa Grande.
This company hereby waives any claim it may have against the City of Casa Grande or any company or entity providing information to the City of Casa Grande by reason of any information being disclosed or opinions provided regarding the actions or performance of this company.
This authorization shall be effective for one year, and a copy of this authorization shall be as valid and effective as the original.
Dated: __________________________________________________________
Name: __________________________________________________________
Title: __________________________________________________________
Email: __________________________________________________________
APPENDIX "B"
SAMPLE CONTRACT FORM
(Revised September 2023)
Contract No. _________
Job Order Contract for
___________________________ Department
City of Casa Grande
City Contact
February 2026
THIS CONTRACT made and entered into by and between the City of Casa Grande, a Municipal Corporation (the
“City”) and _________________________ (the “Contractor”).
The City and the Contractor for the consideration named agree as follows:
SECTION 1. The complete Contract includes all of the Contract Documents as if set forth in full herein. The
Contract and all Contract Change Orders issued after the execution of the Contract, the Special Provisions, the Project’s
Scope of Work, the Bidder’s Proposal, the Notice Inviting Bids, the A.R.S §35-393 and 35-393.01 Certification Form, the Performance Bond and the Payment Bond all of which are essential parts of this Contract as defined in Attachment
1. In the event of any conflict in these provisions, the terms of the Contract Documents shall control, each over the other, in the order provided.
SECTION 2. The Contractor shall furnish all materials, except as otherwise provided in the Plans or Specifications, and will perform all the work for the
PROJECT NAME: ____________________________________(“Project”) necessary to complete in a good, workmanlike, and substantial manner the work in accordance with the Contract
Documents for this Project. The Contract documents are specifically referred to and made a part hereof this Contract.
SECTION 3. This initial term of this contract shall be for __________________________. The term of this contract may be extended, at the sole discretion of the City, _______________________________. Contractor agrees to provide services to the City for the performance of the Project, consistent with the Scope of Work and in the timeframe identified as Exhibit "A" and incorporated herein by reference. No material, labor, or facilities will be furnished by the City, unless otherwise provided for in the Agreement.
The City will pay the Contractor an amount not to exceed $_____________________ for a base contract, subject to change of materials and work orders. For each extension year, the City will pay the Contractor an amount not to exceed the yearly budgeted amount for this Project. The Contractor agrees to receive and accept the prices set forth in the Bid Proposal/Schedule as full compensation for the work required under the bid items awarded by the City subject to additions and/or reductions of the quantities of the various bid items at the unit prices bid for furnishing all labor and materials and for doing all the work contemplated and embraced under this Contract. The Contractor further agrees that:
a. Job Orders may be issued at any time during the term of this contract. The City does not guarantee
Contractor any minimum amount of work during the term of this Contract.
b. Prior to any Job Order being issued, the parties will agree upon the scope of work for the job order.
The pricing for any Job Order issued during the term of this Agreement shall be in compliance with
Exhibit A, which is attached hereto and incorporated herein.
c. The City will not pay any claim submitted to the City by the Contractor unless the claim is
SUBMITTED IN WRITING to the City and APPROVED BY THE CITY IN WRITING
BEFORE any such work is started.
d. The City will not pay for any cost increases for labor and materials outside the original prices as set forth in the Bid Schedule unless SUBMITTED IN WRITING to the City and AGREED TO IN
WRITING by the City IN ADVANCE.
e. In the event of unforeseen difficulties or obstructions arising out of the nature of the work to be performed are encountered by the Contractor, the Contractor SHALL NOT MOVE FORWARD with any additional work until that work is APPROVED IN WRITING by the City’s Project
Manager.
f. The Contractor shall be responsible for all expenses incurred by or in consequence of the suspension and/or discontinuance of work CAUSED BY Contractor.
g. The Contractor shall faithfully complete the work in the manner and in accordance with the Contract
Documents and the requirements of the City’s Project Manager under them.
h. Any additional charges incurred without WRITTEN CONSENT of the City shall be considered incidental costs to the Contract with NO COST to the City.
