RFQ 1018- Attachment 1 - Admin. Info Amended - 21' Boat.docx
DOCX document 108 KB Posted
- Attached to
- 21' Enforcement Boat and Trailer
- Solicitation number
- 1018
- Issued by
- Idaho
About this file
This is a Request for Quote (RFQ) issued by the Idaho Department of Fish and Game for the purchase and delivery of one 21' Enforcement Patrol Boat and Trailer. The RFQ was issued through the IPRO Supplier Portal system, with all submissions to be made electronically via IPRO or email to Doug Peterson, Purchasing Agent, at Doug.Peterson@idfg.idaho.gov or 208-287-2816. Qualified vendors are required to submit responses that include a completed Price Sheet (Attachment 2), Signature Page (Attachment 3), proof of insurance requirements (Attachment 4), and brochures or specification sheets detailing the boat being offered. The boat must be a new, latest-model 21' aluminum enforcement patrol boat meeting minimum specifications including a Duckworth 21 Discovery or equal, with a minimum seven-person capacity, 2,400-pound hull weight capacity, full reverse chine bottom design, full windshield, dual automatic bilge pumps, composite flooring, rear transom door, dual marine group 27 batteries, 60-gallon minimum fuel capacity, rear livewell, Alaska Full hard top cab with Gull wing front door, and associated equipment including a Yamaha VF200XB 200-horsepower outboard motor or equal and a trolling motor. Delivery must be made Monday through Thursday, 8:00 a.m. to 4:00 p.m. local time, to the Idaho Department of Fish and Game at 2885 W Kathleen Avenue, Coeur d'Alene, Idaho 83815, with the contractor providing seven business days' advance written notice. The specific RFQ closing date and award date are referenced as "See IPRO" and are not explicitly stated in the document provided.
Award will be made to the responsive, responsible vendor with the lowest total cost for the complete boat and trailer package. The contractor must provide one parts manual and one operation manual at delivery and must demonstrate current, signed written authorization from the manufacturer as an authorized dealer or reseller. The contractor is responsible for all unloading freight charges, FOB destination prepaid and allowed, and must maintain a factory-authorized repair and warranty service facility within a 100-mile radius of the delivery location. A minimum one-year warranty covering all tools, parts, equipment, labor, and freight is required, with all warranty work to be completed within 30 calendar days of written notice. An acceptance period of 30 calendar days from delivery applies, during which the contractor must correct any discrepancies at no additional cost to the state; failure to meet specifications allows IDFG to reject the boat. Invoices must be submitted only after acceptance and include required itemization information, with payment made in accordance with Idaho Code 67-2302. No set-asides for disadvantaged enterprises are specified in this solicitation. The contract may be terminated for cause, fiscal necessity, or convenience by either party with 90 calendar days' written notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 1018 - Attachment 4 - Insurance - 21' Boat.docx | DOCX document | |
| RFQ 1018- Attachment 2 - Price Sheet - 21' Boat.docx | DOCX document | |
| RFQ 1018 - Attachment 3 - Signature Page - 21' Boat.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO DEPARTMENT OF FISH & GAME
ATTACHMENT 1 – SECTION 1
| RFQ Title: |
| 21’ Enforcement Patrol Boat and Trailer |
| RFQ Number: |
| RFQ # 1018 |
| RFQ Solicitation Contact: |
| Doug Peterson, Purchasing Agent |
Doug.Peterson@idfg.idaho.gov 208.287.2816
| Submit Electronically via IPRO: |
| Supplier Portal / Supplier Portal (inforgov.com) |
| Deadline to Receive Questions: |
| See IPRO |
| RFQ Closing Date: |
| See IPRO |
| Award: |
| Award will be made, all or none, to the responsive responsible vendor with the lowest Total Cost. |
A. Purpose The Idaho Department of Fish & Game (IDFG) is requesting Quotes from qualified vendors for the purchase and delivery of a 21’ Enforcement Patrol Boat and Trailer (Boat) as further detailed below.
B. General Information & Solicitation Instructions This Solicitation is issued by IDFG via IPRO - Supplier Portal / Supplier Portal (inforgov.com) The RFQ Lead is the only contact for this Solicitation. All correspondence regarding this RFQ must be in writing. In the event that it becomes necessary to revise any part of this RFQ, amendments will be posted at IPRO. It is the responsibility of the Bidder to monitor IPRO for any updates or amendments. Any oral interpretations or clarifications of this RFQ will not be relied upon. All changes to this RFQ must be in writing and posted in IPRO to be valid. Alternate Bids are not allowed.
