This is a Request for Qualifications (RFQ) issued by the State of Colorado Office of the State Architect on behalf of Lamar Community College for architectural and engineering consulting services to evaluate and design accessibility upgrades for the Bowman and Administration Buildings. The selected firm will assess existing ADA accessibility deficiencies, provide recommendations for elevator location and installation, and prepare schematic design, design development, and all construction documents required for bidding. Minimum qualifications include a Colorado architecture license and demonstrated experience with projects of similar scope and complexity, particularly in higher education settings. The RFQ follows a Design/Bid/Build delivery method, with potential consideration of a Construction Manager/General Contractor approach if approved by the State Buildings Program. The mandatory pre-submittal conference is scheduled for October 24, 2018, at 1:30 p.m. at Lamar Community College's Bowman Building (Room 139). Five copies of submittals must be received by Sean Lirley, Director of Facilities, by November 14, 2018, at 1:00 p.m. MST, with late submittals rejected without consideration. Oral interviews are anticipated during December 3–7, 2018, with three to five firms expected to be short-listed and interviewed. Contract negotiations are projected to begin December 10–14, 2018, with contract approval anticipated by December 17, 2018, and design work commencing December 18, 2018, followed by construction anticipated from May 6, 2019, through September 30, 2019.
The evaluation process employs a two-stage qualification-based selection in accordance with Colorado Revised Statutes 24-30-1401 et seq., with submittals screened and scored by a state-selected panel before oral interviews. Evaluation criteria include project team qualifications and experience, firm capabilities and management structure, prior experience with similar projects and references, project approach addressing budget methodology, quality control, and schedule management, and work location relative to coordination and familiarity with the project area. The RFQ does not specify a contract amount or pricing terms, as this is a qualifications-based selection where the highest-ranked firm will be negotiated with for contract terms. Respondents must provide an Acknowledgment and Attestation Form and Certification and Affidavit Regarding Unauthorized Immigrants. Questions regarding the RFQ are due November 1, 2018, at 1:00 p.m., with answers provided to all firms by November 5, 2018, at 1:00 p.m. No incumbents or set-asides are referenced in the document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
REQUEST FOR QUALIFICATIONS
FOR
ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES
For The
Lamar Community College
For The
Upgrade Accessibility, Bowman & Administration Buildings
REQUEST FOR QUALIFICATIONS
FOR
ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES
TABLE OF CONTENTS
ADVERTISEMENTS
I. INTRODUCTION
Project Description/Minimum Requirements/Project Delivery Selection Process
1. Mandatory Pre-Submittal Conference
2. Architect/Engineer/Consultant Submittals
3. Screening Panel/ Short List
4. Oral Interviews Schedule
II. SUBMITTAL REQUIREMENTS
A. Project Team B. Firm Capabilities C. Prior Experience D. Project Approach E. Work Location
APPENDICES
| Appendix A: | Preliminary Selection/Evaluation Form |
| Appendix A1: | Interview Selection/Evaluation Form |
| Appendix A2: | Final Ranking Matrix |
| Appendix B: | Architect/Engineer/Consultant Contract (Standard or CM/GC Format) |
| Appendix C: | Certification and Affidavit Regarding Unauthorized Immigrants |
| Appendix D: | Acknowledgment and Attestation Form |
(Insert ADVERTISEMENT)
RFQ
Rev. 7/2015
RFQ
Rev. 7/2015
ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES
REQUEST FOR QUALIFICATIONS
DEPARTMENT OF_HIGHER EDUCATION_
I. INTRODUCTION
A. PROJECT DESCRIPTION
Selected firm will evaluate the conditions of the existing ADA Accessibility deficiencies in the Bowman Building and the Administration Building. A/E will provide recommendations for elevator location and installation for each building, including Design Development, Schematic Design and all Construction Documents required for the bidding process as per the Office of the State Architect.
Minimum Requirements for this project include a license to practice Architecture in Colorado, and completion of projects of similar scope and complexity and experience with Higher Education projects.