SECTION 4. TIME IS OF THE ESSENCE for this Contract. The Contractor agrees to commence work pursuant to this Contract within _______ calendar days after the date of authorization specified in the Notice to Proceed and to diligently prosecute the same, day to day, to completion within _______ calendar days after the date provided except as adjusted by subsequent Contract Change Order(s). All additional work, when authorized by executed Change Order(s) shall be compensated for by a fee as mutually agreed upon by the City and Contractor.
When a contractor submits a request for a date extension for which work must be completed in a contract, a written
Contract Change Order shall be initiated outlining the reason for applying for the extension and the drop-dead date the work will be completed. If the extension is agreed to and signed by the City and the Contractor, it binds the Contractor to complete the work by the extended date designated in the amendment unless the delay in completion of the work by the Contractor results from an unforeseeable cause beyond the control and without the fault or negligence of the
Contractor. It is agreed the City’s only liability for delay from any cause shall be limited to granting a time extension to the Contractor. There is no other obligation, expressed or implied, on part of the City to the Contractor for delay from any cause.
SECTION 5. If the work to be performed by Contactor for this Contract is not timely completed, unless this failure is due to any conditions in Section 6 below, the Contractor will be deemed to be in breach pursuant to Section 9 below.
For the purpose of determining applicability of liquidated damages, completion time shall be extended only if delay in completion of the work by the Contractor results from an unforeseeable cause beyond the control and without the fault or negligence of the Contractor per Section 6.
SECTION 6. Force Majeure: Notwithstanding any other term, condition, or provision hereof to the contrary, in the event any party hereto is precluded from satisfying or fulfilling any duty or obligation imposed upon such party by the terms hereof due to labor strikes, nationwide material shortages, war, civil disturbances, unusual weather conditions, natural disasters, acts of God, or other events beyond the control of such party, the time period provided herein for the performance by such party of such duty or obligation shall be extended for a period equal to the delay occasioned by such events and must be agreed to IN WRITING BY BOTH PARTIES.
SECTION 7 The Contractor agrees to indemnify, defend, and save harmless the City, its Mayor and Council, appointed boards and commissions, officials, officers, and employees, individually and collectively from all losses, claims, suits, demands, expenses, subrogations, attorney’s fees, or actions of any kind and nature arising out of the Contractor’s negligence or any subcontractor employed by the Contractor including bodily injury and death, damages to any property or any other losses, claims, suits, demands, and/or expenses, arising or alleged to have arisen out of the work performed, except any injury or damages arising out of the sole negligence of the City, its officers, agents or employees. The amount and type of insurance coverage requirements set forth in Section 8 will in no way be construed as limiting the scope of indemnity in this paragraph.
SECTION 8. INSURANCE.
8.1 Contractor Liability Insurance. Upon signing of the Agreement and so long as it shall remain in effect, contractor, at its cost and expense, shall purchase and maintain the insurance described in this section. The insurance shall be purchased and maintained in companies duly licensed or otherwise approved by the State of Arizona, with forms acceptable to the City of Casa Grande, and shall be primary with no right of contribution. The contractor’s insurer shall have a minimum A.M. Best’s rating of A-VIII. Use of alternative insurers requires prior approval for the
City of Casa Grande.
The insurance coverages to be purchased and maintained are:
8.1.1 Workers' Compensation. Contractor shall provide workers' compensation insurance as required by state and federal laws having jurisdiction over Contractor’s employees engaged in the performance of the Services within this Agreement.
8.1.2 General Liability. Contractor shall maintain a Commercial General Liability (Occurrence) policy that includes coverage for premises and operations, products and completed operations, contractual liability, broad form property damage, and personal injury liability. The policy shall have limits of not less than:
· $1,000,000 for each occurrence of bodily injury and property damage; and
· $1,000,000 for personal injury.
8.1.3 Automobile Liability. Contractor shall maintain an Automobile Liability policy with a combined single limit for bodily injury and property damage of not less than $1,000,000 for each accident.
The policy shall cover all owned, hired, and non-owned automobiles used in connection with the Agreement for the performance of Contractor’s services.