C. Submission Requirements Your response to this RFQ may be submitted electronically via IPRO or email. IDFG will not be accepting manual submissions for this solicitation. Your submission must include the Required Submittals listed below and be received prior to the deadline noted below. Failure to provide any of the documents or submission on a form different from those provided, may cause your submission to be found as non-responsive.
Electronic Submission:
IPRO – Enter your pricing in IPRO- Supplier Portal / Supplier Portal (inforgov.com)` . and upload all Required Submittals.
When a Bidder has successfully submitted a response to IPRO, the Bidder should see a change in the system from “Draft Bid” (see Fig. 1) to “Submission confirmation email sent” (see Fig. 2). Bidders are encouraged to document notification of successful submission for their records. If you believe you have submitted your Bid, but have not received the “Bid Submitted” message, you are advised to contact the IPRO provider’s help desk (phone number available at https://purchasing.idaho.gov/ipro.html) and notify the solicitation lead prior to the solicitation End Time. Vendors are strongly encouraged to begin the process of submitting the response far enough in advance of the End Time to allow for resolution of technical difficulties. Be advised that the State is not responsible for a Vendor’s failure to timely submit a responsive submission due to any technical or technological difficulties. See IDAPA 38.05.01.61.02.
Fig. 1
Fig. 2
If submitting via IPRO, be advised that that the Offeror for Proposal evaluation and award purposes is the entity profile under which the Proposal is submitted in IPRO, which must be the same legal entity presented in the uploaded response materials. If the entity identified on the state supplied Signature Page differs from the entity under which you submit your Proposal in IPRO, the information provided on the Signature Page prevails.
While it is not mandatory to submit your Proposal electronically via IPRO, all Offerors participating in a Solicitation issued through IPRO must establish an account in the IPRO system (even if submitting a Proposal manually outside of IPRO) as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free and only takes a few minutes.
Offerors are further advised to upload response materials with descriptive file names, organized and consolidated in a manner which allows evaluators to efficiently navigate the Offeror’s response; as the State will print uploaded documents for evaluation in the manner received via IPRO
Email:
Send an email to the Solicitation Contact (listed above) and attach all Required Submittals.
D. Required Submittals As part of your response to this RFQ, the following documents are required.
Attachment 2 – Price Sheet Attachment 3 – Signature Page Attachment 4 - Insurance Requirements Brochures and/or specifications sheet detailing the Boat being submitted for this solicitation.
E. Award Award may be all to one or by line item (if applicable) to the responsive responsible Bidder with the lowest fully burdened cost per line in the best interest of the State, as provided in Attachment 2 in IPRO.
F. Resulting Contract If IDFG awards a contract from this Solicitation, it will do so by issuing a Purchase Order (PO) document, which will be an acceptance of the successful bid. The PO will be comprised of the following documents; this RFQ, including any incorporated documents; the successful bid, including any clarifications requested by IDFG; and an artifact formalizing any requirements agreed upon through Contract discussions or negotiations, if applicable.
The following documents are incorporated into this RFQ as if set out in their entirety:
| Solicitation Instructions for Vendors – January 2017 |
| State of Idaho Standard Contract Terms and Conditions – July 2024 |
The documents may be found on the “Information for Vendors” page of the State’s Division of Purchasing (DOP) website ( https://purchasing.idaho.gov/governing-laws-and-policies/ ). If multiple versions of any of these documents are available on the website, the version in effect on the day the RFQ is issued shall apply.
ATTACHMENT 1 – SECTION 2
The following special terms and conditions are incorporated into the resulting Contract to supplement or add to the State of Idaho Standard Contract Terms and Conditions.
A. Delivery Contractor must provide an estimated Delivery date on Attachment 2 – Price Sheet. The Contractor is responsible for the unloading of the Boat Freight FOB destination, prepaid and allowed.
Delivery must be made Monday through Thursday, 8:00 am to 4:00 pm local time excluding state of Idaho recognized holidays (https://www.idaho.gov/government/holidays.html), unless otherwise approved in writing by IDFG. Contractor must notify IDFG, in writing, no less than seven (7) business days prior to delivery. IDFG delivery contact information will be provided upon Award.
| Delivery Location |
| Idaho Department of Fish and Game |
| 2885 W Kathleen Ave. |
| Coeur D Alene, Idaho 83815 |
B. Acceptance Upon receipt of the Boat, per the delivery location, the Boat will be inspected by the delivery contact (or approved designee) to ensure the requirements and specifications are met. The Acceptance period will be for thirty (30) calendar days from the date the Boat is delivered.
In the event the specifications are not met, the Contractor must pick-up, correct any discrepancies, and re-deliver within thirty (30) calendar days after notification from IDFG, at no additional cost to IDFG. In the event that the Boat does not meet the specifications or is found with discrepancies that are not fixed by the Contractor during the Acceptance period, IDFG reserves the right to reject the Boat via official notification.
