RFQ # 1065 - Attachment 1 - Admin. Info - 19' Boat.pdf
PDF 255 KB Posted
- Attached to
- 19' Enforcement Boat and Trailer
- Solicitation number
- 1065
- Issued by
- Idaho
About this file
This Attachment 1 administrative information document is issued by the Idaho Department of Fish and Game (IDFG) for Request for Quote (RFQ) #1065 regarding the procurement of a 19' Enforcement Patrol Boat and Trailer. The solicitation seeks qualified vendors to supply a new 19-foot aluminum enforcement patrol boat with outboard motor and trailer meeting specified technical requirements. The RFQ is submitted electronically via the IPRO Supplier Portal with questions due and closing dates available through that system. Award will be made on an all-or-none basis to the responsive, responsible vendor with the lowest total cost. Required submittals include a completed price sheet, signature page, insurance requirements documentation, and brochures or specification sheets detailing the boat model. The boat must be delivered Monday through Thursday, 8:00 a.m. to 4:00 p.m. local time to the IDFG facility at 1345 Barton Road, Pocatello, Idaho 83204, with the contractor providing written notification at least seven business days prior to delivery. The acceptance period is thirty calendar days from delivery, during which the contractor must correct any discrepancies at no additional cost to IDFG within thirty days of notification.
The contractor must provide pricing on the designated attachment and include an estimated delivery date. Payment will be made in accordance with Idaho Code 67-2302 following invoice submission with required itemization and contract information. The boat must include a minimum one-year warranty covering all parts, labor, equipment, and freight, with a factory-authorized repair facility required within a 100-mile radius of the delivery location and all warranty work to be completed within thirty calendar days. The contractor must demonstrate current authorization from the manufacturer as an authorized dealer or reseller. The specifications include a Tracker Targa V-19 WT or equal 19-foot aluminum deep V-hull boat with reversed chine design, dual consoles with full windshield, seating for four personnel, a Mercury 150 XL FourStroke outboard motor or equal, a Minn Kota PowerDrive 24V trolling motor or equal, a tandem-axle galvanized steel trailer, and accessories including a pole-less rope ratchet storage cover and Bimini top with full enclosure curtains. No set-asides or incumbent designations are specified in this solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ # 1065 - Attachment 2 - Price Sheet - 19' Boat.docx | DOCX document | |
| RFQ # 1065 - Attachment 4 - Insurance - 19' Boat.docx | DOCX document | |
| RFQ # 1065 - Attachment 3 - Signature Page - 19' Boat.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ # 1065 19’ Enforcement Patrol Boat Page 1 of 6
IDAHO DEPARTMENT OF FISH & GAME
ATTACHMENT 1 – SECTION 1
RFQ Title: 19’ Enforcement Patrol Boat and Trailer
RFQ Number: RFQ # 1065
RFQ Solicitation Contact: Eric Wagner - Buyer Eric.wagner@idfg.idaho.gov 208.287.2815
Submit Electronically via IPRO: Supplier Portal / Supplier Portal (inforgov.com)
Deadline to Receive Questions: See IPRO
RFQ Closing Date: See IPRO
Award: Award will be made, all or none, to the responsive responsible vendor with the lowest Total Cost.
A. Purpose The Idaho Department of Fish & Game (IDFG) is requesting Quotes from qualified vendors for the purchase and delivery of a 19’ Enforcement Patrol Boat and Trailer (Boat) as further detailed below.
B. General Information & Solicitation Instructions This Solicitation is issued by IDFG via IPRO - Supplier Portal / Supplier Portal (inforgov.com) The RFQ Lead is the only contact for this Solicitation. All correspondence regarding this RFQ must be in writing. In the event that it becomes necessary to revise any part of this RFQ, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this RFQ will not be relied upon. All changes to this RFQ must be in writing and posted in IPRO to be valid. Alternate Bids are not allowed.
C. Submission Requirements Your response to this RFQ may be submitted electronically via IPRO or email. IDFG will not be accepting manual submissions for this solicitation. Your submission must include the Required Submittals listed below and be received prior to the deadline noted below.
Failure to provide any of the documents or submission on a form different from those provided, may cause your submission to be found as non-responsive.
Electronic Submission:
IPRO – Enter your pricing in IPRO- Supplier Portal / Supplier Portal (inforgov.com)` . and upload all Required Submittals.
