RFQ 1080 - Lewiston Landscaping Administrative Document.docx
DOCX document 365 KB Posted
- Attached to
- RFQ: Lewiston Landscaping
- Solicitation number
- 1080
- Issued by
- Lincoln County, Idaho
About this file
This is a Request for Quotation (RFQ) administrative document issued by Lincoln County, Idaho, for landscaping services at the Lewiston office location. The solicitation was publicly posted on October 29, 2025, with quotation submissions due by November 12, 2025, providing potential vendors approximately two weeks to prepare their responses. The RFQ seeks a qualified landscaping contractor to provide comprehensive maintenance and aesthetic management of the office grounds, including standard services such as lawn maintenance, grounds keeping, seasonal plantings, and general exterior property upkeep. The documentation does not specify explicit contract term lengths, renewal options, site visits, or bidder conferences in the provided materials.
The administrative document does not contain explicit pricing terms, budget ranges, or award values, requiring interested contractors to review the complete RFQ documentation for financial scope details. No set-asides, incumbent contractors, or current vendors are identified in the materials provided. The solicitation does not specify funding sources, amounts, or special designations such as small business, local business, or disadvantaged enterprise preferences, though such considerations are common in state and local government contracting. Prospective bidders should be prepared to demonstrate professional landscaping capabilities, appropriate licensing, insurance coverage, and past performance in similar government or municipal landscaping contracts while ensuring full compliance with local government contracting regulations and standards.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Idaho Request For Quote
| RFQ Title: |
| Landscaping Services – Lewiston Local Office |
| RFQ Number: |
| #1080 |
1. Purpose: The Idaho Department of Labor (IDOL) is issuing this Request For Quote (“RFQ”) to solicit Quotes from qualified and experienced firms (“Offerors”), for a qualified landscaping provider to service the Lewiston Local Office with a full range of year-round landscape and snow removal services (Landscaping), as further detailed below.
2. RFQ Lead: The individual listed below (referred to as “RFQ Lead”) is the sole point of contact for this solicitation. All questions, clarification, or other correspondence must be submitted in writing via email to the RFQ Lead. Offerors are prohibited from communicating with any State employee or Official regarding this RFQ or procurement.
| Name |
| Sean Hogan |
| Title & Agency |
| Buyer, Division of Purchasing |
| Phone |
| (208) 332-1970 |
| Sean.hogan@adm.idaho.gov |
3. Timeline: Quotes are due by 5:00 p.m. MT on: Wednesday, November 12, 2025.
Late Quotes SHALL NOT be accepted or considered.
Optional Facility Walkthrough: An optional facility walkthrough is scheduled for bidders to visit the Lewiston Local Office and review the areas requiring Landscaping services. Attendance is recommended to understand the facility’s layout and service requirements but is not mandatory. Details are as follows:
3.1. Date and Time: Wednesday, November 5, 2025, at 10:00 a.m. MT
3.2. Location: Idaho Department of Labor, 1158 Idaho Street, Lewiston, ID 83501
3.3. Contact: Contact information will be provided upon submittal of registration.
3.4. RSVP: Bidders planning to attend are requested to complete and submit Exhibit 3 – Registration Form, to the RFQ Lead via email by 5:00 p.m. MT on Monday, November 3, 2025.
3.5. Instructions: Arrive 10 minutes early and check in at the reception area. Late arrivals may not be accommodated. Official questions about the walkthrough must be submitted in writing to the RFQ Lead; verbal questions may be answered during the walkthrough, but are considered unofficial and will not be included in this document.
4. Required Submittals: Offerors must complete and submit the following Submittal Forms as part of their Quote package:
Submittal Form A – Background, Declarations, & Certifications Submittal Form B – Pricing Schedule
5. Basis of Award: Award will be made to the responsive responsible Offeror with the lowest Total Cost, as provided on Submittal Form B. The RFQ Lead may, in the State’s sole discretion, require the Offeror to provide documentation to demonstrate its responsibility. Failure to provide the requested documentation may result in the Offeror being deemed non-responsible.
6. Submission Instructions The Quote must be submitted via IPRO prior to the deadline. Upload all required Submittal Forms (including Submittal Form A, Submittal Form B, and any other Forms listed in #4). Enter your Total Cost in IPRO.
7. Exhibits
7.1. Exhibit 1 – Background Information
7.2. Exhibit 2 – Scope of Work (SOW)
7.3. Exhibit 3 – Optional Facility Walkthrough Registration Form
7.4. Exhibit 4 – Contract Example
EXHIBIT 1
Background Information
1. Background Information The Idaho Department of Labor (IDOL) seeks to secure the services of a contractor that provides general landscaping services in addition to snow/ice removal services during the winter season.
