This is an Amendment to Solicitation (Amendment No. 01) for a federal contract opportunity issued by Fermi Forward Discovery Group, LLC on behalf of Fermilab. The solicitation number is RFP-LBNF-381525-RO for the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment Underground Concrete project. The proposal due date is June 17, 2026, with the amendment issued on June 15, 2026.
The amendment consists of Questions and Answers derived from the pre-proposal meeting. Key clarifications include: (1) a designated mixing space will be provided within 100 feet of water supply and 1,000 feet of all work locations; (2) bond beams are included as part of wall placement with attached structural drawings that were inadvertently omitted from the original solicitation; (3) materials will be delivered to the mixing or placement point by the SDSTA Bull Gang, with the successful bidder responsible for providing any general-use forklift for underground work; and (4) water is available within 100 feet of the mixing location if mixed underground, with drinking water also provided. The amendment includes attached technical drawings (LBNF-FSCF-BSI Sheets 1-2 and U-FD-SS-706 Sheet 6) detailing wall elevations, reinforcement sections, and typical concrete construction details for the underground structural work. The procurement specialist contact is Russell Olliff at (254) 396-6155.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RO File.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT TO SOLICITATION
AMENDMENT NO.
DATE OF AMENDMENT:
June 15, 2026
SOLICITATION NO.
RFP-LBNF-381525-RO
DATE ISSUED:
June 15, 2026
PROJECT NO.
N/A
PROPOSAL DUE DATE:
June 17, 2026
TITLE OF PROJECT:
Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment Underground Concrete
Questions and Answers - Amendment 1
The questions below were asked during the pre-proposal meeting, no other questions have been submitted by the due date for additional questions(June 12, 2026). The drawings referenced in the answer to question 2 is attached
Q1-Will space be made available for mixing concrete?
A1-Yes, a space will be designated in coordination with the successful bidder. This space will be within 100 feet of water supply and within 1,000 feet of all work locations
Q2-Are bond beams provided?
A2. Bond beams are part of the wall placement. See attached drawings that were inadvertently missed in the original solicitation.
Q3- Is a forklift available for use underground?
A3- Materials will be delivered to the point of mixing (underground mixing) or placement (surface supply) by the SDSTA Bull Gang. Any general-use forklift underground shall be provided by the successful bidder.
Q4-Is water available?
A4- Yes, water will be available within 100’ of the mixing location if mixed underground. Drinking water is also provided (bottles)
Fermi Forward Discovery Group, LLC.
206 Ellison Ct.
Lead, SD 57754 M.S 123
Russell Olliff LBNF Procurement Specialist (254)396-6155
YBYA YBYA
(0 .56
m) 1'
- 1 0 1
/4"
(2 .44
m) 8'
- 0
(0 .69
m) 2'
- 3
(0 .28
m) 0'
- 1 1 1
/8"
(0.84m) 2' - 9 1/4"
(2.44m) 8' - 0"
(0.90m) 2' - 11 1/4"
SS-803
LT
B
(1.35m) 4' - 5 1/8"
(1.35m) 4' - 5 1/8"
(3 .99 m)
1"
(1 .20
m) 3'
- 1 1 1
/4"
(0 .96
m) 3'
- 1 3/
4"
(1.42m) 4' - 8"
(2 .54
m) 8'
- 4
(1 .52
m) 5'
- 0
(0 .44
m) 1'
- 5 1/
4"
(0 .21
m) 0'
- 8 3/
8" (0.48m) 1' - 7"
(0 .95
m) 3'
- 1 3/
8"
(0.98m) 3' - 2 1/2"
(1.04m) 3' - 5"
(2) #7
(1.12m) 3' - 8 1/8"
(0.97m) 3' - 2 3/8"
(3.05m) 10' - 0"
(3 .05 m)
0"
Level 4850
SEE UG-FD-C-514 FOR MINE
DOOR AND CONCRETE
WALL DETAILING
(0 .20
m) 0'
- 8
(0.15m) 0' - 6"
(0.61m) 2' - 0"
(0 .49
m) 1'
- 7 1/
8"
(2.90m) 9' - 6"
(0.45m) 1' - 5 3/4"
(0.45m) 1' - 5 3/4"(2
.44 m)
8'
- 0
SS-803
SS-803
SIM
(4.00m)
13' - 1 1/2"(4 .00 m)
1 1
/2"
(0.50m) 1' - 7 5/8"
(0.50m) 1' - 7 5/8"
SS-803
SS-803
SIM
12" DEEP BY 8" WIDE CONC
BEAM ABOVE DOOR OPENING
W/ (2)#7 T&B AND #3
STIRRUPS @ 3" O.C.
(0.61m) 2' - 0"
(0.46m) 1' - 6"
(0 .29
m) 0'
- 1 1 1
/2"
(0 .15
m) 0'
- 6
(0.43m) 1' - 5"
(0 .56
m) 1'
- 1 0"
(0.25m) 0' - 10"
(0.69m) 2' - 3"
(0 .18
m) 0'
- 7
(0 .50
m) 1'
- 7 1/
2"
PROVIDE POUR STOP AT
TOP OF CONC BEAM.
