RFQ_0010246_CMR_for_the_Renovations_of_the_Restrooms_and_Breakrooms_at_a_State_Office_Building.pdf

PDF 352 KB Posted

Attached to
RFQ for CMR for the Renovations of the Restrooms and Breakrooms at a State Office Building
Solicitation number
0010246
Issued by
Travis County, Austin City, Texas

About this file

REQUEST FOR QUALIFICATIONS SUMMARY

This Request for Qualifications (RFQ #0010246) is issued by the Texas Facilities Commission (TFC) for a Construction Manager-at-Risk (CMR) to perform renovation services at the William P. Clements State Office Building located at 300 W 15th Street, Austin, Texas. The project involves renovations of existing restrooms, addition of new restrooms, and renovations of existing breakrooms on floors 1-12 and 14, including upgrades to sanitary sewer lines on these floors. The procurement follows a two-step award process: Step One requires submission of qualifications and experience documentation, with the five highest-ranked respondents advancing to Step Two for pricing proposals. The RFQ was issued on November 17, 2026, with qualifications due by December 15, 2026, at 3:00 PM through the OpenGov electronic procurement portal. Mandatory pre-submittal teleconferences are scheduled for November 30, 2026, at 10:00 AM and December 1, 2026, at 2:00 PM, with attendance required for at least one conference. Award notification is anticipated by February 18, 2027, with contract execution by March 1, 2027. The pre-construction phase is estimated at 180 calendar days, with the construction period projected for 365 calendar days.

The estimated construction budget is $14,000,000, including pre-construction management fees, construction management fees, and cost of work. Step One evaluation criteria include Experience and Qualifications (40%), Methodology and Budget/Schedule Compliance (30%), Quality/Safety Programs and Safety Record (10%), with Litigation History and Subcontracting Plan marked as pass/fail requirements. Step Two evaluation adds Compensation and Fees (20%) to the total scoring. Respondents must submit a $25,000 bid bond and comply with the Texas Facilities Commission's Veteran Heroes United in Business (VetHUB) program requirements, demonstrating good-faith efforts in subcontracting opportunities or performing work in-house. The contract is contingent upon continued funding availability through state appropriations. All submittals must include Attachment A (Execution of Submittal), Attachment B (Subcontracting Plan Forms), Attachment C (CMR Qualification Form), and supporting documentation for qualifications, methodology, quality assurance/control, and safety programs. Asbestos abatement and third-party testing services are excluded from the construction contract scope and budget.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev. 06.17.2026

Texas Facilities Commission P.O. Box 13047

Austin, Texas 78711-3047

REQUEST FOR QUALIFICATIONS

FOR CONSTRUCTION MANAGER-AT-RISK

FOR

THE RENOVATIONS OF THE RESTROOMS AND

BREAKROOMS AT A STATE OFFICE BUILDING

PROJECT #26-005-4203

RFQ #0010246

Dated: November 17, 2026

Qualifications and Subcontracting Plan Due Date: December 15, 2026 3:00 PM

Table of Contents

SECTION I - GENERAL

1) SCOPE:

2) CONSTRUCTION BUDGET:

3) CONTRACT TERM:

4) FUNDING:

5) AGENCY POINTS OF CONTACT:

6) DEFINITIONS

SECTION II - PROJECT DESCRIPTION

1) PROJECT DESCRIPTION:

2) ASBESTOS ABATEMENT:

3) THIRD PARTY TESTING:

SECTION III - SCOPE OF WORK

1) SERVICES:

2) PART ONE:

3) PART TWO:

4) SUBCONTRACTORS:

5) SATISFACTORY UNDERSTANDING:

SECTION IV – SCHEDULE OF EVENTS

1) SCHEDULE OF EVENTS:

2) MANDATORY PRE-SUBMITTAL TELECONFERENCES:

SECTION V - SUBMISSION REQUIREMENTS:

1) Electronic Submission:

2) STEP ONE REQUIRED DOCUMENTS:

3) STEP TWO REQUIRED DOCUMENTS:

4) SUBMITTAL COSTS:

5) PUBLIC INFORMATION:

6) STEP ONE CONTENTS:

2) STEP TWO CONTENTS:

3) INQUIRIES

SECTION VI – SUBMITTAL SUBMISSION

SECTION VII - EVALUATION AND AWARD

ATTACHMENT A – EXECUTION OF SUBMITTAL

ATTACHMENT B – SUBCONTRACTING PLAN FORMS

ATTACHMENT C – CMR QUALIFICATION FORM

ATTACHMENT D - CMR PROPOSAL FORM

ATTACHMENT E – NON-COLLUSION AFFIDAVIT

ATTACHMENT F – PROJECT MANUAL

ATTACHMENT G - CMR SERVICE CONTRACT TEMPLATE

ATTACHMENT H – OPENGOV SUBMISSION INSTRUCTIONS

RFQ 0010246

CMR for the Renovations of the Restrooms and Breakrooms at a State Office Building

SECTION I - GENERAL

1) SCOPE: In accordance with the provisions of Texas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting qualifications for a Construction Manager-at-Risk (CMR) to perform renovation services to the restrooms and breakrooms at the William P. Clements State Office Building, floors 1-12 and 14 located at 300 W 15th Street, Austin, Texas 78701 hereinafter described as TFC Project #26-005-4203 (the Project). This Project will be administered by TFC. This procurement will be a two-step award process with a two-part work requirement.

a) Step One of the solicitation will include a submittal of company experience and qualifications focusing on projects of similar size and type. Respondents will be evaluated on experience and qualifications, as detailed in Section V, Submission Requirements.

b) Step Two of the solicitation will include only the highest ranked five or fewer Respondents from Step One who will be asked to provide pricing.

