RFQ_1-26_SCOPE_OF_WORK.pdf
PDF 133 KB Posted
- Attached to
- Cheyenne MPO 24 Hour Traffic Counts - 2025
- Solicitation number
- RFQ 1-26
- Issued by
- Laramie County, Wyoming
About this file
This document is a bid solicitation from the Cheyenne Metropolitan Planning Organization (MPO) for traffic data collection services within the Cheyenne urban area. The project requires a contractor to collect a total of 400 traffic volume counts during September and November 2025, specifically 300 24-hour volume counts with date, time, and total volume, and 100 24-hour volume counts that also include heavy truck classifications and 85% speed data. The data collection must occur on Tuesdays, Wednesdays, and Thursdays between September 2 and November 20, 2025, with the contractor required to communicate collection locations to the Project Manager via email and avoid construction and bad weather periods.
Bidders must submit pricing through the OpenGov Procurement Portal and obtain a right-of-way (ROW) permit from the city at no cost, though proper licensing to work in Cheyenne will incur a fee. The MPO has indicated they will assess additional costs if supplemental count locations are requested beyond the initial 400 locations. The solicitation provides flexibility for potential additional work while setting clear parameters for the primary data collection effort, with specific requirements for data reporting and collection timing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cheyenne_MPO_24_Hour_Traffic_Counts_-_2025.pdf | ||
| RFQ_1-26_TRAFFIC_COUNT_MAP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 7, 2025
The Cheyenne MPO is bidding a project to collect 24-hour volumes within the
Cheyenne urban area. If you are interested in this work, please send the Cheyenne
MPO a Bid/Cost Proposal for collecting this Traffic Data. The data we are requesting is:
I. 300 24-hour Volume Counts (ADT). (date, time and total volume)
II. 100 24-hour Volume Counts (ADT) with % Heavy Tucks classifications and 85% Speeds. (date, time, classification, speed and total volume)
A Total of 400 Locations:
• All counts, including any recounts that may be required, need to be collected during the months of September & November 2025. Counts shall start on
September 2, 2025, and be completed by November 20, 2025.
• Contractor shall communicate to the Project Manager on locations when counts will be collected via email.
• Counts will be collected during Tuesday, Wednesday, and Thursday
• ROW permit will need to be applied for from the city (no fee), proper licensing to work in Cheyenne will be required (fee).
• Costs to the MPO if additional count locations are requested.
• Construction, bad weather needs to be avoided.
Submit pricing via OpenGov Procurement Portal.
File details come from the government source that posted it. Updated .