When a Bidder has successfully submitted a response to IPRO, the Bidder should see a change in the system from “Draft Bid” (see Fig. 1) to “Submission confirmation email sent” (see Fig. 2). Bidders are encouraged to document notification of successful submission for their records. If you believe you have submitted your Bid, but have not received the “Bid Submitted” message, you are advised to contact the IPRO provider’s help desk (phone number available at https://purchasing.idaho.gov/ipro.html) and notify the solicitation lead prior to the solicitation End Time. Vendors are strongly encouraged to begin the process of submitting the response far enough in advance of the End Time to allow for resolution of technical difficulties. Be advised that the State is not responsible for a Vendor’s failure to timely submit a responsive submission due to any technical or technological difficulties. See
IDAPA 38.05.01.61.02.
mailto:Eric.wagner@idfg.idaho.gov https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA https://sms-idaho-prd.tam.inforgov.com/fsm/SupplyManagementSupplier/page/XiSupplyManagementSupplierPage?csk.SupplierGroup=LUMA https://purchasing.idaho.gov/ipro.html
RFQ # 1065 19’ Enforcement Patrol Boat Page 2 of 6
Fig. 1
Fig. 2
If submitting via IPRO, be advised that that the Offeror for Proposal evaluation and award purposes is the entity profile under which the Proposal is submitted in IPRO, which must be the same legal entity presented in the uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Proposal in IPRO, the information provided on the Signature Page prevails.
While it is not mandatory to submit your Proposal electronically via IPRO, all Offerors participating in a Solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a Proposal manually outside of IPRO) as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free and only takes a few minutes.
Offerors are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows evaluators to efficiently navigate the Offeror’s response; as the State will print uploaded documents for evaluation in the manner received via IPRO
Email:
Send an email to the Solicitation Contact (listed above) and attach all Required Submittals.
D. Required Submittals As part of your response to this RFQ, the following documents are required.
Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 - Insurance Requirements Brochures and/or specifications sheet detailing the Boat being submitted for this solicitation.
E. Award Award may be all to one or by line item (if applicable) to the responsive responsible Bidder with the lowest fully burdened cost per line in the best interest of the State, as provided in Attachment 2 in IPRO.
F. Resulting Contract If IDFG awards a contract from this Solicitation, it will do so by issuing a Purchase Order (PO) document, which will be an acceptance of the successful bid. The PO will be comprised of the following documents; this RFQ, including any incorporated documents; the successful bid, including any clarifications requested by IDFG; and an artifact formalizing any requirements agreed upon through Contract discussions or negotiations, if applicable.
The following documents are incorporated into this RFQ as if set out in their entirety:
Solicitation Instructions for Vendors – January 2017 State of Idaho Standard Contract Terms and Conditions – July 2024
RFQ # 1065 19’ Enforcement Patrol Boat Page 3 of 6
The documents may be found on the “Information for Vendors” page of the State’s Division of Purchasing (DOP) website ( https://purchasing.idaho.gov/governing-laws-and-policies/ ). If multiple versions of any of these documents are available on the website, the version in effect on the day the RFQ is issued shall apply.
ATTACHMENT 1 – SECTION 2
The following special terms and conditions are incorporated into the resulting Contract to supplement or add to the State of Idaho Standard Contract Terms and Conditions.
A. Delivery Contractor must provide an estimated Delivery date on Attachment 2 – Price Sheet. The Contractor is responsible for the unloading of the Boat Freight FOB destination, prepaid and allowed.
Delivery must be made Monday through Thursday, 8:00 am to 4:00 pm local time excluding state of Idaho recognized holidays (https://www.idaho.gov/government/holidays.html), unless otherwise approved in writing by IDFG. Contractor must notify IDFG, in writing, no less than seven (7) business days prior to delivery. IDFG delivery contact information will be provided upon Award.
Delivery Location Idaho Department of Fish and Game 1345 Barton Road Pocatello, Idaho 83204
B. Acceptance Upon receipt of the Boat, per the delivery location, the Boat will be inspected by the delivery contact (or approved designee) to ensure the requirements and specifications are met. The Acceptance period will be for thirty (30) calendar days from the date the Boat is delivered.