If approved by IDFG, the Contractor may correct discrepancies on-site at IDFG’s location in lieu of pick-up and return shipping. The Contractor will be responsible for providing all labor; tools, parts, supplies, and worksite clean up to make any necessary corrections. The timeframe for corrective action will still be as identified above.
C. Invoicing & Payments Invoices – Invoices must be submitted as further detailed below. Invoices submitted prior to Acceptance, or without the required information listed below, will be returned to the Contractor for correction and resubmission.
Invoices must include the following information:
· Contractor Company Name & Contact Information
· Contract Name & Number (PO #)
· Invoice Number & Date
· Itemization of the purchased goods to include: description matching the contract, quantity, unit of measure, unit price, extended price, and total invoiced amount.
Payments – Payment for correctly submitted invoices will be made in accordance with Idaho Code 67-2302: https://legislature.idaho.gov/statutesrules/idstat/title67/t67ch23/sect67-2302/
D. Warranty Warranty must be for a minimum period of one (1) year, for the entire Boat, after Acceptance. Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warrantied item, which may include the entire Boat.
A factory authorized repair and warranty service facility must be located within a one hundred (100) mile radius of delivery location listed above to provide full Boat service, repairs, factory support and full warranty repair.
Warranty must include all tools, parts, equipment, labor, and freight to repair or replace a defective warranted item, which may also include the entire Boat. All warranty work must be complete within thirty (30) calendars days after receipt of written notice from IDFG. If approved by IDFG, the Contractor may perform warranty work on-site, at the Delivery location, in lieu of pick-up and return shipping. The Contractor will be responsible for all travel costs and work-site clean-up associated with any necessary repairs. The timeframe for corrective action will still be as identified above. If the Contractor is unable to repair the Boat on-site within thirty (30) calendars days, or if the Boat continuously malfunctions and causes it to be out of service on multiple occasions, IDFG reserves the right to require the Contractor to pick-up, repair, and return the Boat at no additional cost to IDFG.
Contractor is responsible for all warranty requirements. No third-party warranties will be allowed.
E. Vendor Requirement Vendor must have a current and signed written agreement with the manufacturer stating that the vendor is an authorized dealer or authorized re-seller for the product(s) being quoted in this solicitation.
F. Remedial Action In addition to any remedies available to the State under law or equity, the State may it its sole discretion require one (1) or more of the following remedial actions if any of the service does not conform to the Contract requirements: 1) require the Contractor to take corrective action to ensure that performance conforms to the Contract requirements, 2) require the Contractor to subcontract all or part of the Contract at no additional cost to IDFG, 3) withhold payment or require payment of actual damages caused by the Discrepancy, 4) terminate the Contract pursuant to Section 2.F, Termination of Contract, in addition to any remedies imposed by the State.
If IDFG must perform or hire a separate contractor to perform any of the Contract’s requirements, which is the responsibility of the Contractor under the terms of the Contract, IDFG may withhold the actual cost to IDFG from the Contractor’s payment(s).
G. Termination of Contract For Cause - See Section 1.4, Termination, of the State of Idaho Standard Contract Terms and Conditions – July 2024.
For Fiscal Necessity – See Section 1.18, Termination for Fiscal Necessity, of the State of Idaho Standard Contract Terms and Conditions – July 2024.
For Convenience – Either party may terminate this Contract for its convenience at any time upon providing its written notification at least ninety (90) calendar days prior to the desired termination date.
ATTACHMENT 1 – SECTION 3
A. Requirements The Boat must meet the minimum specifications provided below and must be the latest model produced and sold to commercial trade. The Boat must be new, not used. Though they are not specifically covered herein, all parts necessary to provide a complete and functional Boat must be included. All parts must conform in design, strength, quality of materials, and workmanship to meet or exceed current engineering practices and accepted standards of the industry. All parts must be the manufacturers standard unless otherwise specified in this RFQ.
B. Brand Name The brand name(s) specified in this solicitation are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. Contractor offering an “equal” must include documentation, which demonstrates, to IDFG’s satisfaction, that the offered item(s) meets the requirement of the solicitation. In the event documentation is not satisfactory, IDFG reserves the right to seek clarification from the Contractor. Failure to provide satisfactory documentation or a clarifying response to IDFG may eliminate the Contractor from further consideration.
C. Manuals The Contractor must provide one (1) parts manual (Manual) and one (1) operation Manual for the Boat at the time of Delivery. The manuals must include all components and exploded view drawings with both parts’ identification and parts list. The manuals must be in either paper (book) format or portable document format (PDF) via universal serial bus (USB) drive.