2) CONSTRUCTION BUDGET: Respondents to the RFQ should consider the estimated construction budget as Fourteen Million dollars ($14,000,000), including Pre-construction Management fees, Construction Management fees, and Cost of Work.

3) CONTRACT TERM: Construction is required to commence within five (5) calendar days after the Notice to Proceed for Construction is issued. For planning purposes, the pre-construction time period is estimated to be one hundred and eighty (180) calendar days. The construction contract period is projected for a term of three hundred and sixty-five (365) calendar days except as may be otherwise amended or negotiated.

4) FUNDING: This contract is contingent upon the continued availability of funding. If funds become unavailable through lack of appropriations, legislative budget cuts, amendment of the Appropriations Act, state agency consolidations, or any other disruption of current appropriations, provisions of the Termination Article in the CMR Service Contract shall apply.

5) AGENCY POINTS OF CONTACT: The contacts listed below shall be the sole points of contact during this solicitation. Any discussions regarding this solicitation with other agency personnel, TFC contractors, sub-contractors or tenant agencies may be grounds for disqualification. If primary is unavailable, Respondent may reach out to the secondary contact.

a) Primary Contact:

i) Purchaser Name: James Wooley, CTCD, CTCM

ii) Purchaser Phone: (512)463-1766

iii) Purchaser Email: james.wooley@tfc.texas.gov

b) Secondary Contact:

i) Purchaser Name: James Gonzalez, CTCD, CTCM

ii) Purchaser Phone: (512)936-0647

iii) Purchaser Email: james.gonzalez@tfc.texas.gov

6) DEFINITIONS: All words and phrases in this RFQ in initial caps shall have the meanings set out in this section. All capitalized terms not defined below used herein shall have the meaning given to them in the Uniform General Conditions or Attachment G – CMR Service Contract Template.

TERM DEFINITION

Addendum A modification of the specifications issued by TFC.

Electronic State Business Daily (ESBD)

The designated website that state agencies, universities, and municipalities use to post formal solicitations (over $25K), addenda to posted solicitations, and awards. The link to the ESBD is http://www.txsmartbuy.gov/esbd.

Good Faith Effort Effort required by vendors when completing the Attachment B – Subcontracting Plan Forms, which demonstrates the Respondent has completed one of the following for the planned subcontracting needs: A) Performing “Traditional Good Faith Effort” of soliciting bids from two VetHUBs for each subcontracting opportunity, and allowing seven business days for response, B) Self-Performing Contract (performing all work with own materials and labor), or C) Utilizing a Mentor Protégé Relationship.

Guaranteed Maximum Price (GMP)

The maximum sum that TFC shall be responsible to pay for the completion of the Project.

Veteran Heroes United in Business (VetHUB)

The Texas Comptroller of Public Accounts has adopted amended Veteran Heroes United in Business (VetHUB) program rules at 34 Texas Administrative Code (TAC) Part 1 Chapter 20, Subchapter D, Sections 281-298. The new rules took effect May 12, 2026.

Subcontracting Plan (SP) A written plan that documents how a respondent will utilize subcontractors and demonstrates its good-faith efforts to provide subcontracting opportunities to business certified through the Texas Controller’s Veteran Heroes United in Business (VetHUB) program pursuant to 34 Texas Administrative Code (TAC) §20.285.

Mentor Protégé Relationship

A formal agreement that is recognized by the State of Texas Comptroller of Public Accounts. For a listing of Mentor Protégé agreements click on link:

https://mycpa.cpa.state.tx.us/mentorprotege/ctg/menproPairs/

Owner The Texas Facilities Commission Architect and Engineer Firm (A/E)

The firm designated by the Owner to provide professional architectural and engineering services for the project.

Project Manager The individual designated by the Owner authorized to represent the Owner during the performance of the contract.

Interview Secondary evaluation process during a two-step evaluation phase, to include five or fewer respondents evaluated to be ‘most qualified’ and/or in the competitive range, for the purpose of further distinguishing between the initial solicitation response through verbal questioning and re-scoring of the evaluation criteria.