In the event the specifications are not met, the Contractor must pick-up, correct any discrepancies, and re-deliver within thirty (30) calendar days after notification from IDFG, at no additional cost to IDFG. In the event that the Boat does not meet the specifications or is found with discrepancies that are not fixed by the Contractor during the Acceptance period, IDFG reserves the right to reject the Boat via official notification.
If approved by IDFG, the Contractor may correct discrepancies on-site at IDFG’s location in lieu of pick-up and return shipping. The Contractor will be responsible for providing all labor; tools, parts, supplies, and worksite clean up to make any necessary corrections.
The timeframe for corrective action will still be as identified above.
C. Invoicing & Payments Invoices – Invoices must be submitted as further detailed below. Invoices submitted prior to Acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission.
Invoices must include the following information:
• Contractor Company Name & Contact Information
• Contract Name & Number (PO #)
• Invoice Number & Date
• Itemization of the purchased goods to include: description matching the contract, quantity, unit of measure, unit price, extended price, and total invoiced amount.
Payments – Payment for correctly submitted invoices will be made in accordance with Idaho Code 67-2302:
https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/
D. Warranty Warranty must be for a minimum period of one (1) year, for the entire Boat, after Acceptance. Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warrantied item, which may include the entire Boat.
https://purchasing.idaho.gov/governing-laws-and-policies/ https://www.idaho.gov/government/holidays.html https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/
RFQ # 1065 19’ Enforcement Patrol Boat Page 4 of 6
A factory authorized repair and warranty service facility must be located within a one hundred (100) mile radius of delivery location listed above to provide full Boat service, repairs, factory support and full warranty repair.
Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warranted item, which may also include the entire Boat. All warranty work must be complete within thirty (30) calendars days after receipt of written notice from IDFG. If approved by IDFG, the Contractor may perform warranty work on-site, at the Delivery location, in lieu of pick-up and return shipping. The Contractor will be responsible for all travel costs and work-site clean-up associated with any necessary repairs. The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the Boat on-site within thirty (30) calendars days, or if the Boat continuously malfunctions and causes it to be out of service on multiple occasions, IDFG reserves the right to require the Contractor to pick-up, repair, and return the Boat at no additional cost to IDFG.
Contractor is responsible for all warranty requirements. No third-party warranties will be allowed.
E. Vendor Requirement Vendor must have a current and signed written agreement with the manufacturer stating that the vendor is an authorized dealer or authorized re-seller for the product(s) being quoted in this solicitation.
F. Remedial Action In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to IDFG, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) terminate the Contract pursuant to Section 2.F, Termination of Contract, in addition to any remedies imposed by the State.
If IDFG must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, IDFG may withhold the actual cost to IDFG from the Contractor’s payment(s).
G. Termination of Contract For Cause - See Section 1.4, Termination, of the State of Idaho Standard Contract Terms and Conditions – July 2024.
For Fiscal Necessity – See Section 1.18, Termination for Fiscal Necessity, of the State of Idaho Standard Contract Terms and Conditions – July 2024.
For Convenience – Either party may terminate this Contract for its convenience at any time upon providing its written notification at least ninety (90) calendar days prior to the desired termination date.
ATTACHMENT 1 – SECTION 3
A. Requirements The Boat must meet the minimum specifications provided below and must be the latest model produced and sold to commercial trade. The Boat must be new, not used. Though they are not specifically covered herein, all parts necessary to provide a complete and functional Boat must be included. All parts must conform in design, strength, quality of materials, and workmanship to meet or exceed current engineering practices and accepted standards of the industry. All parts must be the manufacturer’s standard unless otherwise specified in this RFQ.
B. Brand Name The brand name(s) specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Contractor offering an “equal” must include documentation, which demonstrates, to IDFG’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, IDFG reserves the right to seek clarification from the Contractor. Failure to provide satisfactory documentation or a clarifying response to IDFG may eliminate the Contractor from further consideration.
C. Manuals The Contractor must provide one (1) parts manual (Manual) and one (1) operation Manual for the Boat at the time of Delivery. The manuals must include all components and exploded view drawings with both parts’ identification and parts list. The manuals must be in either paper (book) format or portable document format (PDF) via universal serial bus (USB) drive.
RFQ # 1065 19’ Enforcement Patrol Boat Page 5 of 6
D. Enforcement Patrol Boat – General Specifications 19’ Aluminum enforcement patrol boat, with outboard motor and trailer.
The following Specifications are the minimum that IDFG is willing to accept.