This project will be Design/Bid/Build
If State Buildings Program approves use of a Construction Manager/General Contractor process, insert the following paragraph:
The [name of agency/institution] anticipates using a Construction Manager/General Contractor (CM/GC) approach to project delivery. Through the use of an Architect and a Construction Manager/General Contractor, a Guaranteed Maximum Price (GMP) will be established in conjunction with the [agency/institution]. The CM/GC will evaluate, among other things, availability of materials and labor, project schedule, project costs as they relate to the established budget, and constructibility, and will work with the Architect throughout the value engineering phases of the project. The selection process for the CM/GC will begin following the selection of the Architect.
B. SELECTION PROCESS
The selection of an architect/engineer/consultant will be conducted in accordance with the Colorado Revised Statutes, 24-30-1401 et. seq. The process will involve two stages: submittals will be screened and scored. A limited number of firms will be short listed and invited to participate in oral interviews. The [agency/institution] will attempt to negotiate a contract with the highest ranked firm following the interview segment. Following is additional information relative to the selection process:
1. Mandatory Pre-submittal Conference: To ensure sufficient information is available to firms preparing submittals, a mandatory pre-submittal conference has been scheduled. The intent of this conference is to tour the site and to have [agency/institution] staff available to discuss the project. Firms preparing submittals must attend and sign-in in order to have their submittals accepted. The pre-submittal conference will be held at:
Lamar Community College 2401 S Main St.
Lamar, CO 81052 Bowman Building – Rm 139, Large Lecture Hall
Wednesday October 24th, 2018 @ 1:30pm
2. Architect/Engineer/Consultant’s Submittals: Specific requirements for submittals and scoring criteria are detailed in II. SUBMITTAL REQUIREMENTS. In order to facilitate review, _Five ( 5 ) copies of submittals must be provided. Submittals must be received at:
Sean Lirley Director of Facilities Lamar Community College 2401 S Main St Lamar, CO 81052
Deadline for receipt (whether mailed or hand delivered) is:
Wednesday November 14th @ 1:00 pm MST
Late submittals will be rejected without consideration. Lamar Community College and the State of Colorado assume no responsibility for costs related to the preparation of submittals.
3. Screening Panel/Short List: Submittals will be evaluated by a panel of individuals selected in accordance with state policies. The panel will review and score the submittals. Firms ranked the highest will be invited to an oral interview. It is anticipated no fewer than three (3) or no more than Five (5) will be interviewed.
4. Oral Interviews. It is anticipated that oral interviews will be conducted during the week of December 3rd – 7th, 2018. Interviews will be conducted at: Lamar Community College, Administration Building 2401 S Main St. Lamar, CO 81052. The time for interviews is to be determined. Key personnel from the firm and major consultants who will be directly involved with the project should attend the interview. The interview panel will, in particular, be interested in knowing about the project approach proposed and in meeting the individuals who will act as the primary contacts with Lamar Community College.
C. SCHEDULE
Following is a detailed schedule of events for the RFQ process and an outline of the schedule for the balance of the project.
| Advertisement | October 15th |
| RFQ Document Available | October 15th |
| Pre-submittal Conference | October 24th @ 1:30pm |
| Date Email Questions Due | November 1st @ 1:00pm |
| Date Answers Due to all Firms | November 5th @ 1:00 pm |
| RFQ Submittal Due | November 14th @ 1:00 pm |
| Submittal Screening | November 20th |
| A/E Interview List Released | November 22nd @ 1:00 pm |
| A/E Oral Interviews (as scheduled) | December 3-7 |
| Negotiation of A/E Contract | December 10th -14th |
| Contract Approval (projected) | December 17th |
| Anticipated Design Start | December 18th |
| Anticipated CM/GC Start | __________________ |
(if prior approval received from SBP) Anticipated Construction Start/Finish May 6th, 2019 thru September 30th, 2019
II. SUBMITTAL REQUIREMENTS
Firms will be judged not only on their past experience for the type of work involved, but also on their ability to address issues critical to the success of the project requirements outlined in this RFQ document. (Note that the primary focus of the prequalification evaluation will be the firm(s) capability and the primary focus of the oral interview will be the proposed Project Management Team members capabilities.) Following are elements that will be used to evaluate each firm's qualifications:
1. PROJECT TEAM
Identify the project principal, the project manager, key staff and subconsultants. Present a brief discussion regarding how the team's qualifications and experience relate to the specific project.