SECTION II - PROJECT DESCRIPTION

1) PROJECT DESCRIPTION: The project consists of renovations of the existing restrooms, adding additional restrooms, and renovations of the existing breakrooms on floors 1-12 and 14. The renovations will include upgrading the existing sanitary sewer lines on floors 1-12 and 14. The http://www.txsmartbuy.gov/esbd https://nam12.safelinks.protection.outlook.com/?url=https%3A%2F%2Flinks-1.govdelivery.com%2FCL0%2Fhttps%3A%252F%252Fcomptroller.texas.gov%252Fvethub%252F%2F1%2F0100019df3cff2a5-94c4ca5d-76f0-4977-878d-bff725e3e017-000000%2FqL8ehG2QaV9c0B_vVpe82i3mQdlFKT0hxsbysRtSrXg%3D452&data=05%7C02%7Cjames.wooley%40tfc.texas.gov%7C964087311b374d85517508df44c33b5c%7Cef24a33d67bc405f8954956d19012eb1%7C0%7C0%7C639305277451048086%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=4WEcPuP2fEtgfUd2xBT%2BPeeX4nnCyHTxaeyRQ5PnDuY%3D&reserved=0 https://mycpa.cpa.state.tx.us/mentorprotege/ctg/menproPairs/ project is located within the William P. Clements State Office Building located at 300 W 15th St., Austin Texas.

2) ASBESTOS ABATEMENT: For the consideration of this RFQ, TFC is assessing any known asbestos materials in the existing facility to be abated prior to demolition and construction. Any asbestos abatement of the building is to be considered outside of the construction contract and budget of this RFQ.

3) THIRD PARTY TESTING: TFC shall provide or contract with third party for Testing and Balancing Services, RAS Review, Commissioning (BECx and CxA), and Construction Materials Testing.

SECTION III - SCOPE OF WORK

1) SERVICES: CMR services shall be comprehensive in nature and will include but not be limited to: pre-construction services, estimation services, participation in constructability reviews, development/management of complex critical path schedules and bidding multiple packages as necessary to execute the project scope of work. The number of bid packages and Guaranteed Maximum Price amendments to be determined by TFC in cooperation with the A/E and CMR.

2) PART ONE: Collaborate with TFC and its Architect and Engineer Firm (A/E) and third-party consultants, and stakeholders during the completion of construction documents including review and comments at each negotiated milestone prior to completion of Construction Documents. The Respondent’s expertise will be used to affect value engineering, establish a project schedule and ultimately determine the GMP. The services include attending meetings, consultation of plan reviews, constructability reviews, and cost estimating. Provide CMR services from pre-design through construction close-out, as described in Attachment G – CMR Contract Template.

3) PART TWO: In accordance with the approved schedule and GMP, the Contractor is responsible for managing the competitive solicitation process for subcontractors and helping the owner/client select those subcontractors, while complying with all VetHUB requirements and provide and/or secure and install all materials, labor, coordination, management and supervisory activities necessary to complete construction of the Project in accordance with the drawings, specifications and other contract documents that will be prepared by the A/E & TFC.

4) SUBCONTRACTORS: Subcontractors providing services shall meet the same requirements and level of experience as required of the Respondent. No subcontract shall relieve the primary Respondent of responsibility for the service. If the Respondent uses a subcontractor for any or all of the work required, the following conditions shall apply under the listed circumstances:

a) Respondents planning to subcontract all or a portion of the work shall identify the proposed subcontractors on the Attachment B – Subcontracting Plan Forms.

b) Subcontracting shall be at the Respondent’s expense.

c) TFC retains the right to check a subcontractor’s background and make a determination to approve or reject the use of submitted subcontractors.

d) The Respondent shall be the only contact for TFC and subcontractors. Respondent shall list a designated point of contact for all TFC and subcontractor inquiries.

5) SATISFACTORY UNDERSTANDING: Respondents will be held to have satisfactory understanding regarding all existing conditions and to have included in the proposal an amount sufficient to cover all work including permits, fees, etc.

SECTION IV – SCHEDULE OF EVENTS

1) SCHEDULE OF EVENTS: TFC reserves the right to change the dates shown below upon written notification.

EVENT DATE

Issue RFQ 11/17/2026 Mandatory Pre-Submittal Teleconferences 1st Pre-Submittal Conference

OR

2nd Pre-Submittal Conference

11/30/2026, 10:00 AM

OR

12/01/2026, 02:00 PM

Deadline for SP Good Faith Effort Notification Emails 12/03/2026 Deadline for Submission of Questions 12/09/2026, Noon TFC’s Response to Questions 12/11/2026, 5:00 PM Deadline for Submission of Qualifications and SP 12/15/2026, 3:00 PM Notification of Short List Selection 12/28/2026 Optional Site Visit 01/05/2027, 10:00 AM Deadline for Submission of Step 2 Pricing Proposals 01/08/2027, 3:00 PM

If interviews are NOT required by TFC Award by Commission 02/18/2027, 9:00 AM Execute Contract 03/01/2027

If interviews are required by TFC Notification of Interview Selection 01/12/2027 Interviews 01/20/2027 Award by Commission 02/18/2027, 9:00 AM Execute Contract 03/01/2027

2) MANDATORY PRE-SUBMITTAL TELECONFERENCES: Mandatory pre-submittal teleconferences will be held on Monday, November 30, 2026, at 10:00am and Tuesday December 01, 2026, at 2:00pm. Pre-registration is required to participate in the teleconference. Respondents must have an employee of their firm attend at least one (1) of the two (2) pre-submittal conferences.