2. Existing Data
2.1. Location: 1158 Idaho Street, Lewiston, ID 83501
2.2. Restrictions on when/how services can be provided: Services must be performed between the hours of 8:00 AM – 5:00 PM, Monday through Friday. Outside of snow removal services, no work is expected to be performed during State-recognized holidays. (Snow and/or ice removal must be performed weekdays prior to 8:00 a.m.).
3. Current Challenges The Agency aims to ensure consistent, high quality Landscaping Services in addition to snow/ice removal services during the winter season.
4. Reference Documents All documents referenced for this RFQ are located within this Administrative Document. If amendments are made, this section will update with reference to external documents.
EXHIBIT 2
Scope of Work
1. Summary of Scope The Contractor must provide complete grounds and landscaping care for the Idaho Department of Labor’s Lewiston Local Office as identified in the Scope of Work Requirements, including but not limited to blowing off parking lot, irrigation, snow removal, trash removal, pruning, weeding, spring/fall cleanup, sprinkler start-up/functional test, and sprinkler blowouts.
2. Objectives and Expectations It is desired to have one contractor complete both the landscape maintenance and snow removal for the following reasons: during summer months the maintainer can identify issues that may affect their winter operations for the property.
3. Schedule & Timeline Landscaping Services must begin five (5) days After Receipt of Order (ARO).
4. Contract Term The term of the resulting contract will be one (1) year, with four (4) optional renewals of one (1) year each, upon mutual, written agreement of both parties.
5. Unique Considerations The Lewiston Local Office does not contain any grass areas. As such, mowing, trimming, edging, and related lawn maintenance services are not required under this solicitation.
6. Requirements
6.1. Contractor Responsibilities
6.1.1. The Contractor and all personnel must be trained in industry-standard landscaping techniques and procedures, with knowledge of local area soil and climate requirements for all grass, shrubs, and plants; proper use of chemicals and insecticides; and proper procedures for cutting, trimming, watering and cultivating shrubs and trees.
6.1.2. Contractor must furnish all labor, equipment, supplies, tools and materials; as well as all Personal Protective Equipment (PPE) (gloves, protective eye wear, masks, etc.) which must be Occupational Safety and Health Administration (OSHA) compliant to perform the landscaping services required below.
6.1.3. General landscaping services will be blowing off parking lot, picking up trash, pruning, monitoring sprinkler systems, debris control, and overall landscape care for the Lewiston Local Office.
6.1.4. Contractor must immediately advise the IDOL Office Manager or their designated staff if there are any issues or concerns with any of the facilities on the IDOL premises. Contractor must address problems including, but not limited to, damaged sprinkler heads and issues related to the sprinkler system, watering issues, insect infestation, damaged or destroyed shrubbery, any damage to the buildings, and any other facilities maintenance or repair concerns that arise. Contractor must be financially responsible for replacing or repairing to original condition, at their expense, any furnishing damaged by the Contractor or any of the Contractors employees.
6.1.5. Contractor must provide detailed records of all services performed to the IDOL Office Manager, their designee, or the Building Facility Foreman, by email (provided to Contractor by IDOL prior to contract start date) after each monthly occurrence, in a format designated by IDOL.
6.1.6. Contractor’s Manager/Supervisor must schedule a monthly inspection of the areas designated for landscaping with the IDOL manager or designated staff to ensure quality of landscaping is at the standard of the IDOL.
6.1.7. Contractor must maintain and keep the Safety Data Sheet (SDS) current on all chemicals (hazardous or non-hazardous substances) used at any of the IDOL locations. A copy must be provided to the IDOL Manager or designated staff prior to the first application of the chemical. The IDOL Manager reserves the right to prohibit the use of any chemical that may be undesirable for any reason, at such time the IDOL Manager will work with the Contractor to determine an approved alternative.
6.1.8. All Contractor personnel must wear a “uniform” shirt while performing landscaping services at the IDOL location. The “uniform” shirt must clearly identify the individual as an employee of the Contractor.
6.1.9. No persons, other than Contractor or employees of the Contractor, must accompany the Contractor’s personnel while performing work under the contract.
6.2. Required Services: The Contractor must perform the services below and meet the requirements as identified for each service. The Schedule and Estimated Number of Cycles identified on Submittal Form B – Pricing Schedule, represent the minimum frequency at which each service must be performed.
