City of Toledo One Government Center 640 Jackson Street Toledo, Ohio 43604
REQUEST FOR QUOTATION
Goods and Services
SDB Sludge Conveyors Rebuild Purchase Requisition Number 10008935 Issued By Department of Public Utilities / Division of Water Reclamation
Date Issued Friday, October 30, 2026
Response Submission Date and Time: Tuesday, November 24, 2026 at 1:30 PM EST Bids will be read at 2:00 PM EST
Submit online through PlanetBids:
https://pbsystem.planetbids.com/portal/22576/portal-home
Project Title: SDB Sludge Conveyors Rebuild Location: Bay View Water Reclamation Plant, 3900 North Summit Street, Bldg. #1, Toledo, Ohio 43611
PROJECT OVERVIEW
The Division of Water Reclamation operates the sludge cake handling system that consists of seven (7) belt conveyors (identified as Conveyors A through G) that transfer dewatered sludge from six (6) belt filter presses to various hoppers.
These conveyors are critical to the plant operations and have been in service since the mid 1980s. Due to age, wear, and operational demands, the City of Toledo is soliciting proposals from qualified contractors to inspect, identify, and furnish the necessary replacement components for five (5) existing belt conveyors (identified as A, B, C, F, and G) to restore reliable operation and extend their service life. All removal and installation work will be performed by the Division of Water Reclamation Maintenance staff.
WORK OBJECTIVE
1. Evaluate the current condition and operational performance of the five (5) existing sludge conveyors identified in the Sludge Dewatering Building.
2. Identify and provide all necessary replacement components, including but not limited to belts, pulleys, idlers, plows, and associated mechanical appurtenances.
3. Provide replacement components necessary to restore and improve the mechanical reliability of the conveyor systems while retaining the existing conveyor frames, structural supports, elevations, and connections to adjacent equipment.
4. Coordinate inspections, field measurements, and material deliveries with Plant staff to minimize disruption to Plant operations.
5. Ensure that all supplied replacement components meet the specifications and are compatible with the existing conveyor systems.
WORK SCOPE
1. The City of Toledo / Division of Water Reclamation is seeking proposals for the inspection and furnishing of replacement components for five (5) existing sludge conveyors identified as A, B, C, F, and G, located in the Sludge Dewatering Building. All removal, installation, adjustment, testing, and commissioning work shall be performed by the Division of Water Reclamation Maintenance staff.
2. The Contractor shall inspect and identify the required replacement components for the five (5) existing sludge conveyors, including:
· Conveyor A and B
· Conveyor C
· Conveyor F and G
3. The Work shall include furnishing new conveyor belts, pulleys, idlers, drive assemblies, take-up components, plows, and related appurtenances necessary for proper operation.
4. All replacement components shall be suitable for continuous sludge service and compatible with the existing conveyor frames, structural supports, and associated equipment.
5. The contractor shall provide a detailed, itemized list of all components proposed for replacement for each of the five (5) conveyors as part of the submitted proposal. The list shall include the description, quantity, and unit price of each component. All proposed replacement components shall be subject to review and approval by the Water Reclamation Project Manager.
6. At this time, the Division of Water Reclamation has identified the following components for replacement on the five (5) existing sludge conveyors. The Contractor shall field verify the required components and identify any additional parts necessary to ensure proper operation.
List of parts that are required to be replaced for the five belt conveyors:
| CONVEYOR # |
| DESCRIPTION/LOCATION |
| A |
| SAFETY CABLES & EQUIPMENT |
| A |
| DRIVE DRUM AND BEARINGS |
| B |
| DRIVE DRUM AND BEARINGS |
| B |
| SAFETY CABLES & EQUIPMENT |
| C |
| SAFETY CABLES & EQUIPMENT |
| C |
| DRIVE DRUM AND BEARINGS |
| F |
| SAFETY GUARDS TO NOT FALL IN HOPPERS |
| F |
| SAFETY CABLES & EQUIPMENT |
| G |
| SAFETY GUARDS TO NOT FALL IN HOPPERS |
| G |
| SAFETY CABLES & EQUIPMENT |
The following specifications are provided for reference only. Bidders shall field verify all dimensions and specifications to ensure that the proposed replacement components are compatible with the existing conveyor systems and to provide accurate pricing.