TFC shall reject qualifications submitted by firms that did not attend one of the mandatory pre-submittal conferences.

3) Pre-Registration is required.

Register in advance for the Monday, November 30, 2026, meeting with this link:

Registration URL: https://us02web.zoom.us/meeting/register/UNL4Df5MRlapQnVdrg8FJQ

Register in advance for the Tuesday December 01, 2026, meeting with this link:

Registration URL: https://us02web.zoom.us/meeting/register/pCFebtH4TJCVlTTrn5VS6Q

After registering, you will receive a confirmation email containing information about joining the meeting.

SECTION V - SUBMISSION REQUIREMENTS:

1) Electronic Submission: TFC is using the OpenGov electronic procurement system to receive responses. Respondents interested in submitting a response must register for an OpenGov account (No Charge). Submittals shall be submitted per the instructions in Attachment I – OpenGov Submission Instructions prior to 3:00 PM on the date specified in the Schedule of Events. In order to ensure that all documents are submitted before the deadline, allow enough time to upload the documents into the portal. We recommend beginning the upload process one (1) day prior to deadline date. Facsimile and email proposals are not acceptable responses to this RFQ.

2) STEP ONE REQUIRED DOCUMENTS: The initial submittal is of qualifications only. Respondents shall submit documentation through the OpenGov portal link as specified in Attachment H – OpenGov Submission Instructions. Requested documentation includes:

A. Package 1: Required Documentation:

1) Attachment A – Execution of Submittal

2) Copy of Original Bid Bond

3) Litigation History

B. Package 2: Subcontracting Plan:

1) Attachment B – Subcontracting Plan Forms

2) Backup documentation of Good Faith Effort, as applicable

C. Package 3 – Scored Documentation:

1) Attachment C – CMR Qualification Form

2) Supporting documentation of Attachment C

3) Methodology and Budget/Schedule Compliance

4) Quality Assurance/Control & Safety Program

D. Organization: Package pages should be numbered and contain an organized, paginated table of contents corresponding to the section and pages of the submittal.

E. File format: File format shall be as indicated in Attachment H – OpenGov Submission Instructions.

3) STEP TWO REQUIRED DOCUMENTS: For the five or fewer Respondents chosen from Step One, Respondent shall submit the following documentation to the Agency Points of Contact emails reference in Section I – General of this RFQ:

A. Attachment D - CMR Proposal Form

B. Attachment E - Non-Collusion Affidavit

4) SUBMITTAL COSTS: Respondents to this RFQ are responsible for all costs of submittal and interview preparation and delivery costs.

5) PUBLIC INFORMATION: TFC will not consider any submittal that bears a copyright. As a state agency, TFC will strictly adhere to the requirements of Chapter 552 of the TGC (the "Texas Public Information Act") regarding the disclosure of public information. As a result, by participating in this solicitation process Respondent acknowledges that all information, documentation, and other materials submitted in response to this solicitation may be subject to public disclosure under the Texas Public Information Act. TFC does not have authority to agree that any information submitted will not be subject to disclosure. Disclosure is governed by the Texas Public Information Act. Respondents are advised to consult with their legal counsel concerning disclosure issues resulting from this process and to take precautions to safeguard trade secrets and proprietary or otherwise confidential information. TFC assumes no obligation or responsibility relating to the disclosure or nondisclosure of information submitted by Respondents. If it is necessary for Respondent to include trade secrets or proprietary or otherwise confidential information in its submittal, Respondent must clearly mark in bold red letters the term “CONFIDENTIAL” using at least 14-point font, on that specific part or page of the submittal which Respondent believes to be confidential. All submittals and parts of submittals that are not marked confidential will be automatically considered to be public information. If TFC receives a public information request seeking information marked by Respondent as confidential, Respondent will receive notice of the request as required by the Texas Public Information Act. If TFC receives a public information request for submittals and parts of submittals that are not marked confidential, the information will be disclosed to the public as required by the Texas Public Information Act. Do not mark your entire proposal as

“CONFIDENTIAL”.

6) STEP ONE CONTENTS: Below is a summary of required information. Submittals without this information will be evaluated accordingly. TFC reserves the right, in its sole judgment and discretion, to waive minor technicalities and errors in the best interest of the state. The Attachment A – Execution of Submittal, Attachment B – Subcontracting Plan Forms, the Attachment C - CMR Qualification Form, and the Bid Bond shall be returned with the response.

Failure to do so shall result in disqualification.