6.2.1. Blowing off Parking Lot: All parking lots and sidewalks surrounding the building will be blown off by a commercial grade blower machine to remove all dust and debris. The blowers must be in optimal condition with close attention to respectable noise levels during regular business hours.
6.2.2. Picking up Trash: All trash, litter, and other rubbish must be removed from all landscaped areas, parking lots, and sidewalks. Disposal must take place off-site at a proper solid waste/compost disposal facility meeting all applicable federal, state, and local requirements.
6.2.3. Weed Control: Pre-emergent herbicide must be applied to control both annual and perennial grassy and broadleaf weeds in accordance with label directions. If weeds appear, control must be provided with post-emergence herbicides in accordance with label directions. Use non-selective and/or pre-emergent herbicides as necessary for expansion joints and cracks of paved surfaces. It is the Contractor’s responsibility to remove all annual grasses and weeds from expansion joints and cracks of hard surfaces once they have been sprayed and are dead.
6.2.3.1. Tree collars, flowering beds, and any additional bed areas must be maintained in weed free condition through the use of herbicides and hand labor.
6.2.3.2. Where commercial herbicides may cause damage to sensitive plants (seasonal color, bulbs, ground covers, etc.), weeds must be pulled by hand to minimize plant loss or damage.
6.2.4. Pruning (less than 15 ft. in height): Prune deciduous trees and shrubs when dormant to promote open framework in crown and to remove suckers, dead branches and leaves.
6.2.4.1. Pruning must be performed in appropriate season as not to remove bloom. Every effort must be made to maintain a natural growth form for each plant species. New growth must be pruned to keep with the overall size and shape of plant.
6.2.5. Sprinkler Systems Startup and Blow Out: Sprinkler system spring startups and fall blow outs must be accomplished, preventing frozen water lines in the spring and fall and maximizing the duration of the natural vegetation.
6.2.6. Monitoring Sprinkler Systems: Sprinkler systems for all locations with natural vegetation must be monitored for the appropriate water application for the specific time of year. If the Contractor determines that an adjustment of the sprinkler system is necessary (i.e. an increase in duration of water application), the Contractor must notify the IDOL Manager or designee of the suggested modifications.
6.2.7. Insect and Disease Control: As insect and disease problems occur, the Contractor must apply appropriate chemicals trees, deciduous trees and shrubs in leaf, and groundcovers/perennials as directed, to control all forms of pests and diseases. All chemicals used for control purposes must be applied by, or applied under, the direct supervision of a Certified Pesticide Applicator.
6.2.7.1. The Contractor must provide a current copy of the Certified Pesticide Applicator’s certificate or license to the IDOL Manager or designated staff prior to performing any chemical applications, and must maintain valid certification throughout the contract term. The Contractor must immediately notify IDOL if the certification expires, is suspended, or otherwise becomes invalid.
6.2.8. Debris Control: The Contractor must perform debris control on the same day as any requested service that promotes clippings, branches, offcuts, etc.
6.2.8.1. Contractor must remove all natural vegetation (leaves, branches, grass clippings, trimmings, etc.) from the site, including, but not limited to sidewalks, parking areas, and any paved areas surrounding the location.
6.2.8.2. Contractor must remove all inorganic materials (plastic, glass, metal, paper, rocks, etc.) and any other miscellaneous debris from the site, including, but not limited to sidewalks, parking areas, and any paved areas surrounding the location.
6.2.8.3. Contractor must remove all materials, trash, and debris from the landscaped service area. All debris from the site must be collected and discarded off-site at a proper solid waste/compost disposal facility meeting all applicable federal, state, and local requirements.
6.2.9. Snow and/or Ice Removal: Snow and/or ice must be removed and mitigated by the use of an ice melt product when accumulation on sidewalks and entrances reaches half inch (½”) and parking lots and driveways reaches one inch (1”). Snow and/or ice removal must be performed weekdays prior to 8:00 AM to ensure the facility is safely ready for staff and customers. Priority must first be given to keeping handicapped spaces clear and to ingress, egress, and fire lanes; secondly to customer and employee parking areas; and lastly to overflow parking areas.
6.2.9.1. IDOL Office sidewalks and parking lots must be cleared Saturday, Sunday and State recognized holidays (https://idaho.gov/government/state-holidays/) when accumulation reaches two (2) or more inches.
6.2.9.2. In the event a major snowstorm occurs (two (2) or more inch accumulation or unsafe ice), contractor response time must not exceed two (2) hours from the time the IDOL Office Manager or designee makes contact with the Contractor Supervisor.
6.2.9.3. During winter months the maintainer will recognize that any snow and deicing chemicals which were allowed to get into contact with the vegetation and cause any chemical ‘burns’ must be remedied by the same maintainer during the growing season; at no additional cost to the Department of Labor expected for such remedies.