PROVIDE SEPARATE
POURS ABOVE AND
BELOW POUR STOP LINE
(1.83m) 6' - 0"
(0 .31 m)
MI
N
1'
- 0
(0 .30 m)
MI
N
1'
- 0
(1 .02
m) 3'
- 4
(2) #7
Arup USA Inc 77 Water Street, New York NY 10005, T 212 896 3000 www.arup.com
DRAWING NO.
SCALE:
REV.
REVISIONS
DESIGNED
DRAWN
CHECKED
DESCRIPTIONDATEREV.
Fermilab Long-Baseline Neutrino Facility
K 1 /1
/2
515-1-6
UNDERGROUND, STRUCTURAL
LBNF-FSCF-BSI
IB
JA
JA ARUP WALL ELEVATIONS
SHEET 1 OF 2
U-FD-SS-601
ARUP
ARUP
1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
NORTH CAVERN WEST ACCESS
WALL
SCALE: 1/4" = 1'-0"
NORTH CAVERN EAST ACCESS
WALL 1
SCALE: 1/4" = 1'-0"
1AIRLOCK 1
NOTES:
1. ALL PENETRATIONS WILL BE COORDINATED WITH
RESPECTIVE MEP CONTRACTORS.
2. FINAL PENETRATION SIZES & LOCATIONS WILL BE
SUBMITTED FOR APPROVAL IN SHOP DRAWINGS.
0 2' 4' 8'
1 03/17/23 ADDENDUM 3
2 09/14/23 ISSUED FOR PERMIT
3 11/10/23 ISSUED FOR CONSTRUCTION
4 08/19/25 IFC BULLETIN 13
5 12/19/25 IFC BULLETIN 14
SCALE: 1/4" = 1'-0"
2WASTE ACCESS DRIFT 1 WALL
SCALE: 1/4" = 1'-0"
3WEST ACCESS DRIFT WALL
KAJV Document Control QR Code http://www.arup.com
WALL REINF
#4 .
AT SPACING
OF WALL VERTS
SLAB REINF,
TYP
STD HOOK
WALL REINF
ADD (2) - #6 MIN
WALL REINF
STD HOOK
WALL REINF
FDN
OR BM
DOWELS TO MATCH
SIZE & SPACING OF
VERT WALL REINF
WALL REINF
FDN
OR BM
ADD (1) #6 MIN
DOWELS TO MATCH
SIZE & SPACING OF
VERT WALL REINF
WALL ON ROCK
M
AX3"
TOP OF WALL
M
AX3"
WALL ON ROCK
HEAD & SILL AT OPENING
TOP OF WALL (SAME FOR
LAYER WALL REINFORCING
WALL BELOW SLAB SINGLE
LAYER WALL REINFORCING
WALL BELOW SLAB DOUBLE
NOTES:
1. IF NO TIES IN THE WALL:
VERTICAL BARS ON THE INSIDE, HORIZONTAL
BARS WILL PROVIDE ENCLOSEMENT.
WATERSTOP
IF REQUIRED
DOWEL REBAR INTO
ROCK MIN 8" (0.203m) W/
HILTI HIT-HY 200, TYP
DOWEL REBAR INTO
ROCK MIN 8" (0.203m) W/
HILTI HIT-HY 200, TYP
DOUBLE LAYER PLAN
OPENING DETAILS
OPENING SEE
TYP WALL
END OF WALL
DOWELS TO MATCH
SIZE AND SPACING OF
HORIZONTAL WALL
REINF HORIZONTAL
WALL REINF
HORIZONTAL
WALL REINF
INTERSECTIONS
MAX 1/2
SPACING TYP AT
SPLICE, TYP
SCHEDULED LAP
STD HOOK,
TYP
SPACING
MAX 1/2
SPLICE, TYP
SCHEDULED LAP TY
P
LT
B
U-BARS TO MATCH SIZE AND
SPACING OF HORIZONTAL
WALL REINF
TYPICAL (FOR MOST WALLS): #4 @
SPACING OF WALL HORIZONTAL, LEG
LENGTH = 18"
DOWELS TO MATCH
SIZE AND SPACING OF
HORIZONTAL WALL
REINF
LAP SPLICE
SCHEDULED
ADDITIONAL BARS
PER TYP WALL
OPENING DETAIL
U-BARS PER TYP
WALL OPENING
DETAIL
MATCH
HORIZONTAL
#4 @ SPACING
OF HORIZONTAL
MATCH
HORIZONTAL
#5 AND SMALLER #6 AND LARGER
PIPING (CONDUIT) THROUGH WALL PIPING (CONDUIT) PARALLEL WALL
NOTE:
1. WHERE CLEAR DISTANCE BETWEEN OPENINGS IS LESS THAN MIN LISTED. THE ENTIRE AREA
(ENVELOPING THE OPENINGS) SHALL BE TREATED AS A WALL OPENING.
SEE NOTE 1
THE LARGE OF
3D OR 4" MIND
SEE NOTE 1
C.L.