8.1.4 Property Insurance. A policy or policies of fire and extended coverage property damage insurance covering the full insurable value of all tools and equipment used by contractor from time to time on the lands of City of Casa Grande pursuant to the Agreement, including mobile equipment. Contractor shall also require its agents, contractors, licensees and others performing the obligations, or exercising the rights, of Contractor under the Agreement to carry such property damage insurance. Such policy or policies shall cover the full insurable value of such tools and equipment.
8.1.5 Adjustment of Liability Limits. If the initial term of the Agreement shall exceed ten years or if the aggregate term of the Agreement, including any extension or renewal terms agreed to by the parties or provided for in the Agreement shall exceed ten years, on each tenth anniversary of the date of the
Agreement, the liability limits provided for in sections 8.1.2 and 8.1.3 shall be increased by an amount proportional to the increase in the US consumer price index occurring since the date of the Agreement or the date of the last such increase as appropriate.
8.1.6 Professional Liability. The Contractor retained by the City to provide the engineering services required by the Agreement will maintain Professional Liability insurance covering errors and omissions arising out of the Services performed by the Contractor or any person employed by him, with an unimpaired limit of not less than $1,000,000 each claim and $2,000,000 all claims, or 10% for the construction budget, whichever is larger. In the event the insurance policy is written on a “claims made” basis, coverage shall extend for two years past completion and acceptance of Services as evidenced by annual
Certificates of Insurance.
8.2 Insurance Certificate. Contractor shall not exercise any of its rights under the Agreement until it delivers to City of Casa Grande's designated recipient certificates from contractor’s insurers showing that the coverage required above has been obtained.
8.2.1 The insurance certificates must show City of Casa Grande, its subsidiaries, affiliates directors, officers, and employees as additional insured parties in respect of all liability coverage except workers' compensation. The policy shall provide and the certificate shall reflect that the insurance afforded applies separately to each insured against whom claim is made or suit is brought except with respect to the limits of the company’s liability.
8.2.2 The insurance certificate shall provide on its face that the policies it represents will not be terminated, amended, or allowed to expire without 30 days prior written notice to City of Casa Grande.
8.2.3 Failure of City of Casa Grande to demand the insurance certificate or other evidence of full compliance with these insurance requirements or failure of City of Casa Grande to identify a deficiency from any certificate provided to it shall not be construed as a waiver of Contractor’s obligation to maintain such insurance.
8.3 Severability of Interests. The policies referenced in 8.1.2 and 8.1.3 shall contain a severability of interests clause, generally providing, "the insurance afforded applies separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the company's insurance."
8.4 Waiver of Subrogation. Contractor hereby waives any and all rights that it might have against City of
Casa Grande, its employees, officers, and directors, to recover all or part of any loss or damage insured or insurable by the insurance policies carried or required to be carried by it pursuant to the Contract Documents. Contractor shall require each of its agents, contractors, licensees and others performing the obligations, or exercising the rights, of
Contractor under the Agreement to provide a similar waiver for City of Casa Grande’s benefit.
8.5 Deductibles. Contractor may purchase the required insurance policies with deductibles which are reasonable in light of the contractor’s financial condition; provided that any loss not covered due to the deductible will be paid by Contractor. Contractor shall also require its agents, contractors, licensees and others performing the obligations, or exercising the rights, of contractor under the Agreement to carry such property damage insurance.
Such policy or policies shall cover the full insurable value of such tools and equipment.
SECTION 9. This Contract may be terminated at any time by mutual written consent, or by the City, with or without cause, upon giving thirty (30) days written notice. If this Contract is terminated, the City shall be liable only for payment for services rendered and accepted by the City before the effective date of termination.
The City reserves the right to terminate in whole or any part of this Contract due to the failure of the Contractor to carry out any term or condition of the Contract. The City will issue a written notice of default to the Contractor for failing to perform the stipulations, conditions or services/specifications required in this Contract. The Contractor shall have 5 days from receipt of the notice to rectify the failure or establish a plan for remedy. Contractor shall provide documentation of the remedy or proposed plan for approval by the City.