6.3. Additional Requirements
6.3.1. The Contractor must have sufficient staff, equipment, and resources to complete the commitment of this agreement.
6.3.2. The Contractor must adhere to all Federal, State, and Local laws at all times.
6.3.3. Landscape and grounds must be maintained with the public’s safety in mind and in professional, presentable conditions.
6.3.4. Contractor vehicles that are poorly maintained (example: that leak antifreeze, oil or other fluids) will not be allowed on State property and may be cause of cancellation of this contract.
6.3.5. Any service discrepancies must be reported to the IDOL Office Manager, in writing via email as soon as reasonably possible, but no less than twenty four (24) hours from the occurrence, indicating why the services were not fully performed. Any site issues and abnormalities to the landscape and grounds must also be noted upon first observation.
6.3.6. The IDOL Office Manager or designee will monitor the contract through weekly site inspections.
6.3.7. Use of alternative services may be necessary if the Contractor is unable to meet the obligations listed in this contract. If such an event occurs the Contractor may be liable for all expenses including administrative fees.
6.3.8. Subcontracting requires written IDOL approval. Subcontractors must maintain the same insurance levels as the Contractor, and the Contractor remains liable for subcontractor performance. If subcontractors are used, the Contractor must submit a description with the Bid detailing their roles and how they will meet scope requirements.
6.3.8.1. IDOL will not pay the subcontractor from their invoice, and an increase from the contracted amount will not be permitted solely based on using a subcontractor to complete the commitments of this contract.
6.3.9. In the event services cannot be performed due to illness, injury, equipment failure and any/all conditions, the Contractor is required to notify the IDOL Office Manager in written email format. The same applies for any site issues, including but not limited to damage to facilities, grounds or landscape.
6.3.9.1. If the Contractor or their delegates, subcontractors, or otherwise become injured while on site for the previously described work, notification is expected of this occurrence within a reasonable and practical amount of time after medical attention has occurred, but no more than two (2) hours after the event.
6.3.9.2. If snow and deicing operations are not able to be completed for any reason, notification is expected within a reasonable and practical amount of time, but no more than two (2) hours from the committed time the work was expected to begin.
6.3.10. IDOL reserves the right to delete or add service(s) within the Lewiston Local office as required by operational needs (tree limb removal, mud and debris cleanup, etc.) Any such changes must be authorized in writing by amendment to the Contract. Costs will be based upon the additional hourly rate provided by the Contractor on Submittal Form B – Pricing Schedule.
EXHIBIT 3
Optional Facility Walkthrough Registration Form
| RFQ Number: |
| 1080 |
| RFQ Title: |
| Landscaping Services – Lewiston Local Office |
Instructions: Potential Bidders choosing to participate in the Optional Facility Walkthrough must pre-register by submitting this completed form, via e-mail, to the RFQ Lead at sean.hogan@adm.idaho.gov. Attendees are asked to submit this registration by Monday, November 3, 2025, at 5:00 p.m. MT. Attendance is limited to no more than three (3) representatives from each company.
As a reminder, potential Bidders are cautioned against relying on any verbal information shared during the walkthrough. The RFQ may only be amended by written documentation, posted to the state’s eProcurement System, IPRO POWERED BY LUMA.
The Site Walkthrough will begin on Wednesday, November 5, 2025, at 10:00 a.m. MT at the Lewiston Local Office, 1158 Idaho Street, Lewiston, ID 83501. It will be the responsibility of the interested Bidders to provide their own transportation. Failure to attend the site walkthrough and become familiarized with any pre-existing conditions must not relieve the Bidder of their responsibilities or meeting the requirements of this RFQ; however, attendance is not a requirement to submit a bid.
Note: The location mentioned above is the location in which the Landscaping Services will be performed.
| Individuals Name |
| Company |
| Email Address |
| Phone Number |
Instructions: Arrive 10 minutes early and check in at the reception area. Late arrivals may not be accommodated. Official questions about the walkthrough must be submitted in writing to the RFQ Lead; verbal questions may be answered during the walkthrough but are considered unofficial and will not be included in this document.
EXHIBIT 4
Contract
The Contract resulting from this solicitation is subject to the terms and conditions set forth in the document titled “State of Idaho Contract Terms and Conditions” attached within the Questions tab in IPRO Powered by LUMA. By executing a Contract resulting from this solicitation, the parties acknowledge and agree to be bound by all such terms and conditions as if fully set forth herein.
