rfpBaconWAN27A (1).xlsx

XLSX spreadsheet 18 KB Posted

Attached to
RFPBaconWAN27, Fiber Optic WAN Service
Solicitation number
PE-55047-NONST-2027-000000002
Issued by
Banks County, Georgia

About this file

This is a pricing schedule for a Wide Area Network (WAN) connectivity proposal for Bacon County Schools in Georgia. The document outlines a 36-month term contract for network services connecting six school district facilities: the Central Office in Alma, plus Bacon County Primary School, Middle School, High School, Elementary School, and the Professional Learning Center. All sites are located in Alma, Georgia, with precise geographic coordinates provided. The proposal calls for 10 Gbps connection speeds to each location, with all connections terminating at the Bacon County Central Office as the core hub. The pricing schedule includes fields for fiber pair counts, total fiber distance, connection charges, one-time charges, and monthly recurring costs, though all monetary values in the submitted document are blank or show zero dollars.

The pricing structure distinguishes between E-rate eligible and E-rate ineligible costs, indicating potential federal funding consideration through the E-rate program. The proposal template provides for topology descriptions and network technology specifications (such as MPLS, SD-WAN, Ethernet, or Dark Fiber), with footnotes clarifying that Z-locations identify physical fiber termination points, Z2-locations address secondary connections in ring topologies, and X-locations identify logical network gateways. The document emphasizes that for facilities connected through a gateway, pricing should reflect by-location or by-segment approaches, with gateway facility charges adjusted accordingly. The completed pricing schedule is intended to reflect total monthly service costs across the entire school district network.

View the file

Other files

File Type Posted
rfpBaconWAN27.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

locations

Core sitesStreetCityStateZipLatitude, Longitude
Bacon County Schools Central Office102 West 4th StAlmaGA3151031.536674592107502, -82.45399024589808
School / Admin sitesStreetCityStateZipLatitude, Longitude
Bacon County Primary School251 Cumberland RdAlmaGA3151031.55930056433961, -82.47918576536084
Bacon County Middle School1188 US Highway 1 SAlmaGA3151031.523093768817176, -82.45841783552086
Bacon County High School1190 US Highway 1 SAlmaGA3151031.523093768817176, -82.45841783552086
Bacon County Elementary School523 E 16th StreetAlmaGA3151031.53578761669803, -82.45535763240349
Bacon County Schools Professional Learning Center308 Ammons StAlmaGA3151031.546502669960596, -82.46542824774352

pricing 36-Month Term

A-LocZ-Loc1Z2-Loc1X-Loc2Topology DescriptionNetwork Tech (MPLS, SD-WAN, Ethernet, Dark Fiber)Fiber Pair CountTotal Fiber Distance (in miles)4Connection SpeedConnection ChargeOther One-Time ChargeMonthly RecurringTotal E-rate EligibleTotal E-rate Ineligible
Bacon County Schools Central OfficeBacon County CO10 Gbps$ - 0$ - 0$ - 0$ - 0
Bacon County Primary SchoolBacon County CO10 Gbps$ - 0$ - 0$ - 0$ - 0$ - 0
Bacon County Middle SchoolBacon County CO10 Gbps$ - 0$ - 0$ - 0$ - 0$ - 0
Bacon County High SchoolBacon County CO10 Gbps$ - 0$ - 0$ - 0$ - 0
Bacon County Elementary SchoolBacon County CO10 Gbps$ - 0$ - 0$ - 0$ - 0
Bacon County Schools Professional Learning CenterBacon County CO10 Gbps$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0
$ - 0
Totals3:$ - 0$ - 0$ - 0$ - 0
1. The Z-location should identify the physical termination point of the fiber. The Z2-location should only be used in cases where a facility physically connects to a second facility such as in a fiber ring. For lit services such as MPLS over a carrier network, the Z-location should identify the carrier pop.
2. The X-location identifies the current logical gateway/hubs of the District's network.
3. Note that the price sheeting includes the gateway facility to allow for by-location pricing. If the pricing is by segment, the charges for the gateway should be left blank. The total line amounts should reflect the total monthly cost of service.

4. For proposals requiring new fiber construction, please provide the total fiber distance for the entire network to the nearest mile

File details come from the government source that posted it. Updated .