D. Enforcement Patrol Boat – General Specifications 21’ Aluminum enforcement patrol boat, with outboard motor and trailer.
The following Specifications are the minimum that IDFG is willing to accept.
1. Duckworth 21 Discovery, twenty-one (21) ft. or equal.
2. Must have a minimum seven (7) person capacity.
3. Hull Weight Capacity – Must have a twenty-four hundred (2400) lb. at a minimum capacity.
4. Beam – not exceeding ninety-eight (98) in.
5. Must have a full reverse chine bottom design
6. Must have aluminum hull.
7. Must have minimum bottom thickness of .190 inches thick.
8. Must have minimum side height of thirty-eight (38) inches
9. Must have Full windshield for driver and passenger with center walk through design.
10. Must have a minimum of five (5), eight (8) inch welded cleats.
11. The boat must have a three (3) step folding boarding ladder with grab handle.
12. Boat must have dual, automatic bilge pumps.
13. Boat must have a full width self-draining splash platform.
14. Boat must have composite flooring and kick panels from bow to stern, or equal.
15. Must have forward and aft floor storage compartments.
16. Must have a rear transom door.
17. Boat must have twenty-five (25) in. offshore bracket with integral bottom sheet.
18. The boat must have two (2) rear storage bench seats with backrests.
19. Must have two (2) Air Ride captain seats with adjustable pedestals.
20. The boat must have bow and stern eyes.
21. Must have transducer brackets.
22. Must have an electric bow plug in for trolling motor.
23. Must have Dual marine group 27 batteries.
24. Must have a dual bank battery charger.
25. The Boat must have bow and stern rails.
26. Must have a bow storage box.
27. Must have sixty (60) gallon minimum fuel capacity.
28. Must have a fuel/water separator, Racor 660R, or equal.
29. Must have a rear Livewell.
30. Must include heavy duty travel/storage cover with reinforced wear points and sewn in vents.
31. Must have an Alaska Full hard top cab with Gull wing front door, or equal.
32. Must have rear curtain
33. Must have a wash down system.
34. Must have a remote LED spotlight
35. Must have electric trim tabs
E. Boat Interior The following is a list of more detailed specifications that the boat interior must have at a minimum.
1. The boat must have a custom console design with a five (5) piece walk through windshield.
2. Windshield must have port and starboard wipers.
3. Must have a twelve (12) volt power receptacle.
4. Must have a Port Side rear console steering station
5. The console must have fully lighted instrumentation.
6. Must have two (2) Air Ride captain seats with adjustable pedestals.
7. The boat must have two (2) rear storage bench seats with backrests.
8. Must have onboard diesel heat, Wallas Viking Air ten thousand five hundred (10,500) BTU, or equal.
9. The console must have a lockable glovebox.
10. Console must have a Yamaha 6YC display with command like compatible engine, or equal.
11. The console must have interior lighting.
12. The console must have a flush mounted horn.
13. The console must have a cell phone holder.
14. Must have twelve (12) inch Garmin 1243xsv CHIRP traditional sonar and engine diagnostics, or equal
F. Outboard Motor
1. Yamaha VF200XB, or equal.
2. Engine – 4.2-liter V6 cylinder, or equal.
3. Two Hundred (200) HP.
4. Electronic fuel injection.
5. Shaft length to match offshore bracket height.
6. Must have power trim and tilt.
7. Minimum seventy (70) amp alternator.
8. The engine must not exceed five hundred and seventy (570 lbs).
9. Must have an aluminum propeller with the pitch designed for performance at an elevation of twenty-five hundred (2500) feet elevation.
G. Boat Trailer
1. Must be designed to fit the boat specified above with an adequate payload capacity.
2. Must be constructed with galvanized steel, or equal.
3. Must have fully adjustable wood-free synthetic Maxi-Tuff bunks and side guides for boat fit, or equal.
4. Must have transom tie downs.
5. Must have LED tail and marking lights with 4-way flat connector.
6. Must have surge brakes with stainless steel brake lines.
7. Must have a cadmium plated winch with strap and hook or equal.
8. Heavy duty tongue jack with two (2) inch ball hitch.
9. Radial tires, fourteen (14) in. minimum.
10. Must have a spare tire carrier bracket and must come with full size spare tire.
H. Trolling Motor
1. Must be a minimum of twenty-four (24) volts.
2. Must have minimum sixty (60) in. shaft length.
3. Must have minimum thrust of eighty (80) lbs.
4. Must be Bluetooth connectable.
5. Must have dual frequency GPS, or equal.
6. Must be foot pedal compatible.
7. Must have a full mount on bow.
RFQ # 1018 21’ Enforcement Patrol Boat Page 4 of 4 image1.gif image2.png image3.png
File details come from the government source that posted it. Updated .