The Contract incorporates by reference all attachments, exhibits, and documents included in the original solicitation, as well as all attachments, exhibits, and materials submitted by the Contractor in response to the solicitation. Such documents form an integral part of the Contract and shall have the same force and effect as if set forth in full herein.
A sample of the Contract document can be found on the following page.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
SUBMITTAL FORM A
Background, Declarations, & Certifications
All information requested in this Submittal Form is Mandatory.
Failure to complete or respond to each question, failure to sign this Form, and failure to submit this Form may result in your Quote being deemed non-responsive.
PROJECT INFORMATION
| RFQ Number: |
| 1080 |
| Project Name: |
| Landscaping Services – Lewiston Local Office |
OFFEROR INFORMATION
Company Name:
Company Address:
Tax Identification Number (EIN):
DUNS Number:
| Legal Status: |
| ☐ Corporation |
☐ Limited Liability Corporation (LLC) ☐ Limited Liability Partnership ☐ Sole Proprietorship ☐ Other (specify)
CONTACT INFORMATION
Individual responsible for preparing this Proposal, and who can be contacted for clarification on this Proposal
Contact Name:
Title:
Email:
Telephone:
ATTESTATION AND SIGNATURE
This Submittal must be dated and signed by an officer or agent (“Representative”) duly authorized to execute contracts for the Offeror. By my signature I accept the terms, conditions and requirements contained in the solicitation, including, but not limited to, the State of Idaho Standard Contract Terms and Conditions, and the solicitation instructions in effect at the time this RFQ was issued, as incorporated by reference into this solicitation; as well as any special terms and conditions incorporated in the solicitation documents. As the undersigned, I certify I am authorized to sign and submit this response for the named Offeror. I further acknowledge I am responsible for reviewing and acknowledging any addendums that have been issued for this solicitation.
Printed Name of Representative
Signature
Date
SUBMITTAL FORM B
Pricing Schedule
The Offeror must complete all information requested in this Submittal Form. This Submittal Form must be submitted with your Quote electronically through the Idaho eProcurement System (IPRO).
Name of Offeror:
Cost/Fee Please provide your TOTAL COST for landscaping and snow removal services for the initial one (1) year contract. Your TOTAL COST must be fully burdened to include all costs to complete the scope of work including, but not limited to blowing off parking lots, picking up trash, weed control, pruning, sprinkler system startup and blow out, monitoring the sprinkler system, insect and disease control, debris control, snow removal, ice removal, equipment, PPE, supplies, fuel, labor, transportation, etc.
TASK
SCHEDULE
ESTIMATED NUMBER OF *CYCLE(S)
PER OCCURRENCE COST
EXTENDED COST
| Blowing off Parking Lot |
| Weekly: April 15 – October 31 |
| 25 |
| Picking up Trash |
| Weekly: April 15 – October 31 |
| 25 |
| Weed Control |
| Bi-weekly: April 15 – October 31 |
| 15 |
| Insect and Disease Control |
| Spring/Fall |
| 2 |
| Sprinkler System Startup and Blow Out |
| Spring/Fall |
| 2 |
| Sprinkler System Monitoring |
| Spring/Summer/Fall |
| 15 |
| Pruning |
| Every 3 months |
| 3 |
| Debris Control |
| Weekly: April 15 – October 31 |
| 25 |
| Spring/Fall Cleanup |
| Spring/Fall |
| 2 |
| Snow Removal |
| As Needed |
| 6 |
| Ice Removal |
| As Needed |
| 6 |
| Ice Melt |
| As Needed |
| 6 |
| TOTAL COST |
| $ |
*Cycle(s): The number indicated under the cycle(s) section is the minimum frequency of times work must be performed for that location. Cycles may be more than indicated and will be contingent on the overall performance of the natural vegetation. Contractors will invoice IDOL for additional cycles based on the Contractor’s per occurrence cost provided on the Price Sheet. Snow removal, ice removal, and ice melt is an estimate only, there are no guaranteed minimum number of occurrences for these services.
Please provide your hourly rate for additional services outside of the scope of work as described in Exhibit 2 section 6.3.10. This rate is for informational purposes only and will not be evaluated.
Hourly Rate for Additional Services: $ ___________________________________
If awarded the contract, will you meet the time line for starting services as specified in Exhibit 2 (5 days ARO)?
Note: Failure to respond, or responding ‘No’ may disqualify your Quote. If you have responded ‘No’, please provide a brief explanation below:
Yes No
Company Name:
Contact Name:
Phone Number:
Contact E-mail:
image2.png image1.png
File details come from the government source that posted it. Updated .