Specifications for Conveyors A and B
| Length of Conveyor |
| 101 ft |
| Belt Material |
| Two-ply polyester fabric with 1/8-in. Type SOR nitrile cover |
| Belt Strength |
| 220 lbs/in. of width working tension |
| Head Pulley |
| 16-in. diameter and 26-in. wide with 3/8-in. thick vulcanized rubber herringbone pattern |
| Tail Pulley |
| 12-in. diameter and 26-in. wide with 36-in. travel take-up frame |
Drive Motor:
Speed Reducer
| Type |
| Shaft mounted torque arm reducer |
| Idlers |
| Transall flat belt idlers (Model 400-24F Series C) and rubber disc return idlers (Model 500-24) |
| Plow Control |
| T.J. air cylinders with limit switch |
| Weigh Scales |
| Thayer flexure supervision system, Model FP24T, 30-ton/hour capacity, integrator and totalizer unit |
Input Source
| Conveyor A |
| Belt Filter Press Nos. 1, 3, and 5 |
| Conveyor B |
| Belt Filter Press Nos. 2, 4, and 6 |
Discharge Point
| Conveyor A |
| Sludge Cake Pump Hopper (Plow A-1 Hopper (Plow A-2), Hopper (Plow A-3), Discharge Chute to Conveyor C (End Discharge) |
| Conveyor B |
| Sludge Cake Pump Hopper (Plow B-1) Hopper (Plow B-2), Hopper (Plow B-3), Discharge Chute to Conveyor C (End Discharge) |
Specifications for Conveyor C
| Belt Material |
| Two-ply polyester fabric with 1/8-in. Type SOR nitrile cover. |
| Belt Strength |
| 220 lbs/in. of width working tension |
| Head Pulley |
| 16-in. diameter and 26-in. wide with 3/8-in. thick vulcanized rubber herringbone pattern |
| Tail Pulley |
| 12-in. diameter and 26-in. wide with 12-in. take-up frame |
Drive Motor
| Type |
| Shaft mounted torque arm reducer |
Speed Reducer:
| Type |
| Shaft mounted torque arm reducer |
| Idlers |
| Transall flat belt idlers (Model 400-24F Series C) and rubber disc return idlers (Model 500-24) |
| Plow Control |
| T.J. air cylinders with limit switch |
| Input Sources |
| Conveyors A and B |
| Discharge Points |
| Chutes to Conveyors F and G and chutes to Sludge Day Hopper Nos. 1 and 2 |
Specifications for Conveyors F and G
| Belt Material |
| Two-ply polyester fabric with 1/8-in. Type SOR nitrile cover. |
| Belt Strength |
| 220 lbs/in. of width working tension |
| Head Pulley |
| 16-in. diameter and 26-in. wide with 3/8-in. thick vulcanized rubber herringbone pattern |
| Tail Pulley |
| 12-in. diameter and 26-in. wide with 24-in. take-up frame |
Drive Motor
Speed Reducer
| Type Shaft |
| mounted torque arm reducer |
| Idlers |
| Transall flat belt idlers (Model 400-24 Series C) and rubber disc return idlers (Model 500-24) |
| Plow Control |
| T.J. air cylinder with limit switch |
| Input Sources |
| Conveyors D and E |
Discharge Points
| Conveyor F |
| Sludge Storage Hopper No. 1 (Plows F-1, F-2, and F-3); Sludge Storage Hopper No. 3 (Plows F-4 and F-5; End Discharge) |
| Conveyor G |
| Sludge Storage Hopper No. 2 (Plows G-1, G-2, and G-3); Sludge Storage Hopper No. 4 (Plows G-4 and G-5; End Discharge) |
Work Coordination
1. The Contractor shall coordinate all inspections, field measurements, and material deliveries with the Water Reclamation Project Manager and Plant staff to minimize disruption to Plant operations.
