This is a Statement of Work (SOW) issued by the Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs (EEA) for the purchase, installation, and commissioning of electric vehicle (EV) charging equipment at Shawme-Crowell State Forest in Sandwich, Massachusetts. The project requires vendors to install two Level 2 networked EV charging stations—one at the Administration Building and one at the Maintenance Garage—with associated equipment including wall mount guards or bollards, exterior disconnect switches, conduit, wiring, circuit breakers, and junction boxes. Vendors must provide itemized quotes for dual-port charging stations (ChargePoint CP6000 or approved alternative) and single-port charging stations (ChargePoint CPF50-L23 or approved alternative), with separate pricing for 1-year and 5-year (including 2, 3, and 4-year options) networking and warranty packages. The SOW became available on COMMBUYS on April 17, 2026, with an optional site visit on April 30, 2026 (10:30 AM to 12:00 PM), vendor questions due May 1, 2026 by 5:30 PM EST, and proposals due May 11, 2026 by 4:00 PM. The estimated contract start date is May 19, 2026, with all work required to be completed by June 29, 2026. All proposals must be submitted electronically through COMMBUYS and include the Response Cover Sheet, itemized quotation with fixed pricing and timeline, and detailed expenses.

The solicitation is issued under the Massachusetts Statewide Contract VEH122 for Advanced Vehicle Technology Equipment and is subject to the Small Business Purchasing Program (SBPP), which gives preference to SBPP-registered vendors meeting best value criteria. All vendors, regardless of size or location, may submit proposals; however, SBPP participants with principal places of business in Massachusetts, at least one year in business, 50 or fewer full-time equivalent employees, and gross revenues of $15 million or less (three-year average) will receive award preference if they meet best value standards. EEA Facilities reserves the right to award the contract in whole or in part, accept partial bid components, or proceed with only one installation site. Vendors are responsible for all permitting, inspections, equipment commissioning, delivery of specification sheets, and as-built drawings. No services may be performed or fees incurred without a written Scope of Services agreement, a not-to-exceed amount, and a Notice to Proceed from EEA Facilities. No reimbursements will be provided for proposal preparation costs.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs

100 Cambridge Street, Suite 900 Boston, MA 02114

Maura T. Healey

GOVERNOR

Kimberley Driscoll

LIEUTENANT GOVERNOR

Rebecca L. Tepper

SECRETARY

Tel: (617) 626-1000 Fax: (617) 626-1081 http://www.mass.gov/eea

STATEMENT OF WORK (SOW) FOR

Project Number: DCR-003-26

Project Name: DCR Fleet EV Charging Stations Shawme-Crowell State

Forest

Project Locations: Shawme-Crowell State Forest Administration Building; 42 Main Street, Sandwich, MA, 02563 Maintenance Garage; 42 Main Street, Sandwich, MA, 02563 Property ID: 99_1_1

Location ID: F_924547_2737411 Approximate lot Size: 3787 acres

Source & Date: Massachusetts Interactive Property Map - April 8, 2026

Project Manager(s): Juan Guzman - Juan.Guzman@mass.gov Ryan Kingston - Ryan.C.Kingston@mass.gov

Awarding Entity: Executive Office of Energy and Environmental Affairs (100

Cambridge Street, Boston, MA)

Under OSD Statewide Contract:

VEH122: Advanced Vehicle Technology Equipment, Supplies and Services

Category 1: Electric Vehicle Supply Equipment (EVSE), Hardware, Software, and Ancillary Services https://massgis.maps.arcgis.com/apps/OnePane/basicviewer/index.html?appid=47689963e7bb4007961676ad9fc56ae9 mailto:Juan.Guzman@mass.gov mailto:Ryan.C.Kingston@mass.gov

This is a single document associated with a complete Bid that can be found on COMMBUYS (www.commbuys.com/). All Vendors are responsible for reviewing and adhering to all information, forms and requirements incorporated into the Statement of Work. Responses received after the deadline shall be disqualified. All Vendors should plan advance lead time for uploading proposals into COMMBUYS in a timely manner prior to the deadline. All Questions and Answers and Bid Responses must be submitted electronically through COMMBUYS.

Vendors requiring assistance in the registration and use of COMMBUYS should contact the COMMBUYS Helpdesk at COMMBUYS@state.ma.us or the COMMBUYS Helpline at 1-888- MA-STATE. The Helpline is staffed from 8:00 AM to 5:00 PM Monday through Friday Eastern time, as applicable, except on federal, state and Suffolk County holidays.