1) Minimum Qualifications:

(1) Out of State contractors doing business in Texas shall have a Certificate of Authority to do business in Texas. A copy of the certificate should be submitted with the submittal.

a) Relevant Experience and Qualifications: <40 pts.>

1) Relevant Experience:

a. Complete and submit the Attachment C - CMR Qualification Form.

b. Respondent should also provide a free-form narrative the describes in detail any qualifications and other projects not enumerated on Attachment C - CMR Qualification Form.

b) Methodology and Budget/Schedule Compliance: <30 pts.>

1) Proposed Methodology: A detailed plan outlining the methodology intended to be employed by the Respondent that demonstrates the processes of implementation regarding the requirements of the RFQ Scope of Work into a realized and finished project. This shall include, but not be limited to:

a. Processes and techniques used execute the Work; Pre-Construction; Construction, Completion and Activation, and Warranty;

b. Methodologies for identification and resolution of project challenges;

c. Value engineering;

d. Cost Management System, including reporting of budget and cost components to the

TFC/Project Team

e. Developing and maintaining schedules; Approach to change orders during construction.

f. Coordination of work with subcontractors and/or consultants.

g. Strategies for minimizing/mitigating impacts from cost escalation.

h. Given the labor and subcontracting challenges that may be experienced during this project, describe strategies to minimize/mitigate these potential impacts to cost and schedule.

i. Contract Resolution and Closeout.

c) Quality Assurance/Control & Safety Program: <10 pts.>

1) Quality Assurance: The Respondent shall provide a description of the firm’s quality assurance processes and program, and the name and job title of the person in the organization who oversees said program.

2) Quality Control: Vendor shall describe its quality requirements and means of measurement. Provide process flow charts on how quality is maintained and achieved.

The Respondent shall describe the firm’s policy regarding establishing quality control processes similar to ISO 9000 and other in-place controls for adherence to budget, quality, safety and schedule. TFC reserves the right to require a copy of the Quality Control Manual, which, if awarded, may become an exhibit to the contract.

3) Safety Program and Safety Record:

a. Safety Program:

(1) Indicate the name and job title of the person in your organization who manages your safety program.

(2) Provide a description of your firm’s safety program.

(3) TFC reserves the right to require a copy of your safety manual if your firm's proposal is scored within the highest range of proposals, which will become a Contract Document after award.

b. Contractor’s Safety Record:

(1) Provide the company’s workers' compensation experience modification rate (EMR) for the last five years as part of the submittal. This shall be submitted in your response on your insurance carrier’s letterhead.

d) Litigation: <Pass/Fail>

1) Provide details of all past or pending litigation or administrative claims involving Respondent within the past five (5) years. Failure to provide this information may be grounds for disqualification.

2) Respondents involved in litigation with owners, subcontractors, or A/E firms, depending upon the circumstances, may be disqualified at the full and sole discretion of

TFC.

e) Attachment A - Execution of Submittal: Failure to sign and return the Execution of Submittal with the response shall result in rejection of the response.

f) Addenda Acknowledgment: Receipt of all addenda to this RFQ should be acknowledged by checking each addendum in the OpenGov portal. Any amendment to this procurement solicitation will be posted as an addendum on the ESBD and OpenGov. It is the responsibility of interested parties to periodically check online for updates to the solicitation prior to solicitation submittal. Respondent’s failure to periodically check the ESBD will in no way release the selected vendor from “addenda or additional information” resulting in additional costs to meet the requirements of the RFQ.

g) Bid Bond:

1) Respondents shall submit an electronic bid bond and associated Power of Attorney for the Texas Facilities Commission in the sum of $25,000.00. No other form of security will be accepted. Respondent shall submit original bid bond by mail or in person within 3 business days of the solicitation due date. Address for mailing of bid bond is: Texas Facilities Commission, Attn: Procurement, 1711 San Jacinto Blvd., Austin, TX 78701. The Bid Bond submitted by the awarded vendor will be held until GMP is accepted by TFC, and Performance and Payment Bonds subsequently received and approved.

2) Should the contractor fail, neglect, or refuse to begin performance of the contract after receiving the award, said security will be forfeited to TFC. Performance shall be considered begun upon acknowledgement of the contract award and the furnishing of all required security bonds and insurance coverage.

3) If TFC has not made an award within ninety (90) calendar days after responses are opened, Respondents may withdraw their responses without prejudice; however, Respondents have the option to extend the time in which their response will be honored after this ninety (90) day period.

h) Insurance Requirements for CMRs: The insurance requirements, located in the Attachment G – CMR Service Contract Template, shall be reviewed by an agent of your insurance company prior to submitting a response. Upon acceptance of the high scorer’s negotiated proposed pricing, the insurance requirements shall be met by providing the Certificates of Insurance (COIs) and the corresponding policy endorsements.

i) Subcontracting Plan:

1) In accordance with the Texas Government Code (TGC), Sections 2161.181-182 and Title 34, Part 1, Chapter 20, Subchapter D, §20.281- §20.298 of the Texas Administrative Code (TAC), the TFC shall make a Good Faith Effort to utilize VetHUBs in contracts for general services, construction services, professional and consulting services, and commodities contracts. The purpose of the Office of Business Opportunities Program is to promote full and equal business opportunities for all businesses in State contracting in accordance with 34 TAC § 20.284.

2) Statement of Probability: TFC has determined that subcontracting opportunities are probable in connection with this procurement solicitation. Therefore, a Subcontracting Plan (SP) is required as a part of the Respondent's Submittal. The awarded Respondent shall develop and administer an SP as a part of the Respondent's Contract.

3) As mandated by 34 TAC § 20.285 Respondents must submit an SP that identifies all subcontracting items and complies with good faith effort requirements.