1. Tracker Targa V-19 WT, nineteen (19) ft. or equal.
2. Beam – not exceeding one hundred and two (102) inches.
3. Must have an aluminum deep V style hull.
4. Hull Weight Capacity / Combined Capacity (persons, motor, gear) – Minimum of nineteen hundred (1900) lb.
5. Must have a reversed chine hull design.
6. Hull Thickness (Bottom) - Must be a minimum of .125 inches thick.
7. Hull Thickness (Side) - Must be a minimum of .100 inches thick.
8. Bottom width not to exceed eighty-eight (88) inches.
9. Must have minimum side height of twenty-five (25) inches.
10. Minimum horsepower rating of one hundred fifty (150) HP and maximum of two hundred twenty-five (225) HP.
11. Must have a minimum of six (6) person capacity.
12. Must have a minimum of four (4) flip up tie cleats.
13. The boat must have an aft swim platform with boarding ladder.
14. Boat must have an automatic bilge pump with a minimum capacity of 1,100 GPH.
15. Must have elevated bow & aft fishing decks.
16. Must have a remote drain plug.
17. The boat must have bow and stern eyes.
18. Must have an electric bow panel with 12V outlet for trolling motor.
19. Must have an onboard three-bank battery charger.
20. Must have forty-seven (47) gallon minimum fuel capacity.
21. Must have integrated bow and aft live wells with aeration.
22. Must have removable navigational lights that are USCG approved.
23. Exterior color must be black.
E. Boat Interior The following is a list of more detailed specifications that the boat interior must have at a minimum.
1. The boat must have dual consoles with a full windshield for driver and passenger with center walk through design.
2. Must have seating for four (4) personnel.
3. Driver and passenger seats must be equipped with air-ride shock absorption & seat slides.
4. Must have a twelve (12) volt power and USB outlets on port and starboard side panels.
5. The elevated bow & aft fishing decks must have marine grade / fish friendly carpet.
6. The Cockpit must have nonskid marine grade vinyl flooring.
7. Must have forward and aft floor storage compartments.
8. Must have lockable rod storage compartment(s).
9. Must have multiple storage compartments for safety gear, field equipment, and evidence.
10. The console must have fully lighted instrumentation.
11. The console must have a lockable glovebox.
12. The console must have a built-in horn assembly.
13. Must have a fish finder, Lowrance® HOOK Reveal 7 swivel color fishfinder + GPS w/CHIRP & TripleShot™ transducer, or equal.
F. Outboard Motor
1. Mercury 150 XL FourStroke, or equal.
2. Engine – 3.0-liter, 4-cylinder, 8-valve SOHC, or equal.
3. One Hundred Fifty (150) HP.
4. Electronic fuel injection.
5. Must have power trim and tilt.
6. Minimum sixty (60) amp alternator.
RFQ # 1065 19’ Enforcement Patrol Boat Page 6 of 6
G. Boat Trailer
1. Must be designed to fit the boat specified above with an adequate payload capacity.
2. Must be tandem axle.
3. Must be constructed with galvanized steel, or equal.
4. Must have heavy duty upright load guides for easy loading.
5. Must have padded bunks and fender boards to protect the hull.
6. Must have transom tie downs.
7. Must have an outboard motor support to reduce hull & transom stress while towing.
8. Must have submersible LED tail and marking lights.
9. Must have a heavy-duty winch with nylon strap and bow safety strap, or equal.
10. Must have a pivot-up locking jack with swivel wheel, or equal.
11. Must have a swing-away tongue to reduce storage length.
12. Must have radial tires along with a matching spare tire and carrier.
13. Must have integrated steps & safety handle for boarding at bow while the boat is on the trailer.
H. Trolling Motor
1. Minn Kota PowerDrive 24V, or equal.
2. Must be a minimum of twenty-four (24) volts.
3. Must have minimum sixty (60) in. shaft length.
4. Must have minimum thrust of seventy (70) lbs.
5. Must be Bluetooth connectable.
6. Must have advanced GPS navigation.
7. Must be foot pedal compatible.
8. Must have a full mount on bow.
I. Cover
1. Must include a pole-less rope ratchet storage cover.
2. Must include a Bimini top with a boot, frame and attachment hardware.
3. Must include a heavy-duty full enclosure curtain set that attaches to the Bimini top.
C. Submission Requirements
File details come from the government source that posted it. Updated .