Document Outline

I. Project Description II. Applicable Procurement Law

III. Scope of Work for Charging Stations IV. Compliance with Contract Requirements V. Compensation

VI. Best Value Selection and Negotiation VII. Small Business Purchasing Program (SBPP)

VIII. Bidder Communication IX. Estimated SOW Calendar X. Questions via the Bid (Q&A) on COMMBUYS

XI. Required Components for Response Submission XII. Attachments

a. Attachment A – Response Cover Sheet

b. Attachment B – Administration Building – Installation Area

View

c. Attachment C – Maintenance Garage – Installation Area View

d. Attachment D – Administration Building - EV Charging

Electrical Sketch

e. Attachment E – Maintenance Garage - EV Charging Electrical

Sketch

f. Attachment F – Wall Mount Guard

g. Attachment G – Mini Wall Mount Guard

h. Attachment H – Wall Mount Sketch

i. Attachment I – Bollard Diagram

j. Attachment J – CPF50-L23 Architectural Drawings

I. Project Description

The Commonwealth of Massachusetts, through EEA Facilities (EOEEA) is seeking to engage a qualified vendor (hereafter referred to as “Vendor”) to purchase, install, and commission http://www.commbuys.com/

Electrical Vehicle (EV) charging equipment at two (2) install locations in Shawme-Crowell State Forest for Fleet use. The detailed scope of work is provided in Section III. Additional diagrams associated with the scope are attached under the “Attachments” section of this document.

NO PROPOSALS WILL BE ACCEPTED BY EMAIL, DELIVERY OR MAIL. ONLY

PROPOSALS RECEIVED VIA COMMBUYS WILL BE ACCEPTED.

II. Applicable Procurement Law This Solicitation is issued, and any contract will be awarded, under MGL c. 7, § 22; c.

30, § 51, § 52; and 801 CMR 21.00 (Goods and Services).

III. Scope of Work for Charging Stations

In accordance with the latest recognized National Electrical Code, (and all other applicable codes) the contractor shall be responsible for furnishing, installing, and commissioning all the equipment listed below:

Equipment:

• Level 2 EV Networked Charging Stations, double port, Wall-mounted, 18 feet cable, Power Select at 48A, Power Share, ChargePoint CP6000 or approved alternative. – Must be WEX compatible o (1) to be installed at the Administration Building o (1) to be installed at the Maintenance Garage

• Wall Mount Guard for protection – as per Attachments F (installed at the Administration Building) and G (installed at the Maintenance Garage) or equivalent. (2) bollards can be considered as an alternate if no Wall Mount Guard options can be properly fitted

• Exterior Disconnect Switch (quantity as needed)

• Conduit, Wiring, Circuit Breakers, labeling, Junction Boxes, and all other associated hardware/equipment/ parts as needed for complete operational system

• Please structure your quote by providing the following itemized options, such that EEA will select the most appropriate quote:

o (2) – Level 2 Dual Port EV Charging Stations (as specified above), cost per building o (2) –Level 2, single port, wall mounted, 23 feet cable, Power Select at 48A, networked, and WEX compatible.

ChargePoint CPF50-L23 or approved alternative. (see Attachment J)

EEA Facilities reserves the right to award the contract in whole or in part, including acceptance of partial bid components, including but not limited to proceeding with only one of the listed installation sites. It is required that the Vendor ensure that the completed operational systems have the required permitting and inspections. Other requirements include:

General Requirements:

• EV charging equipment to be wall-mounted at specifically designated locations, as indicated in project attachments

• All wiring to be run in conduit

• All wiring to be Copper

• Trenching will not be required

• Vendor must deliver spec sheet for all equipment – prior to completed work

• Vendor must deliver electrical one-line and/or as built drawings

• Vendor shall be responsible for inspection, permitting, and equipment commissioning

• Vendor must do a final walkthrough prior to the closing of this contract

• Vendors should include separate and clearly defined pricing for:

o 1-year networking and warranty options o 5-year networking and warranty options (include 2-year, 3-year, and 4-year)

The Vendor shall coordinate its work with the EEA team and shall not commence work until a Notice to Proceed has been issued. All work as defined in the RFP must be completed by no later than June 29th, 2026.

There are 10 diagrams attached to this document under the “Attachments” section.

They provide additional clarification and visuals for the desired outcomes of the installation.

IV. Compliance with Contract Requirements The vendor shall comply with all terms and conditions of their respective contract.

EEA Facilities reserves the right to negotiate and modify requirements with the awarded vendor.