2. All Contractor activities at the Plant shall be conducted during standard working hours (7:00 AM to 4:00 PM, Monday through Friday), unless otherwise approved by Water Reclamation.
3. Any inspections requiring conveyor shutdowns shall be coordinated with Plant Operations and approved by the Project Manager prior to execution. No more than one (1) conveyor shall be taken out of service at a time unless otherwise authorized by the Project Manager and Plant Operations.
4. The Contractor shall comply with all applicable OSHA regulations and City of Toledo safety requirements while performing inspections, field measurements, and other activities on Plant property. Any required equipment shutdowns or lockout/tagout procedures shall be coordinated with Plant Maintenance staff.
Work Execution
1. The Contractor shall identify any additional components or modifications necessary to ensure proper operation of the existing conveyors. Any proposed changes shall be submitted to the Water Reclamation Project Manager for review and approval prior to ordering.
2. The Contractor shall be responsible for furnishing and delivering all approved replacement components to the Sludge Dewatering Building at the Bay View Water Reclamation Plant. All delivery and transportation costs shall be included in the submitted proposal.
3. The Contractor shall have a minimum of five (5) years of experience in the inspection, maintenance, or supply of replacement components for industrial conveyor systems similar to those specified in this RFQ. The Contractor shall provide a detailed list of completed projects within the past five (5) years, including project locations, descriptions, completion dates, and contact names and phone numbers.
4. Any changes or additions to the approved list of replacement components shall be documented and submitted to the Water Reclamation Project Manager for review and approval prior to purchase. Any additional costs shall be subject to the City's change order approval process.
WARRANTY
The Contractor shall provide a written warranty to the City of Toledo / Division of Water Reclamation stating that all materials and replacement components furnished under this contract will be free from any defects in materials and manufacturing and shall meet the specified requirements.
The warranty shall be valid for twenty-four (24) months from the date the materials and replacement components are received and accepted by the City of Toledo. If any defects in the supplied materials or components are discovered during this period, the Contractor shall, at no additional cost to the City of Toledo, promptly replace the defective materials or components to the City's satisfaction.
PRE-BID MEETING
There will be a pre-bid meeting held on Tuesday, November 10, 2026, at 1:00 pm. The meeting will be held in the Administration Building at the Division of Water Reclamation, located at 3900 N. Summit Street, Building #1, Toledo, OH 43611. Attendance is strongly encouraged. Failure to attend may result in the likelihood that your bid may not be scored lowest and best.
PREVAILING WAGE
This is a prevailing wage project. The latest prevailing wage rates at the time this bid was posted are available on the “Documents” tab of this bid in PlanetBids. The successful bidder shall submit certified payrolls to the City for all labor performed on the project 2 weeks after start dates and weekly thereafter. Please Note; Pre-Construction meeting w/ Compliance is required prior to work starting.
PROJECT LABOR AGREEMENT (PLA)
Toledo Municipal Code Section 187.12(d) requires the successful bidder of a public improvement contract of $100,000 or greater, which is funded by the City of Toledo or other sources that do not exclude Project Labor Agreements (“PLA”), to enter into a PLA with the Northwest Ohio Building and Construction Trades Council (“NWOBTC”).
Once the successful bidder is notified of bid award, a pre-job conference shall be held within fifteen (15) days of the award notification between the Bidder and the Northwest Ohio Building and Construction Trades Council (“NWOBTC”). An executed Project Labor Agreement must be delivered to the Division of Purchases and Supplies within fifteen (15) working days from pre-job conference with NWOBTC. An executed Project Labor Agreement must have the signature of the lead contractor and the Executive Secretary of the Northwest Ohio Building and Construction Trades Council at a minimum to be deemed valid. A template PLA is attached to this bid for your review.
