Addendum 1 To RFP A22-0839.pdf
PDF 278 KB Posted
- Attached to
- Request for Proposal for Arc Melting System with Addendum 1 Federal contract opportunity
- Solicitation number
- RFP-SC-22-0839
- Issued by
- Department of Energy Ames Laboratory
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A22-0839 RFP with All Appendices.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ames Laboratory RFP SC-22-0839 ADDENDUM NUMBER 1
ADDENDUM NUMBER 1
ADDENDUM DATE: 2/7/2022
PROJECT: RFP# A22-0839
PROPOSAL DUE DATE: 2/16/2022 at 5:00 PM CST
ADDENDUM ISSUED DATE: 2/7/2022
The information contained in this Addendum modifies, supplements, or replaces information contained in the Bidding Documents dated 1/21/2022 and is hereby made a part of the Contract Documents.
Acknowledge receipt of this Addendum in the proposal submitted.
Addendum consists of 2 pages.
ADDENDUM INDEX
GENERAL ITEMS
Questions submitted and Answers Provided APPLICABLE TO THE PROJECT SPECIFICATIONS:
• Items #1 through Item #3 inclusive.
ATTACHMENTS
• Updated Appendix B – Arc Melting Specification Rev.1, dated 02/07/2022
GENERAL ITEMS
Questions submitted and Answers Provided:
Question. Section C, Subsection 3, Factor 1.e and 1.e.1. What is the maximum raw material volume associated with the melt size of 1100g and of 2000g?
Answer. That mass is based on Fe density, so volume can be assumed from that.
Question. Section C, Subsection 3, Factor 2.a. What is the minimum/maximum size of the water-cooled surface?
Answer. We are not specifying any sizes of water-cooled surface.
Question. Vacuum requirement of 10-7 Pa is too high and not necessary for melting alloy using inert gas. Ender use may mean 10-7 torr. Please confirm.
Answer. That should be 10-7 torr (note this is only preferred, not required)
Question. Quenching melt into water is not suitable in a high vacuum system. The possibility is to quench a water cold mold. Please confirm.
Answer. We don't have a requirement for quenching melt into water. We said preferred to have water cooled mold.
Ames Laboratory RFP SC-22-0839 ADDENDUM NUMBER 1
Question. Please confirm the max melting amount. It will be a different design for 1000g and 2000 g.
Answer. We don't have a max melting amount, but rather a minimum requirement of how much the system can handle. The system must be able to melt 1000 g (based on Fe density). The ability to melt 2000 g is preferred.
APPLICABLE TO THE PROJECT SPECIFICATIONS
ITEM #1 Specification I. E. – Add “(Based on iron density)”.
ITEM #2 Specification I. E. 1. – Add “(Based on iron density)”.
ITEM #3 Specification 3.B. – Change “…10 -7 Pa…” to “…10-7 torr…”.
Issued 2/7/2022
Rev. 1 02/07/2022
Appendix B – Arc Melting System Specifications
RFP A22-0839 for quotes for metal and alloy melting/solidification center
The following is a request for a single system, modular system, or multiple systems that can meet the following conditions for preparation of metals and alloys in laboratory batch sizes.
Requirements:
I. Melting:
A. Ability to operate melting process in inert gas or vacuum
1. Ability to getter the atmosphere preferred B. Ability to melt metals, including refractory elements up to Tungsten (3,422°C) in a crucible or hearth with minimal contamination C. Electric arc melting preferred D. Electromagnetic stirring available to ensure homogeneous alloy melting E. Melt size 50-1100g (Based on iron density)
1. Capability up to 2000g preferred (Based on iron density) F. Load-lock or ability to feed without breaking atmosphere preferred
II. Processing:
A. Rapid quenching onto a water-cooled surface option desired (similar to strip casting 50-500 rpm) B. Interchangeable mold preferred
1. Capability to pour molten charge into cooled crucibles for rapid solidification
2. Water cooled molds preferred
C. Modular or integrated powder atomization of molten metal desired D. Centrifugal casting capability preferred E. Heated nozzle or tundish for casting and pouring preferred
Rev. 1 02/07/2022
III. Vacuum system:
A. Roughing pump included B. Diffusion pump included (better than 10-7 torr preferred) C. Vacuum gauge included
IV. System interface:
A. Interface to record temperature and pressure to PC
1. Ability to record power and other system settings preferred
V. Utilities:
A. Specify power requirements and electrical certifications (e.g., UL) B. Specify water flow requirements C. Specify Gas requirements
VI. Safety:
A. System should be interlocked to prevent operation without proper cooling or safety conditions.
B. Please provide information about safe handling of metal vapor or fines
| Addendum To RFP A22-0839 |
| APPLICABLE TO THE PROJECT SPECIFICATIONS |
| Appendix B - Arc Melting System Specifications - Rev. 1 dated 02-07-2022 |
| I. Melting: |
| A. Ability to operate melting process in inert gas or vacuum |
| 1. Ability to getter the atmosphere preferred |
| B. Ability to melt metals, including refractory elements up to Tungsten (3,422 C) in a crucible or hearth with minimal contamination |
| C. Electric arc melting preferred |
| D. Electromagnetic stirring available to ensure homogeneous alloy melting |
| E. Melt size 50-1100g (Based on iron density) |
| 1. Capability up to 2000g preferred (Based on iron density) |
F. Load-lock or ability to feed without breaking atmosphere preferred
| II. Processing: |
| A. Rapid quenching onto a water-cooled surface option desired (similar to strip casting 50-500 rpm) |
| B. Interchangeable mold preferred |
| 1. Capability to pour molten charge into cooled crucibles for rapid solidification |
| 2. Water cooled molds preferred |
| C. Modular or integrated powder atomization of molten metal desired |
| D. Centrifugal casting capability preferred |
| E. Heated nozzle or tundish for casting and pouring preferred |
| III. Vacuum system: |
| A. Roughing pump included |
| B. Diffusion pump included (better than 10-7 torr preferred) |
| C. Vacuum gauge included |
| IV. System interface: |
| A. Interface to record temperature and pressure to PC |
| 1. Ability to record power and other system settings preferred |
| V. Utilities: |
| A. Specify power requirements and electrical certifications (e.g., UL) |
| B. Specify water flow requirements |
| C. Specify Gas requirements |
| VI. Safety: |
| A. System should be interlocked to prevent operation without proper cooling or safety conditions. |
| B. Please provide information about safe handling of metal vapor or fines |