V. Compensation No services may be performed, or fees incurred by the vendor under the contract unless a Scope of Services has been agreed to in writing and with a not-to-exceed amount and a written notice to proceed from EEA Facilities has been issued. No payments shall be made for goods or services not rendered. There will be no reimbursements for any costs incurred in the preparation of a bidder’s response to this RFP including but not limited to travel expenses, phone charges, tolls, fuel, parking or rental fees.

The services that may be provided are set forth in the SOW, and all expenses to deliver services shall be included in the contract prices. All invoices for payment under Contract shall include a detailed accounting of work authorized in a form and detail acceptable to EEA Facilities. Invoices must be submitted in a timely manner.

VI. Best Value Selection and Negotiation EEA Facilities may select the response which demonstrates the best value overall, including proposed alternatives, that will achieve the procurement and service goals of the EOEEA. Bidders may provide supplemental information. EEA Facilities and the selected bidder(s) may negotiate a change in any element of contract performance or cost identified in the original SOW or the selected Bidder’s or Contractor’s response which results in lower costs or a more cost effective or better value than was presented in the selected Bidder’s or Contractor’s original response.

During the selection process, EEA Facilities reserves the right to take any or all of the following actions if it deems them to be in the interests of the Commonwealth of Massachusetts:

• Reject any and all proposals;

• Waive any minor informalities in proposals received or request Respondents to correct them;

• Request additional information from Respondents and seek clarification from a

Respondent provided that EEA Facilities determines it is not prejudicial to the interests of the other Respondents to do so. Action by the selection team in this regard should not be construed to imply acceptance or rejection of a proposal.

VII. Small Business Purchasing Program (SBPP) Program Background. The Massachusetts Small Business Purchasing Program (SBPP) was established pursuant to Executive Order 599 to increase state contracting opportunities with small businesses having their principal place of business within the Commonwealth of Massachusetts.

Pursuant to the SBPP, it is the intention of the issuing department to award this Small Procurement to one or more SBPP participating business(es) as described below.

SBPP Award Preference. While all businesses, no matter the size or principal place of business, may submit responses to this solicitation, should an SBPP participant respond and meet the best value criteria as described in this solicitation, the SBPP participant shall be awarded the contract.

The Strategic Sourcing Services Team (SST) will not evaluate submissions from non-SBPP participants unless no SBPP Bidder meets the SSST’s best value evaluation criteria.

SBPP Participation Eligibility. To be eligible to participate in this procurement as an SBPP participant, an entity must meet the following criteria, and be marked as an SBPP registered business in COMMBUYS:

1. Have its principal place of business in the Commonwealth of Massachusetts;

2. Been in business for at least one year;

3. Employ a combined total of 50 or fewer full-time equivalent employees in all locations, or employees work less than a combined total of 26,000 hours per quarter; and

4. Have gross revenues, as reported on appropriate tax forms, of $15 million or less, based on a three-year average.

Non-profit firms also must be registered as a non-profit or charitable organization with the MA Attorney General’s Office and be up to date with all filings required by that office and be tax exempt under Section 501(c) of the Internal Revenue Code.

https://www.mass.gov/sbpp https://www.mass.gov/executive-orders/no-599-reaffirming-programs-to-ensure-diversity-equity-and-inclusion-for-diverse-and-small-massachusetts-businesses-in-state-procurement-and-contracting?_gl=1*wnz9qe*_ga*OTcxODE1Mjg3LjE2ODM2MzUyMjc.*_ga_MCLPEGW7WM*MTY5ODA3OTg1NC4yNi4wLjE2OTgwNzk4NTQuMC4wLjA.

https://www.commbuys.com/bso/

SBPP Compliance Requirements. It is the responsibility of the Bidder to ensure that their SBPP status is current at the time of submitting a response and throughout the life of any resulting contract. Misrepresentation of SBPP status will result in disqualification from consideration, and may result in debarment, contract termination, and other actions. To learn more about the SBPP, including how to apply, visit the SBPP Webpage.

Program Resources and Assistance. Bidders and Contractors seeking assistance regarding SBPP may visit the SBPP webpage, http://www.mass.gov/sbpp, or contact the SBPP Help Desk at sbpp@mass.gov.

VIII. Bidder Communication Bidders are prohibited from communicating directly with any employee regarding this SOW except as specified in this SOW with the EEA Facilities team. No other individual Commonwealth employee or representative is authorized to provide any information or respond to any question or inquiry concerning this SOW. Bidders may contact the contact person for this SOW in the event that the SOW is incomplete, or the bidder is having trouble obtaining any required attachments electronically through

COMMBUYS.