· Qualifications and relevant individual experience.
· Unique knowledge of key team members relating to the project.
· Experience on projects as a team.
· Key staff involvement in project management and on-site presence.
· Time commitment of key staff.
· Qualifications and relevant subconsultant experience.
B. FIRM/TEAM CAPABILITIES
· Are the lines of authority and coordination clearly identified?
· Are essential management functions identified?
· Are the functions effectively integrated? (e.g., subconsultants’ role delineated)?
· Current and projected work load.
Note: Organization charts and graphs depicting your capacity may be included.
C. PRIOR EXPERIENCE
Use this portion of your submittal to describe relevant experiences with the project type described in this RFQ document and various services to be provided.
· Experience of the key staff and firm with projects of similar scope and complexity.
· Demonstrated success on past projects of similar scope and complexity.
· References.
Note: Include the name and current telephone number of the owner’s project manager for every project listed.
D. PROJECT APPROACH
For the project and services outlined in the RFQ document, describe how you plan to accomplish the following project control and management issues:
· Budget Methodology/Cost Control.
· Establish and maintain estimates of probable cost within owner's established budget.
· Control consultant contract costs
· Coordinate value engineering activities
· Quality Control Methodology.
· Insure State procedures are followed
· Improve energy efficiency through the use of an integrated design process, life cycle costing, the use of an energy standard (current OSA energy code) and the specification of energy efficient materials, systems, and equipment
· Insure the project is designed for durability and maintainability
· Schedule.
· Manage the required work to meet the established schedule
E. WORK LOCATION
Describe where the prime and subconsultants will do the key work elements of this project.
· Proximity of firms office as it may affect coordination with the State's project manager and the potential project location.
· Firm's familiarity with the project area.
· Knowledge of the local labor and material markets.
RFQ
Rev. 7/2015 Appendix A
STATE BUILDINGS PROGRAM
PRELIMINARY SELECTION/EVALUATION FORM
ARCHITECT/ENGINEERING/CONSULTANT SERVICES
QUALIFICATION BASED SELECTION (This form is to be used in the first step, i.e. short listing, of an architectural/engineering/consulting services selection process.)
Evaluator #:_____________________________________ Date:_________________________ Name of Firm:_________________________________________________________________ Name of Project:_______________________________________________________________
RFQ REFERENCE
MINIMUM REQUIREMENTS Y ____ N ____
If the minimum requirements have not been met, specify the reason(s): __________________________________________________________________________________________________________________________________________________________________
Acknowledgment and Attestation included: Y _____ N _____
SCORE (PROJECT SPECIFIC QUALIFICATIONS): Weight2 x Rating3 = Score
1. PROJECT TEAM1
· Qualifications and relevant individual experience. _____x_____=____
· Unique knowledge of key team members relating to the
| project. | _____x_____=____ |
| · Experience on projects as a team. | _____x_____=____ |
· Key staff involvement in project management and on-
| site presence. | _____x_____=____ | |
| · Time commitment of key staff. | _____x_____=____ | |
| · Qualifications and relevant subconsultant experience. | _____x_____=____ |
2. FIRM CAPABILITIES1
| · Are the lines of authority and coordination clearly identified | _____x_____=____ | |
| · Are essential management functions identified? | _____x_____=____ |
· Are the functions effectively integrated (e.g., subconsultants’
| roles delineated?) | _____x_____=____ |
| · Current and projected work load. | _____x_____=____ |
3. PRIOR EXPERIENCE1
· Experience of the key staff and firm with projects of similar scope and complexity. _____x_____=____
· Demonstrated success on past projects of similar scope
| and complexity. | _____x_____=____ |
| · References. | _____x_____=____ |
4. PROJECT APPROACH1
| · Budget methodology/cost control. | _____x_____=____ |
| · Quality control methodology. | _____x_____=____ |
| · Schedule maintenance methodology. | _____x_____=____ |
5. WORK LOCATION1
· Proximity of firm’s office as it may affect coordination with
| the state's project manager and the potential project location. | _____x____=_____ | |
| · Firm's familiarity with the project area. | _____x____=_____ | |
| · Knowledge of the local labor and material markets. | _____x____=_____ |
TOTAL SCORE: ________4
NOTES:
1. Criteria: Agencies/Institutions are encouraged to include additional criteria that reflect unique characteristics of the project under each category to help determine the submitter’s overall qualifications.