The successful bidder, and all of the bidder’s contractors and subcontractors, must comply with and adhere to all of the provisions of the PLA executed with the NWOBTC.
LOCAL PREFERENCE
The description of and procedure to apply local preference to responsive bids received by the City of Toledo can be found under Toledo Municipal Code section 187.34.
The Toledo Municipal Code can be found by searching for the City of Toledo webpage toledo.oh.gov and clicking the “Government” link, then clicking the “City Code” link.
REVIEW AND SELECTION CRITERIA
This bid is evaluated and selected based on “lowest and best” offer. The following factors determine “lowest and best:” bid price, past work/experience with the City of Toledo, local preference, if applicable.
QUESTIONS
All questions regarding the plans and specifications must be submitted in writing through the PlanetBids website Q&A tab. The City’s responses will be posted through PlanetBids.
BID SUBMISSION
Bids for this project will be accepted via e-bid though the City of Toledo’s PlanetBids portal. Bid submittals or other transmissions of information have not been completed until an email confirmation of the transmission has been issued by PlanetBids. Bid prices shall be to two (2) decimal places (i.e. $0.00). Only one (1) price per line item will be accepted.
In order to be awarded a contract, the City requires all of the following documents must be submitted with each bid your company submits in 2026 in PlanetBids:
· Project Paperwork*
· Line Items – will auto-populate with e-bid
· Bid Guaranty (bid bond or certified check / cashier’s check on a solvent bank) – see instructions below
· Signed Contract by the Vendor*
· Detailed list of related experience *Located on “Documents” tab in PlanetBids
Bid Guaranty requirements are located on the “Bid Information” tab on PlanetBids. The bid guaranty shall be in the form of a cashier’s check/official check on a solvent bank or a bid bond. If using a check as the bid guaranty, the check must be scanned and uploaded with your bid. In addition, the check must be received by the Division of Purchases and Supplies no later than the due date and time to be deemed responsive. No Company / No Personal checks will be accepted. Checks shall be made payable to “City of Toledo.” If your company is using a bid bond, scan and upload with bid; the original does not need to be received by the City of Toledo. If your company does not provide a bid guaranty, your bid submittal will be deemed non-responsive. (TMC 187.09)
City of Toledo Division of Purchases and Supplies One Government Center, Suite 2000 640 Jackson Street Toledo, OH 43604
Beginning with bids advertised on or after March 13, 2026 the following documents will only need to be submitted once for your company for the duration of all contracts with the City. If any information changes, it is the company’s responsibility to notify the city and update the applicable documentation.
City Paperwork:
· Vendor Registration Form, if your company is new to doing business with the city
· Business Tax Registration Form, if your company is new to doing business with the city
· Child Support Affidavit, notarized
· Vendor Utility
Beginning with bids advertised on or after March 13, 2026 the following documents will only need to be submitted once for all bids your company submits in 2026. If any information changes, it is the company’s responsibility to notify the City and update the applicable paperwork.
Annual Paperwork:
· W-9
· Insurance Certificate, naming the City of Toledo as an additional insurer – requirements available on the “Documents” tab of PlanetBids
· EEO Compliance
· Debarment Certification
· Living Wage Affidavit, updated no later than February 1st
· Bureau of Worker’s Compensation Certificate
BID OPENING MEETING
Bids will be open at 2 PM EST on the due date of this bid via Zoom Meeting at:
https://link.edgepilot.com/s/72026a0a/vScHndadGUqgTn8jHzPYJQ?u=https://toledo-oh-gov.zoom.us/j/96570601158
This meeting is available to all interested parties. Preliminary Bid results will be available within one day on the PlanetBids website after bid opening. Bid results will be published to the PlanetBids website once awarded.