IX. Estimated SOW Calendar

Milestone Date Availability of SOW on COMMBUYS April 17th, 2026 (Mandatory) Shawme-Crowell State Forest Site Visit

Vendors can visit Thursday, April 30th, 2026

Site personnel will be available only from:

10:30 AM to 12:00 PM

Submission of Vendor Question(s) through COMMBUYS (DUE)

May 1st, 2026 by 5:30PM

EST

Responses to Vendor Questions posted in COMMBUYS (Estimated)

May 8th, 2026

Proposal Submission Deadline May 11th, 2026 by 4PM Estimated Contract Start Date May 19th, 2026 Final Date for all Deliverables/ Specifications under the Scope of Work Deadline

June 29th, 2026

X. Questions via the Bid (Q&A) on COMMBUYS The Bid Q&A provides the opportunity for Vendors to ask written questions and receive written answers from EEA Facilities regarding this SOW. All Vendor questions must be submitted through the Bid Q&A found on COMMBUYS. Questions may be asked at any time prior to the http://www.mass.gov/sbpp http://www.mass.gov/sbpp mailto:sbpp@mass.gov

Deadline for Submission of Questions stated in the Estimated Procurement Calendar. EEA Facilities reserves the right not to respond to questions submitted after this date. It is the Vendor’s responsibility to verify receipt of questions.

Please note that any questions submitted to EEA Facilities using any other medium (including those that are sent by mail, fax, email or voicemail, etc.) will not be answered. To reduce the number of redundant or duplicate questions Vendors are asked to review all questions previously submitted to determine whether the question has already been posted.

Vendors are responsible for entering content suitable for public viewing, since all questions are accessible to the public. Vendors must not include any information that could be considered personal, security sensitive, inflammatory, incorrect, collusory, or otherwise objectionable, including information about the Vendor’s company or other companies. EEA Facilities reserves the right to edit or delete any submitted questions that raise any of these issues or that are not in the best interest of the Commonwealth or this SOW.

All answers are final when posted. Any subsequent revisions to previously provided answers will be dated.

It is the responsibility of the prospective/ awarded Vendor to maintain an active registration in COMMBUYS and to keep current the email address of the Vendor’s contact person and prospective contract manager. If awarded a contract, the Vendor is required to monitor that email inbox for communications from EEA Facilities, including requests for clarification. EEA Facilities assumes no responsibility if a prospective/ awarded Vendor’s designated email address is not current, or if technical problems, including those with the prospective/ awarded Vendor’s computer, network or internet service provider (ISP) cause email communications sent to/ from the prospective/ awarded Vendor and EEA Facilities to be lost or rejected by any means including email or spam filtering.

XI. Required Components for Response Submission The following components specific to this SOW must be included in the order outlined below with your response. Failure to include all the requested information and completed required forms may result in rejection of your firm’s submission. Proposals received after the deadline will be rejected. The required SOW components are as follows:

1) Attachment A – Response Cover Sheet

2) Proposal based on Scope of Work (including Schedule)

3) Compensation Structure/ Pricing and Expenses

Proposal based on Scope of Work: This refers to an itemized bid quotation that outlines a not to exceed fixed-price fees, the expected timeline (schedule) for deliverables, and details any associated expenses outlined in the project scope. This quotation must account for any quote requirements mandated through the designated Massachusetts Statewide Contract.

Bidders are encouraged to provide supplemental information regarding anything pertaining to the scope. Bidders will not be penalized for not submitting supplemental information. EEA Facilities will consider all aspects of a bidder’s proposal in its determination.

XII. Attachments

ATTACHMENT A – Response Cover Sheet DCR Fleet EV Charging Stations Shawme-Crowell State Forest

Issued on:

April 17th, 2026

VENDOR SUBMITTING RESPONSE

Firm Submitting Proposal

Name of Authorized Signatory Title

Email Phone Number

Address of Firm

Signature Date

ATTACHMENT B – Administration Building – Installation Area View

ATTACHMENT C – Maintenance Garage – Installation Area View

ATTACHMENT D – Administration Building - EV Charging Electrical Sketch

ATTACHMENT E – Maintenance Garage - EV Charging Electrical Sketch

ATTACHMENT F – Wall Mount Guard

ATTACHMENT G – Mini Wall Mount Guard

ATTACHMENT H – Wall Mount Sketch

ATTACHMENT I – Bollard Diagram

ATTACHMENT J – CPF50-L23 Architectural Drawings