2. Weights: Agency/Institutions to assign weights, using whole numbers, to all criteria on evaluation forms for inclusion into RFQ document and prior to evaluations.
3. Ratings: Evaluator to assess the strength of each firms qualifications and assign a numerical rating of 1 to 5 with 5 being the highest rating. (Use whole numbers)
4. Total Score: Includes the sum of all criteria. Note: a passing score (as a percentage of the total points available) is optional and should be assigned by the agency/institution prior to evaluation.
Appendix A1
STATE BUILDINGS PROGRAM
ORAL INTERVIEW SELECTION/EVALUATION FORM
ARCHITECTURAL/ENGINEERING/CONSULTANT SERVICES
QUALIFICATION BASED SELECTION (This form is to be used in the second step, i.e. oral interview, of an architectural/engineering/consulting services selection process.)
Evaluator #:_________________________________________ Date:_____________________ Name of Firm:_________________________________________________________________ Name of Project:_______________________________________________________________
SCORE (OVERALL QUALIFICATIONS)1: Weight2 x Rating3 = Score
1. PROJECT TEAM1 _____ x _____ = _____
2. TEAM CAPABILITIES1 _____ x _____ = _____
3. PRIOR EXPERIENCE1 _____ x _____ = _____
4. PROJECT APPROACH1 _____ x _____ = _____
5. WORK LOCATION1 _____ x _____ = _____
TOTAL SCORE: ________4
1. Criteria: Agencies/Institutions are encouraged to include additional criteria that reflect unique characteristics of the project under each category to help determine the submitter’s overall qualifications.
2. Weights: Agency/Institutions to assign weights, using whole numbers, to all criteria on evaluation forms for inclusion into RFQ document and prior to evaluations.
3. Ratings: Evaluator to assess the strength of each firms qualifications and assign a numerical rating of 1 to 5 with 5 being the highest rating. (Use whole numbers)
4. Total Score: Includes the sum of all criteria. Note: a passing score (as a percentage of the total points available) is optional and should be assigned by the agency/institution prior to evaluation.
Rev. 7/2015 Appendix A2
STATE BUILDINGS PROGRAM
FINAL RANKING MATRIX
QUALIFICATION BASED SELECTION
(This form is to be used separately to rank and determine the most qualified architectural/engineering/consulting services firm for both the preliminary and interview evaluations.)
FIRM
QUALIFICATIONS SCORE1
CUMULATIVE2
TOTAL SCORE
RANK3
EVAL
#1
EVAL
#2
EVAL
#3
EVAL
#4
EVAL
#5
EVAL
#6
| 1. | Insert total score from each evaluator's PRELIMINARY SELECTION AND INTERVIEW SELECTION/EVALUATION FORMS. DO NOT combine scores of the two evaluations. |
| 2. | Add all evaluators' total scores to determine the cumulative score. NOTE: Each firm's cumulative total score should be as a percentage of the total points available. |
| 3. | Rank all firms with the highest scoring firm being the most qualified. |
Appendix B
ARCHITECT/ENGINEER/CONSULTANT CONTRACT
(STANDARD OR CM/GC FORMAT)
Appendix C
CERTIFICATION AND AFFIDAVIT REGARDING UNAUTHORIZED IMMIGRANTS
Appendix D
ACKNOWLEDGEMENT AND ATTESTATION FORM
By responding to these guidelines, the respondent(s) certify that he/she has reviewed the Agreement and its Exhibits contained herein, and is familiar with their terms and conditions and finds them expressly workable without change or modification.
I certify and declare that the foregoing is true and correct.
Subscribed on ________________________ at _________________________, Date City ____________________________, State of ____________________________, County State
| ________________________________ | ____________________ | |
| Applicant or Corporate Officer Signature | Date |
| ________________________________ | _____________________ | |
| Witness | Date |
NOTE: Use full corporate name and affix corporate seal (if available).