4) Pursuant to TGC § 2161.252(B), the Texas Facilities Commission shall reject any response that does not include a fully completed SP. An incomplete SP is considered a material failure to comply with the solicitation requirements.

5) The SP shall become a provision of the contract between the awarded Respondent and TFC. The awarded Respondent can only change the SP if (a) the Respondent complies with 34 TAC Section 20.285; (b) the Respondent provides its proposed changes to TFC for review; (c) TFC approves the Respondent’s proposed changes to its SP; and (d) TFC and the Respondent amends their contract by submitting a revised Subcontracting Plan containing the changes approved by TFC.

6) If TFC determines that the Respondent failed to implement the SP in good faith, TFC, in addition to any other remedies, may report nonperformance to the Texas Comptroller in accordance with 34 TAC, Section 20.285, (h) (3).

7) Subcontracting opportunities may be available in the following NIGP commodity class/item codes and descriptions. The list below contains the ‘Class’ (three-digit) and ‘Item’ (two-digit) codes of potential subcontracting trades for this solicitation. These codes are defined by the National Institute of Governmental Purchasing (NIGP). A complete listing of all NIGP Class & Item Codes can be found at:

https://comptroller.texas.gov/purchasing/nigp/

Class/Item Description

909-75 Site Clean-up, Post-Construction

910-42 Kitchen and Bathroom Fixture Repair Services, Not Plumbing: Bathtubs, Sinks, Cabinets, Counter Tops, etc.

914-10 Building Documentation Services 914-27 Carpentry 914-28 Cleaning, Interior and Exterior, New Construction 914-30 Concrete 914-31 Composites 914-38 Electrical 914-44 Flooring 914-47 Glass and Glazing 914-50 Heating, Ventilating and Air Conditioning (HVAC) 914-53 Insulation 914-61 Painting and Wallpapering 914-64 Plastering 914-68 Plumbing 914-83 Tile and Marble Work, All Types 914-84 Trade Services, Construction, (Not Otherwise Classified) 914-85 Welding

8) The initial SP submitted in response to this RFQ solely addresses the Part One Pre-Construction collaborative phase of the scope of work. The awarded Respondent must submit a revised SP, documenting the required Good Faith Effort (GFE) outreach to potential subcontractors to determine GMP. The TFC Office of Business Opportunities must approve the revised GMP SP before issuing a Notice to Proceed for Part Two Construction.

9) If assistance is needed in preparing the Subcontracting Plan, potential Respondents may contact the Office of Business Opportunities Division by email at opportunities@tfc.texas.gov.

10) Prior to soliciting bids in preparation for GMP, the CMR shall coordinate with the Office of Business Opportunities to schedule a “Meet the Prime” event in order to promote outreach to VetHUBs for subcontracting opportunities.

https://comptroller.texas.gov/purchasing/nigp/ mailto:opportunities@tfc.texas.gov

11) Requirement to Utilize HUB Compliance Reporting System. Pursuant to Texas Administrative Code, Title 34 §§ 20.285(h) and 20.285(g), TFC administers SP-PAR compliance monitoring through a HUB Compliance Reporting System commonly known as B2G. The successful Respondent and any subcontractors must submit required PAR information into the B2G system. Any delay in the timely submission of PAR information into the B2G system will be treated as an invoicing error subject to dispute under Tx. Gov’t Code Section 2251.042.

2) STEP TWO CONTENTS: Step Two only applies to the five or fewer Respondents chosen from the Step One qualification evaluation. Below is a summary of required information. TFC reserves the right, in its sole judgment and discretion, to waive minor technicalities and errors in the best interest of the state. The Attachment D – CMR Proposal Form and the Attachment E – Non- Collusion Affidavit shall be submitted upon request; failure to do so shall result in disqualification.

a) Attachment D - CMR Proposal Form: This form must be completed and returned.

Respondents may not add qualifications, conditions or exceptions to the proposal. Any such representation by the Respondent may be cause for rejection of the proposal at the full and sole discretion of TFC.

1) The Offer: The offer (as more fully set forth in the Attachment D – CMR Proposal Form) shall be comprised of the components listed below.

a. A Pre-Construction Management Not-to-Exceed fee for collaboration with TFC and its A/E during the pre-construction phase described in Section III Scope of Work, Part One. This will be negotiated with top ranked Respondent after evaluation of proposal and interviews.

b. A Construction Management Fee as a percentage of the estimated Cost of Work.

Such fee shall represent overhead and profit.

c. A Not-to-Exceed fee for Construction General Conditions.

d. Builder’s Risk Insurance as a percentage of the Cost of Work.

e. Liability Insurance as a percentage of the Cost of Work.

f. Performance and Payment Bonds as a percentage of the Cost of Work.

2) Construction Time: Construction time is estimated at three hundred and sixty-five

(365) calendar days.

3) Submittal Duration: If TFC has not made an award ninety (90) calendar days after responses are opened Respondents may withdraw their responses without prejudice;

however, Respondents have the option to extend the time in which their responses will be honored after this ninety (90) day period.

b) Attachment E - Non-Collusion Affidavit: The Attachment E – Non-Collusion Affidavit must be enclosed with the proposal. The Attachment E – Non-Collusion Affidavit form can be obtained electronically at the following link, ‘Forms Index’, Document #3, https://web.tfc.texas.gov/vendors/doing-business-with-tfc/construction-forms

3) INQUIRIES:

a) All inquiries shall be submitted through OpenGov portal or emailed to the Agency Points of Contact identified above.

b) All inquiries will result in responses posted to OpenGov Portal and ESBD.

https://web.tfc.texas.gov/vendors/doing-business-with-tfc/construction-forms

c) Any Respondents finding discrepancies between the provided documents, or in doubt as to their exact meaning, shall notify TFC at once. TFC may then, as an option, issue addenda clarifying the same. TFC is not responsible for oral instructions or for misinterpretation of the drawings and specifications.

d) Upon issuance of this RFQ, beside written inquiries as described above, other employees and representatives of TFC will not answer questions or otherwise discuss the contents of the RFQ with any potential vendor or their representatives. Failure to observe this restriction may result in disqualification of any subsequent response. This restriction does not preclude discussions between affected parties for conducting business unrelated to this solicitation.

SECTION VI – SUBMITTAL SUBMISSION

1) Submittals shall be submitted through the OpenGov portal by 3:00 PM on the date specified in the Schedule of Events above. In order to ensure that all documents are submitted before the deadline, TFC recommends beginning the upload process well in advance of the deadline to allow enough time to upload the documents into the portal.

2) Follow the submittal instructions specified in the Attachment H – OpenGov Submission Instructions.

3) Facsimile and email submittals are not acceptable responses to the RFQ.

4) Respondents having difficulty using the online system should be addressed through OpenGov support. If unable to upload the documents to the OpenGov Portal, contact the Purchaser prior to the deadline to make alternate arrangements. Failure to contact the Purchaser prior to the deadline will result in deeming submittal non-responsive or late.

5) TFC will not consider any exceptions and/or requests for modification to the proposed contract that are submitted after the date and time for submission of Respondents’ submittals.

Exceptions and/or requests submitted after this date cannot be considered as they create a possibility for a protest, which would delay award and execution. General statements of reservation of right to later review or negotiate additional items not included in the response prior to award will not be considered or allowed.

SECTION VII - EVALUATION AND AWARD

1) The intent of TFC is to award a contract to the vendor whose qualifications and pricing are considered to be ‘best value’ to the state. When considering ‘best value’ and award, the Owner reserves the right to set a minimum requirement regarding the criteria listed below.

2) An evaluation committee will be established to evaluate submittals. The committee will include employees of TFC and may include other impartial individuals who are not TFC employees. By submitting qualifications in response to this RFQ, Respondent accepts the solicitation and evaluation process and acknowledges and accepts that scoring of the qualifications may involve some subjective judgments by the evaluation committee. The evaluation committee will evaluate and score each submittal based on the following criteria:

a) Step 1 Criteria Weight

i) Experience and Qualifications 40%

ii) Methodology and Budget/Schedule Compliance 30%

iii) Quality/Safety Programs & Safety Record 10%

iv) Litigation History Pass/Fail

v) Subcontracting Plan Pass/Fail

vi) Total 80%

b) Step 2 Criteria Weight

i) Compensation and Fees 20%

ii) Step 1 Criteria 80%

iii) Total 100%

3) The evaluation committee may conduct an interview to make a determination for award recommendation. Scoring of the interview may replace the scoring of the Step One criteria listed above. The following will be expected during an interview:

a) One hour is allocated for the interview.

b) Attendance by team members assigned to the Project to represent themselves as to their relevant experience and proposed involvement in the Project. Interview must be led by the identified project manager for the project.

c) Agenda questions for the interview will be provided by TFC requiring an elaboration of company relevant experience and qualifications, proposed methodology, and quality and safety programs.

4) Giving priority in order of the ranking determined by the scores, TFC will undertake to negotiate an agreement with the Respondent which is evaluated as the highest scoring, deemed the best value to the State. The Evaluation Committee will determine if price negotiations are necessary and may negotiate final pricing per TGC, Chapter 2269, Subchapter D, §2269.254 (b), (c). If an agreement cannot be negotiated, the negotiations will be formally terminated and TFC will attempt to negotiate an agreement with the next Respondent in order of scoring until an agreement is reached, no qualified Respondents remaining, or the list is exhausted, upon which the solicitation will be cancelled and may be re-issued.

5) In evaluating proposals to determine the best value for the State of Texas, TFC may consider information related to past contract performance of a Respondent including, but not limited to, the Vendor Performance Tracking System available at http://www.txsmartbuy.gov/vpts. Prior work performance with TFC and other State agencies or governmental entities, which are familiar with a Respondent’s performance, depending on problems encountered, may be grounds for disqualification.

6) RIGHT TO AUDIT: Vendor understands that acceptance of funds under this contract acts as acceptance of the authority of the State Auditor’s Office, TFC, or any successor agency to conduct an audit or investigation in connection with those funds. Vendor further agrees to cooperate fully with the above parties in the conduct of the audit or investigation, including providing all records requested. Vendor shall ensure that this clause concerning the authority to audit funds received indirectly by subcontractors through the vendor and the requirement to cooperate is included in any subcontract awarded.

