Amendment 2. Questions and Answers received for RFPSSPR464972 as of 07.22.2026.pdf

PDF 57 KB Posted

Attached to
Ladders, Scaffolding, and accessories
Solicitation number
RFPSSPR464972
Issued by

About this file

This is a Questions and Answers (Q&A) amendment document for RFP SSPR464972, containing clarifications issued as of July 17, 2026 and July 22, 2026.

The procurement is for supplies only on an unrestricted basis, specifically ladders, scaffolding, and accessories to be delivered to Oak Ridge National Laboratory (ORNL/UT-Battelle, LLC, 1 Bethel Valley Road, Bldg 7120, Oak Ridge, TN 37830). The pricing is Firm Fixed Price for delivery only, with no labor included. ORNL will provide forklift and manpower for material staging at the site. Offerors are not required to source from all three suppliers listed in the bill of materials (Universal Manufacturing, Direct Scaffolding Supply, and Metal Tech); a single consolidated vendor may be proposed if items meet attachment requirements and qualify as domestic equivalents. Substitutions are permitted if they satisfy all functional, safety, performance, and other stated requirements. No subcontracting limitation percentage is imposed, and no approved alternate sources or distributors are identified. The company intends to make one award. Questions were due by July 22, 2026 at 2:00 PM Eastern, with offers due by July 27, 2026 at 2:00 PM Eastern. The procurement does not require engineered drawings, scaffolder services, or concrete forms, and is being issued on an unrestricted (non-small business set-aside) basis.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 2. Questions and Answers received for RFPSSPR464972 as of 07.17.2026.

Question 1.

Subcontracting and Self-Performance Limitations: The RFP specifies Firm Fixed Price for "Ladders, Scaffolding, and accessories." FAR 52.219-14 and DEAR regulations impose limitations on subcontracting depending on contract type and set-aside status. Since this is *not* a small-business set-aside (per Section 2), I assume the general FAR 52.219-14 ceiling applies (e.g., 100% for unrestricted supplies, or potentially lower percentages for specialty trade construction if applicable). Please confirm: (a) Is this procurement intended to be treated as supply/COTS acquisition, construction, or specialty trade work, and (b) what is the applicable subcontracting limitation percentage, if any?

Answer 1. This solicitation is for supplies only and is being issued on an unrestricted basis.

Neither the RFQ text, Attachment B (ORNL Terms and Conditions), nor Attachment C (Prime Supplemental Flowdowns) references FAR 52.219-14, Limitations on Subcontracting, and the solicitation does not state a subcontracting limitation percentage.

Question 2.

Bill of Materials — Multiple Suppliers Required: Attachment A lists items from three distinct suppliers (Universal Manufacturing, Direct Scaffolding Supply, and Metal Tech). The RFP requires offers to provide "requested products per Attachment A or Domestic Equivalents."

To ensure compliance and cost accuracy, please clarify: (a) Does the Company require all three suppliers to be sourced, or may I propose a single consolidated vendor that can supply equivalent items from all three categories? (b) Are there any approved alternate sources or distributors that can consolidate these product lines? (c) Will the Company consider slight modifications or substitutions in product sourcing to improve lead-time or cost, provided functionality and safety specifications are met?

Answer 2.

(a) No. Offerors are not required to source from all three suppliers listed in Attachment A. A single vendor may be proposed if the items meet Attachment A requirements and qualify as domestic equivalents.

(b) No approved alternate sources or distributors are identified. Offerors are responsible for proposing compliant products.

(c) Yes. Substitutions may be considered if they meet all Attachment A functional, safety, performance, and other stated requirements.

Question 3.

Can you confirm the RFP Submission Deadline?

Answer 3.

Questions Due By: 07/22/2026 at 2:00 PM Eastern

Offers Due By: 07/27/2026 at 2:00 PM Eastern

Questions and Answers received for RFPSSPR464972 as of 07.22.2026.

Question 4. Are there concrete forms in this RFQ?

Answer 4. No.

Question 5. Can I just bid the ladders?

Answer 5. As stated in Section 6. Competition. The Company intends to make one award.

Question 6. Do I have to buy everything from one supplier?

Answer 6. Offerors must make that determination.

Question 7. What is the ship to address?

Answer 7. ORNL/UT-Battelle, LLC, 1 Bethel Valley Road, Bldg 7120, Oak Ridge, TN 37830

Question 8. You want a price on dropping the material off at your site, not labor in any fashion?

Answer 8. Correct. Delivery only. No labor.

Question 9. Will you provide a forklift at site and manpower to stage material?

Answer 9. Yes.

Question 10. Are you looking for engineered drawings or scaffolders to build your scaffolds for this particular project?

Answer 10. No.

Question 11. Is the Oak Ridge National Laboratory in Tennessee the correct delivery location?

Answer 11. Yes. See Answer 7 above.