OF WALL
MAX D = T/5 OR 2"
WHICHEVER IS SMALLER
THE LARGER OF
3D OR 4", MIND
T
EQEQ
CL
CL
NOTES:
1. OMIT TRIM BARS FOR SINGLE OPENING WHEN D < 6"
2. PLACE BARS IN SAME PLANE FOR WALLS 6" OR LESS.
TRIM BARS TO MATCH
WALL VERT BARS 1-#5 EF MIN
TRIM BARS TO MATCH WALL
HORIZONTAL BARS 1-#5 EF MIN
FOR D => 18"
ADD 1-#5 x 6'-0" EF
FOR WALLS 12'-0" AND THICKER
MIN CLEARANCE BETWEEN SLEEVES
IS THE LARGER DIAMETER 'D'
D
2'-0" MAX
D
2'-0" MAX
Ld
2'-0" MIN
TYP
NOTES
1. FOR LENGTH OF SPLICES SEE SCHEDULES OF SPLICE AND DEVELOPMENT LENGTHS.
2. WHERE MIN. / MAX. LENGTHS GIVEN ABOVE CANNOT BE MET, CONTRACTOR TO SUBMIT LOCATION AND DIMENSIONS TO ENGINEER FOR APPROVAL.
3. FOR SLEEVES 4" O.D. OR SMALLER NO ADDITIONAL REINFORCEMENT IS REQUIRED PROVIDED NO BARS ARE CUT, AND MINIMUM COVER TO REBAR IS MAINTAINED.
4. FOR WATERPROOFING DETAIL AT WALL PENETRATIONS & SLEEVES, SEE ARCH. DWGS.
TYPICAL WALL ELEVATION INDICATING
OPENINGS AND OTHER MISC. DETAILS
4'-0" MAX.
SPLICE TOP CONT.
SPLICE BTM. CONT.
REINF. AT SUPPORTS
2'-0" CLR. MIN.
TO MATCH BAR SPACINGLdLdLd
Ld
2'-6" MIN.
BELOW LOWEST
POINT OF WALL OR
WALL REINF. TYP.
SEE SECTIONS
WALL REINF. TYP.
SEE SECTIONS
WALL REINF. TYP.
SEE SECTIONS
CON. TOP REINF.
WHERE OCCURS
SEE SECTIONS
(2) #6 x4'-6" TYP.
CORNER BARS.
HALF THE NUMBER OF BARS
INTERRUPTED BY OPG + 1
EACH SIDE AT 3" TYP
MID-WAY BTW.
SUPPORTS.
FTG.
BTM. CONT. REINF.
WHERE OCCURS
SEE SECTIONS
SEE TYP. WALL
END REINF. DETAIL
4 SIDES TYP.
SEE NOTE 3
(2) #6 MIN.
(2) #6 MIN. (2) #6 x4'-6" TYP.
(2) #6 MIN.
PILASTER / WALL
BEYOND
Ld Ld
18" MAX.
WALL SCHEDULE
THICKNESS (in)
VERTICAL
REINFORCEMENT
(SEE NOTE 1)
HORIZONTAL
REINFORCEMENTMARK NOTES
W1 8 #5@8"O.C. #5@8"O.C. TWO LAYERS, HORIZONTAL BARS ON OUTSIDE, VERTICAL BARS ON INSIDE
3 '
LTB#7 @ 24" OC,
EMBEDDED MIN 36"
W/ HIT-HY 200 EPOXY
TYP REBAR NOT
SHOWN FOR CLARITY
Arup USA Inc 77 Water Street, New York NY 10005, T 212 896 3000 www.arup.com
DRAWING NO.
SCALE:
REV.
REVISIONS
DESIGNED
DRAWN
CHECKED
DESCRIPTIONDATEREV.
Fermilab Long-Baseline Neutrino Facility
K 1 /1
/2
415-1-6
UNDERGROUND, STRUCTURAL
LBNF-FSCF-BSI
IB
JA
JA ARUP TYPICAL DETAILS
SHEET 6 OF 6
U-FD-SS-706
ARUP
ARUP
N.T.S.
SCALE: NTS
TYPICAL CONCRETE WALL
REINFORCING SECTIONS
SCALE: N.T.S.
TYPICAL WALL REINFORCING
DETAIL
SCALE: N.T.S.
3PIPE PENETRATION DETAIL
SCALE: N.T.S.
CIRCULAR OPENING REINFORCING
DETAIL
SCALE: N.T.S.
5TYPICAL CIP WALL DETAILS
SCALE: 3/8" = 1'-0"
CONCRETE WALL TO ROCK
DETAILING
1 12/04/20 100% FD UPDATE
2 Date 23 ADDENDUM 4
3 09/14/23 ISSUED FOR PERMIT
4 11/10/23 ISSUED FOR CONSTRUCTION
KAJV Document Control QR Code http://www.arup.com
| Amendment 01--RFP LBNF-381525-RO |
| U-FD-SS-601.05.IFC.05.01 |
| U-FD-SS-706.04.IFC.04.01 |
File details come from the government source that posted it. Updated .