7) PUBLIC DISCLOSURE: News or social media releases pertaining to this RFQ or the services, study, data, or project to which it relates shall not be made without TFC’s prior written authorization. In the exercise of TFC’s sole and absolute discretion, any breach by the Respondent may result in the disqualification of response or cancellation of this RFQ and the disqualification of the Respondent to respond to any re-solicitation.

8) PROTESTS: Protests shall be governed by TAC Title 1, Administration, Part 5 Texas Facilities Commission, Chapter 111 Administration, Subchapter C Complaints and Dispute Resolution, §111.32 Protests/Dispute Resolution/Hearings.

http://www.txsmartbuy.gov/vpts

9) RISK OF NON-PERFORMANCE: TFC may disqualify a Respondent if there is an unacceptable risk that it will fail to perform the Contract. The Respondent bears the burden of establishing:

a) ability, capacity, and skill to perform the contract or provide the service required

b) ability to perform the contract or provide the service promptly, or in the time required, without delay or interference

c) character, responsibility, and integrity

d) current compliance with laws relating to the contract or service

e) sufficient financial resources to perform the contract and provide the service, and

f) conformity to all material specifications required in this Solicitation.

g) TFC may consider any source of information it deems reliable.

10) ORDER OF PRECEDENCE: In the event of conflicts or inconsistencies between this contract and its attachments, such conflicts or inconsistencies shall be resolved by reference to the documents in the following order of priority: 1) Amendments to the Contract, 2) Signed Contract, 3) Request for Qualifications, and 4) Respondent’s Response to Request for Qualifications.

REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK

ATTACHMENT A – EXECUTION OF SUBMITTAL

(Posted on the ESBD and OpenGov Portal)

ATTACHMENT B – SUBCONTRACTING PLAN FORMS

ATTACHMENT C – CMR QUALIFICATION FORM

ATTACHMENT D - CMR PROPOSAL FORM

(Submitted at Step 2 by Selected Respondents Only)

ATTACHMENT E – NON-COLLUSION AFFIDAVIT

Obtain a copy at the following website, Construction Contracts Item #3 at

TFC website link: https://web.tfc.texas.gov/vendors/doing-business-with-tfc/construction-forms

ATTACHMENT F – PROJECT MANUAL

ATTACHMENT G - CMR SERVICE CONTRACT TEMPLATE

REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK

ATTACHMENT H – OPENGOV SUBMISSION INSTRUCTIONS

Receiving Electronic Bids Only

• Submit Electronic Responses via the Texas Facilities Commission's eProcurement Portal hosted by OpenGov at https://procurement.opengov.com/portal/tfctexas

• Respondents are required to register for an account via the Texas Facilities Commission's eProcurement Portal hosted by OpenGov.

Submittal Deadline

• Submittals may be received up to but not later than the date and time specified in the Schedule of Events. The Texas Facilities Commission's eProcurement Portal Clock is the official clock for the determination of all deadline dates and times.

Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. Texas Facilities Commission strongly recommends completing your response well ahead of the deadline.

Addenda Notification and Acknowledgement

• Once the respondent has completed registration, they will receive addenda notifications to their email by clicking “Follow” on this solicitation.

• It is the responsibility of each respondent to periodically check the site for any addenda to this RFQ and acknowledge each addendum through the portal.

Submittal Opening

• All visitors to the public portal can view who has submitted a response to posted solicitations by viewing the Followers tab on the solicitation page.

• There will not be a public opening for this solicitation.

Submitting Questions and Receiving Responses

• Respondents can submit inquiries regarding this solicitation via the OpenGov Portal up to the date specified for submitting inquiries in the Schedule of Events. Answers to inquiries will be posted on the OpenGov portal. Respondents who are following this solicitation will receive an email notification when answers are posted. It is the responsibility of the respondent to check the website for answers to inquiries.

Technical Support

• Any issues regarding the OpenGov site shall be addressed with OpenGov Contact Support via https://opengov.my.site.com/support/s/. Online chat is the fastest course for resolving issues with the system.

https://procurement.opengov.com/portal/tfctexas https://opengov.my.site.com/support/s/

SECTION I - GENERAL
SECTION II - PROJECT DESCRIPTION
SECTION III - SCOPE OF WORK
SECTION IV – SCHEDULE OF EVENTS
SECTION V - SUBMISSION REQUIREMENTS:
SECTION VI – SUBMITTAL SUBMISSION
SECTION VII - EVALUATION AND AWARD
ATTACHMENT A – EXECUTION OF SUBMITTAL
ATTACHMENT B – SUBCONTRACTING PLAN FORMS
ATTACHMENT C – CMR QUALIFICATION FORM
ATTACHMENT D - CMR PROPOSAL FORM
ATTACHMENT E – NON-COLLUSION AFFIDAVIT
ATTACHMENT F – PROJECT MANUAL
ATTACHMENT G - CMR SERVICE CONTRACT TEMPLATE
ATTACHMENT H – OPENGOV SUBMISSION INSTRUCTIONS

File details come from the government source that posted it. Updated .