The City may terminate this Contract for cause if:
A. In the opinion of the City, the Contractor attempts to impose personnel, materials or services of an unacceptable quality;
B. In the opinion of the City, the Contractor fails to furnish the required services and/or product within the time stipulated in the Contract;
C. In the opinion of the City, the Contractor fails to make progress in the performance of the requirements of the
Contract;
D. The Contractor gives the City a positive indication that the Contractor will not or cannot perform to the requirements of the Contract.
In the event the Contractor has failed to perform any substantial obligation to be performed by the Contractor under this Agreement and said failure has not been cured within the times set forth in this Agreement, then the City may, upon written notice, withhold all monies due and payable to Contractor, without penalty, until such failure to perform is cured or otherwise adjudicated.
If funds that are appropriated or allocated for the payment of obligations under this Contract are not allocated by the City and available for the continued purchase of the services and/or materials provided under this Contract, this Contract may be terminated by the City at the end of the period for which funds are available. The City will notify the Contractor in the event that continued service will or may be affected by non-appropriation. No penalty shall accrue to the City in the event that this provision is exercised, and the City shall not be obligated or liable for any future payments due or for any damages as a result of termination under this paragraph.
Upon Notice of Termination the Contractor shall appraise the work the Contractor has completed and submit this appraisal to the City for evaluation.
The Contractor shall receive as compensation for services performed through the date of such termination, a fee for the percentage of work actually completed. This fee shall be a percentage of the Contractor fee described in this Contract and shall be in the amount mutually agreed to between the Contractor and the City. The City shall make this final payment within sixty (60) days after the Contractor has delivered the last of the partially completed items or service.
Notice required under this section shall be in writing and shall be served by certified mail upon the other party. When served by certified mail, services shall be conclusively deemed made five (5) days after posting thereof in the United
States mail, postage prepaid.
SECTION 10. Any written commitment received from the Contractor concerning this Agreement shall be binding upon the Contractor, unless otherwise specifically provided herein with reference to this paragraph. Failure of the
Contractor to materially fulfill such a commitment shall result in a breach of this Contract. A commitment includes, but is not limited to any representation made prior to execution of this Agreement, whether or not incorporated elsewhere herein by reference, as to performance of services or equipment, prices or options for future acquisition to remain in effect for a fixed period, or warranties.
SECTION 11. The Contractor agrees that any inspection by the City Representative or by other agents or employees of the City of the work performed is for the purpose of ensuring the technical competence of the work and adherence to other contractual provisions. Inspections are not for the purpose of safeguarding workers on the job, which is the sole responsibility of the Contractor.
The Contractor warrants that he/she is fully familiar with all the safety requirements of the Occupational Safety and
Health Act as promulgated by the Federal Government and as implemented by the State of Arizona, and that he/she will be solely responsible for implementing and enforcing the same at all times.
SECTION 12. The Contractor agrees to accomplish the work with a minimum of traffic interruption. If it becomes necessary to close any traffic lanes on any street within the City, permission must first be obtained from the City
Engineer’s Office. Permission shall be requested at least 48 hours in advance for residential streets and 72 hours in advance for arterial streets. The Contractor shall furnish and place all detour signs and any other warning signs in accordance with the SPECIAL PROVISIONS.
SECTION 13. All writings, programs, data, public records, or other materials prepared by the Contractor and/or its
Contractors or subcontractors, in connection with the performance of this Agreement shall be the sole and absolute property of the City.
SECTION 14. In the event that any litigation should arise concerning the construction or interpretation of any of the terms of this Agreement, the venue of such action of litigation shall be in the courts of the State of Arizona in and for the County of Pinal. This Agreement shall be governed by the laws of the State of Arizona. Should the City bring any legal or equitable action for the purpose of protecting or enforcing its rights under this Contract, the City shall recover, in addition to all other relief, its reasonable attorney’s fees and court costs to be fixed by the court.
SECTION 15. It is agreed that the Steve Hardesty, Community Services Director, or his/her designee is authorized to execute Contract Change Order(s)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .